State Broadband Data and Development Grant Program, 32545-32565 [E9-16103]

Download as PDF Federal Register / Vol. 74, No. 129 / Wednesday, July 8, 2009 / Notices mstockstill on DSKH9S0YB1PROD with NOTICES additional copy of those comments on diskette. Any interested party may request a hearing within 30 days of publication of this notice. See 19 CFR 351.310(c). Hearing requests should contain the following information: (1) the party’s name, address, and telephone number; (2) the number of participants; and (3) a list of the issues to be discussed. Oral presentations will be limited to issues raised in the briefs. If a request for a hearing is made, parties will be notified of the time and date for the hearing to be held at the U.S. Department of Commerce, 14th Street and Constitution Avenue, NW, Washington, DC 20230. See 19 CFR 351.310(d). The Department will issue the final results of this administrative review, which will include the results of its analysis of issues raised in any such comments, within 120 days of publication of these preliminary results, pursuant to section 751(a)(3)(A) of the Act. Assessment Rates The Department will determine, and CBP shall assess, antidumping duties on all appropriate entries of subject merchandise in accordance with the final results of this review. For assessment purposes, we calculated exporter/importer- (or customer) -specific assessment rates for merchandise subject to this review. Where appropriate, we calculated an ad valorem rate for each importer (or customer) by dividing the total dumping margins for reviewed sales to that party by the total entered values associated with those transactions. For duty– assessment rates calculated on this basis, we will direct CBP to assess the resulting ad valorem rate against the entered customs values for the subject merchandise. Where appropriate, we calculated a per–unit rate for each importer (or customer) by dividing the total dumping margins for reviewed sales to that party by the total sales quantity associated with those transactions. For duty–assessment rates calculated on this basis, we will direct CBP to assess the resulting per–unit rate against the entered quantity of the subject merchandise. Where an importer- (or customer) -specific assessment rate is de minimis (i.e., less than 0.50 percent), the Department will instruct CBP to assess that importer (or customer’s) entries of subject merchandise without regard to antidumping duties. We intend to instruct CBP to liquidate entries containing subject merchandise exported by the PRC–wide entity at the PRC–wide rate we determine in the final VerDate Nov<24>2008 17:23 Jul 07, 2009 Jkt 217001 results of this review. The Department intends to issue appropriate assessment instructions directly to CBP 15 days after publication of the final results of this review. DEPARTMENT OF COMMERCE Cash–Deposit Requirements 32545 State Broadband Data and Development Grant Program The following cash–deposit requirements will be effective upon publication of the final results of this administrative review for all shipments of the subject merchandise from the PRC entered, or withdrawn from warehouse, for consumption on or after the publication date, as provided by section 751(a)(2)(C) of the Act: (1) for CPZ, the cash deposit rate will be that established in the final results of this review, except if the rate is zero or de minimis no cash deposit will be required; (2) for previously investigated or reviewed PRC and non–PRC exporters not listed above that have separate rates, the cash deposit rate will continue to be the exporter–specific rate published for the most recent period; (3) for all PRC exporters of subject merchandise which have not been found to be entitled to a separate rate, the cash deposit rate will be the PRC–wide rate of 92.84 percent; and (4) for all non–PRC exporters of subject merchandise which have not received their own rate, the cash deposit rate will be the rate applicable to the PRC exporters that supplied that non– PRC exporter. These deposit requirements, when imposed, shall remain in effect until further notice. Notification to Importers This notice also serves as a preliminary reminder to importers of their responsibility under 19 CFR 351.402(f) to file a certificate regarding the reimbursement of antidumping duties prior to liquidation of the relevant entries during this review period. Failure to comply with this requirement could result in the Secretary’s presumption that reimbursement of antidumping duties occurred and the subsequent assessment of double antidumping duties. We are issuing and publishing these preliminary results of review in accordance with sections 751(a)(2)(B) and 777(i)(1) of the Act, and 19 CFR 351.221(b). Dated: June 30, 2009. John M. Andersen, Acting Deputy Assistant Secretary for Antidumping and Countervailing Duty Operations. [FR Doc. E9–16096 Filed 7–7–09; 8:45 am] BILLING CODE 3510–DS–S PO 00000 Frm 00017 Fmt 4703 Sfmt 4703 National Telecommunications and Information Administration RIN 0660–ZA29 AGENCY: The National Telecommunications and Information Administration, U.S. Department of Commerce. ACTION: Notice of funds availability (Notice) and solicitation of applications. SUMMARY: The National Telecommunications and Information Administration (NTIA), U.S. Department of Commerce, publishes this Notice to announce the availability of funds pursuant to the American Recovery and Reinvestment Act of 2009 (Recovery Act), Public Law 111–5 (Feb. 17, 2009), and the Broadband Data Improvement Act (BDIA), Title I of Public Law 110–385, 122 Stat. 4096 (Oct. 10, 2008) and to provide guidelines for the State Broadband Data and Development Grant Program (State Broadband Data Program or Program). The State Broadband Data Program is a competitive, merit-based matching grant program that effects the joint purposes of the Recovery Act and the BDIA by funding projects that collect comprehensive and accurate State-level broadband mapping data, develop Statelevel broadband maps, aid in the development and maintenance of a national broadband map, and fund statewide initiatives directed at broadband planning. DATES: Applications will be accepted from July 14, 2009 at 8 a.m. Eastern Time (ET) until August 14, 2009 at 11:59 p.m. ET. ADDRESSES: All applications must be submitted through the online Grants.gov system no later than 11:59 p.m. ET on August 14, 2009, as more fully described in the section entitled ‘‘Request for Application Package’’ below. Failure to properly register and apply for State Broadband Data Program funds by the deadlines may result in forfeiture of the grant opportunity. Applications are accepted until the deadline and processed as received. Applications submitted by hand delivery, mail, email or facsimile will not be accepted. FOR FURTHER INFORMATION CONTACT: For general inquiries regarding the State Broadband Data Program, applicants may contact Edward ‘‘Smitty’’ Smith, Program Director, State Broadband Data and Development Grant Program, E:\FR\FM\08JYN1.SGM 08JYN1 32546 Federal Register / Vol. 74, No. 129 / Wednesday, July 8, 2009 / Notices National Telecommunications and Information Administration, U.S. Department of Commerce, 1401 Constitution Avenue, NW., Room 4898, Washington, DC 20230; by telephone at 202–482–4949 or via electronic mail at broadbandmapping@ntia.doc.gov. Information about the State Broadband Data Program can also be obtained electronically via the Internet at https:// www.ntia.doc.gov/broadbandgrants. SUPPLEMENTARY INFORMATION: Catalog of Federal Domestic Assistance (CFDA) Number: 11.558. Additional Items in SUPPLEMENTARY INFORMATION: mstockstill on DSKH9S0YB1PROD with NOTICES I. Overview: Describes the statutory origin of the broadband mapping requirement under the Recovery Act, the applicability of the BDIA, the structure of the Program and the public comment process. II. Funding Opportunity Description: Provides a more thorough description of the Program, including a description of mapping and planning priorities, and the application review process. III. Definitions: Sets forth the key terms and other terms used in this Notice. IV. Award Information: Describes funding availability and other award information. V. Eligibility Information: Discusses eligibility criteria, including the 20 percent match, confidentiality requirements, and funding restrictions. VI. Application and Submission Information: Provides information about how to apply, application materials, and the application process. VII. Application Review Information: Establishes the scoring criteria for evaluating applications. VIII. Anticipated Award Dates: Identifies the initial award announcement and award dates for Program awards. IX. Award Administration Information: Provides award notice information, administrative requirements, terms and conditions, and other reporting requirements for award recipients. X. Other Information: Sets forth guidance on funding, compliance with various laws, regulations and other such requirements. I. Overview A. The Recovery Act: Section 6001(l) of the Recovery Act requires the Assistant Secretary to develop and maintain a comprehensive, interactive, and searchable nationwide inventory map of existing broadband service capability and availability in the United States that depicts the geographic extent to which broadband service capability is deployed and available from a commercial or public provider throughout each State.1 The Recovery Act requires the Assistant Secretary to make the national broadband map 1 Recovery Act section 6001(l), 123 Stat. at 516. See Section IV for the definition of ‘‘State’’ and other relevant definitions. VerDate Nov<24>2008 17:23 Jul 07, 2009 Jkt 217001 accessible by the public on an NTIA Web site no later than February 17, 2011.2 The Recovery Act authorizes NTIA to expend up to $350 million pursuant to the BDIA and for the purposes of developing and maintaining a broadband inventory map.3 Implementation of the BDIA is useful to fulfill Congress’ intent to develop a national broadband map as expressed and funded under the Recovery Act. B. The BDIA: The BDIA is intended to improve data on the deployment and adoption of broadband service to assist in the extension of broadband technology across all regions of the United States.4 Section 106 of the BDIA directs the Secretary of Commerce to establish the State Broadband Data Program and to award grants to eligible entities to develop and implement statewide initiatives to identify and track the adoption and availability of broadband services within each State.5 In effecting this purpose, the BDIA provides several eligible uses for grant funds, including uses related to the gathering of broadband-related data at the State level and the development of statewide broadband maps.6 C. The State Broadband Data Program: In keeping with the Recovery Act’s direction that NTIA develop and maintain a comprehensive and interactive national broadband map and the requirements of the BDIA, NTIA has established this grant program. Awardees under this Program will 2 Id. 3 Recovery Act, Title II, Div. A, 123 Stat. at 123 (to be codified at 47 U.S.C. 1301). 4 BDIA § 102, 122 Stat. at 4096. 5 BDIA § 106(b), 122 Stat. at 4099. The Secretary delegated his authority to meet the obligations of Section 106 of the BDIA to the Assistant Secretary for Communications and Information (Assistant Secretary) on April 9, 2009. 6 The BDIA authorizes the Secretary to make grants to eligible entities for the following eligible uses: (1) To develop and provide a baseline assessment of broadband deployment in each State; (2) to identify and track the areas with low levels of deployment, the rate at which residential and business users adopt broadband service and other related information technology services, and possible suppliers of such services; (3) to identify barriers to the adoption of broadband service and information technology services; (4) to identify the available speeds for broadband connection; (5) to create and facilitate by county or designated region in a State, local technology planning teams; (6) to collaborate with broadband service providers and information technology companies to encourage deployment and use; (7) to establish computer ownership and Internet access programs in unserved and areas with lower than average penetration on a national basis; (8) to collect and analyze detailed market data concerning use and demand for broadband service; (9) to facilitate information exchange regarding use and demand for broadband services between public and private sector users; and (10) to create within each State a geographic inventory map of broadband service. BDIA § 106(e), 122 Stat. at 4100–4101. PO 00000 Frm 00018 Fmt 4703 Sfmt 4703 receive grants to fund their collection of broadband-related data as well as funding for planning programs at the State level. Awardees will use the broadband-related data that they collect to develop statewide broadband maps, which will be linked to a Department of Commerce Web page. In addition, the awardees will submit all of their collected data to NTIA for use by NTIA and the Federal Communications Commission (FCC) in developing and maintaining the national broadband map, which will be displayed on an NTIA Web page before February 17, 2011. NTIA’s decisions are based on the statutory requirements of the Recovery Act and are informed by NTIA’s own expertise, the expertise of other Federal agencies, including the FCC, and public comment. D. Public Comment: On March 10, 2009, NTIA, the FCC, and the U.S. Department of Agriculture’s Rural Utilities Service (RUS) cosponsored a public meeting to initiate public outreach about the current availability of broadband service in the United States and ways in which the availability of broadband service could be expanded.7 The March 10th meeting was followed by the release of a Request for Information (RFI) and six days of additional public meetings and field hearings during March.8 The RFI requested the submission of information on a broad range of topics including topics related to broadband mapping, the Recovery Act and the BDIA. The meetings and hearings included nearly 120 panelists with representatives from consumer and public interest groups, State and local governments, tribal governments, minority and vulnerable populations, industry, academia and other institutions. In response to the RFI and the public meetings, NTIA received over 1,000 comments from institutions and individuals on the broadband initiatives funded by the Recovery Act.9 With regard to the issues surrounding the State Broadband Data Program and the national broadband map that NTIA is 7 See Notice: American Recovery and Reinvestment Act of 2009 Broadband Initiatives, 74 FR 8914 (Feb. 27, 2009). 8 See Notice: American Recovery and Reinvestment Act of 2009 Broadband Initiatives, 74 FR 10716 (March 12, 2009). Agendas, transcripts and presentations from each meeting are available on NTIA’s Web site at https://www.ntia.doc.gov/ broadbandgrants/meetings.html. 9 Agendas, transcripts, and presentations from each meeting are available on NTIA’s Web site at https://www.ntia.doc.gov/broadbandgrants/ meetings.html. All public comments in Docket No. 090309298–9299–01 are on file with NTIA and may be viewed on NTIA’s Web site at https:// www.ntia.doc.gov/broadbandgrants/comments.cfm. E:\FR\FM\08JYN1.SGM 08JYN1 Federal Register / Vol. 74, No. 129 / Wednesday, July 8, 2009 / Notices mstockstill on DSKH9S0YB1PROD with NOTICES required to prepare under Section 6001(l) of the Recovery Act, NTIA received more than 200 comments, many of which played a role in formulating the structure of this Program. For further discussion and explanation of the policy decisions involved in establishing this program, see the attached Policy Justification Appendix. II. Funding Opportunity Description A. Program Description: The State Broadband Data Program is a competitive, merit-based matching grant program that implements the joint purposes of the Recovery Act and the BDIA through the award of grants. This Program is designed to fund projects that gather comprehensive and accurate State-level broadband mapping data, develop State-level broadband maps, aid in the development and maintenance of a national broadband map, and fund statewide initiatives for broadband planning. While the BDIA mandates that each State may have only a single eligible entity, each applicant will be carefully evaluated against a program standard. Any applicant that fails to meet the program standard will not receive grant funding; therefore, the efficient fulfillment of the goals of the Recovery Act and the BDIA will be advanced by the submission of a qualifying application from each State highly responsive to the review criteria contained in this Notice. In the event that a State fails to produce a grant awardee, NTIA reserves the right to perform the necessary broadband data collection. 1. Use of Collected Broadband Data by Awardees. Awardees may use the data collected under this Program for any lawful use consistent with the requirements of this Program, including the confidentiality restrictions contained herein, and existing agreements between the awardee, the State, and broadband service providers. It is expected, however, that, in addition to providing all collected data to NTIA, applicants will use the data to develop and maintain a statewide broadband map that will be separate and distinct from the national broadband map and will be tailored to suit the needs of the particular State. Though it will be separate and distinct from the national broadband map, applicants must provide NTIA with a hypertext link to the State maps for display on a Web page on the Department of Commerce Web site. 2. Use of Collected Broadband Data by NTIA and the FCC. The data collected under this Program will be VerDate Nov<24>2008 17:23 Jul 07, 2009 Jkt 217001 used for public purposes and also utilized by governmental entities. For example, because of its value in identifying appropriate areas for broadband investment and economic stimulus, the collected data will inform NTIA’s grant-making decisions under the Broadband Technology Opportunities Program (BTOP). The national broadband map that will be developed and maintained using these and other data will publicly display the following information about broadband service available from a public or private provider: (a) Geographic areas in which broadband service is available; (b) The technologies used to provide broadband service in such areas; (c) The spectrum used for the provision of wireless broadband service in such areas; (d) The speeds at which broadband service is available in such areas; and (e) Broadband service availability at public schools, libraries, hospitals, colleges and universities and all public buildings owned or leased by agencies or instrumentalities of the States or municipalities or other subdivisions of the States and their respective agencies or instrumentalities. The national map will also be searchable by address. To the greatest extent possible, at every address, the type and speed of broadband service will be provided. For providers of wireless broadband service, the spectrum used for the provision of service will be provided. If the applicable broadband service provider so chooses, the provider’s identity will also be available, otherwise the map will simply display that an anonymous provider utilizing a particular type of technology is providing service to a location. Furthermore, to the extent possible, the service areas of individual providers will be aggregated with other providers of the same technology type. Though collected under this Program, data concerning the Average Revenue Per User (ARPU) and data regarding the type, technical specification, or location of infrastructure owned, leased, or used by a broadband service provider will not be displayed on the public national broadband map.10 The above paragraphs notwithstanding, if provider consent is granted, NTIA may display the above provider-specific information on the national broadband map. In addition to the above broadbandrelated information, the national broadband map may display a wide 10 However, NTIA is considering methods for displaying some pricing data that will be collected through other avenues. PO 00000 Frm 00019 Fmt 4703 Sfmt 4703 32547 range of additional, economic, and demographic data derived from other sources. Such data, however, are not the subject of this Notice. B. Program Priorities: 1. Broadband Mapping. With respect to this Program, NTIA’s highest priority is the development and maintenance of a national broadband map. Therefore, NTIA intends to fund high-quality projects that are designed to gather data at the address-level on broadband availability, technology, speed, infrastructure, ARPU, and, in the case of wireless broadband, the spectrum used, across the project areas. NTIA has determined that the BDIA’s eligible uses regarding State-specific data collection and geographic inventory broadband mapping activities are encompassed within the broadband mapping grant guidelines described herein. Successful projects must propose: (a) To provide comprehensive and verifiable data meeting the Program standards as published in this Notice, such data will be accessible and clearly presented to NTIA, the public, and State and local governments without unduly compromising data or the protection of Confidential Information as defined in this notice; (b) a workable and sustainable framework for repeated updating of data; (c) a plan for collaboration with State-level agencies, local authorities, and other constituencies, as well as a proposal for planning projects designed to identify and address broadband challenges in the State; (d) feasible projects as demonstrated by a reasonable and costefficient budget, and a showing of applicant capacity, knowledge and experience; and (e) a timeline for expedient data delivery. 2. Broadband Planning. Only applications that meet the broadband mapping purposes set forth in the above paragraph will be considered for planning funding, and mapping proposals do not need to include a planning component. However, applicants may propose projects or award uses that relate to an enumerated BDIA purpose described in Section I of this Notice that addresses a need in their State. Any proposed use of funds that is not directed towards the collection of data for, or the development and maintenance of, the State or national broadband map will be considered a planning use. There is a presumption that the BDIA purposes involving the identification of barriers to the adoption of broadband service and information technology services, the creation and facilitation of local technology planning teams, and the establishment of computer ownership E:\FR\FM\08JYN1.SGM 08JYN1 mstockstill on DSKH9S0YB1PROD with NOTICES 32548 Federal Register / Vol. 74, No. 129 / Wednesday, July 8, 2009 / Notices and Internet access programs are not mapping-related and therefore are only eligible for broadband planning funding. However, applicants may demonstrate in their applications how a use under such categories will inform the collection of broadband data or development of State and national broadband maps. Broadband planning funds will be limited, and broadband planning-related uses under any grant application budget may not exceed $500,000. C. Review and Selection Processes: The review process involves the three stages outlined below. NTIA anticipates that the processing and selection of applications for funding will require one (1) month from the date of submission. 1. Eligibility. Upon receipt, NTIA will screen applications for factors determining eligibility as described in the section entitled ‘‘Eligibility Information’’ below. In the case that NTIA determines that an application fails to address adequately any eligibility criteria before the application deadline, NTIA may alert the applicant of such deficiency and the applicant may revise such application before the application deadline to comply with Program requirements. However, NTIA has no affirmative obligation to notify applicants of a deficient application and will not be held responsible for any deficiencies that are not remedied in a timely manner. 2. Technical Review. Each eligible application will be reviewed by a panel of at least three peer/expert reviewers who have demonstrated expertise in both the programmatic and technological aspects of the Program. The peer/expert review panel members will individually evaluate applications according to the review criteria provided in Section VII of this Notice and provide ratings to the Program staff. Each peer/expert reviewer will be required to sign and submit a nondisclosure and confidentiality form to prevent the dissemination of Confidential Information, and to prevent financial and other conflicts of interest. 3. Programmatic Review and Revision Process. Following the Technical Review, each eligible application will be reviewed by Program staff for policy determinations and conformity with programmatic goals. Program staff will analyze applications considered for award to assess: (a) Whether a proposed project meets the Program’s funding constraints; (b) the eligibility of costs and matching funds included in an application’s budget; and (c) the extent to which an application complements or duplicates projects previously funded or VerDate Nov<24>2008 17:23 Jul 07, 2009 Jkt 217001 under consideration by NTIA or other Federal programs. Following this programmatic review, Program staff may contact an eligible applicant to discuss any recommended adjustments or revisions to their applications necessary to better meet Program goals. Revisions are intended to resolve any differences that exist between the applicant’s original request and what the State Broadband Data Program proposes to fund and, if necessary, to clarify items in the application. Staff may also request additional corroborating documentation from applicants. These documents will be reviewed by Program staff with the support of external engineering, design, information technology, geographic information systems, broadband, and other subjectmatter experts to evaluate the consistency of the applications with the supporting documents and ensure that applications merit State Broadband Data Program awards. Upon the conclusion of the programmatic review and revision process, each application will continue through the selection process. The Program Director will prepare and present a slate of recommended grant awards to the Associate Administrator for review and approval. The Program Director’s recommendations and the Associate Administrator’s review and approval of those recommendations will take into account the selection factors listed below. Upon approval by the Associate Administrator, the Program Director’s recommendations will be presented to the Selecting Official, the Assistant Secretary. The Assistant Secretary selects the applications for grant award, taking into consideration the Program Director’s recommendations and the degree to which the slate of applications, taken as a whole, satisfies the selection factors described below and the Program’s stated purposes as set forth in the section entitled ‘‘Program Description.’’ The Selecting Official will issue awards after considering the following selection factors: (a) The evaluations of the peer/expert reviewers; (b) The analysis of Program staff; (c) The degree to which the proposed grants meet the Program’s purpose as described in this Notice; (d) Avoidance of redundancy and conflicts with the initiatives of other Federal agencies; and (e) The availability of funds. III. Definitions For the purposes of this Program, NTIA has adopted the following PO 00000 Frm 00020 Fmt 4703 Sfmt 4703 definitions for the State Broadband Data Program, many of which were developed for BTOP, pursuant to Recovery Act Section 6001(a). Applicants for these grants should refer to the following definitions when completing their applications: Applicant. An entity requesting approval for an award under this Notice. ARPU. Average Revenue Per User. Average Revenue Per User for this Program is as defined in the Technical Appendix. Assistant Secretary. The Assistant Secretary for Communications and Information, National Telecommunications and Information Administration, Department of Commerce, or the Assistant Secretary’s designee. Associate Administrator. The Associate Administrator of the National Telecommunications and Information Administration, Department of Commerce/the Director of the Office of Telecommunications and Information Applications, or the Associate Administrator’s designee. Available. Broadband service is ‘‘available’’ to an end user at an address if a broadband service provider does, or could, within a typical service interval (7 to 10 business days) without an extraordinary commitment of resources, provision two-way data transmission to and from the Internet with advertised speeds of at least 768 kilobits per second (kbps) downstream and at least 200 kbps upstream to the end user at the address. Award. A grant made under this Notice by NTIA. Awardee. A recipient of an Award under this Notice; a grantee. Broadband. Data transmission technology that provides two-way data transmission to and from the Internet with advertised speeds of at least 768 kilobits per second (kbps) downstream and at least 200 kbps upstream to end users, or providing sufficient capacity in a middle mile project to support the provision of broadband service to end users within the project area. Broadband Service. The provision of broadband on either a commercial or non-commercial basis. BTOP. The Broadband Technology Opportunities Program, administered by NTIA, under Section 6001 of the Recovery Act. Community Anchor Institutions. Schools, libraries, medical and healthcare providers, public safety entities, community colleges and other institutions of higher education, and other community support organizations and entities. E:\FR\FM\08JYN1.SGM 08JYN1 mstockstill on DSKH9S0YB1PROD with NOTICES Federal Register / Vol. 74, No. 129 / Wednesday, July 8, 2009 / Notices Confidential Information. Any information, including trade secrets, or commercial or financial information, submitted under this Program that: (1) Identifies the type and technical specification of infrastructure owned, leased, or used by a specific broadband service provider; (2) identifies the average revenue per user (ARPU) for a specific broadband service provider; or (3) explicitly identifies a broadband service provider in relation to its specific Service Area or at a specific Service Location. For example, a broadband service provider’s specific service ‘‘footprint’’, as identified with such provider, will be considered Confidential Information for the purposes of this Program and will either (a) be aggregated with other available providers of the same technology type before being published in the national broadband map, in which case the map would only display the aggregated list of providers that have consented to have their names displayed for such service area; or (b) in the absence of other providers of the same technology type with which a provider’s specific service ‘‘footprint’’ can be aggregated, be displayed without providing the provider’s identity, unless the provider gives its consent. NTIA and the FCC may otherwise aggregate, combine or mask broadband service provider data, and take other steps so as to make such data suitable for public release. Notwithstanding the foregoing, Confidential Information, as defined herein and as provided as part of a project funded under this Program, will not be made publicly available, pursuant to the limitations set forth in the BDIA, except as required by applicable law or judicial or administrative action or proceeding, including the Freedom of Information Act requirements.11 Data. Statistics, figures, descriptions, maps, geographic coordinates, or other such information relating to the provision of broadband services. End User. A residential or business party, institution or State or local government entity, including a Community Anchor Institution, that may use broadband service for its own purposes and that does not resell such service to other entities or incorporate such service into retail Internet-access services. Internet Service Providers (ISPs) are not ‘‘end users’’ for this purpose. In-Kind Contribution. Qualifying noncash donations, including third-party in-kind contributions, of property, goods or services, which benefit a 11 BDIA § 106(h), 122 Stat. at 4101. VerDate Nov<24>2008 17:23 Jul 07, 2009 Jkt 217001 Federally assisted project, and which may count toward satisfying the nonFederal matching requirement. See the section entitled ‘‘Eligibility Information’’ below for a full discussion of the Program’s treatment of in-kind contributions and the Federal structure for determining when a contribution qualifies. Pre-Award Costs. Reasonable costs incurred after the enactment of the Recovery Act (February 17, 2009) but prior to the effective date of the award directly pursuant to and in anticipation of the award where such costs are necessary to comply with the proposed delivery schedule or period of performance. Such costs are allowable only to the extent that they would have been allowable if incurred after the date of the award, and only with the written approval of NTIA. Recovery Act. The American Recovery and Reinvestment Act of 2009, Public Law 111–5, 123 Stat. 115 (2009). Rural Area. Any area, as confirmed by the latest decennial census of the Bureau of the Census, which is not located within: (i) A city, town, or incorporated area that has a population of greater than 20,000 inhabitants; or (ii) an urbanized area contiguous and adjacent to a city or town that has a population of greater than 50,000 inhabitants. For purposes of the definition of rural area, an urbanized area means a densely populated territory as defined in the latest decennial census of the U.S. Census Bureau. Secretary. The Secretary of Commerce. Service Area. The entire area within which an existing service provider offers broadband service. Service Location. The specific geographic point or location at which a service provider offers broadband service, such as a specific residence or business. State. A State, the District of Columbia, or a territory or possession of the United States. For the purposes of the designation of an eligible entity, the term ‘‘State’’ will be interpreted to mean the Governor or in the absence of a designation by the Governor, the Legislature, officer, or executive agency within the State that the Governor or State Constitution authorizes to take binding action for the State. In the case State, the District of Columbia, or a territory or possession of the United States, the terms Governor, Legislature or State Constitution shall mean their respective functional equivalents. Substantially Complete Data Set. A data set is substantially complete when it contains data on broadband services PO 00000 Frm 00021 Fmt 4703 Sfmt 4703 32549 provided by (a) 70 percent of broadband service providers in a State; (b) to 80 percent of households in a State; (c) to 90 percent of households in rural areas of the State; and (d) to 95 percent of public Community Anchor Institutions. Underserved Area. An area composed of one or more contiguous census blocks meeting certain criteria that measure the availability of broadband service and the level of advertised broadband speeds.12 Specifically, an area is underserved if at least one of the following factors is met, though the presumption will be that more than one factor is present: (i) No more than 50 percent of households in the service area have access to facilities-based terrestrial broadband service at greater than the minimum broadband transmission speed (set forth in the definition of broadband above); (ii) no fixed or mobile broadband service provider advertises broadband transmission speeds of at least three megabits per second (‘‘mbps’’) downstream in the area; or (iii) the rate of broadband subscribership for the area is 40 percent of households or less.13 A household has access to broadband service if the household can readily subscribe to that service upon request. Unserved Area. An area composed of one or more contiguous census blocks where at least 90 percent of households in the service area lack access to facilities-based terrestrial broadband service, either fixed or mobile, at the minimum broadband transmission speed (set forth in the definition of broadband above). A household has access to broadband service if the household can readily subscribe to that service upon request. IV. Award Information A. Funding Availability and Estimated Funding: The Recovery Act authorizes NTIA to expend up to $350 million for the purposes of developing and maintaining a broadband inventory map and pursuant to the BDIA.14 NTIA expects grant awards to range between $1.9 million and $3.8 million per State for the mapping portion of each project, 12 Census blocks are the smallest geographic areas for which the U.S. Bureau of the Census collects and tabulates decennial census data. Census blocks are formed by streets, roads, railroads, streams and other bodies of water, other visible physical and cultural features, and the legal boundaries shown on Census Bureau maps. Census data at this level serve as a valuable source for small-area geographic studies. See the Census Bureau’s Web site at https://www.census.gov for more detailed information on its data gathering methodology. 13 These criteria conform to the two distinct components of the BIP and BTOP categories of eligible projects—Last Mile and Middle Mile. 14 Recovery Act, Title II, Div. A. 123 Stat. at 128. E:\FR\FM\08JYN1.SGM 08JYN1 32550 Federal Register / Vol. 74, No. 129 / Wednesday, July 8, 2009 / Notices and up to $500,000 for the planning portion of each project. The exact size of any award will depend on the specifics of each project, the quality of each project as determined in NTIA’s review, as well as demographic and geographic features unique to each State. Project budgets will be carefully reviewed to ensure that they are appropriate given the specifics of the project and the project State. Fiscally irresponsible budgets will be detrimental to an application. Any funds not expended under this Program will be reallocated to BTOP purposes. Publication of this Notice does not obligate NTIA to award any specific project or obligate all or any parts of any available funds. B. Award Period: All awards under this Program must be made no later than September 30, 2010. The period of performance will be five (5) years from the date of award. C. Type of Funding Instrument: Grant. V. Eligibility Information A. Eligible Applicants: Pursuant to the BDIA, eligible recipients of State Broadband Data Program grants are: (a) Entities that are either (i) an agency or instrumentality of a State, or a municipality or other subdivision (or agency or instrumentality of a municipality or other subdivision) of a State; (ii) a nonprofit organization that is described in Section 501(c)(3) of the Internal Revenue Code of 1986 and that is exempt from taxation under Section 501(a) of such Code; or (iii) an independent agency or commission in which an office of a State is a member on behalf of the State; and (b) The single eligible entity in the State that has been designated by the State to receive a grant under this section.15 Matching Funds and Cost Sharing Requirements: Awardees under this Program will be required to provide and document at least 20 percent nonFederal matching funds toward the total eligible project cost.16 Applicants must document their capacity to provide matching funds. Matching funds may be in the form of either cash or in-kind contributions consistent with 15 CFR 14.23, 24.3, and 24.24. Certain preaward costs may be credited towards an mstockstill on DSKH9S0YB1PROD with NOTICES 15 BDIA § 106(i)(2)(B), 122 Stat. at 4102. § 106(c)(2), 122 Stat. at 4099. Generally, Federal funds may not be used as matching funds except as provided by Federal statute. See ‘‘Uniform Administrative Requirements for Grants and Agreements with Institutions of Higher Education, Hospitals, Other Non-profit, and Commercial Organizations,’’ 15 CFR 14.23(a)(5); see also ‘‘Uniform Administrative Requirements for Grants and Cooperative Agreements to State and Local Governments,’’ 15 CFR 24.24(b)(1). 16 BDIA VerDate Nov<24>2008 17:23 Jul 07, 2009 Jkt 217001 applicant’s matching funds requirements. As provided in 48 U.S.C. 1469a, the requirement for local matching funds under $200,000 (including in-kind contributions) is waived for the Territorial governments in Guam, American Samoa, the U.S. Virgin Islands, and the Commonwealth of the Northern Mariana Islands. Grant funds under this Program will be released in direct proportion to the documented expenditure of matching funds. In-Kind Contributions. In-kind contributions, which include third-party in-kind contributions, are non-cash donations of property, goods or services, which benefit a Federally assisted project, and which may count toward satisfying the non-Federal matching requirement when they meet certain criteria.17 The rules governing allowable in-kind contributions are very detailed and encompass a wide range of properties and services. NTIA encourages grant applicants to consider thoroughly potential sources of in-kind contributions which, depending on the particular property or service and the cost principles applicable to the applicants’ organization type, could include: employee or volunteer services; equipment; supplies; indirect costs;18 computer hardware and software; use of facilities; expenditures for existing programs presented as part of the project proposal under this Program. In addition, applicants may propose as inkind contributions the ascertainable fair market value of data previously collected and related to the BDIAeligible uses under this Program. If data previously collected is to be claimed as an in-kind contribution, applicants must provide a basis for estimating fair market value, including but not limited to the documented costs incurred for data collection. NTIA reserves the right at its discretion to provide in-kind credit for an amount different than that claimed by the applicant. 17 15 CFR 14.23, 24.3, 24.22, 24.24. See also OMB Circular A–87, ‘‘Cost Principles for State, Local and Indian Tribal Governments’’ (Rev. May 10, 2004), OMB Circular A–122, Cost Principles for Non-Profit Organizations (Rev. May 10, 2004), and 48 CFR pt. 31, ‘‘Contract Cost Principles and Procedures.’’ 18 Reasonable indirect costs may be included as part of cost sharing or matching only with the prior approval of NTIA. The amount of indirect charges allocated to the budget is based on an applicant’s indirect cost rate. An applicant may already have an indirect cost rate negotiated with a Federal agency, in which case, that rate may be applied to the applicant’s grant if it is current. If it is not current, the applicant will need to update it. If an applicant does not have a negotiated rate, but would like to include indirect costs, the applicant will need to establish a rate with the Department of Commerce. PO 00000 Frm 00022 Fmt 4703 Sfmt 4703 B. Confidentiality Requirements: The BDIA requires that to be eligible to receive a grant under this Program, entities must agree to treat any matter that is a trade secret, commercial or financial information, or privileged or confidential, as a record not subject to public disclosure except as otherwise mutually agreed to by the broadband service provider and the entity.19 As a condition of grant funding under this Program, awardees may not agree to a more restrictive definition of Confidential Information than the definition adopted by this Program. Nondisclosure Agreements. As a measure to protect the confidential or proprietary nature of the information received from broadband service providers and other organizations during the data collection phase, awardees may execute nondisclosure agreements (consistent with applicable law) that require the awardees to treat any matter that is a trade secret, commercial or financial information, or privileged or confidential, as a record not subject to public disclosure except where mutually agreed upon by the information provider and the awardee, provided, however, that any such nondisclosure restriction (a) will not restrict the providing of all data collected under this Program to NTIA, nor (b) restrict NTIA’s use of such data as contemplated under this Notice (including sharing such data with the FCC or other Federal agencies). To the extent required by law, NTIA agrees that it will not publicly disclose any Confidential Information, as defined herein, provided to it by an applicant or awardee under this Program. Providing Confidential Information to the FCC, or other Federal agencies as necessary, shall not constitute public disclosure. In any disclosure to the FCC or other Federal agencies, NTIA will request that such agency make no further disclosure of the Confidential Information except as required by applicable law or judicial or administrative action or proceeding.20 C. Information Provided: In order to be eligible for a grant under this Program, each applicant must agree to provide NTIA with broadband data, of 19 BDIA §§ 106(c)(3) and 106(h)(2), 122 Stat. at 4101–2 (This requirement applies only to information submitted by the FCC or a broadband provider to carry out the provisions of the BDIA and shall not otherwise limit or affect the rules governing public disclosure of information collected by any Federal or State entity under any other Federal or State law or regulation). 20 The provisions of this section notwithstanding, all information submitted by an applicant or awardee to NTIA for the purposes of this Program will be subject to Freedom of Information Act requirements under 5 U.S.C. 552. E:\FR\FM\08JYN1.SGM 08JYN1 Federal Register / Vol. 74, No. 129 / Wednesday, July 8, 2009 / Notices the type and in the format provided in the Technical Appendix, from all commercial or public providers of broadband service in their respective States, including, but not limited to, commercial or public providers of broadband service to Indian tribes (as defined in Section 4 of the Indian SelfDetermination and Education Assistance Act 21), Native Hawaiian organizations, Community Anchor Institutions or agencies or instrumentalities of the States, or municipalities or other subdivisions of the States and their respective agencies or instrumentalities. In no case, however, are applicants required to propose collecting data on broadband service provided by the Federal government or any agencies or instrumentalities of the Federal government or broadband service provided on property owned or leased by the Federal government or any agencies, or instrumentalities of the Federal government. Failure to agree to collect the required data will render an applicant ineligible for funding under this Program. D. Participation Limit: This is a new program and no activities have been funded under it as of the date of this Notice. BDIA stipulates that no Statedesignated entity may receive a grant under this Program to fund activities described above if that entity, or another entity designated by that State, obtained prior grant awards under this section to fund the same activities in that State in each of the previous four (4) consecutive years.22 Because the Recovery Act requires the obligation of all funds by September 30, 2010, NTIA does not anticipate any situations where a violation of this provision could occur. E. Funding Restrictions: 1. Eligible Costs. Grant funds must be used only to pay for eligible costs. Under this Notice, eligible costs are governed by the Federal cost principles identified in the applicable OMB circulars and in the Program’s authorizing legislation.23 In addition, 21 25 U.S.C. 450(b). § 106(f), 122 Stat. at 4101. 23 The government has established a set of Federal principles for determining eligible or allowable costs. Allowability of costs will be determined in accordance with the cost principles applicable to the entity incurring the costs. Thus, allowability of costs incurred by State, local or Federallyrecognized Indian tribal governments is determined in accordance with the provisions of OMB Circular A–87, ‘‘Cost Principles for State, Local and Indian Tribal Governments.’’ The allowability of costs incurred by non-profit organizations is determined in accordance with the provisions of OMB Circular A–122, ‘‘Cost Principles for Non-Profit Organizations.’’ The allowability of costs incurred by institutions of higher education is determined in accordance with the provisions of OMB Circular A– mstockstill on DSKH9S0YB1PROD with NOTICES 22 BDIA VerDate Nov<24>2008 17:23 Jul 07, 2009 Jkt 217001 costs must be reasonable, allocable, necessary to the project, and comply with the funding statute requirements. Neither mapping nor planning projects may include any construction costs. 2. Recovery Act-Specific Restrictions. The Recovery Act imposes an additional limitation on the use of funds expended or obligated from appropriations made pursuant to its provisions. Specifically, for purposes of this Notice, none of the funds appropriated or otherwise made available under the Recovery Act may be used by any State or local government, or any private entity, for any casino or other gambling establishment, aquarium, zoo, golf course, or swimming pool.24 VI. Application and Submission Information A. Address To Request Application Package: To ensure a successful submission, applicants must apply for State Broadband Data Program funding through the online Grants.gov system through the Authorized Organization Representative (AOR). Grants.gov, an eGovernment initiative, is a ‘‘storefront’’ that provides a unified process for all seekers of Federal grants to find funding opportunities and apply for funding. If applicants have previously used Grants.gov, the existing account may be used for the State Broadband Data Program. States that have not previously submitted an application through Grants.gov are strongly encouraged to initiate the registration process as soon as possible. Instructions are available on the Grants.gov Web site (https:// www.grants.gov). Application forms and instructions are also available at Grants.gov. To access these materials, go to https://www.grants.gov, select ‘‘Apply for Grants,’’ and then select ‘‘Download Application Package.’’ Enter the CFDA and/or the funding opportunity number located on the cover of this announcement. Select ‘‘Download Application Package,’’ and then follow the prompts. To download the instructions, go to ‘‘Download Application Package’’ and select ‘‘Instructions.’’ Applicants should visit Grants.gov prior to filing their 21, ‘‘Cost Principles for Educational Institutions.’’ The allowability of costs incurred by hospitals is determined in accordance with the provisions of Appendix E of 45 CFR pt. 74, ‘‘Principles for Determining Costs Applicable to Research and Development under Grants and Contracts with Hospitals.’’ The allowability of costs incurred by commercial organizations and those non-profit organizations listed in Attachment C to Circular A– 122 is determined in accordance with the provisions of the Federal Acquisition Regulation (FAR) at 48 CFR pt. 31. See 15 CFR 14.27, 24.22 (governing the Department of Commerce’s implementation of OMB requirements). 24 Recovery Act § 1604, 123 Stat. at 303. PO 00000 Frm 00023 Fmt 4703 Sfmt 4703 32551 applications so that they fully understand the process and requirements. Failure to properly register and apply for State Broadband Data Program funds by the deadlines may result in forfeiture of the grant opportunity. Applications are accepted until the deadline and processed as received. Applications submitted by hand delivery, mail, e-mail or facsimile will not be accepted. B. Registration: 1. DUNS Number.—All applicants must supply a Dun and Bradstreet Data Universal Numbering System (DUNS) number. Applicants can receive a DUNS number at no cost by calling the dedicated toll-free DUNS number request line at 1–866–705–5711 or via the Internet at https:// www.dunandbradstreet.com. 2. Central Contractor Registration (CCR). All applicants must provide a CCR (CAGE) number evidencing current registration in the Central Contractor Registration (CCR) database. If the applicant does not have a current CCR (CAGE) number, the applicant must register in the CCR system available at: https://www.ccr.gov/ StartRegistration.aspx. C. Content and Form of Application Submitted Through Grants.gov: The following is a list of required application forms: • Standard Form 424, Program Abstract/Program Narrative; • Standard Form 424, Application for Federal Assistance; • Standard Form 424A, Budget Information—Non-Construction Programs; • Standard Form 424B, Assurances— Non-Construction Programs; • Standard Form LLL, Disclosure of Lobbying Activities; • CD–511 Certification Regarding Lobbying; and • Letter of State Designation. Program Narrative. The applicant must complete a Program Narrative including responses to the five review criteria listed in Section VII (A) and listed below. The Narrative should begin with an introduction that serves as an Executive Summary of the project. It should be a brief, straightforward statement of what the application proposes to accomplish. The Narrative should also include a description of all unserved and underserved areas in their State as defined herein, to the extent they are known, and a prioritization for the allocation of grant funds within that E:\FR\FM\08JYN1.SGM 08JYN1 mstockstill on DSKH9S0YB1PROD with NOTICES 32552 Federal Register / Vol. 74, No. 129 / Wednesday, July 8, 2009 / Notices State for projects in or affecting the State.25 The Narrative should then address the five review criteria in separate sections of the Narrative. Applicants should address the five criteria in the following order and each section should be labeled with the name of the criterion being discussed to help the reviewers who evaluate the application. Any exhibits, maps, timelines, or spreadsheets should be placed within the appropriate section of the narrative. 1. Data: (a) Data Gathering. Applicants must provide a comprehensive description of how the applicant plans to obtain all data required under the Technical Appendix from commercial or public providers, as applicable (such description should identify general or specific methods, or legal authorities upon which applicants will rely to obtain the required data). Applicants should refer to specific data elements in the Technical Appendix when appropriate as part of their narrative. (b) Accuracy and Verification. Applicants must provide a description of what methods the applicant intends to employ to verify data accuracy. (c) Accessibility. Applicants must provide a description of how the State’s broadband data will be publicly accessible, clearly presented, and easily understood by the public, government and the research community. Applicants must also describe the applicant’s proposed State-level map. (d) Security and Confidentiality. Applicants must provide a description of what methods the applicant intends to employ to ensure both transparency of process and protection of collected data, including Confidential Information as defined herein. 2. Project Feasibility: (a) Applicant Capabilities. Applicants must provide a detailed budget narrative providing detailed description of proposed project costs (including a detailed description of any proposed expenditures for the purchase of computer hardware, software, other information systems or the compensation of information technology personnel that will be used to collect and store all required data) and describing any proposed sources of inkind match. The budget narrative must provide sufficient explanation of each budget category in order to establish the need for the funds in each category, and the basis for figures used. The budget narrative must be accompanied by a 25 Applicants may illustrate such known unserved areas through submission of a map. VerDate Nov<24>2008 17:23 Jul 07, 2009 Jkt 217001 spreadsheet supporting how the budget request was calculated. Applicants that include requests for Broadband Planning activities within their application must provide a separate budget narrative and spreadsheet for the planning portion of their request. All applicants must demonstrate that they have the ability to secure the funding necessary to meet the required 20 percent non-Federal matching contribution. (b) Applicant Capacity, Knowledge and Experience. Applicants must provide a description of applicant qualifications, including knowledge and experience of the applicant and the associated project personnel with conducting projects of similar scope and scale, including dealing with broadband or telecommunications technology, overseeing the projects that collect broadband or telecommunicationsrelated data, or Geographic Information System (GIS) data. 3. Expedient Data Delivery: Applicants must provide a timeline for major project goals, including anticipated dates of data delivery. This timeline should be ambitious and designed to facilitate the delivery of all data required by the Technical Appendix. NTIA will have a preference for the provision of a substantially complete set of availability data by November 1, 2009. Applicants that cannot provide a substantially complete set of availability data by November 1, 2009, may propose to provide an alternative data set by that date. Applicants must demonstrate that they have the ability to complete the project requirements within the proposed timeline, including the requirements to provide a substantially complete set of all broadband mapping data on or before February 1, 2010 and to complete such data collection by March 1, 2010. All data provided in the first collection should be accurate as of June 30, 2009. 4. Process for Repeated Data Updating: Applicants must provide a description of what methods the applicant intends to use to provide for repeated updating of data on at least a semi-annual basis continuing for at least five (5) years after the date of the initial collection.26 26 Broadband mapping data should be updated at least on March 1 of each year (by submitting data as of December 31 of the previous year) and at least September 1 of each year (by submitting data as of June 30 of that year). Because the initial data collection is due on February 1, 2010, the next update will be due on September 1, 2010 but should include data accurate as of both December 31, 2009 and June 30, 2010, after which, the PO 00000 Frm 00024 Fmt 4703 Sfmt 4703 5. Planning and Collaboration: Applicants must provide a description of how the applicant intends to collaborate with State-level agencies and local authorities in carrying out the mapping effort. Applicants that include a planning component must provide a description and justification on how well the proposed planning process will address one or more of the projects identified earlier in the BDIA. The narrative should be no longer than forty (40) pages in length, single spaced in 12 point Times New Roman font (or equivalent). Letter of State Designation. This letter, signed by the Governor or equivalent chief executive of the State, or his duly authorized designee, affirms that the applicant is the single eligible entity in the State that has been designated by the State to receive a grant under this Program. D. Submission Dates and Times: All applications must be submitted between July 14, 2009 at 8 a.m. ET and 11:59 p.m. ET on August 14, 2009. The electronic application system at Grants.gov will provide a date and time stamped confirmation number that will serve as proof of submission. E. Material Representations: The application, including certifications, and all forms submitted as part of the application will be treated as a material representation of fact upon which NTIA will rely in awarding grants. F. Material Revisions: No material revision will be permitted for any applicant after the submission deadline. VII. Application Review Information A. Evaluation Criteria: NTIA will evaluate applications for Mapping Grants on the basis of the following criteria. The relative weight of each criterion is identified in parenthesis. 