Download as PDF Federal Register / Vol. 74, No. 122 / Friday, June 26, 2009 / Notices II. What Action Is the Agency Taking? Under GSA Contract Number GS00T99ALD0204, Task Order Number T0002AJMZ39, contractor CSC of 15000 Conference Center Dr., Chantilly, VA, and its subcontractor General Dynamics Systems Development and Integration Services, Inc., previously named Veridian Information Solutions, of 10560 Arrowhead Drive, Fairfax, VA will assist the Office of Pollution Prevention and Toxics (OPPT) in computer operations and maintenance of TSCA CBI Computer Systems and Communications Network, linking CBI sites located in Washington, DC. CSC and its subcontractor will also assist in maintaining and operating the EPA CBI computer facilities located in Research Triangle Park, NC. In accordance with 40 CFR 2.306(j), EPA has determined that under GSA Contract Number GS00T99ALD0204, Task Order Number T0002AJMZ39, CSC and its subcontractor will require access to CBI submitted to EPA under all sections of TSCA to perform successfully the duties specified under the contract. CSC and its subcontractor personnel will be given access to information submitted to EPA under all sections of TSCA. Some of the information may be claimed or determined to be CBI. EPA is issuing this notice to inform all submitters of information under all sections of TSCA that EPA may provide CSC and its subcontractor access to these CBI materials on a need-to-know basis only. All access to TSCA CBI under this contract will take place at EPA Headquarters and the Research Triangle Park, NC facilities under the EPA TSCA CBI Protection Manual. CSC and its subcontractor will be authorized access to TSCA CBI at EPA Headquarters and the Research Triangle Park, NC facilities under the EPA TSCA CBI Protection Manual. Access to TSCA data, including CBI, will continue until September 30, 2009. If the contract is extended, this access will also continue for the duration of the extended contract without further notice. CSC and its subcontractor personnel will be required to sign nondisclosure agreements and will be briefed on appropriate security procedures before they are permitted access to TSCA CBI. List of Subjects Environmental protection, Confidential business information. VerDate Nov<24>2008 16:39 Jun 25, 2009 Jkt 217001 Dated: June 22, 2009. Matthew Leopard, Acting Director, Information Management Division, Office of Pollution Prevention and Toxics. [FR Doc. E9–15142 Filed 6–25–09; 8:45 am] BILLING CODE 6560–50–S ENVIRONMENTAL PROTECTION AGENCY [ER–FRL–8594–8] Environmental Impact Statements and Regulations; Availability of EPA Comments Availability of EPA comments prepared pursuant to the Environmental Review Process (ERP), under section 309 of the Clean Air Act and Section 102(2)(c) of the National Environmental Policy Act as amended. Requests for copies of EPA comments can be directed to the Office of Federal Activities at 202–564–7146. An explanation of the ratings assigned to draft environmental impact statements (EISs) was published in FR dated April 17, 2009 (74 FR 17860). Draft EISs EIS No. 20090066, ERP No. D–AFS– L65569–OR, Tracy Placer Mining Project, Proposing Mine Development on a Portion of the Unpatented Cedar Gulch Group Placer Claim, Plan-ofOperations, Wild Rivers Ranger District, Rogue River-Siskiyou National Forest, Josephine County, OR. Summary: EPA expressed environmental objections to Alternative 2 based on the likelihood of mining and timber harvest activities to increase temperatures in Sucker Creek, and impact Cedar Gulch and the un-named creek in the project area. In addition, we have concerns about potential impacts to listed species; coho salmon and northern spotted owl, and reclamation and long term site recovery. Rating EO2. EIS No. 20090071, ERP No. D–FHW– F40447–OH, Cleveland Innerbelt Project, Proposing Major Rehabilitation and Reconstruction between I–71 and I–90, Cleveland Central Business District, Funding, City of Cleveland, Cuyahoga County, OH. Summary: EPA expressed environmental concerns about stormwater impacts. Rating