1. Data (30%)—All applicants will be evaluated based on the data they propose to provide to NTIA. As provided above in the section entitled ‘‘Eligibility Information’’, each applicant must agree to provide NTIA with broadband data, of the type and in the format provided in the Technical Appendix, from all commercial or public providers of broadband service in their respective States, including, but not limited to, commercial or public providers of broadband service to Indian tribes (as defined in Section 4 of the Indian Self-Determination and collections will follow the specified schedule. For the purposes of this program, an update will be deemed to be a verification of existing data and a collection of any additional data reflecting the expansion or contraction of broadband availability since the previous data collection or update. E:\FR\FM\08JYN1.SGM 08JYN1 Federal Register / Vol. 74, No. 129 / Wednesday, July 8, 2009 / Notices mstockstill on DSKH9S0YB1PROD with NOTICES Education Assistance Act), Native Hawaiian organizations, Community Anchor Institutions or agencies or instrumentalities of the States, or municipalities or other subdivisions of the States and their respective agencies or instrumentalities. Failure to agree to collect such data will render an applicant ineligible for funding under this Program. In no case, however, are applicants required to propose collecting data on broadband service provided by the Federal government or any agencies or instrumentalities of the Federal government or broadband service provided on property owned or leased by the Federal government or any agencies, or instrumentalities of the Federal government. Reviewers will consider the following factors in scoring this criterion: (a) Accuracy and Verification. Data accuracy is extremely important and, while NTIA recognizes that 100 percent accuracy is not possible, reviewers will carefully consider an applicant’s proposed methods for verifying data.27 Also, proposed data collection methods that do not provide more than one way to determine the accuracy of availability data at any given location will not receive high scores. (b) Accessibility. Applicants will be evaluated based on how the data are accessible to, clearly presented to, and easily understood by the public, including members of the research community, and local and State government, excluding any data considered to be Confidential Information, as defined in this Notice. (c) Security and Confidentiality. Some data collected under the Program may be considered highly sensitive or confidential. Therefore, applicants must demonstrate and will be evaluated based on how well the applicant proposes to protect collected data, including Confidential Information as defined herein, while fulfilling the other criteria provided in this section. 2. Project Feasibility (30%)— (a) Budget. This criterion evaluates whether the applicant presents a budget that is both reasonable and cost efficient, considering the full nature and scope of the project. Reviewers will also consider whether the applicant has demonstrated ability to secure the 27 For example, a project should propose to collect availability data by address, as required by the Technical Appendix, and should cross-check that data for accuracy by using at least one other metric (e.g., the location and capability of local infrastructure and whether such infrastructure could realistically serve a supposed service address, on-the-ground verification or telephone survey. Each method should be used to check a statistically significant sample of all addresses, and a statistically significant sample of rural addresses). VerDate Nov<24>2008 17:23 Jul 07, 2009 Jkt 217001 funding necessary to meet the required 20 percent non-Federal matching contribution. (b) Applicant Capacity, Knowledge, and Experience. Reviewers also will assess whether the applicant possesses the necessary qualifications to complete the proposed project within Program standards. In performing this assessment reviewers will consider the capacity and relevant subject matter specific knowledge and experience of the applicant and the associated project personnel with conducting projects of similar scope and scale. Reviewers will assess the qualifications and past experience of the project leaders and/or partners in dealing with broadband or telecommunications technology and in designing, implementing, and effectively managing and overseeing the projects that collect broadband or telecommunications-related data, and utilize and manage Geographic Information System (GIS) data. 3. Expedient Data Delivery (20%)— Applicants will be reviewed based on the timeline on which they project delivery of the initial submission of a substantially complete set of broadband mapping data. This timeline should be ambitious and designed to facilitate the delivery of all data required by the Technical Appendix. NTIA will have a preference for the provision of a substantially complete set of availability data by November 1, 2009. Applicants that cannot provide a substantially complete set of availability data by November 1, 2009, may propose to provide an alternative data set by that date. Applicants must demonstrate that they have the ability to complete the project requirements within the proposed timeline, including the requirements to provide a substantially complete set of all broadband mapping data on or before February 1, 2010 and to and to complete such data collection by March 1, 2010. All data provided in the first collection should be accurate as of June 30, 2009. 4. Process for Repeated Data Updating (10%)—The broadband landscape is rapidly changing, and both the State broadband maps and national broadband map must be able to reflect these changes. All applicants will be evaluated based on their ability to update the data at least semi-annually and on a continuing basis. Because the initial data collection is due on February 1, 2010, the next update will be due on September 1, 2010 but will collect data as of both December 31, 2009 and June 30, 2010. For all subsequent data updates, data should be updated at least on March 1 of each year (by submitting data as of December 31 PO 00000 Frm 00025 Fmt 4703 Sfmt 4703 32553 of the previous year) and at least September 1 of each year (by submitting data as of June 30 of that year), so as to coincide with the Federal Communications Commission’s Form 477 data collections. Applicants are expected to propose to update data for at least five (5) years from the date of award. Applicants are encouraged to consider methods of automated or direct-from-provider data input, while also considering Data Accuracy and Verification needs. 5. Planning and Collaboration (10%)— (a) Collaboration. Collaboration with State-level agencies, local authorities, businesses and non-profit organizations will be a critical component of any successful data collection or mapping effort. Reviewers will carefully consider the transparency and inclusiveness of the process used to plan and execute data collection and State-level broadband mapping. Reviewers will also examine the existing relationships and proposed collaborations with necessary parties, including broadband service providers, information technology companies, mapping companies, State and local governments, geographic information agencies and councils, Community Anchor Institutions, consumer and public interest groups, Indian tribes (as defined in Section 4 of the Indian SelfDetermination and Education Assistance Act), Native Hawaiian organizations, minority and vulnerable populations, industry, and other such parties and institutions. If applicable, any applications that do not include the collection of data from Indian tribes (as defined in Section 4 of the Indian Self-Determination and Education Assistance Act), tribal lands, or Native Hawaiian organizations will not be eligible for grants. (b) Planning. In addition to inclusiveness and collaboration, proposals including planning components will be evaluated based on how well the proposed planning process will identify service availability and gaps, analyze problems and opportunities related to broadband deployment, and determine priorities as well as resolve conflicting priorities. Planning proposals must present the following: (1) The BDIA-related purpose as listed footnote 6; (2) the problem(s) to be addressed; (3) the proposed solution; (4) the anticipated outcomes of the project; and (5) the cost of such proposal in light of the previous factors. VIII. Anticipated Award Dates NTIA will announce the awards starting on or about September 15, 2009. E:\FR\FM\08JYN1.SGM 08JYN1 32554 Federal Register / Vol. 74, No. 129 / Wednesday, July 8, 2009 / Notices mstockstill on DSKH9S0YB1PROD with NOTICES NTIA will make award documents available to successful applicants within thirty (30) calendar days of the award announcement. NTIA expects compliance with all applicable documentation requirements from successful applicants within sixty (60) calendar days of award announcement. IX. Award Administration Information A. Award Notices: Applicants will be notified by the Department of Commerce’s Grants Officer if their applications are selected for an award. If the application is selected for funding, the Department of Commerce’s Grants Officer will issue the grant award (Form CD–450), which is the authorizing financial assistance award document. By signing the Form CD–450, the awardee agrees to comply with all award provisions. NTIA will provide the Form CD–450 by mail or overnight delivery to the appropriate business office of the recipient’s organization. The awardee must sign and return the Form CD–450 without modification within thirty (30) calendar days of receipt. If an applicant is awarded funding, neither the Department of Commerce nor NTIA is under any obligation to provide any additional future funding in connection with that award or to make any future award(s). Amendment or renewal of an award to increase funding or to extend the period of performance is at the discretion of the Department of Commerce and of NTIA. B. Award Terms and Conditions: 1. Scope. Awardees, including all contractors and subcontractors, are required to comply with the obligations set forth in the Recovery Act and the requirements established herein. Any obligation that applies to the awardee shall extend for the life of the Federallyfunded facilities. 2. Access to Records for Audits, Site Visits, Monitoring and Law Enforcement Purposes. The Inspector General of the Department of Commerce, or any of his or her duly authorized representatives, and NTIA representatives, or any of their duly authorized representatives, shall have access to and the right to inspect any property or documents funded by the grant, or relating to the grant funding, of the parties to a grant, including their subsidiaries, if any, whether written, printed, recorded, produced, or reproduced by any electronic, mechanical, magnetic or other process or medium, in order to make audits, inspections, site visits, excerpts, transcripts, copies, or other examinations as authorized by law. An audit of an award may be conducted at any time. VerDate Nov<24>2008 17:23 Jul 07, 2009 Jkt 217001 C. Award Conditions: Awardees are required to comply with the Department of Commerce Financial Assistance Standard Terms and Conditions (March 8, 2008), the Department of Commerce American Recovery and Reinvestment Act Award Terms (April 9, 2009), and any Special Award Terms and Conditions that are included by the Grants Officer in the award. X. Other Information A. Discretionary Awards: The Federal Government is not obligated to make any award as a result of this announcement, and will fund only projects that are deemed likely to achieve the Program’s goals and for which funds are available. B. Third Party Beneficiaries: The State Broadband Data Program is a discretionary grant program that is not intended to and does not create any rights enforceable by third party beneficiaries. C. Recovery Act Logo: As provided above in the section entitled ‘‘Funding Restrictions,’’ neither mapping nor planning projects may include construction costs. However, all projects that are funded by the Recovery Act, including projects under this Program, shall display signage that features the Primary Emblem throughout the construction phase. The signage should be displayed in a prominent location on site. Some exclusions may apply. The Primary Emblem should not be displayed at a size less than 6 inches in diameter. D. Environmental and National Historic Preservation Requirements: All applicants seeking Federal funding may be required to provide adequate environmental information and gather information from Federal and State regulatory agencies, including the designated State Historic Preservation Officer and Indian tribes, as appropriate. Applications must comply with the National Environmental Policy Act of 1969, as amended (NEPA), and Section 106 of the National Historic Preservation Act of 1966, as amended (NHPA), and may require the submission of additional information early in the application process. Applicants will also be required to cooperate with NTIA in identifying feasible measures to reduce or avoid any identified adverse environmental impacts of their proposal. The failure to do so shall be grounds for not selecting an application. In some cases if additional information is required after an application is selected, funds can be withheld by the Grants Officer under a special award condition requiring the recipient to submit additional PO 00000 Frm 00026 Fmt 4703 Sfmt 4703 environmental compliance information sufficient to enable NTIA to make an assessment on any impacts that a project may have on the environment. NEPA’s implementing regulations require NTIA to provide, as appropriate, public notice of the availability of project-specific environmental documents. Detailed information on NTIA compliance with NEPA can be found at the following NOAA NEPA Web site: https://www.nepa.noaa.gov/ procedures.html under ‘‘Department of Commerce Categorical Exclusions and Administrative Record’’ and the ‘‘NTIA Broadband Technology Opportunity Program Categorical Exclusions and Administrative Record.’’ Written requests for a hard copy should be submitted to: Steve Kokkinakis, National Oceanic and Atmospheric Administration, Office of Program Planning & Integration, SSMC3, Room 15723, 1315 East-West Highway, Silver Spring, MD 20910. E. Davis-Bacon Wage Requirements: Pursuant to section 1606 of the Recovery Act, any project using Recovery Act funds requires the payment of not less than the prevailing wages for ‘‘all laborers and mechanics employed by contractors and subcontractors on projects funded directly by or assisted in whole or in part by and through the Federal Government.’’ 28 F. Buy America: None of the funds appropriated or otherwise made available by the Recovery Act may be used for the construction, alteration, maintenance, or repair of a public building or public work (as such terms are defined in 2 CFR 176.140) unless all of the iron, steel, and manufacturing goods used in the project are produced in the United States.29 G. Financial and Audit Requirements: To maximize the transparency and accountability of funds authorized under the Recovery Act, all applicants are required to comply with the applicable regulations set forth in OMB’s Interim Final Guidance for Federal Financial Assistance.30 Recipients that expend $500,000 or more of Federal funds during their fiscal year are required to submit an organization-wide financial and compliance audit report. The audit must be performed in accordance with the U.S. General Accountability Office, Government Auditing Standards, located at https://www.gao.gov/govaud/ 28 Recovery Act § 1606, 123 Stat. at 303. Act, § 1605, 123 Stat. at 303. 30 See Requirements for Implementing Sections 1512, 1605, and 1606 of the American Recovery and Reinvestment Act of 2009 for Financial Assistance Awards, 74 FR 18, 449 (Apr. 23, 2009). 29 Recovery E:\FR\FM\08JYN1.SGM 08JYN1 mstockstill on DSKH9S0YB1PROD with NOTICES Federal Register / Vol. 74, No. 129 / Wednesday, July 8, 2009 / Notices ybk01.htm, and OMB Circular A–133, Audits of States, Local Governments, and Non-Profit Organizations, located at https://www.whitehouse.gov/omb/ circulars/a133/a133.html. Awardees are responsible for ensuring that subrecipient audit reports are received and for resolving any audit findings. H. Deobligation: NTIA reserves the right to deobligate awards to recipients under this Notice that demonstrate an insufficient level of performance, or wasteful or fraudulent spending, and award these funds competitively to new or existing applicants. I. Disposition of Unsuccessful Applications: Unsuccessful applications accepted for review for the Fiscal Year 2009 the State Broadband Data Program will be retained for two years, after which they will be destroyed. J. Compliance with Applicable Laws and Administrative Requirements: Any recipient and subrecipient of funds under this Notice shall be required to comply with all applicable obligations set forth in the Recovery Act and all Federal and State laws. Administrative and national policy requirements for State Broadband Data Program funding, inter alia, are contained in the DOC American Recovery and Reinvestment Act Award Terms (Apr. 9, 2009) and Pre-Award Notification Requirements for Grants and Cooperative Agreements (DOC Pre-Award Notice), published in the Federal Register on February 11, 2008 (73 FR 7696), as amended. This notice may be accessed by entering the Federal Register volume and page number provided in the previous sentence at the following Internet Web site: https://www.gpoaccess.gov/fr/ index.html. All State Broadband Data Program applicants are required to comply with all applicable provisions set forth in the DOC Pre-Award Notice. Note that section 1515 of the Recovery Act authorizes the Inspector General to examine records and interview officers and employees of the grantee and other entities regarding the award of funds.31 K. Waiver Authority: It is the general intent of NTIA not to waive any of the provisions set forth in this Notice. However, under extraordinary circumstances and when it is in the best interests of the Federal government, NTIA, upon its own initiative or when requested, may waive the provisions in this Notice. Waivers may only be granted for requirements that are discretionary and not mandated by statute or other applicable law. Any request for a waiver must set forth the extraordinary circumstances for the request and be included in the 31 Recovery Act § 1515, 123 Stat. at 289. VerDate Nov<24>2008 17:23 Jul 07, 2009 Jkt 217001 application or sent to the address provided in ‘‘NTIA Contacts’’ above. L. Limitation of Liability: Under no circumstances will NTIA or the Department of Commerce be responsible for proposal preparation costs if this Program fails to receive funding or is canceled because of other NTIA priorities. Publication of this announcement does not oblige NTIA to award any specific project or to obligate any available funds. M. Cooperation with NTIA and FCC National Broadband Mapping Efforts: Cooperation. In addition to the other requirements provided in this Notice, all awardees agree to cooperate with NTIA and the FCC’s national broadband mapping efforts. In particular, awardees agree that, to the extent necessary, they will coordinate with and lend reasonable assistance to NTIA and the FCC, or the employees, agents, representatives, contractors, vendors or consultants of each, in such parties’ efforts to assist the recipients in their data collection or to collect broadband mapping related data directly in the States. In the case that an application on behalf of a State fails to satisfy the requirements of this Program, NTIA reserves the right to collect broadband mapping data relating to such State directly or through NTIA’s authorized agent, contractor or representative, using whatever means are within its legal authority.32 FCC Authority. Insofar as awardees are unwilling or unable to obtain requested data, NTIA reserves the right to request that the FCC exercise its authority to compel data production from any broadband service provider subject to its jurisdiction. N. Administrative Procedure Act and Regulatory Flexibility Act Statement: This Notice is being issued without prior notice or public comment. The Administrative Procedure Act (APA), 5 U.S.C. 553, has several exemptions to rulemaking requirements. Among them is an exemption for ‘‘good cause’’ found at 5 U.S.C. 553(b)(B), which allows effective government action without rulemaking procedures where withholding the action would be ‘‘impracticable, unnecessary, or contrary to the public interest.’’ Commerce has determined, consistent with the APA, that making these funds available under this Notice for broadband development, as mandated by the Recovery Act, is in the public 32 Recovery Act § 6001(l), 123 Stat. at 516 requires that NTIA develop and maintain a comprehensive nationwide inventory map of existing broadband service capability and availability in the United States. PO 00000 Frm 00027 Fmt 4703 Sfmt 4703 32555 interest. Given the emergency nature of the Recovery Act and the extremely short time period within which all funds must be obligated, withholding this Notice to provide for public notice and comment would unduly delay the provision of benefits associated with these broadband initiatives and be contrary to the public interest. For the same reasons, Commerce finds good cause under 5 U.S.C. 553(d)(3) to waive the 30-day delay in effectiveness for this action. Because notice and opportunity for comment are not required pursuant to 5 U.S.C. 553(d)(3) or any other law, the analytical requirements of the Regulatory Flexibility Act (5 U.S.C. 601 et seq.) are inapplicable. Therefore, a regulatory flexibility analysis is not required and has not been prepared. O. Congressional Review of Act: NTIA has submitted this Notice to the Congress and the Government Accountability Office under the Congressional Review of Agency Rulemaking Act, 5 U.S.C. 801 et seq. This Notice is a ‘‘major rule’’ within the meaning of the Act because it will result in an annual effect on the economy of $100,000,000 or more. This Notice sets out the administrative procedures for making grants to State, local, tribal and other State approved organizations for the development and implementation of statewide initiatives to identify and track the availability and adoption of broadband services within each State through the State Broadband Data Program. With funds made available through the Recovery Act, the State Broadband Data Program will provide approximately $240 million in grants to assist eligible entities, including States, in developing State-specific data on the deployment levels and adoption rates of broadband services. All grant funds must be obligated by September 30, 2010. The State-specific data collected through this Program will help to determine those areas of the United States that are ‘‘unserved’’ or ‘‘underserved’’ and so inform the award of grants under BTOP, which grants also must be awarded no later than September 30, 2010. The data will also be used in the development of the national broadband map that NTIA is required to create and make publicly available by February 2011 under Section 6001(l) of the Recovery Act. A 60-day delay in implementing this Notice would hamper NTIA’s mission to expeditiously provide assistance to eligible entities for the development of this key State-specific data on broadband deployment levels and adoption rates as well as hinder NTIA’s E:\FR\FM\08JYN1.SGM 08JYN1 mstockstill on DSKH9S0YB1PROD with NOTICES 32556 Federal Register / Vol. 74, No. 129 / Wednesday, July 8, 2009 / Notices ability to meet the purposes of the BTOP and national broadband map development in a timely fashion. Thus, in compliance with Section 808(2) of the Congressional Review of Agency Rulemaking Act, 5 U.S.C. 808(2), for good cause, NTIA finds that notice and public comment on this Notice is impracticable and contrary to the public interest. This finding is consistent with the objectives of the Recovery Act, which specifically provides clear preferences for rapid agency action and quick-start activities designed to spur job creation and economic benefit.33 Accordingly, this Notice shall take effect upon publication in the Federal Register. P. Paperwork Reduction Act: This notice contains an information collection requirement subject to the requirements of the Paperwork Reduction Act (44 U.S.C. 3501 et seq.). Applicants have been requested to submit applications using Standard Form 424, Program Abstract/Program Narrative; Standard Form 424, Application for Federal Assistance; Standard Form 424A, Budget Information—Non-Construction Programs; Standard Form 424B, Assurances—Non-Construction Programs; and Standard Form LLL, Disclosure of Lobbying Activities, all of which have been approved by OMB under the respective control numbers 4040–0003, 4040–0004, 4040–0006, 4040–0007 and 0348–0046. Copies of all forms, regulations, and instructions referenced in this Notice may be obtained from NTIA. Data furnished by the applicants will be used to determine eligibility for Program benefits. Furnishing the data is voluntary; however, the failure to provide data could result in Program benefits being withheld or denied. The collection of information is vital to NTIA to ensure compliance with the provisions of this Notice and to fulfill the requirements of the Recovery Act. In summary, the collection of broadband data, as required under the Technical Appendix, is necessary in order to implement this Program. Notwithstanding any other provision of law, no person is required to respond to, nor shall any person be subject to a penalty for failure to comply with a collection of information subject to the Paperwork Reduction Act unless that collection displays a currently valid OMB Control Number. 1. General Recovery Act and BDIA Reporting Requirements (a) OMB Reporting Requirements Implementing the Recovery Act. Any 33 See, e.g., Recovery Act § 1602, 123 Stat. at 302. VerDate Nov<24>2008 17:23 Jul 07, 2009 Jkt 217001 grant awarded under this Notice shall be subject to the applicable regulations and statutes regarding reporting on Recovery Act funds. For specific Recovery Act requirements, see 2 CFR part 176.34 (b) Accounting. If Recovery Act funds are combined with other funds to fund or complete projects and activities, Recovery Act funds must be accounted for separately from other funds and reported to NTIA or any Federal Web site established for Recovery Act reporting purposes. Moreover, recipients of funds under this Notice must also comply with the accounting requirements as established or referred to in this Notice. (c) Required Data Elements. The awardee and each contractor engaged by the awardee must submit the following information to NTIA: i. The total amount of Recovery Act funds received; ii. The amount of Recovery Act funds received that were expended or obligated to projects or activities; iii. A detailed list of all projects or activities for which Recovery Act funds were expended or obligated, including (a) the name of the project or activity; (b) a description of the project or activity; (c) an evaluation of the completion status of the project or activity; (d) an estimate of the number of jobs created and the number of jobs retained by the project or activity; and iv. Detailed information on any subcontracts or subgrants awarded by the awardee to include the data elements required to comply with the Federal Funding Accountability and Transparency Act of 2006 (Pub. L. 102– 282), allowing aggregate reporting on awards below $25,000 or to individuals.35 2. Reporting Deadlines. Recovery Act reports are due to NTIA ten (10) calendar days after the quarter in which the award was issued ends and, unless otherwise noted, each quarter thereafter until a final report is made at the end of five (5) years. The final report should summarize the awardee’s quarterly filings and state whether the project goals have been satisfied. Pursuant to OMB Guidelines, reports should be submitted electronically to https:// www.federalreporting.gov. If the awardee fails to submit an acceptable quarterly report or audited financial 34 See also OMB Memorandum M–09–21, Implementing Guidance for the Reports on Use of Funds Pursuant to the American Recovery and Reinvestment Act of 2009, June 22, 2009 (OMB Implementing Guidance). For additional Recovery Act Implementation Guidance applicable to recipients, see OMB Implementing Guidance at 6–7. 35 Recovery Act § 1512(c), 123 Stat. at 287. PO 00000 Frm 00028 Fmt 4703 Sfmt 4703 statement within the timeframe designated in the grant or loan award, NTIA may suspend further payments until the awardee complies with the reporting requirements. Additional information regarding reporting requirements will also be specified at the time the award is issued. 3. State Broadband Data Program Reporting Requirements. All awardees under this Program will provide quarterly reports on: (a) Achievement of project goals, objectives, and milestones (e.g., collection of a ‘‘substantially complete data set’’; completion of data review or quality control process) as set forth by the applicant in their application timeline: i. Expenditure of grant funds and how much of the award remains; ii. Amount of non-Federal cash or inkind investment that is being added to complete the project; and iii. Whether the awardee is on schedule to provide broadband-related data in accordance with the mapping project timeline. Upon completion of its State-level broadband map, each awardee will provide NTIA with a hypertext link to such map for display on a Web page on the Department of Commerce Web site. Q. Payment of Federal Funds: NTIA will not make any payment under an award until the grantee has returned the signed CD–450 accepting the award and unless and until the recipient complies with all relevant requirements. R. Executive Order 12372 (Intergovernmental Review): Applications under this Program are not subject to Executive Order (EO) 12372, ‘‘Intergovernmental Review of Federal Programs.’’ S. Executive Order 12866: This notice has been determined to be Economically Significant under Executive Order 12866. The Secretary of Commerce was authorized by the Recovery Act to fund the BDIA and implement the State Broadband Data Program. This Program will make approximately $240 million in funds available for eligible entities to develop and implement statewide initiatives to identify and track the availability and adoption of broadband services within each State. This is a onetime grant program in which funds will be awarded no later than September 30, 2010. T. Executive Order 13132 (Federalism): It has been determined that this Notice does not contain policies with Federalism implications as that term is defined in E.O. 13132. U. Recovery Act: Additional information about the Recovery Act is available at https://www.Recovery.gov. E:\FR\FM\08JYN1.SGM 08JYN1 32557 Federal Register / Vol. 74, No. 129 / Wednesday, July 8, 2009 / Notices Authority: Title II, Division A of the American Recovery and Reinvestment Act of 2009, Public Law 111–5, 123 Stat. 115 (Feb. 17, 2009); Broadband Data Improvement Act, Title I of Public Law 110–385, 122 Stat. 4096 (Oct. 10, 2008). 1. Broadband Service Availability in Provider’s Service Area Dated: July 2, 2009. Lawrence E. Strickling, Assistant Secretary for Communications and Information. For each facilities-based provider of broadband service to specified end-user locations in their State, awardees shall provide NTIA with a list of all addresses at which broadband service is available to end users in the provider’s service area, along with the associated service characteristics identified below. For this purpose, ‘‘broadband service’’ is the provision, on either a commercial or non-commercial basis, of data transmission technology that provides two-way data transmission to and from the Internet with advertised speeds of at least 768 kilobits per second (kbps) downstream and greater than 200 kbps upstream to end users, or providing sufficient capacity in a middle mile project to support the provision of broadband service to end-users within the project area. For this purpose, an ‘‘end user’’ of broadband service is a residential or business party, institution or State or local government entity that may use broadband service for its own purposes and that does not resell such service to Appendix A: Technical Appendix Awardees shall provide the following information to NTIA in the format specified via ftp to sftp.ntia.doc.gov or CD/DVD to Edward ‘‘Smitty’’ Smith, Program Director, State Broadband Data Program, National Telecommunications and Information Administration, U.S. Department of Commerce, 1401 Constitution Avenue, NW., Room 4898, Washington, DC 20230 no later than February 1, 2010. All data should be accurate as of June 30, 2009, unless otherwise indicated. Questions about the data content or formats should be addressed to Your Name at broadbandmapping@ntia.doc.gov. (a) Availability by Service AddressService Associated With Specific Addresses other entities or incorporate such service into retail Internet-access services. Internet Service Providers (ISPs) are not ‘‘end users’’ for this purpose. An entity is a ‘‘facilitiesbased’’ provider of broadband service connections to end user locations if any of the following conditions are met: (1) It owns the portion of the physical facility that terminates at the end user location; (2) it obtains unbundled network elements (UNEs), special access lines, or other leased facilities that terminate at the end user location and provisions/equips them as broadband; or (3) it provisions/equips a broadband wireless channel to the end user location over licensed or unlicensed spectrum. For this purpose, ‘‘broadband service’’ is ‘‘available’’ at an address if the provider does, or could, within a typical service interval (7 to 10 business days) without an extraordinary commitment of resources, provision two-way data transmission to and from the Internet with advertised speeds of at least 768 kilobits per second (kbps) downstream and greater than 200 kbps upstream to end-users at that address. The list of addresses shall be submitted to NTIA as a tab-delimited text file in which each record has the following format: RECORD FORMAT FOR ADDRESS DATA FOR EACH PROVIDER Field Provider Identification Data: Provider Name ................. DBA Name ....................... FRN .................................. ID ...................................... End User location/Service Data: End-User Address ............ mstockstill on DSKH9S0YB1PROD with NOTICES End-User Building Number End-User Prefix Direction End-User Street ................ End-User Street Type ...... End-User Suffix Direction End-User City ................... End-User State Abbreviation. End-User ZIP Code .......... End-User ZIP Plus 4 ........ Category of End User ...... Technology of Transmission. Maximum Advertised Downstream Speed. Maximum Advertised Upstream Speed. VerDate Nov<24>2008 17:23 Jul 07, 2009 Description Type Provider Name .......................................................................... ‘‘Doing-business-as’’ name ....................................................... Provider FCC Registration Number .......................................... Sequential record number ......................................................... Text .............. Text .............. Integer .......... Integer .......... ABC Co. Superfone, Inc. 8402202. 1. Complete address ..................................................................... Text .............. Building number ........................................................................ Prefix direction .......................................................................... Street name ............................................................................... Street type ................................................................................. Suffix direction ........................................................................... City ............................................................................................ Two-letter State postal abbreviation ......................................... Text .............. Text. Text .............. Text .............. Text .............. Text .............. Text .............. 1401 Constitution Ave., NW., Washington, DC 20230. 1401. 5-digit ZIP code (with leading zeros) ........................................ 4-digit add-on code (with leading zeros) .................................. Category of End User Served at Address (see details below for codes). Category of technology available for the provision of service at the address (see details below for codes). Speed tier code for the maximum advertised downstream speed available at the address (see details below for codes). Speed tier code for the maximum advertised upstream speed that is offered with the above maximum advertised downstream speed available at the address (see details below for codes). Text .............. Text .............. Integer .......... 20230. 0005. 3. Integer .......... 50. Integer .......... 8. Integer .......... 8. Jkt 217001 PO 00000 Frm 00029 Fmt 4703 Sfmt 4703 E:\FR\FM\08JYN1.SGM 08JYN1 Example Constitution. Ave. NW. Washington. DC. 32558 Federal Register / Vol. 74, No. 129 / Wednesday, July 8, 2009 / Notices RECORD FORMAT FOR ADDRESS DATA FOR EACH PROVIDER—Continued Field Description Typical Downstream Speed. Typical Upstream Speed .. Type Speed tier code for the downstream data transfer throughput rate that most subscribers to service at the maximum advertised downstream speed (above) can achieve consistently during expected periods of heavy network usage (see details below for codes). Speed tier code for the upstream data transfer throughput rate that most subscribers to service at the maximum advertised upstream speed (above) can achieve consistently during expected periods of heavy network usage (see details below for codes). Integer .......... 8 Integer .......... 8. Address Record Format Details: 1. All fields are required. 2. Instructions for providers needing to obtain a FRN can be accessed at https://fjallfoss.fcc.gov/coresWeb/ publicHome.do. 3. The ID field is a sequential integer ranging from 1 to the total number of addresses. 4. Address data fields should be space-delimited in standardized Postal Example Service form. See https://pe.usps.gov/ cpim/ftp/pubs/Pub28/pub28.pdf. 5. Categories of end users should be entered as integers based on the following reference: END USER CODES End user category code End user category Description 1 ............... Residential .................................................. 2 ............... Governmental ............................................. 3 ............... 4 ............... 5 ............... Small Business ........................................... Medium or Large Enterprise ....................... Other ........................................................... Address denotes a residential living unit, individual living unit in institutional settings such as college dormitories and nursing homes and other locations designed primarily for residential use at which broadband service is available. Address denotes a State or local government location at which broadband service is available. Address denotes the location of a small business. Address denotes the location of a medium or large enterprise. Address denotes a location not meeting any of the above descriptions. 6. For reporting the technology of transmission, report the technology used by the portion of the connection that terminates at the end-user location. If different technologies are used in the two directions of information transfer (‘‘downstream’’ and ‘‘upstream’’), report the connection in the technology category for the downstream direction. The technology of transmission should be entered as an integer based on the following reference: TECHNOLOGY OF TRANSMISSION CODES Description 10 .............. 20 .............. 30 .............. Asymmetric xDSL. Symmetric xDSL. Other Copper Wireline .................................................................. 40 .............. 41 .............. 50 .............. Cable Modem—DOCSIS 3.0. Cable Modem—Other. Optical Carrier/Fiber to the End User ........................................... 60 .............. 70 .............. 71 .............. 80 .............. 90 .............. 0 ................ mstockstill on DSKH9S0YB1PROD with NOTICES Technology code Satellite. Terrestrial Fixed Wireless—Unlicensed. Terrestrial Fixed Wireless—Licensed. Terrestrial Mobile Wireless. Electric Power Line. All Other ........................................................................................ Details All copper-wire based technologies other than xDSL (Ethernet over copper and T–1 are examples). Fiber to the home or business end user (does not include ‘‘fiber to the curb’’). Any specific technology not listed above. 7. Speed tiers should be entered as integers based on the following reference: VerDate Nov<24>2008 17:23 Jul 07, 2009 Jkt 217001 PO 00000 Frm 00030 Fmt 4703 Sfmt 4703 E:\FR\FM\08JYN1.SGM 08JYN1 32559 Federal Register / Vol. 74, No. 129 / Wednesday, July 8, 2009 / Notices SPEED TIER CODES Upload speed tier Download speed tier 1 ................ 2 ................ 3 ................ 4 ................ 5 ................ 6 ................ 7 ................ 8 ................ 9 ................ 10 .............. 11 .............. .................... .................... 3 4 5 6 7 8 9 10 11 Description Less than or equal to 200 kbps. Greater than 200 kbps and less than 768 kbps. Greater than or equal to 768 kbps and less than 1.5 mbps. Greater than or equal to 1.5 mbps and less than 3 mbps. Greater than or equal to 3 mbps and less than 6 mbps. Greater than or equal to 6 mbps and less than 10 mbps. Greater than or equal to 10 mbps and less than 25 mbps. Greater than or equal to 25 mbps and less than 50 mbps. Greater than or equal to 50 mbps and less than 100 mbps. Greater than or equal to 100 mbps and less than 1 gbps. Greater than or equal to 1 gbps. 8. Data for the entire State or territory should be submitted as a single, tabdelimited plain text file named ‘‘address_availability_XX.txt’’ where XX is the two-letter postal abbreviation for the State or territory. (b) Availability by Shapefile—Wireless Services not Provided to a Specific Address For those facilities-based providers of wireless broadband service that is not address specific (e.g., nomadic, terrestrial mobile wireless, or satellite), awardees may alternatively provide NTIA with GIS-compatible map layers depicting areas in which broadband service is available to end users. For this purpose, an ‘‘end user’’ of broadband service is a residential or business party, institution, or State or local government entity that may use broadband service for its own purposes and that does not resell such service to other entities or incorporate such service into retail Internet-access service. Internet Service Providers (ISPs) are not ‘‘end users’’ for this purpose. An entity is a ‘‘facilities-based’’ provider of broadband service connections to end user locations if any of the following conditions are met: (1) It owns the portion of the physical facility that terminates at the end user location; (2) it obtains unbundled network elements (UNEs), special access lines, or other leased facilities that terminate at the end user location and provisions/equips them as broadband; or (3) it provisions/ equips a broadband wireless channel to the end user location over licensed or unlicensed spectrum. For this purpose, ‘‘broadband service’’ is ‘‘available’’ at a location if the provider does, or could, within a typical service interval (7 to 10 business days) without an extraordinary commitment of resources, provision two-way data transmission with advertised speeds of at least 768 kilobits per second (kbps) downstream and greater than 200 kbps upstream to end-users at that location. The data shall be submitted to NTIA as an ESRI Shapefile such that the associated data contains the following fields: RECORD FORMAT FOR AVAILABILITY AREA DATA FOR EACH PROVIDER—USE ONLY IN CONNECTION WITH WIRELESS SERVICES NOT PROVIDED TO A SPECIFIC ADDRESS Field Description Type Example Provider Name ................................................ DBA Name ...................................................... FRN ................................................................. Technology of Transmission ........................... Provider Name ................................................................. ‘‘Doing-business-as’’ name .............................................. Provider FCC Registration Number ................................. Category of technology for the provision of service (see details following Part 1(a) for codes). If technology of transmission is wireless, is Cellular spectrum (824–849 MHz; 862–869) used to provide service (Y/N)? If technology of transmission is wireless, is 700 MHz spectrum (698–758 MHz; 775–788 MHz; 805–806 MHz) used to provide service (Y/N)? If technology of transmission is wireless, is Broadband Personal Communications Services spectrum (1850– 1915 MHz; 1930–1995) used to provide service (Y/N)? If technology of transmission is wireless, is Advanced Wireless Services spectrum (1710–1755 MHz; 2100– 2155) used to provide service (Y/N)? If technology of transmission is wireless, is Broadband Radio Service/Educational Broadband Service spectrum (2496–2690 MHz) used to provide service (Y/ N)? If technology of transmission is wireless, is Unlicensed (including broadcast television ‘‘white spaces’’) spectrum used to provide service (Y/N)? Text ...................... Text ...................... Integer .................. Integer .................. ABC Co. Superfone, Inc. 8402202. 41. Text ...................... Y. Text ...................... Y. Text ...................... Y. Text ...................... N. Text ...................... N. Text ...................... N. Spectrum Used ................................................ Spectrum Used ................................................ Spectrum Used ................................................ Spectrum Used ................................................ mstockstill on DSKH9S0YB1PROD with NOTICES Spectrum Used ................................................ Spectrum Used ................................................ VerDate Nov<24>2008 17:52 Jul 07, 2009 Jkt 217001 PO 00000 Frm 00031 Fmt 4703 Sfmt 4703 E:\FR\FM\08JYN1.SGM 08JYN1 32560 Federal Register / Vol. 74, No. 129 / Wednesday, July 8, 2009 / Notices RECORD FORMAT FOR AVAILABILITY AREA DATA FOR EACH PROVIDER—USE ONLY IN CONNECTION WITH WIRELESS SERVICES NOT PROVIDED TO A SPECIFIC ADDRESS—Continued Field Description Type Spectrum Used ................................................ If technology of transmission is wireless, but the spectrum used to provide service is not listed above, please identify as one of the following: Specialized Mobile Radio Service (SMR) (817–824 MHz; 862–869 MHz; 896–901 MHz; 935–940 MHz), Wireless Communications Service (WCS) spectrum (2305–2320 MHz; 2345–2360 MHz), 3650–3700 MHz, Satellite (Lband, Big LEO, Little LEO, 2 GHz). Speed tier code for the maximum advertised downstream speed available (see details following Part 1(a) for codes). Speed tier code for the maximum advertised upstream speed that is offered with the above maximum advertised downstream speed available (see details following Part 1(a) for codes). Speed tier code for the downstream data transfer throughput rate that most subscribers to service at the maximum advertised downstream speed (above) can achieve consistently during expected periods of heavy network usage (see details following Part 1(a) for codes). Speed tier code for the upstream data transfer throughput rate that most subscribers to service at the maximum advertised upstream speed (above) can achieve consistently during expected periods of heavy network usage (see details following Part 1(a) for codes). Text ...................... SMR. Integer .................. 8. Integer .................. 8. Integer .................. 8. Integer .................. 8. Maximum Advertised Downstream Speed ...... Maximum Advertised Upstream Speed .......... Typical Downstream Speed ............................ Typical Upstream Speed ................................. mstockstill on DSKH9S0YB1PROD with NOTICES Availability Area Shapefile Details: 1. Instructions for providers needing to obtain a FRN can be accessed at https://fjallfoss.fcc.gov/coresWeb/ publicHome.do. 2. All map areas must be closed, nonoverlapping polygons with a single, unique identifier. 3. Any variation in any of the required fields necessitates the creation of a separate closed, non-overlapping polygon. 4. In the area covered by each polygon, subscribers must have broadband service with the speed characteristics shown in the data record 95% of the time to within 50 feet of the polygon’s boundary. 5. The technology of transmission should be entered as an integer based on the coding scheme shown in Part 1(a) above. 6. The speed tiers should be entered as integers according to the reference in Part 1(a) above. 7. The data must be expressed using the WGS 1984 geographic coordinate system. 8. Maps must be accompanied by metadata or a plain text ‘‘readme’’ file that contains a comprehensive explanation of the methodology employed to generate the map layer including any necessary assumptions and an assessment of the accuracy of the finished product. 9. Since ESRI Shapefiles typically consist of 5 to 7 individual files including the associated metadata and geodatabase, data for the entire State or territory should be submitted as a single, zipped file containing all the component files. The file should be named ‘‘area_availability_XX.zip’’ where XX is the two-letter postal abbreviation for the State or territory. 2. Residential Broadband Service Pricing in Provider’s Service Area Example subscribers in the month for which other data is reported (i.e., June or December, as applicable) by county, and (2) subscriber-weighted nominal speed (blended average rate). For this purpose, a ‘‘residential subscriber’’ of broadband service is any end user assigned to Category 1, in Part 1.(a), above. For this purpose, ‘‘broadband service’’ is the provision to end users of two-way data transmission to and from the Internet with advertised speeds of at least 768 kilobits per second (kbps) downstream and greater than 200 kbps upstream. These data shall be submitted to NTIA as a tab-delimited text file in which each record has the following format: (a) Average Revenue per End User and Weighted Average Speed For each broadband service provider in the State, awardees shall provide NTIA with (1) average revenue per end user (ARPU) associated with residential RECORD FORMAT FOR RESIDENTIAL BROADBAND SERVICE PRICING AND SPEED CHARACTERISTICS BY COUNTY FOR EACH PROVIDER Field Description Type Example Record Identifiers: Provider Name ......................................... DBA Name ............................................... FRN .......................................................... Provider Name ................................................................. ‘‘Doing-business-as’’ name .............................................. Provider FCC Registration Number ................................. Text ...................... Text ...................... Integer .................. ABC Co. Superfone, Inc. 8402202. VerDate Nov<24>2008 17:23 Jul 07, 2009 Jkt 217001 PO 00000 Frm 00032 Fmt 4703 Sfmt 4703 E:\FR\FM\08JYN1.SGM 08JYN1 32561 Federal Register / Vol. 74, No. 129 / Wednesday, July 8, 2009 / Notices RECORD FORMAT FOR RESIDENTIAL BROADBAND SERVICE PRICING AND SPEED CHARACTERISTICS BY COUNTY FOR EACH PROVIDER—Continued Field Description County ...................................................... State ......................................................... Technology of Transmission .................... ARPU, All Advertised Speed Offerings .... Subscriber-Weighted Nominal Speed ...... Service Plan Record Detail: 1. Instructions for providers needing to obtain a FRN can be accessed at https://fjallfoss.fcc.gov/coresWeb/ publicHome.do. 2. Use the set of counties that best approximate each market area of the provider. County ANSI (formerly FIPS) codes may be accessed at https:// www.census.gov/geo/www/ansi/ ansi.html. 3. For each county in the provider’s broadband Internet service area, all applicable fields must be populated. 4. For reporting the technology of transmission, report the technology used by the portion of the connection that terminates at the end-user location. If different technologies are used in the two directions of information transfer (‘‘downstream’’ and ‘‘upstream’’), report the connection in the technology category for the downstream direction. The technology of transmission should be entered as an integer based on the coding scheme shown in Part 1(a) above. ( speed tier-1 in kbps Type 3-digit County ANSI (FIPS) Code .................................... 2-digit State ANSI (FIPS) Code ....................................... Category of technology used in the provision of service (see details following Part 1(a) for codes). Average monthly revenue per residential user for the county (see details below for methodology). Subscriber-weighted nominal speed (blended average rate in kbps) (see details below for methodology). Integer .................. Integer .................. Integer .................. 560. 51. 2. Float ..................... 34.45. Float ..................... 2753.3. 5. The speed tiers should be entered as integers according to the reference in Part 1(a) above. 6. As an example, for June 2009, a provider’s ARPU should be calculated by dividing the provider’s total monthly residential broadband service revenue for the county by its average monthly residential broadband subscribers. (a). The ARPU entered in the record format above must be the monthly ARPU for June 2009 calculated by dividing (i) total monthly residential broadband service revenue by (ii) average monthly residential broadband subscribers. i. Numerator: Total monthly residential broadband service revenue must be calculated as total revenue for the month (monthly data access fees including discounts, overage charges and service or connection fees, but excluding all taxes, fees and surcharges paid to government programs, e.g., E911) attributable to the provision of broadband service to billed residential subscribers in the county for June 2009. Example ii. Denominator: Average monthly residential broadband subscribers must be calculated as the simple average of beginning-of-month and end-of-month counts of billed residential subscribers to broadband service in the county for June 2009. 7. A provider’s subscriber-weighted nominal speed (in kbps) should be calculated as the sum of the products of the provider’s advertised maximum download data transmission rate (in kbps) for each residential rate tier advertised by the provider in the county, times the average monthly number of residential subscribers receiving the advertised download transmission rate tier for the relevant reporting month (i.e., June or December, as applicable), divided by the average total number of residential subscribers for all the included data transmission rate tiers in the county for that month. This is expressed in the following formula: × no. of tier-1 subscribers ) + ( speed tier-2 in kbps × no. of tier-2 subscribers ) + ... For example, if the service provider offers two tiers of service with advertised maximum download speeds of 1500 kbps and 6000 kbps, calculate the product of 1500 kbps times the average monthly number of residential subscribers to the 1500 kbps speed tier plus the product of 6000 kbps times the average monthly number of residential subscribers to the 6000 kbps speed tier and divide the sum by the sum (or total) of the average monthly number of residential subscribers in both tiers. 8. Data for the entire State or territory should be submitted as a single, tabdelimited plain text file named ‘‘pricing_XX.txt’’ where XX is the twoletter postal abbreviation for the State or territory. VerDate Nov<24>2008 17:23 Jul 07, 2009 Jkt 217001 3. Broadband Service Infrastructure in Provider’s Service Area (a) Last-Mile Connection Points Awardees shall provide NTIA with a list of the locations of the first points of aggregation in the networks (serving facilities) used by facilities-based providers to provide broadband service to end users. For this purpose, an ‘‘end user’’ of broadband service is a residential or business party, institution, or State or local government entity that may use broadband service for its own purposes and that does not resell such service to other entities or incorporate such service into retail Internet-access service. Internet Service Providers (ISPs) are not ‘‘end users’’ for this purpose. An PO 00000 Frm 00033 Fmt 4703 Sfmt 4703 entity is a ‘‘facilities-based’’ provider of broadband service connections to end user locations if any of the following conditions are met: (1) It owns the portion of the physical facility that terminates at the end user location; (2) it obtains unbundled network elements (UNEs), special access lines, or other leased facilities that terminate at the end user location and provisions/equips them as broadband; or (3) it provisions/ equips a broadband wireless channel to the end user location over licensed or unlicensed spectrum. ‘‘Last-mile’’ infrastructure consists of facilities used to provide broadband service between end-user (including residences, businesses, community anchor institutions, etc.) equipment and the appropriate access point, router or E:\FR\FM\08JYN1.SGM 08JYN1 EN08JY09.001</MATH> mstockstill on DSKH9S0YB1PROD with NOTICES total average monthly subscribers 32562 Federal Register / Vol. 74, No. 129 / Wednesday, July 8, 2009 / Notices first significant aggregation point in the broadband network. Examples of such facilities include, among other things: For broadband service provided by incumbent local exchange carriers, connections between end users and the central office or remote terminal; for cable modem service, connections between end users and the cable headend or fiber node; for wireless broadband service, connections between the wireless end-user device or customer premises equipment and the wireless tower or base station; for WiFi broadband service, connections between end users and the WiFi access point; or the analogous portion of the facilities of other providers of broadband services. The first points of aggregation in this context are therefore the central office, remote terminal, cable headend, wireless tower or base station, or the like. For this purpose, ‘‘broadband service’’ is the provision of two-way data transmission with advertised speeds of at least 768 kilobits per second (kbps) downstream and greater than 200 kbps upstream to end users. These data shall be submitted to NTIA as a tab-delimited text file in which each record has the following format: RECORD FORMAT FOR LAST-MILE CONNECTION POINTS DATA FOR EACH PROVIDER Field Description Type Example Provider Name ................................................ DBA Name ...................................................... FRN ................................................................. Technology of Transmission ........................... Provider Name ................................................................. ‘‘Doing-business-as’’ name .............................................. FCC Registration Number ................................................ Category of technology for the provision of service (see details following Part 1(a) for codes). Upstream capacity of the serving facility (see details below). Type of upstream transport facility (1=Fiber; 2=Copper; 3=Hybrid Fiber Coax (HFC); 4=Wireless). Count of end users served from this point of aggregation. Latitude in decimal degrees of facility .............................. Longitude in decimal degrees of facility ........................... Elevation relative to grade to the nearest foot (positive integers indicate above grade, negative below grade). Text ...................... Text ...................... Integer .................. Integer .................. ABC Co. Superfone, Inc. 8402202. 10. Integer .................. 1. Integer .................. 1. Integer .................. 24. Float ..................... Float ..................... Integer .................. 38.884560. ¥77.028123. 2. Serving Facility Backhaul Capacity ................. Serving Facility Backhaul Type ....................... End-users served ............................................ Latitude ............................................................ Longitude ......................................................... Elevation .......................................................... Connections to Last-Mile Infrastructure Record Detail: 1. Instructions for providers needing to obtain a FRN can be accessed at https://fjallfoss.fcc.gov/coresWeb/ publicHome.do. 2. The technology of transmission should be entered as an integer based on the coding scheme shown in Part 1(a) above. 3. The capacity of the serving facility should represent the capacity as currently configured and be expressed according to the following reference: SERVING FACILITY CODES Data rate code Data rate 1 ............... 2 ............... Less than 1.5 mbps. Greater than or equal to 1.5 mbps and less than 3 mbps. Greater than or equal to 3 mbps and less than 6 mbps. Greater than or equal to 6 mbps and less than 10 mbps. Greater than or equal to 10 mbps and less than 25 mbps. 3 ............... 4 ............... mstockstill on DSKH9S0YB1PROD with NOTICES 5 ............... interconnection points of facilities in their State that provide connectivity Data rate between (a) a service provider’s network Data rate code elements (or segments) or (b) between a service provider’s network and another 6 ............... Greater than or equal to 25 provider’s network, including the mbps and less than 50 mbps. 7 ............... Greater than or equal to 50 Internet backbone. (Collectively, (a) and mbps and less than 100 (b) are ‘‘middle-mile and backbone interconnection points’’). mbps. 8 ............... Greater than or equal to 100 Middle-mile and backbone mbps and less than 1 gbps. interconnection points typically enable 9 ............... Greater than or equal to 1 gbps. relatively fast data rates, are built to handle substantial capacities, and may 4. Coordinates must be expressed be service-quality assured. using the WGS 1984 geographic Examples might include: points of coordinate system. 5. Data for the entire State or territory interconnection enabling communications between an incumbent should be submitted as a single, tablocal exchange carrier central office and delimited plain text file named the Internet, between a cable aggregation ‘‘lastmile_XX.txt’’ where XX is the twoletter postal abbreviation for the State or point (headend) and the Internet, or between a wireless base station and the territory. provider’s core network elements that (b) Middle-Mile and Backbone connect to other networks including the Interconnection Points Internet. In addition to the information shown These data shall be submitted to NTIA in the tables above, awardees shall as a tab-delimited text file in which provide NTIA with a list of each record has the following format: SERVING FACILITY CODES—Continued RECORD FORMAT FOR MIDDLE-MILE AND INTERNET BACKHAUL CONNECTION POINTS DATA FOR EACH PROVIDER Field Description Type Provider Name ......... DBA Name ............... FRN .......................... Ownership ................ Provider Name .............................................................................................................. Doing-business-as name .............................................................................................. FCC Registration Number ............................................................................................. Is the facility owned (0) or leased (1)? ......................................................................... Text .......... Text .......... Integer ..... Integer ..... VerDate Nov<24>2008 17:23 Jul 07, 2009 Jkt 217001 PO 00000 Frm 00034 Fmt 4703 Sfmt 4703 E:\FR\FM\08JYN1.SGM 08JYN1 Example ABC Co. Superfone, Inc. 8402202. 0. 32563 Federal Register / Vol. 74, No. 129 / Wednesday, July 8, 2009 / Notices RECORD FORMAT FOR MIDDLE-MILE AND INTERNET BACKHAUL CONNECTION POINTS DATA FOR EACH PROVIDER— Continued Field Description Type Serving Facility Capacity. Serving Facility Type Serving capacity of transport facility (see details below) ............................................. Integer ..... 1. Type of transport facility (1=Fiber; 2=Copper; 3=Hybrid Fiber Coax (HFC); 4=Wireless). Latitude in decimal degrees .......................................................................................... Longitude in decimal degrees ....................................................................................... Elevation relative to grade to the nearest foot (positive integers indicate above grade, negative below grade). Integer ..... 1. Float ......... Float ......... Integer ..... 38.884560. ¥77.028123. ¥10. Latitude .................... Longitude ................. Elevation .................. Connections Record Detail: 1. Instructions for providers needing to obtain a FRN can be accessed at https://fjallfoss.fcc.gov/coresWeb/ publicHome.do. The capacity of the serving facility should represent the capacity as currently configured and be expressed according to the following reference: Data rate code Interconnection point data rate 3 ............... Greater than 150 mbps and less than 600 mbps. Greater than or equal to 600 mbps and less than 2.4 gbps. Greater than or equal to 2.4 gbps and less than 10 gbps. Greater than or equal to 10 gbps. Data rate code Interconnection point data rate 1 ............... Multiple T1s and less than 40 mbps. Greater than 40 mbps and less than 150 mbps. ‘‘middlemile_XX.txt’’ where XX is the two-letter postal abbreviation for the State or territory. 4. Community Anchor Institutions 4 ............... 5 ............... 6 ............... SERVING FACILITY CODES 2 ............... SERVING FACILITY CODES—Continued Example 2. Coordinates must be expressed using the WGS 1984 geographic coordinate system. 3. Data for the entire State or territory should be submitted as a single, tabdelimited plain text file named Awardees shall provide NTIA with a list of community anchor institutions in their State, along with the associated information described below. ‘‘Community Anchor Institutions’’ consist of schools, libraries, medical and healthcare providers, public safety entities, community colleges and other institutions of higher education, and other community support organizations and entities. The list shall be submitted to NTIA as a tab-delimited text file in which each record has the following format: RECORD FORMAT FOR COMMUNITY ANCHOR INSTITUTIONS Field Description Type Example Name ........................ Institution Name ............................................................................................................ Text .......... Address .................... Complete address of institution .................................................................................... Text .......... Latitude .................... Longitude ................. Category ................... Broadband Service? Technology of Transmission. Advertised Downstream Service Speed. Advertised Upstream Service Speed. Latitude in decimal degrees of institution ..................................................................... Longitude in decimal degrees of institution .................................................................. Category of institution (see details below for category codes) .................................... Does institution subscribe to broadband service at location? Category of technology used for the provision of broadband service to the institution (see details following Part 1(a) for codes). Speed tier code for the downstream advertised data transfer throughput rate associated with the service that the institution receives (see details following Part 1(a) for codes). Speed tier code for the upstream data transfer throughput rate associated with the service that the institution receives (see details following Part 1(a) for codes). Float ......... Float ......... Integer ..... Text .......... Integer ..... John Smith Community Center. 1401 Constitution Ave., NW., Washington DC 20230 38.884560. ¥77.028123. 2. Y. 10. Integer ..... 8. Integer ..... 8. mstockstill on DSKH9S0YB1PROD with NOTICES The category of each Community Anchor Institution should be expressed according to the following reference: COMMUNITY ANCHOR INSTITUTION CATEGORY CODES Category code 1 2 3 4 ............... ............... ............... ............... VerDate Nov<24>2008 Category School—K through 12. Library. Medical/healthcare. Public safety. 17:23 Jul 07, 2009 Jkt 217001 COMMUNITY ANCHOR INSTITUTION CATEGORY CODES—Continued Category code Category 5 ............... University, college, other postsecondary. Other community support—government. Other community support—nongovernmental. 6 ............... 7 ............... PO 00000 Frm 00035 Fmt 4703 Sfmt 4703 Appendix B: Policy Justification As discussed in the Notice of Funds Availability (Notice) for the State Broadband Data Program, dated July 1, 2009, NTIA, the FCC, and the RUS cosponsored a series of public meetings and released a Request for Information (RFI) to initiate public outreach about the current availability of broadband service in the United States and ways in E:\FR\FM\08JYN1.SGM 08JYN1 32564 Federal Register / Vol. 74, No. 129 / Wednesday, July 8, 2009 / Notices mstockstill on DSKH9S0YB1PROD with NOTICES which the availability of broadband service could be expanded.36 The RFI requested the submission of information on a broad range of topics including topics related to broadband mapping, the American Recovery and Reinvestment Act (Recovery Act) and the Broadband Data Improvement Act (BDIA). In response to the RFI and the public meetings, NTIA received over 1,000 comments from institutions and individuals on the broadband initiatives funded by the Recovery Act and over 200 comments relating to broadband mapping.37 The comments relating to broadband mapping included comments regarding: (1) The information that should be included on the national broadband map; (2) the level of geographic or other granularity the national broadband map should provide; (3) whether there are State or other mapping programs that provide models for the statewide inventory grants; (4) the information States should collect as conditions of receiving statewide inventory grants; and (5) the technical specifications that should be required of grantees to ensure that statewide inventory maps can be efficiently included in a national broadband map. Map Information. In the RFI, NTIA requested additional information regarding the elements that the national broadband map should include.38 NTIA also examined mapping methodologies employed at the State level and consulted with the Federal Communications Commission (FCC) to determine what data elements should be included in a national standard that would be applied to the collection of broadband mapping related data by awardees under this Program so as to better ensure comprehensiveness, cohesiveness and uniformity in the national broadband map.39 36 See Notice: American Recovery and Reinvestment Act of 2009 Broadband Initiatives, 74 FR 8914 (Feb. 27, 2009). 37 Agendas, transcripts, and presentations from each meeting are available on NTIA’s Web site at https://www.ntia.doc.gov/broadbandgrants/ meetings.html. All public comments in Docket No. 090309298–9299–01 are on file with NTIA and may be viewed on NTIA’s Web site at https:// www.ntia.doc.gov/broadbandgrants/comments. 38 74 FR at 10718. 39 Commenters offered a range of comments about what data the map should include: State of North Dakota at 9 (Apr. 14, 2009) (types of technology used by providers); National Association of Telecommunications Officers and Advisors (NATOA) at 24 (Apr. 13, 2009) (actual and offered speeds and prices for a particular area); Joint Comments of Massachusetts Broadband Institute, Massachusetts Department of Telecommunications and Cable, and Vermont Department of Public Service (Joint Comments) at 7 (Apr. 14, 2009) (current availability of service, adoption rates, and service provider identity); The Telecommunications VerDate Nov<24>2008 17:23 Jul 07, 2009 Jkt 217001 NTIA finds that the data elements contained in the Technical Appendix attached to the Notice must be collected by each awardee under this Program and that such data must be provided to NTIA pursuant to the terms of the Notice. To the greatest extent possible, at every address, the type and speed of broadband service will be provided. For providers of wireless broadband service, the spectrum used for the provision of service will be provided. If the applicable broadband service provider so chooses, the provider’s identity will Industry Association (TIA) at 19 (Apr. 10, 2009) (location of infrastructure points); Pennsylvania Governor’s Office of Administration (Apr. 13, 2009) (location of water and cell towers); Big Think Strategies at 9 (Apr. 13, 2009) (location of ‘‘meetme-backbone-points’’); University of Nebraska at 4 (Apr. 13, 2009) (both dark and lit fiber); FiberTower Corporation at 13 (Apr. 13, 2009) (locations of broadband enabled buildings); County Office of Economic Development, Garrett County, MD at 13 (trunking locations/nodes); Wireless Internet Service Providers Associations (WISPA) at 13 (Apr. 13, 2009) (point-of-presence locations); Public Interest Spectrum Coalition at 10 (Apr. 13, 2009) (spectrum frequency/signal strength by time of year/day); ZeroDivide at 13 (Apr. 13, 2009) (adoption rates in new broadband deployment areas); RF Check, Inc. at 1 (GPS mapping); City of Boston at 9 (Apr. 13, 2009) (data transfer rates); Association of Public Safety Communications Officials (APCO) at 13 (Apr. 13, 2009) (network interoperability); FiberTower Corporation at 4–6 (Apr. 14, 2009) (bandwidth availability for backhaul); CostQuest/LinkAmerica Alliance at 10 (RF propagation and antennae direction); FiberTower Corporation at 10 (middle and last mile bandwidth capacity); CostQuest/LinkAmerica Alliance at 12 (topography features and location of facilities); Rural Internet and Broadband Policy Group at 9, 10 (traffic network architecture); CostQuest/LinkAmerica Alliance at 10 (social demographic data); National Organization of Black County Officials (NCBM et al.) at 3 (Apr. 14, 2009) (race); NCBM et al. at 3 (gender, income, age, education, and difference in language(s)); Rural and Tribal Systems Development (RTSD) at 17 (Apr. 14, 2009) (political subdivisions); NCBM et al. at 3 (employment status); Space Data at 6 (economically disadvantaged areas); FirstMile.US at 14 (Apr. 10, 2009) (physical and financial accessibility); CostQuest/LinkAmerica Alliance at 10 (location of public technology access and learning centers (schools); Level 3 Communications at 15 (Apr. 13, 2009) (population trends); The People of the State of California and Governor Arnold Schwarzenegger at 42, 46, 48 (Apr. 13, 2009) (subscriber data); CostQuest/LinkAmerica Alliance at 10 (customer class); National Emergency Number Association (NENA) at 16–18 (Apr. 13, 2009) (public safety broadband availability); Intrado Inc. and Intrado Communications Inc. (Intrado) at 10 (Apr. 10, 2009) (PSAP locations); Apex CoVantage at 4 (road segments); Joint Comments at 7 (Apr. 14, 2009) (broadband availability type); CostQuest/ LinkAmerica Alliance at 10 (locations of public libraries); Pennsylvania Governor’s Office of Administration at 6, 7 (broadband stimulus fund projects); State of Iowa at 7 (Apr. 13, 2009) (rightsof-way); National Association of County and City Health Officials (NACCHO) at 3 (Apr. 13, 2009) (health care facilities); Rural Internet and Broadband Policy Group at 4 (Apr. 13, 2009) (voice and data connectivity rates in tribal areas); Broadpoint Inc. at 3 (Apr. 13, 2009) (offshore economic and business hubs); Stratsoft LLC at 1 (Mar. 23, 2009) (frequency of electrical outages, electrical currents for radios, and usage data). PO 00000 Frm 00036 Fmt 4703 Sfmt 4703 also be available, otherwise the map will simply display that an anonymous provider utilizing a particular type of technology is providing service to a location. Furthermore, to the extent possible, the service areas of individual providers will be aggregated with other providers of the same technology type. NTIA has made this determination based on its review of the comments, an examination of mapping methodologies employed at the State level, and consultation with the FCC. Though collected under this Program, data concerning the Average Revenue Per User (ARPU) and data regarding the type, technical specification, or location of infrastructure owned, leased, or used by a broadband service provider will not be displayed on the public national broadband map.40 The above paragraphs notwithstanding, if provider consent is granted, NTIA may display the above provider-specific information on the national broadband map. In addition to the above broadbandrelated information, the national broadband map may display a wide range of additional, economic, and demographic data derived from other sources. Such data, however, are not the subject of the Notice. State broadband maps developed pursuant to awards under this Program should display, at a minimum, technology type and speed, subject to the restrictions contained herein, including those within the section entitled ‘‘Confidential Information’’ of the Notice. Nothing in the Notice, however, is intended to otherwise limit the data elements that States may include in their State broadband maps or the format that they use to display such data elements, and States are encouraged to adapt their maps to fit their individual State needs.41 Level of Granularity. NTIA’s RFI included a question regarding the level of geographic or other granularity at which the national broadband map should display information on broadband service.42 Commenters presented a range of suggestions for the appropriate level of granularity.43 40 However, NTIA is considering methods for displaying some pricing data that will be collected through other avenues. 41 The fact that some data elements have not been included in the technical requirements for the national broadband map, or not made publicly available, does not indicate that those elements may not be useful for individual State purposes. 42 74 FR at 10718. 43 The majority of commenters supported street address level granularity. See, e.g., Vermont Center for Geographical Information (VCGI) at 2 (Mar. 24, 2009). There was also support for data collection at lower levels of granularity. See, e.g., City of Beverly Hills at 3 (Apr. 10, 2009) (census block); Lehigh E:\FR\FM\08JYN1.SGM 08JYN1 Federal Register / Vol. 74, No. 129 / Wednesday, July 8, 2009 / Notices mstockstill on DSKH9S0YB1PROD with NOTICES Based on its review of the comments, examination of mapping methodologies currently employed at the State level, and consultation with the FCC, NTIA finds that data at the address level, or as close to the address level as practicable considering the technology type being employed, as set out in the Technical Appendix, should be collected by each awardee under this Program and that such data must be provided to NTIA pursuant to the terms of the Notice. State broadband maps developed pursuant to awards under this Program should display data at the address level, or as close to the address level as practicable considering the technology type being employed and as provided more fully in the Technical Appendix. State Models. NTIA has gathered information from a variety of sources, including mapping experts from many States. Additionally, commenters provided suggestions on what maps NTIA should use as models for the national broadband map.44 After careful consideration and consultation with the FCC and other agencies, determined that none of the suggested State map models contain all of the data sets necessary for the national broadband map, but may prove to be instructive and the source of valuable ideas. The information required under the Notice and Technical Appendix, however, is the principal source of information for the national map and guidance for applicants under this Program. State Collection of Mapping Information. State participation is critical to the national broadband mapping effort. Commenters expressed a range of opinions on the information that States should be required to collect as a condition of receiving statewide inventory grants.45 In order to promote Valley Cooperative Telephone Association at 6 (Apr. 13, 2009) (census tract level per FCC form 477 data collection); Traverse Technologies, Inc. at 2 (Mar. 25, 2009) (providers’ customer service areas). 44 See, e.g., CostQuest/LinkAmerica Alliance at 17 (Alabama map); State of Arizona Government Information Technology Agency at 9 (Arizona Map); City and County of San Francisco at 25 (Apr. 13, 2009) (California Map); State of Iowa at 7 (Hawaii map); Oakland County, Michigan at 7 (Illinois Map); ConnectKentucky at 3 (Kentucky Map); Joint Comments at 8, 13 (Massachusetts Map); Diane Wells at 1, 2 (Apr. 13, 2009) (Minnesota Map); State of Iowa at 7 (Missouri Map); Joint Response of the New York State CIO et al. at 4 (New York Map); Pennsylvania Governor’s Office of Administration at 8 (North Carolina Map); Pennsylvania Governor’s Office of Administration at 8 (Pennsylvania Map); Scott County Mayor Ricky A. Keeton at 1 (Apr. 13, 2009) (Tennessee Map); Stratrum Broadband at 19 (Mar. 31, 2009) (Vermont Map); City of Boston at 9 (Virginia Tech Map); ViaStat, Inc. at 14, 15 (Apr. 13, 2009) (Australia Map); City of Boston at 9 (New Zealand Map). 45 The RFI included a question regarding the specific information the States should collect as VerDate Nov<24>2008 17:23 Jul 07, 2009 Jkt 217001 the efficient creation of the State and national broadband maps, NTIA and RUS will require that broadband internet service providers that apply for infrastructure grants under BTOP and RUS’ Broadband Initiatives Program (BIP) agree to provide the data that awardees under this Program are required to collect pursuant to the Technical Appendix. NTIA and RUS find that the BIP/BTOP program’s incentive structure should complement the goals of the State and national mapping efforts and this requirement will further facilitate data collection. Technical Specifications of State Maps. The BDIA is silent on the technical specifications that should be included in each State map. NTIA sought comment in the RFI on the specifications that should be required of State Broadband Data Program grantees to ensure that the data collected at the State level can be efficiently incorporated into the national broadband map.46 As stated above, NTIA also consulted with the FCC and examined mapping methodologies currently employed at the State level, regarding the technical specifications with which awardees should comply in composing their maps with program funds. In response to the RFI, commenters provided varying insights on the data sets that should be displayed,47 and the technical format of the information conditions of receiving statewide inventory grants (74 FR 10718). Most commenters agreed that States should collect information. See, e.g., WISPA at 13. There was disagreement over whether State data collection should be a condition to qualify for grants. See, e.g., Windstream Communications, Inc. at 27. Some commenters did not think providers should be required to provide mapping data. See, e.g., Independent Telephone and Telecommunications Alliance at 35. Some commenters recommended that providers be required to submit data. See, e.g., State of Missouri/ Missouri Public Services Commission at 12. 46 74 FR at 10718. 47 NTIA received comments on the technical specifications of the map including the following: Triangle J Council of Governments Cable Broadband Consortium at 15 (Apr. 13, 2009) (NTIA should establish a standard template, such as a database directory, by which information is submitted); CostQuest/LinkAmerica Alliance at 18 (NTIA should clearly define certain data sets such as: Coverage areas, speed and service attributes, quality of service data, technologies, infrastructure elements, demand and demographic data price, deployment costs); The People of the State of California and Governor Arnold Schwarzenegger at 46 (NTIA should establish definitions for address); National Tribal Telecommunications Association at 3, 4 (NTIA should show customer class (residential, business, etc.); Joint Response of the New York State CIO et al. at 11 (data should allow for multiple demographic overlays); Apex CoVantage at 4 (link the customer database to the provider database and link the political data to census data); SEDA— Council of Governments at 6 (searchable by address and display in graphical rather than tabular format). PO 00000 Frm 00037 Fmt 4703 Sfmt 4703 32565 provided.48 NTIA has determined to require that data be collected as specified in the Technical Appendix attached hereto. [FR Doc. E9–16103 Filed 7–7–09; 8:45 am] BILLING CODE 3510–60–P DEPARTMENT OF COMMERCE National Oceanic and Atmospheric Administration RIN 0648–XQ00 Taking and Importing Marine Mammals: Taking Marine Mammals Incidental to Harbor Activities Related to the Delta IV/Evolved Expendable Launch Vehicle at Vandenberg Air Force Base, CA AGENCY: National Marine Fisheries Service (NMFS), National Oceanic and Atmospheric Administration (NOAA), Commerce. ACTION: Notice; proposed incidental harassment authorization; request for comments. SUMMARY: NMFS has received an application from United Launch Alliance (ULA) for an Incidental Harassment Authorization (IHA) to take small numbers of marine mammals, by harassment, incidental to conducting Delta Mariner operations, cargo unloading activities, harbor maintenance dredging, and kelp habitat mitigation activities related to the Delta IV/Evolved Expendable Launch Vehicle (Delta IV/EELV) at south Vandenberg Air Force Base, CA (VAFB). Pursuant to the Marine Mammal Protection Act (MMPA), NMFS requests comments on its proposal to authorize ULA to take, by Level B harassment only, small numbers of two species of pinnipeds at south VAFB beginning August, 2009. DATES: Comments and information must be received no later than August 7, 2009. ADDRESSES: Comments on the application should be addressed to 48 Link America Alliance at 17 (NTIA should follow Federal Geospatial Data Content standards that included geographic and topographic information); University of Nebraska at 4 (NTIA should require GIS software compatibility); The People of the State of California and Governor Arnold Schwarzenegger at 47 (NTIA should create Metadata (data about the data) according to Federal Geospatial Data Content (FGDC) standards to be generated after geo-coding); State of Arizona Government Information Technology Agency at 9 (NTIA should create Metadata (data about the data) according to ESRI mapping standards); CostQuest/ Link America Alliance at 18, 19 (maps and features (data layers) should be collected in accordance with Open Geospatial Consortium (OGC) standards for geospatial data). E:\FR\FM\08JYN1.SGM 08JYN1

Agencies

[Federal Register Volume 74, Number 129 (Wednesday, July 8, 2009)]
[Notices]
[Pages 32545-32565]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E9-16103]


-----------------------------------------------------------------------

DEPARTMENT OF COMMERCE

National Telecommunications and Information Administration

RIN 0660-ZA29


State Broadband Data and Development Grant Program

AGENCY: The National Telecommunications and Information Administration, 
U.S. Department of Commerce.

ACTION: Notice of funds availability (Notice) and solicitation of 
applications.

-----------------------------------------------------------------------

SUMMARY: The National Telecommunications and Information Administration 
(NTIA), U.S. Department of Commerce, publishes this Notice to announce 
the availability of funds pursuant to the American Recovery and 
Reinvestment Act of 2009 (Recovery Act), Public Law 111-5 (Feb. 17, 
2009), and the Broadband Data Improvement Act (BDIA), Title I of Public 
Law 110-385, 122 Stat. 4096 (Oct. 10, 2008) and to provide guidelines 
for the State Broadband Data and Development Grant Program (State 
Broadband Data Program or Program). The State Broadband Data Program is 
a competitive, merit-based matching grant program that effects the 
joint purposes of the Recovery Act and the BDIA by funding projects 
that collect comprehensive and accurate State-level broadband mapping 
data, develop State-level broadband maps, aid in the development and 
maintenance of a national broadband map, and fund statewide initiatives 
directed at broadband planning.

DATES: Applications will be accepted from July 14, 2009 at 8 a.m. 
Eastern Time (ET) until August 14, 2009 at 11:59 p.m. ET.

ADDRESSES: All applications must be submitted through the online 
Grants.gov system no later than 11:59 p.m. ET on August 14, 2009, as 
more fully described in the section entitled ``Request for Application 
Package'' below. Failure to properly register and apply for State 
Broadband Data Program funds by the deadlines may result in forfeiture 
of the grant opportunity. Applications are accepted until the deadline 
and processed as received. Applications submitted by hand delivery, 
mail, email or facsimile will not be accepted.

FOR FURTHER INFORMATION CONTACT: For general inquiries regarding the 
State Broadband Data Program, applicants may contact Edward ``Smitty'' 
Smith, Program Director, State Broadband Data and Development Grant 
Program,

[[Page 32546]]

National Telecommunications and Information Administration, U.S. 
Department of Commerce, 1401 Constitution Avenue, NW., Room 4898, 
Washington, DC 20230; by telephone at 202-482-4949 or via electronic 
mail at broadbandmapping@ntia.doc.gov. Information about the State 
Broadband Data Program can also be obtained electronically via the 
Internet at https://www.ntia.doc.gov/broadbandgrants.

SUPPLEMENTARY INFORMATION: Catalog of Federal Domestic Assistance 
(CFDA) Number: 11.558.
    Additional Items in Supplementary Information:

    I. Overview: Describes the statutory origin of the broadband 
mapping requirement under the Recovery Act, the applicability of the 
BDIA, the structure of the Program and the public comment process.
    II. Funding Opportunity Description: Provides a more thorough 
description of the Program, including a description of mapping and 
planning priorities, and the application review process.
    III. Definitions: Sets forth the key terms and other terms used 
in this Notice.
    IV. Award Information: Describes funding availability and other 
award information.
    V. Eligibility Information: Discusses eligibility criteria, 
including the 20 percent match, confidentiality requirements, and 
funding restrictions.
    VI. Application and Submission Information: Provides information 
about how to apply, application materials, and the application 
process.
    VII. Application Review Information: Establishes the scoring 
criteria for evaluating applications.
    VIII. Anticipated Award Dates: Identifies the initial award 
announcement and award dates for Program awards.
    IX. Award Administration Information: Provides award notice 
information, administrative requirements, terms and conditions, and 
other reporting requirements for award recipients.
    X. Other Information: Sets forth guidance on funding, compliance 
with various laws, regulations and other such requirements.

I. Overview

    A. The Recovery Act: Section 6001(l) of the Recovery Act requires 
the Assistant Secretary to develop and maintain a comprehensive, 
interactive, and searchable nationwide inventory map of existing 
broadband service capability and availability in the United States that 
depicts the geographic extent to which broadband service capability is 
deployed and available from a commercial or public provider throughout 
each State.\1\ The Recovery Act requires the Assistant Secretary to 
make the national broadband map accessible by the public on an NTIA Web 
site no later than February 17, 2011.\2\ The Recovery Act authorizes 
NTIA to expend up to $350 million pursuant to the BDIA and for the 
purposes of developing and maintaining a broadband inventory map.\3\ 
Implementation of the BDIA is useful to fulfill Congress' intent to 
develop a national broadband map as expressed and funded under the 
Recovery Act.
---------------------------------------------------------------------------

    \1\ Recovery Act section 6001(l), 123 Stat. at 516. See Section 
IV for the definition of ``State'' and other relevant definitions.
    \2\ Id.
    \3\ Recovery Act, Title II, Div. A, 123 Stat. at 123 (to be 
codified at 47 U.S.C. 1301).
---------------------------------------------------------------------------

    B. The BDIA: The BDIA is intended to improve data on the deployment 
and adoption of broadband service to assist in the extension of 
broadband technology across all regions of the United States.\4\ 
Section 106 of the BDIA directs the Secretary of Commerce to establish 
the State Broadband Data Program and to award grants to eligible 
entities to develop and implement statewide initiatives to identify and 
track the adoption and availability of broadband services within each 
State.\5\ In effecting this purpose, the BDIA provides several eligible 
uses for grant funds, including uses related to the gathering of 
broadband-related data at the State level and the development of 
statewide broadband maps.\6\
---------------------------------------------------------------------------

    \4\ BDIA Sec.  102, 122 Stat. at 4096.
    \5\ BDIA Sec.  106(b), 122 Stat. at 4099. The Secretary 
delegated his authority to meet the obligations of Section 106 of 
the BDIA to the Assistant Secretary for Communications and 
Information (Assistant Secretary) on April 9, 2009.
    \6\ The BDIA authorizes the Secretary to make grants to eligible 
entities for the following eligible uses: (1) To develop and provide 
a baseline assessment of broadband deployment in each State; (2) to 
identify and track the areas with low levels of deployment, the rate 
at which residential and business users adopt broadband service and 
other related information technology services, and possible 
suppliers of such services; (3) to identify barriers to the adoption 
of broadband service and information technology services; (4) to 
identify the available speeds for broadband connection; (5) to 
create and facilitate by county or designated region in a State, 
local technology planning teams; (6) to collaborate with broadband 
service providers and information technology companies to encourage 
deployment and use; (7) to establish computer ownership and Internet 
access programs in unserved and areas with lower than average 
penetration on a national basis; (8) to collect and analyze detailed 
market data concerning use and demand for broadband service; (9) to 
facilitate information exchange regarding use and demand for 
broadband services between public and private sector users; and (10) 
to create within each State a geographic inventory map of broadband 
service. BDIA Sec.  106(e), 122 Stat. at 4100-4101.
---------------------------------------------------------------------------

    C. The State Broadband Data Program: In keeping with the Recovery 
Act's direction that NTIA develop and maintain a comprehensive and 
interactive national broadband map and the requirements of the BDIA, 
NTIA has established this grant program. Awardees under this Program 
will receive grants to fund their collection of broadband-related data 
as well as funding for planning programs at the State level. Awardees 
will use the broadband-related data that they collect to develop 
statewide broadband maps, which will be linked to a Department of 
Commerce Web page. In addition, the awardees will submit all of their 
collected data to NTIA for use by NTIA and the Federal Communications 
Commission (FCC) in developing and maintaining the national broadband 
map, which will be displayed on an NTIA Web page before February 17, 
2011.
    NTIA's decisions are based on the statutory requirements of the 
Recovery Act and are informed by NTIA's own expertise, the expertise of 
other Federal agencies, including the FCC, and public comment.
    D. Public Comment: On March 10, 2009, NTIA, the FCC, and the U.S. 
Department of Agriculture's Rural Utilities Service (RUS) cosponsored a 
public meeting to initiate public outreach about the current 
availability of broadband service in the United States and ways in 
which the availability of broadband service could be expanded.\7\ The 
March 10th meeting was followed by the release of a Request for 
Information (RFI) and six days of additional public meetings and field 
hearings during March.\8\ The RFI requested the submission of 
information on a broad range of topics including topics related to 
broadband mapping, the Recovery Act and the BDIA. The meetings and 
hearings included nearly 120 panelists with representatives from 
consumer and public interest groups, State and local governments, 
tribal governments, minority and vulnerable populations, industry, 
academia and other institutions.
---------------------------------------------------------------------------

    \7\ See Notice: American Recovery and Reinvestment Act of 2009 
Broadband Initiatives, 74 FR 8914 (Feb. 27, 2009).
    \8\ See Notice: American Recovery and Reinvestment Act of 2009 
Broadband Initiatives, 74 FR 10716 (March 12, 2009). Agendas, 
transcripts and presentations from each meeting are available on 
NTIA's Web site at https://www.ntia.doc.gov/broadbandgrants/meetings.html.
---------------------------------------------------------------------------

    In response to the RFI and the public meetings, NTIA received over 
1,000 comments from institutions and individuals on the broadband 
initiatives funded by the Recovery Act.\9\ With regard to the issues 
surrounding the State Broadband Data Program and the national broadband 
map that NTIA is

[[Page 32547]]

required to prepare under Section 6001(l) of the Recovery Act, NTIA 
received more than 200 comments, many of which played a role in 
formulating the structure of this Program. For further discussion and 
explanation of the policy decisions involved in establishing this 
program, see the attached Policy Justification Appendix.
---------------------------------------------------------------------------

    \9\ Agendas, transcripts, and presentations from each meeting 
are available on NTIA's Web site at https://www.ntia.doc.gov/broadbandgrants/meetings.html. All public comments in Docket No. 
090309298-9299-01 are on file with NTIA and may be viewed on NTIA's 
Web site at https://www.ntia.doc.gov/broadbandgrants/comments.cfm.
---------------------------------------------------------------------------

II. Funding Opportunity Description

    A. Program Description: The State Broadband Data Program is a 
competitive, merit-based matching grant program that implements the 
joint purposes of the Recovery Act and the BDIA through the award of 
grants. This Program is designed to fund projects that gather 
comprehensive and accurate State-level broadband mapping data, develop 
State-level broadband maps, aid in the development and maintenance of a 
national broadband map, and fund statewide initiatives for broadband 
planning.
    While the BDIA mandates that each State may have only a single 
eligible entity, each applicant will be carefully evaluated against a 
program standard. Any applicant that fails to meet the program standard 
will not receive grant funding; therefore, the efficient fulfillment of 
the goals of the Recovery Act and the BDIA will be advanced by the 
submission of a qualifying application from each State highly 
responsive to the review criteria contained in this Notice. In the 
event that a State fails to produce a grant awardee, NTIA reserves the 
right to perform the necessary broadband data collection.
    1. Use of Collected Broadband Data by Awardees. Awardees may use 
the data collected under this Program for any lawful use consistent 
with the requirements of this Program, including the confidentiality 
restrictions contained herein, and existing agreements between the 
awardee, the State, and broadband service providers. It is expected, 
however, that, in addition to providing all collected data to NTIA, 
applicants will use the data to develop and maintain a statewide 
broadband map that will be separate and distinct from the national 
broadband map and will be tailored to suit the needs of the particular 
State. Though it will be separate and distinct from the national 
broadband map, applicants must provide NTIA with a hypertext link to 
the State maps for display on a Web page on the Department of Commerce 
Web site.
    2. Use of Collected Broadband Data by NTIA and the FCC. The data 
collected under this Program will be used for public purposes and also 
utilized by governmental entities. For example, because of its value in 
identifying appropriate areas for broadband investment and economic 
stimulus, the collected data will inform NTIA's grant-making decisions 
under the Broadband Technology Opportunities Program (BTOP). The 
national broadband map that will be developed and maintained using 
these and other data will publicly display the following information 
about broadband service available from a public or private provider:
    (a) Geographic areas in which broadband service is available;
    (b) The technologies used to provide broadband service in such 
areas;
    (c) The spectrum used for the provision of wireless broadband 
service in such areas;
    (d) The speeds at which broadband service is available in such 
areas; and
    (e) Broadband service availability at public schools, libraries, 
hospitals, colleges and universities and all public buildings owned or 
leased by agencies or instrumentalities of the States or municipalities 
or other subdivisions of the States and their respective agencies or 
instrumentalities.
    The national map will also be searchable by address. To the 
greatest extent possible, at every address, the type and speed of 
broadband service will be provided. For providers of wireless broadband 
service, the spectrum used for the provision of service will be 
provided. If the applicable broadband service provider so chooses, the 
provider's identity will also be available, otherwise the map will 
simply display that an anonymous provider utilizing a particular type 
of technology is providing service to a location. Furthermore, to the 
extent possible, the service areas of individual providers will be 
aggregated with other providers of the same technology type.
    Though collected under this Program, data concerning the Average 
Revenue Per User (ARPU) and data regarding the type, technical 
specification, or location of infrastructure owned, leased, or used by 
a broadband service provider will not be displayed on the public 
national broadband map.\10\ The above paragraphs notwithstanding, if 
provider consent is granted, NTIA may display the above provider-
specific information on the national broadband map.
---------------------------------------------------------------------------

    \10\ However, NTIA is considering methods for displaying some 
pricing data that will be collected through other avenues.
---------------------------------------------------------------------------

    In addition to the above broadband-related information, the 
national broadband map may display a wide range of additional, 
economic, and demographic data derived from other sources. Such data, 
however, are not the subject of this Notice.
    B. Program Priorities:
    1. Broadband Mapping. With respect to this Program, NTIA's highest 
priority is the development and maintenance of a national broadband 
map. Therefore, NTIA intends to fund high-quality projects that are 
designed to gather data at the address-level on broadband availability, 
technology, speed, infrastructure, ARPU, and, in the case of wireless 
broadband, the spectrum used, across the project areas. NTIA has 
determined that the BDIA's eligible uses regarding State-specific data 
collection and geographic inventory broadband mapping activities are 
encompassed within the broadband mapping grant guidelines described 
herein. Successful projects must propose: (a) To provide comprehensive 
and verifiable data meeting the Program standards as published in this 
Notice, such data will be accessible and clearly presented to NTIA, the 
public, and State and local governments without unduly compromising 
data or the protection of Confidential Information as defined in this 
notice; (b) a workable and sustainable framework for repeated updating 
of data; (c) a plan for collaboration with State-level agencies, local 
authorities, and other constituencies, as well as a proposal for 
planning projects designed to identify and address broadband challenges 
in the State; (d) feasible projects as demonstrated by a reasonable and 
cost-efficient budget, and a showing of applicant capacity, knowledge 
and experience; and (e) a timeline for expedient data delivery.
    2. Broadband Planning. Only applications that meet the broadband 
mapping purposes set forth in the above paragraph will be considered 
for planning funding, and mapping proposals do not need to include a 
planning component. However, applicants may propose projects or award 
uses that relate to an enumerated BDIA purpose described in Section I 
of this Notice that addresses a need in their State. Any proposed use 
of funds that is not directed towards the collection of data for, or 
the development and maintenance of, the State or national broadband map 
will be considered a planning use. There is a presumption that the BDIA 
purposes involving the identification of barriers to the adoption of 
broadband service and information technology services, the creation and 
facilitation of local technology planning teams, and the establishment 
of computer ownership

[[Page 32548]]

and Internet access programs are not mapping-related and therefore are 
only eligible for broadband planning funding. However, applicants may 
demonstrate in their applications how a use under such categories will 
inform the collection of broadband data or development of State and 
national broadband maps. Broadband planning funds will be limited, and 
broadband planning-related uses under any grant application budget may 
not exceed $500,000.
    C. Review and Selection Processes:
    The review process involves the three stages outlined below. NTIA 
anticipates that the processing and selection of applications for 
funding will require one (1) month from the date of submission.
    1. Eligibility. Upon receipt, NTIA will screen applications for 
factors determining eligibility as described in the section entitled 
``Eligibility Information'' below. In the case that NTIA determines 
that an application fails to address adequately any eligibility 
criteria before the application deadline, NTIA may alert the applicant 
of such deficiency and the applicant may revise such application before 
the application deadline to comply with Program requirements. However, 
NTIA has no affirmative obligation to notify applicants of a deficient 
application and will not be held responsible for any deficiencies that 
are not remedied in a timely manner.
    2. Technical Review. Each eligible application will be reviewed by 
a panel of at least three peer/expert reviewers who have demonstrated 
expertise in both the programmatic and technological aspects of the 
Program. The peer/expert review panel members will individually 
evaluate applications according to the review criteria provided in 
Section VII of this Notice and provide ratings to the Program staff. 
Each peer/expert reviewer will be required to sign and submit a 
nondisclosure and confidentiality form to prevent the dissemination of 
Confidential Information, and to prevent financial and other conflicts 
of interest.
    3. Programmatic Review and Revision Process. Following the 
Technical Review, each eligible application will be reviewed by Program 
staff for policy determinations and conformity with programmatic goals. 
Program staff will analyze applications considered for award to assess: 
(a) Whether a proposed project meets the Program's funding constraints; 
(b) the eligibility of costs and matching funds included in an 
application's budget; and (c) the extent to which an application 
complements or duplicates projects previously funded or under 
consideration by NTIA or other Federal programs. Following this 
programmatic review, Program staff may contact an eligible applicant to 
discuss any recommended adjustments or revisions to their applications 
necessary to better meet Program goals. Revisions are intended to 
resolve any differences that exist between the applicant's original 
request and what the State Broadband Data Program proposes to fund and, 
if necessary, to clarify items in the application. Staff may also 
request additional corroborating documentation from applicants. These 
documents will be reviewed by Program staff with the support of 
external engineering, design, information technology, geographic 
information systems, broadband, and other subject-matter experts to 
evaluate the consistency of the applications with the supporting 
documents and ensure that applications merit State Broadband Data 
Program awards.
    Upon the conclusion of the programmatic review and revision 
process, each application will continue through the selection process. 
The Program Director will prepare and present a slate of recommended 
grant awards to the Associate Administrator for review and approval. 
The Program Director's recommendations and the Associate 
Administrator's review and approval of those recommendations will take 
into account the selection factors listed below.
    Upon approval by the Associate Administrator, the Program 
Director's recommendations will be presented to the Selecting Official, 
the Assistant Secretary. The Assistant Secretary selects the 
applications for grant award, taking into consideration the Program 
Director's recommendations and the degree to which the slate of 
applications, taken as a whole, satisfies the selection factors 
described below and the Program's stated purposes as set forth in the 
section entitled ``Program Description.''
    The Selecting Official will issue awards after considering the 
following selection factors:
    (a) The evaluations of the peer/expert reviewers;
    (b) The analysis of Program staff;
    (c) The degree to which the proposed grants meet the Program's 
purpose as described in this Notice;
    (d) Avoidance of redundancy and conflicts with the initiatives of 
other Federal agencies; and
    (e) The availability of funds.

III. Definitions

    For the purposes of this Program, NTIA has adopted the following 
definitions for the State Broadband Data Program, many of which were 
developed for BTOP, pursuant to Recovery Act Section 6001(a). 
Applicants for these grants should refer to the following definitions 
when completing their applications:
    Applicant. An entity requesting approval for an award under this 
Notice.
    ARPU. Average Revenue Per User. Average Revenue Per User for this 
Program is as defined in the Technical Appendix.
    Assistant Secretary. The Assistant Secretary for Communications and 
Information, National Telecommunications and Information 
Administration, Department of Commerce, or the Assistant Secretary's 
designee.
    Associate Administrator. The Associate Administrator of the 
National Telecommunications and Information Administration, Department 
of Commerce/the Director of the Office of Telecommunications and 
Information Applications, or the Associate Administrator's designee.
    Available. Broadband service is ``available'' to an end user at an 
address if a broadband service provider does, or could, within a 
typical service interval (7 to 10 business days) without an 
extraordinary commitment of resources, provision two-way data 
transmission to and from the Internet with advertised speeds of at 
least 768 kilobits per second (kbps) downstream and at least 200 kbps 
upstream to the end user at the address.
    Award. A grant made under this Notice by NTIA.
    Awardee. A recipient of an Award under this Notice; a grantee.
    Broadband. Data transmission technology that provides two-way data 
transmission to and from the Internet with advertised speeds of at 
least 768 kilobits per second (kbps) downstream and at least 200 kbps 
upstream to end users, or providing sufficient capacity in a middle 
mile project to support the provision of broadband service to end users 
within the project area.
    Broadband Service. The provision of broadband on either a 
commercial or non-commercial basis.
    BTOP. The Broadband Technology Opportunities Program, administered 
by NTIA, under Section 6001 of the Recovery Act.
    Community Anchor Institutions. Schools, libraries, medical and 
healthcare providers, public safety entities, community colleges and 
other institutions of higher education, and other community support 
organizations and entities.

[[Page 32549]]

    Confidential Information. Any information, including trade secrets, 
or commercial or financial information, submitted under this Program 
that: (1) Identifies the type and technical specification of 
infrastructure owned, leased, or used by a specific broadband service 
provider; (2) identifies the average revenue per user (ARPU) for a 
specific broadband service provider; or (3) explicitly identifies a 
broadband service provider in relation to its specific Service Area or 
at a specific Service Location. For example, a broadband service 
provider's specific service ``footprint'', as identified with such 
provider, will be considered Confidential Information for the purposes 
of this Program and will either (a) be aggregated with other available 
providers of the same technology type before being published in the 
national broadband map, in which case the map would only display the 
aggregated list of providers that have consented to have their names 
displayed for such service area; or (b) in the absence of other 
providers of the same technology type with which a provider's specific 
service ``footprint'' can be aggregated, be displayed without providing 
the provider's identity, unless the provider gives its consent. NTIA 
and the FCC may otherwise aggregate, combine or mask broadband service 
provider data, and take other steps so as to make such data suitable 
for public release.
    Notwithstanding the foregoing, Confidential Information, as defined 
herein and as provided as part of a project funded under this Program, 
will not be made publicly available, pursuant to the limitations set 
forth in the BDIA, except as required by applicable law or judicial or 
administrative action or proceeding, including the Freedom of 
Information Act requirements.\11\
---------------------------------------------------------------------------

    \11\ BDIA Sec.  106(h), 122 Stat. at 4101.
---------------------------------------------------------------------------

    Data. Statistics, figures, descriptions, maps, geographic 
coordinates, or other such information relating to the provision of 
broadband services.
    End User. A residential or business party, institution or State or 
local government entity, including a Community Anchor Institution, that 
may use broadband service for its own purposes and that does not resell 
such service to other entities or incorporate such service into retail 
Internet-access services. Internet Service Providers (ISPs) are not 
``end users'' for this purpose.
    In-Kind Contribution. Qualifying non-cash donations, including 
third-party in-kind contributions, of property, goods or services, 
which benefit a Federally assisted project, and which may count toward 
satisfying the non-Federal matching requirement. See the section 
entitled ``Eligibility Information'' below for a full discussion of the 
Program's treatment of in-kind contributions and the Federal structure 
for determining when a contribution qualifies.
    Pre-Award Costs. Reasonable costs incurred after the enactment of 
the Recovery Act (February 17, 2009) but prior to the effective date of 
the award directly pursuant to and in anticipation of the award where 
such costs are necessary to comply with the proposed delivery schedule 
or period of performance. Such costs are allowable only to the extent 
that they would have been allowable if incurred after the date of the 
award, and only with the written approval of NTIA.
    Recovery Act. The American Recovery and Reinvestment Act of 2009, 
Public Law 111-5, 123 Stat. 115 (2009).
    Rural Area. Any area, as confirmed by the latest decennial census 
of the Bureau of the Census, which is not located within: (i) A city, 
town, or incorporated area that has a population of greater than 20,000 
inhabitants; or (ii) an urbanized area contiguous and adjacent to a 
city or town that has a population of greater than 50,000 inhabitants. 
For purposes of the definition of rural area, an urbanized area means a 
densely populated territory as defined in the latest decennial census 
of the U.S. Census Bureau.
    Secretary. The Secretary of Commerce.
    Service Area. The entire area within which an existing service 
provider offers broadband service.
    Service Location. The specific geographic point or location at 
which a service provider offers broadband service, such as a specific 
residence or business.
    State. A State, the District of Columbia, or a territory or 
possession of the United States. For the purposes of the designation of 
an eligible entity, the term ``State'' will be interpreted to mean the 
Governor or in the absence of a designation by the Governor, the 
Legislature, officer, or executive agency within the State that the 
Governor or State Constitution authorizes to take binding action for 
the State. In the case State, the District of Columbia, or a territory 
or possession of the United States, the terms Governor, Legislature or 
State Constitution shall mean their respective functional equivalents.
    Substantially Complete Data Set. A data set is substantially 
complete when it contains data on broadband services provided by (a) 70 
percent of broadband service providers in a State; (b) to 80 percent of 
households in a State; (c) to 90 percent of households in rural areas 
of the State; and (d) to 95 percent of public Community Anchor 
Institutions.
    Underserved Area. An area composed of one or more contiguous census 
blocks meeting certain criteria that measure the availability of 
broadband service and the level of advertised broadband speeds.\12\ 
Specifically, an area is underserved if at least one of the following 
factors is met, though the presumption will be that more than one 
factor is present: (i) No more than 50 percent of households in the 
service area have access to facilities-based terrestrial broadband 
service at greater than the minimum broadband transmission speed (set 
forth in the definition of broadband above); (ii) no fixed or mobile 
broadband service provider advertises broadband transmission speeds of 
at least three megabits per second (``mbps'') downstream in the area; 
or (iii) the rate of broadband subscribership for the area is 40 
percent of households or less.\13\ A household has access to broadband 
service if the household can readily subscribe to that service upon 
request.
---------------------------------------------------------------------------

    \12\ Census blocks are the smallest geographic areas for which 
the U.S. Bureau of the Census collects and tabulates decennial 
census data. Census blocks are formed by streets, roads, railroads, 
streams and other bodies of water, other visible physical and 
cultural features, and the legal boundaries shown on Census Bureau 
maps. Census data at this level serve as a valuable source for 
small-area geographic studies. See the Census Bureau's Web site at 
https://www.census.gov for more detailed information on its data 
gathering methodology.
    \13\ These criteria conform to the two distinct components of 
the BIP and BTOP categories of eligible projects--Last Mile and 
Middle Mile.
---------------------------------------------------------------------------

    Unserved Area. An area composed of one or more contiguous census 
blocks where at least 90 percent of households in the service area lack 
access to facilities-based terrestrial broadband service, either fixed 
or mobile, at the minimum broadband transmission speed (set forth in 
the definition of broadband above). A household has access to broadband 
service if the household can readily subscribe to that service upon 
request.

IV. Award Information

    A. Funding Availability and Estimated Funding: The Recovery Act 
authorizes NTIA to expend up to $350 million for the purposes of 
developing and maintaining a broadband inventory map and pursuant to 
the BDIA.\14\ NTIA expects grant awards to range between $1.9 million 
and $3.8 million per State for the mapping portion of each project,

[[Page 32550]]

and up to $500,000 for the planning portion of each project. The exact 
size of any award will depend on the specifics of each project, the 
quality of each project as determined in NTIA's review, as well as 
demographic and geographic features unique to each State. Project 
budgets will be carefully reviewed to ensure that they are appropriate 
given the specifics of the project and the project State. Fiscally 
irresponsible budgets will be detrimental to an application. Any funds 
not expended under this Program will be reallocated to BTOP purposes.
---------------------------------------------------------------------------

    \14\ Recovery Act, Title II, Div. A. 123 Stat. at 128.
---------------------------------------------------------------------------

    Publication of this Notice does not obligate NTIA to award any 
specific project or obligate all or any parts of any available funds.
    B. Award Period: All awards under this Program must be made no 
later than September 30, 2010. The period of performance will be five 
(5) years from the date of award.
    C. Type of Funding Instrument: Grant.

V. Eligibility Information

    A. Eligible Applicants: Pursuant to the BDIA, eligible recipients 
of State Broadband Data Program grants are:
    (a) Entities that are either (i) an agency or instrumentality of a 
State, or a municipality or other subdivision (or agency or 
instrumentality of a municipality or other subdivision) of a State; 
(ii) a nonprofit organization that is described in Section 501(c)(3) of 
the Internal Revenue Code of 1986 and that is exempt from taxation 
under Section 501(a) of such Code; or (iii) an independent agency or 
commission in which an office of a State is a member on behalf of the 
State; and
    (b) The single eligible entity in the State that has been 
designated by the State to receive a grant under this section.\15\
---------------------------------------------------------------------------

    \15\ BDIA Sec.  106(i)(2)(B), 122 Stat. at 4102.
---------------------------------------------------------------------------

    Matching Funds and Cost Sharing Requirements: Awardees under this 
Program will be required to provide and document at least 20 percent 
non-Federal matching funds toward the total eligible project cost.\16\ 
Applicants must document their capacity to provide matching funds. 
Matching funds may be in the form of either cash or in-kind 
contributions consistent with 15 CFR 14.23, 24.3, and 24.24. Certain 
pre-award costs may be credited towards an applicant's matching funds 
requirements. As provided in 48 U.S.C. 1469a, the requirement for local 
matching funds under $200,000 (including in-kind contributions) is 
waived for the Territorial governments in Guam, American Samoa, the 
U.S. Virgin Islands, and the Commonwealth of the Northern Mariana 
Islands. Grant funds under this Program will be released in direct 
proportion to the documented expenditure of matching funds.
---------------------------------------------------------------------------

    \16\ BDIA Sec.  106(c)(2), 122 Stat. at 4099. Generally, Federal 
funds may not be used as matching funds except as provided by 
Federal statute. See ``Uniform Administrative Requirements for 
Grants and Agreements with Institutions of Higher Education, 
Hospitals, Other Non-profit, and Commercial Organizations,'' 15 CFR 
14.23(a)(5); see also ``Uniform Administrative Requirements for 
Grants and Cooperative Agreements to State and Local Governments,'' 
15 CFR 24.24(b)(1).
---------------------------------------------------------------------------

    In-Kind Contributions. In-kind contributions, which include third-
party in-kind contributions, are non-cash donations of property, goods 
or services, which benefit a Federally assisted project, and which may 
count toward satisfying the non-Federal matching requirement when they 
meet certain criteria.\17\ The rules governing allowable in-kind 
contributions are very detailed and encompass a wide range of 
properties and services. NTIA encourages grant applicants to consider 
thoroughly potential sources of in-kind contributions which, depending 
on the particular property or service and the cost principles 
applicable to the applicants' organization type, could include: 
employee or volunteer services; equipment; supplies; indirect 
costs;\18\ computer hardware and software; use of facilities; 
expenditures for existing programs presented as part of the project 
proposal under this Program. In addition, applicants may propose as in-
kind contributions the ascertainable fair market value of data 
previously collected and related to the BDIA-eligible uses under this 
Program. If data previously collected is to be claimed as an in-kind 
contribution, applicants must provide a basis for estimating fair 
market value, including but not limited to the documented costs 
incurred for data collection. NTIA reserves the right at its discretion 
to provide in-kind credit for an amount different than that claimed by 
the applicant.
---------------------------------------------------------------------------

    \17\ 15 CFR 14.23, 24.3, 24.22, 24.24. See also OMB Circular A-
87, ``Cost Principles for State, Local and Indian Tribal 
Governments'' (Rev. May 10, 2004), OMB Circular A-122, Cost 
Principles for Non-Profit Organizations (Rev. May 10, 2004), and 48 
CFR pt. 31, ``Contract Cost Principles and Procedures.''
    \18\ Reasonable indirect costs may be included as part of cost 
sharing or matching only with the prior approval of NTIA. The amount 
of indirect charges allocated to the budget is based on an 
applicant's indirect cost rate. An applicant may already have an 
indirect cost rate negotiated with a Federal agency, in which case, 
that rate may be applied to the applicant's grant if it is current. 
If it is not current, the applicant will need to update it. If an 
applicant does not have a negotiated rate, but would like to include 
indirect costs, the applicant will need to establish a rate with the 
Department of Commerce.
---------------------------------------------------------------------------

    B. Confidentiality Requirements: The BDIA requires that to be 
eligible to receive a grant under this Program, entities must agree to 
treat any matter that is a trade secret, commercial or financial 
information, or privileged or confidential, as a record not subject to 
public disclosure except as otherwise mutually agreed to by the 
broadband service provider and the entity.\19\ As a condition of grant 
funding under this Program, awardees may not agree to a more 
restrictive definition of Confidential Information than the definition 
adopted by this Program.
---------------------------------------------------------------------------

    \19\ BDIA Sec. Sec.  106(c)(3) and 106(h)(2), 122 Stat. at 4101-
2 (This requirement applies only to information submitted by the FCC 
or a broadband provider to carry out the provisions of the BDIA and 
shall not otherwise limit or affect the rules governing public 
disclosure of information collected by any Federal or State entity 
under any other Federal or State law or regulation).
---------------------------------------------------------------------------

    Nondisclosure Agreements. As a measure to protect the confidential 
or proprietary nature of the information received from broadband 
service providers and other organizations during the data collection 
phase, awardees may execute nondisclosure agreements (consistent with 
applicable law) that require the awardees to treat any matter that is a 
trade secret, commercial or financial information, or privileged or 
confidential, as a record not subject to public disclosure except where 
mutually agreed upon by the information provider and the awardee, 
provided, however, that any such nondisclosure restriction (a) will not 
restrict the providing of all data collected under this Program to 
NTIA, nor (b) restrict NTIA's use of such data as contemplated under 
this Notice (including sharing such data with the FCC or other Federal 
agencies).
    To the extent required by law, NTIA agrees that it will not 
publicly disclose any Confidential Information, as defined herein, 
provided to it by an applicant or awardee under this Program. Providing 
Confidential Information to the FCC, or other Federal agencies as 
necessary, shall not constitute public disclosure. In any disclosure to 
the FCC or other Federal agencies, NTIA will request that such agency 
make no further disclosure of the Confidential Information except as 
required by applicable law or judicial or administrative action or 
proceeding.\20\
---------------------------------------------------------------------------

    \20\ The provisions of this section notwithstanding, all 
information submitted by an applicant or awardee to NTIA for the 
purposes of this Program will be subject to Freedom of Information 
Act requirements under 5 U.S.C. 552.
---------------------------------------------------------------------------

    C. Information Provided: In order to be eligible for a grant under 
this Program, each applicant must agree to provide NTIA with broadband 
data, of

[[Page 32551]]

the type and in the format provided in the Technical Appendix, from all 
commercial or public providers of broadband service in their respective 
States, including, but not limited to, commercial or public providers 
of broadband service to Indian tribes (as defined in Section 4 of the 
Indian Self-Determination and Education Assistance Act \21\), Native 
Hawaiian organizations, Community Anchor Institutions or agencies or 
instrumentalities of the States, or municipalities or other 
subdivisions of the States and their respective agencies or 
instrumentalities.
---------------------------------------------------------------------------

    \21\ 25 U.S.C. 450(b).
---------------------------------------------------------------------------

    In no case, however, are applicants required to propose collecting 
data on broadband service provided by the Federal government or any 
agencies or instrumentalities of the Federal government or broadband 
service provided on property owned or leased by the Federal government 
or any agencies, or instrumentalities of the Federal government.
    Failure to agree to collect the required data will render an 
applicant ineligible for funding under this Program.
    D. Participation Limit: This is a new program and no activities 
have been funded under it as of the date of this Notice. BDIA 
stipulates that no State-designated entity may receive a grant under 
this Program to fund activities described above if that entity, or 
another entity designated by that State, obtained prior grant awards 
under this section to fund the same activities in that State in each of 
the previous four (4) consecutive years.\22\ Because the Recovery Act 
requires the obligation of all funds by September 30, 2010, NTIA does 
not anticipate any situations where a violation of this provision could 
occur.
---------------------------------------------------------------------------

    \22\ BDIA Sec.  106(f), 122 Stat. at 4101.
---------------------------------------------------------------------------

    E. Funding Restrictions:
    1. Eligible Costs. Grant funds must be used only to pay for 
eligible costs. Under this Notice, eligible costs are governed by the 
Federal cost principles identified in the applicable OMB circulars and 
in the Program's authorizing legislation.\23\ In addition, costs must 
be reasonable, allocable, necessary to the project, and comply with the 
funding statute requirements. Neither mapping nor planning projects may 
include any construction costs.
---------------------------------------------------------------------------

    \23\ The government has established a set of Federal principles 
for determining eligible or allowable costs. Allowability of costs 
will be determined in accordance with the cost principles applicable 
to the entity incurring the costs. Thus, allowability of costs 
incurred by State, local or Federally-recognized Indian tribal 
governments is determined in accordance with the provisions of OMB 
Circular A-87, ``Cost Principles for State, Local and Indian Tribal 
Governments.'' The allowability of costs incurred by non-profit 
organizations is determined in accordance with the provisions of OMB 
Circular A-122, ``Cost Principles for Non-Profit Organizations.'' 
The allowability of costs incurred by institutions of higher 
education is determined in accordance with the provisions of OMB 
Circular A-21, ``Cost Principles for Educational Institutions.'' The 
allowability of costs incurred by hospitals is determined in 
accordance with the provisions of Appendix E of 45 CFR pt. 74, 
``Principles for Determining Costs Applicable to Research and 
Development under Grants and Contracts with Hospitals.'' The 
allowability of costs incurred by commercial organizations and those 
non-profit organizations listed in Attachment C to Circular A-122 is 
determined in accordance with the provisions of the Federal 
Acquisition Regulation (FAR) at 48 CFR pt. 31. See 15 CFR 14.27, 
24.22 (governing the Department of Commerce's implementation of OMB 
requirements).
---------------------------------------------------------------------------

    2. Recovery Act-Specific Restrictions. The Recovery Act imposes an 
additional limitation on the use of funds expended or obligated from 
appropriations made pursuant to its provisions. Specifically, for 
purposes of this Notice, none of the funds appropriated or otherwise 
made available under the Recovery Act may be used by any State or local 
government, or any private entity, for any casino or other gambling 
establishment, aquarium, zoo, golf course, or swimming pool.\24\
---------------------------------------------------------------------------

    \24\ Recovery Act Sec.  1604, 123 Stat. at 303.
---------------------------------------------------------------------------

VI. Application and Submission Information

    A. Address To Request Application Package: To ensure a successful 
submission, applicants must apply for State Broadband Data Program 
funding through the online Grants.gov system through the Authorized 
Organization Representative (AOR). Grants.gov, an e-Government 
initiative, is a ``storefront'' that provides a unified process for all 
seekers of Federal grants to find funding opportunities and apply for 
funding. If applicants have previously used Grants.gov, the existing 
account may be used for the State Broadband Data Program. States that 
have not previously submitted an application through Grants.gov are 
strongly encouraged to initiate the registration process as soon as 
possible. Instructions are available on the Grants.gov Web site (https://www.grants.gov). Application forms and instructions are also available 
at Grants.gov. To access these materials, go to https://www.grants.gov, 
select ``Apply for Grants,'' and then select ``Download Application 
Package.'' Enter the CFDA and/or the funding opportunity number located 
on the cover of this announcement. Select ``Download Application 
Package,'' and then follow the prompts. To download the instructions, 
go to ``Download Application Package'' and select ``Instructions.'' 
Applicants should visit Grants.gov prior to filing their applications 
so that they fully understand the process and requirements. Failure to 
properly register and apply for State Broadband Data Program funds by 
the deadlines may result in forfeiture of the grant opportunity. 
Applications are accepted until the deadline and processed as received. 
Applications submitted by hand delivery, mail, e-mail or facsimile will 
not be accepted.
    B. Registration:
    1. DUNS Number.--All applicants must supply a Dun and Bradstreet 
Data Universal Numbering System (DUNS) number. Applicants can receive a 
DUNS number at no cost by calling the dedicated toll-free DUNS number 
request line at 1-866-705-5711 or via the Internet at https://www.dunandbradstreet.com.
    2. Central Contractor Registration (CCR). All applicants must 
provide a CCR (CAGE) number evidencing current registration in the 
Central Contractor Registration (CCR) database. If the applicant does 
not have a current CCR (CAGE) number, the applicant must register in 
the CCR system available at: https://www.ccr.gov/StartRegistration.aspx.
    C. Content and Form of Application Submitted Through Grants.gov: 
The following is a list of required application forms:
     Standard Form 424, Program Abstract/Program Narrative;
     Standard Form 424, Application for Federal Assistance;
     Standard Form 424A, Budget Information--Non-Construction 
Programs;
     Standard Form 424B, Assurances--Non-Construction Programs;
     Standard Form LLL, Disclosure of Lobbying Activities;
     CD-511 Certification Regarding Lobbying; and
     Letter of State Designation.
    Program Narrative. The applicant must complete a Program Narrative 
including responses to the five review criteria listed in Section VII 
(A) and listed below.
    The Narrative should begin with an introduction that serves as an 
Executive Summary of the project. It should be a brief, straightforward 
statement of what the application proposes to accomplish.
    The Narrative should also include a description of all unserved and 
underserved areas in their State as defined herein, to the extent they 
are known, and a prioritization for the allocation of grant funds 
within that

[[Page 32552]]

State for projects in or affecting the State.\25\
---------------------------------------------------------------------------

    \25\ Applicants may illustrate such known unserved areas through 
submission of a map.
---------------------------------------------------------------------------

    The Narrative should then address the five review criteria in 
separate sections of the Narrative. Applicants should address the five 
criteria in the following order and each section should be labeled with 
the name of the criterion being discussed to help the reviewers who 
evaluate the application. Any exhibits, maps, timelines, or 
spreadsheets should be placed within the appropriate section of the 
narrative.
    1. Data:
    (a) Data Gathering. Applicants must provide a comprehensive 
description of how the applicant plans to obtain all data required 
under the Technical Appendix from commercial or public providers, as 
applicable (such description should identify general or specific 
methods, or legal authorities upon which applicants will rely to obtain 
the required data). Applicants should refer to specific data elements 
in the Technical Appendix when appropriate as part of their narrative.
    (b) Accuracy and Verification. Applicants must provide a 
description of what methods the applicant intends to employ to verify 
data accuracy.
    (c) Accessibility. Applicants must provide a description of how the 
State's broadband data will be publicly accessible, clearly presented, 
and easily understood by the public, government and the research 
community. Applicants must also describe the applicant's proposed 
State-level map.
    (d) Security and Confidentiality. Applicants must provide a 
description of what methods the applicant intends to employ to ensure 
both transparency of process and protection of collected data, 
including Confidential Information as defined herein.
    2. Project Feasibility:
    (a) Applicant Capabilities. Applicants must provide a detailed 
budget narrative providing detailed description of proposed project 
costs (including a detailed description of any proposed expenditures 
for the purchase of computer hardware, software, other information 
systems or the compensation of information technology personnel that 
will be used to collect and store all required data) and describing any 
proposed sources of in-kind match. The budget narrative must provide 
sufficient explanation of each budget category in order to establish 
the need for the funds in each category, and the basis for figures 
used. The budget narrative must be accompanied by a spreadsheet 
supporting how the budget request was calculated.
    Applicants that include requests for Broadband Planning activities 
within their application must provide a separate budget narrative and 
spreadsheet for the planning portion of their request.
    All applicants must demonstrate that they have the ability to 
secure the funding necessary to meet the required 20 percent non-
Federal matching contribution.
    (b) Applicant Capacity, Knowledge and Experience. Applicants must 
provide a description of applicant qualifications, including knowledge 
and experience of the applicant and the associated project personnel 
with conducting projects of similar scope and scale, including dealing 
with broadband or telecommunications technology, overseeing the 
projects that collect broadband or telecommunications-related data, or 
Geographic Information System (GIS) data.
    3. Expedient Data Delivery:
    Applicants must provide a timeline for major project goals, 
including anticipated dates of data delivery. This timeline should be 
ambitious and designed to facilitate the delivery of all data required 
by the Technical Appendix. NTIA will have a preference for the 
provision of a substantially complete set of availability data by 
November 1, 2009. Applicants that cannot provide a substantially 
complete set of availability data by November 1, 2009, may propose to 
provide an alternative data set by that date. Applicants must 
demonstrate that they have the ability to complete the project 
requirements within the proposed timeline, including the requirements 
to provide a substantially complete set of all broadband mapping data 
on or before February 1, 2010 and to complete such data collection by 
March 1, 2010. All data provided in the first collection should be 
accurate as of June 30, 2009.
    4. Process for Repeated Data Updating:
    Applicants must provide a description of what methods the applicant 
intends to use to provide for repeated updating of data on at least a 
semi-annual basis continuing for at least five (5) years after the date 
of the initial collection.\26\
---------------------------------------------------------------------------

    \26\ Broadband mapping data should be updated at least on March 
1 of each year (by submitting data as of December 31 of the previous 
year) and at least September 1 of each year (by submitting data as 
of June 30 of that year). Because the initial data collection is due 
on February 1, 2010, the next update will be due on September 1, 
2010 but should include data accurate as of both December 31, 2009 
and June 30, 2010, after which, the collections will follow the 
specified schedule. For the purposes of this program, an update will 
be deemed to be a verification of existing data and a collection of 
any additional data reflecting the expansion or contraction of 
broadband availability since the previous data collection or update.
---------------------------------------------------------------------------

    5. Planning and Collaboration:
    Applicants must provide a description of how the applicant intends 
to collaborate with State-level agencies and local authorities in 
carrying out the mapping effort. Applicants that include a planning 
component must provide a description and justification on how well the 
proposed planning process will address one or more of the projects 
identified earlier in the BDIA.
    The narrative should be no longer than forty (40) pages in length, 
single spaced in 12 point Times New Roman font (or equivalent).
    Letter of State Designation. This letter, signed by the Governor or 
equivalent chief executive of the State, or his duly authorized 
designee, affirms that the applicant is the single eligible entity in 
the State that has been designated by the State to receive a grant 
under this Program.
    D. Submission Dates and Times: All applications must be submitted 
between July 14, 2009 at 8 a.m. ET and 11:59 p.m. ET on August 14, 
2009. The electronic application system at Grants.gov will provide a 
date and time stamped confirmation number that will serve as proof of 
submission.
    E. Material Representations: The application, including 
certifications, and all forms submitted as part of the application will 
be treated as a material representation of fact upon which NTIA will 
rely in awarding grants.
    F. Material Revisions: No material revision will be permitted for 
any applicant after the submission deadline.

VII. Application Review Information

    A. Evaluation Criteria: NTIA will evaluate applications for Mapping 
Grants on the basis of the following criteria. The relative weight of 
each criterion is identified in parenthesis.
    1. Data (30%)--All applicants will be evaluated based on the data 
they propose to provide to NTIA. As provided above in the section 
entitled ``Eligibility Information'', each applicant must agree to 
provide NTIA with broadband data, of the type and in the format 
provided in the Technical Appendix, from all commercial or public 
providers of broadband service in their respective States, including, 
but not limited to, commercial or public providers of broadband service 
to Indian tribes (as defined in Section 4 of the Indian Self-
Determination and

[[Page 32553]]

Education Assistance Act), Native Hawaiian organizations, Community 
Anchor Institutions or agencies or instrumentalities of the States, or 
municipalities or other subdivisions of the States and their respective 
agencies or instrumentalities. Failure to agree to collect such data 
will render an applicant ineligible for funding under this Program. In 
no case, however, are applicants required to propose collecting data on 
broadband service provided by the Federal government or any agencies or 
instrumentalities of the Federal government or broadband service 
provided on property owned or leased by the Federal government or any 
agencies, or instrumentalities of the Federal government.
    Reviewers will consider the following factors in scoring this 
criterion:
    (a) Accuracy and Verification. Data accuracy is extremely important 
and, while NTIA recognizes that 100 percent accuracy is not possible, 
reviewers will carefully consider an applicant's proposed methods for 
verifying data.\27\ Also, proposed data collection methods that do not 
provide more than one way to determine the accuracy of availability 
data at any given location will not receive high scores.
---------------------------------------------------------------------------

    \27\ \\ For example, a project should propose to collect 
availability data by address, as required by the Technical Appendix, 
and should cross-check that data for accuracy by using at least one 
other metric (e.g., the location and capability of local 
infrastructure and whether such infrastructure could realistically 
serve a supposed service address, on-the-ground verification or 
telephone survey. Each method should be used to check a 
statistically significant sample of all addresses, and a 
statistically significant sample of rural addresses).
---------------------------------------------------------------------------

    (b) Accessibility. Applicants will be evaluated based on how the 
data are accessible to, clearly presented to, and easily understood by 
the public, including members of the research community, and local and 
State government, excluding any data considered to be Confidential 
Information, as defined in this Notice.
    (c) Security and Confidentiality. Some data collected under the 
Program may be considered highly sensitive or confidential. Therefore, 
applicants must demonstrate and will be evaluated based on how well the 
applicant proposes to protect collected data, including Confidential 
Information as defined herein, while fulfilling the other criteria 
provided in this section.
    2. Project Feasibility (30%)--
    (a) Budget. This criterion evaluates whether the applicant presents 
a budget that is both reasonable and cost efficient, considering the 
full nature and scope of the project. Reviewers will also consider 
whether the applicant has demonstrated ability to secure the funding 
necessary to meet the required 20 percent non-Federal matching 
contribution.
    (b) Applicant Capacity, Knowledge, and Experience. Reviewers also 
will assess whether the applicant possesses the necessary 
qualifications to complete the proposed project within Program 
standards. In performing this assessment reviewers will consider the 
capacity and relevant subject matter specific knowledge and experience 
of the applicant and the associated project personnel with conducting 
projects of similar scope and scale. Reviewers will assess the 
qualifications and past experience of the project leaders and/or 
partners in dealing with broadband or telecommunications technology and 
in designing, implementing, and effectively managing and overseeing the 
projects that collect broadband or telecommunications-related data, and 
utilize and manage Geographic Information System (GIS) data.
    3. Expedient Data Delivery (20%)--Applicants will be reviewed based 
on the timeline on which they project delivery of the initial 
submission of a substantially complete set of broadband mapping data. 
This timeline should be ambitious and designed to facilitate the 
delivery of all data required by the Technical Appendix. NTIA will have 
a preference for the provision of a substantially complete set of 
availability data by November 1, 2009. Applicants that cannot provide a 
substantially complete set of availability data by November 1, 2009, 
may propose
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.