EC2. EIS No. 20090087, ERP No. D–FRA– K59009–00, DesertXpress High-Speed Passenger Train Project, Proposes to Construct and Operate High-Speed PO 00000 Frm 00070 Fmt 4703 Sfmt 4703 30569 Passenger Train between Victorville, California and Las Vegas, Nevada. Summary: EPA expressed environmental concerns about impacts to hydrology, aquatic resources, air quality, and wildlife movement. Rating EC2. EIS No. 20090137, ERP No. D–AFS– K65362–CA, Sierra National Forest Travel Management Plan, To Prohibit Motorized Vehicle Travel Off Designated National Forest Transportation System (NFIS) Roads, Trails and Area, Fresno, Mariposa, Madera Counties, CA. Summary: EPA expressed environmental concerns about impacts to watersheds with significant water quality impairment. Rating EC2. Final EISs EIS No. 20090128, ERP No. F–AFS– K65347–CA, Gemmill Thin Project, Proposal to Reduce the Intensity and Size of Future Wildfires, and to Maintain/Improve Ecosystem Function and Wildlife Habitat, Chanchellula Late-Successional Reserve, Shasta-Trinity National Forest, Trinity County, CA. Summary: EPA continues to have environmental concerns about the criteria and decision-making process that will be use in this thinning project. EIS No. 20090138, ERP No. FA–COE– K36098–CA, Santa Ana River Interceptor (SARI) Protection/ Relocation Project, Reduce the Risk of Damage to the SARI to allow for the Operation of Santa Ana River Project (SARP), and Releases from Prado Dam of up to 30,000 cubic feet per second (cfs), Right-of-Way Permit and US COE Section 404 Permit, Orange and Riverside Counties, CA. Summary: EPA’s previous concerns have been resolved; therefore, EPA does not object to the proposed action. Dated: June 23, 2009. Robert W. Hargrove, Director, NEPA Compliance Division, Office of Federal Activities. [FR Doc. E9–15140 Filed 6–25–09; 8:45 am] BILLING CODE 6560–50–P ENVIRONMENTAL PROTECTION AGENCY [ER–FRL–8594–7] Environmental Impact Statements; Notice of Availability Responsible Agency: Office of Federal Activities, General Information (202) 564–1399 or https://www.epa.gov/ compliance/nepa/ E:\FR\FM\26JNN1.SGM 26JNN1 30570 Federal Register / Vol. 74, No. 122 / Friday, June 26, 2009 / Notices Weekly receipt of Environmental Impact Statements filed 06/15/2009 through 06/19/2009 pursuant to 40 CFR 1506.9. EIS No. 20090196, Draft EIS, SFW, MT, Montana Department of Natural and Resources and Conservation Plan (HCP), Forested State Trust Lands, Designed to Minimize and Mitigate Any Such Take of Endangered or Threatened Species, Application for an Incidental Take Permit, MT, Comment Period Ends: 09/23/2009, Contact: Amelia Orton-Palmer 303– 236–4211. EIS No. 20090197, Final EIS, WAP, MN, Big Stone II Power Plant and Transmission Project, Addresses the Impacts of Changes to the Proposed Action Relative to Cooling Alternatives and the Use of Groundwater as Backup Water Source, US Army COE Section 10 and 404 Permits, Grant County, SD and Big Stone County, MN, Wait Period Ends: 07/27/2009, Contact: Matt Blevins 720–962–7261. EIS No. 20090198, Draft EIS, AFS, CA, Shasta-Trinity National Forest Motorized Travel Management Project, Proposal to Prohibit CrossCounty Motor Vehicle Travel off Designated National Forest Transportation System (NFTS) Roads, Motorized Trails and Areas by the Public Except as Allowed by Permit or Other Authorization (excluding snowmobile use), CA, Comment Period Ends: 08/10/2009, Contact: Robert Remillard 530–226–2421. EIS No. 20090199, Draft EIS, AFS, OR, Westside Rangeland Analysis Project, Proposal to Allocate Forage for Commercial Livestock Grazing on Six Alternatives, Mud and Tope Creeks, Wallowa Valley Ranger District, Wallowa-Whitman National Forest, Wallowa County, OR, Comment Period Ends: 08/10/2009, Contact: Alicia Glassford 541–426–5689. EIS No. 20090200, Draft EIS, AFS, MI, Niagara Project, To Address SiteSpecific Vegetation and Transportation System Needs in the Project Areas, Hiawatha National Forest, St. Ignace and Sault Ste. Marie Ranger Districts, Mackinac and Chippewa Counties, MI, Comment Period Ends: 08/10/2009, Contact: Martha Sjogren 906–643–7900 Ext. 117. EIS No. 20090201, Final Supplement, AFS, CA, Brown Project, Revised Proposal To Improve Forest Health by Reducing Overcrowded Forest Stand Conditions, Trinity River Management Unit, Shasta-Trinity National Forest, Weaverville Ranger VerDate Nov<24>2008 16:39 Jun 25, 2009 Jkt 217001 District, Trinity County, CA, Wait Period Ends: 07/27/2009, Contact: Robert Remillard 530–226–2421. EIS No. 20090202, Final EIS, AFS, MT, Ashland Ranger District Travel Management Project, Proposing to Designate Routes for Public Motorized Use, Ashland Ranger District, Custer National Forest, Rosebud and Power River Counties, MT, Wait Period Ends: 07/27/2009, Contact: Doug Epperly 406–657–6202 Ext. 225. EIS No. 20090203, Final EIS, NOA, 00, Snapper Grouper Amendment 15B, Fishery Management Plan, Updated Information on the Economic Analysis for the Bag Limit Sales Provision, Update Management Reference Point for Golden Tilefish (Lopholatilus chamaeleonticeps); Define Allocations for Snowy Grouper (Epinephelus niveatus) and Red Porgy (Pagrus pagrus), NC, SC, FL and GA, Wait Period Ends: 07/27/2009, Contact: Dr. Roy E. Crabtree 727–824– 5305. EIS No. 20090204, Final EIS, AFS, 00, Sioux Ranger District Travel Management Project, To Designate the Road and Trail and Areas Suitable for Public Motorized Travel, Sioux Ranger District, Custer National Forest, Carter County of MT and Harding County of South Dakota, Wait Period Ends: 07/27/2009, Contact: Doug Epperly 406–657–6205 Ext 225. EIS No. 20090205, Draft Supplement, AFS, OR, Invasive Plant Treatments Within the Deschutes and Ochoco National Forests and the Crooked River National Grassland, Updated Information on Three New Alternatives, Proposal for Treatment of Invasive Plant Infestation and Protection of Uninfested Areas, Implementation, Several Cos., OR, Comment Period Ends: 08/10/2009, Contact: Beth Peer 541–383–4769. EIS No. 20090206, Final EIS, NOA, 00, PROGRAMMATIC EIS—Fishery Management Plan for Regulating Offshore Marine Aquaculture in the Gulf of Mexico, To Increase the Maximum Sustainable Yield (MSY) and Optimun Yield (OY), Implementation, Wait Period Ends: 07/27/2009, Contact: Dr. Roy E. Crabtree 727–551–5755. EIS No. 20090207, Final EIS, FHW, UT, SR–262; Montezuma Creek to Aneth Project, Improvements to the Intersection of SR–162, SR–262, and County Road (CR) 450 in Montezuma Cree, Funding, Navajo Nation, San Juan County, UT, Wait Period Ends: 07/27/2009, Contact: Ed Woolford 801–963–0182. EIS No. 20090208, Draft EIS, FHW, IL, Illinois 336 Corridor Project, (Federal PO 00000 Frm 00071 Fmt 4703 Sfmt 4703 Aid Primary Route 315), Proposed Macomb Bypass in McDonough County, to I–474 west of Peoria in Peoria County, Funding, McDonough, Fulton and Peoria Counties, IL, Comment Period Ends: 08/24/2009, Contact: Norman Stoner, P.E. 217– 492–4600. EIS No. 20090209, Draft EIS, BLM, WY, Wright Area Coal Lease Project, Applications for Leasing Six Tracts of Federal Coal Reserves Adjacent to the Black Thunder, Jacob Ranch, and North Antelope Rochelle Mines, Wyoming Powder River Basin, Campbell County, WY, Comment Period Ends: 08/24/2009, Contact: Sarah Bucklin 307–261–7541. EIS No. 20090210, Draft EIS, FRC, 00, Ruby Pipeline Project, Proposed Natural Gas Pipeline Facilities, Rightof-Way Grants (and/or Temporary Use or Special Use Permits), WY, UT, NV and OR, Comment Period Ends: 08/ 10/2009, Contact: Patricia Schaub 1– 866–208–3372. EIS No. 20090211, Draft Supplement, AFS, CO, Vail Ski Area’s 2007 Improvement Project, Proposed OnMountain Restaurant from the top of Vail Mountain to Mid Vail, SpecialUse-Permit, Eagle/Holy Cross Ranger District, White River National Forest, Eagle County, CO, Comment Period Ends: 08/10/2009, Contact: Don Dressler 970–827–5157. EIS No. 20090212, Final EIS, FTA, MN, Central Corridor Project, Selected the Preferred Alternative, 11 miles Light Rail Transit between downtown Minneapolis and downtown St. Paul, Minnesota, Twin Cities Metropolitan Area, MN, Wait Period Ends: 07/27/ 2009, Contact: William Wheeler 312– 353–2639. EIS No. 20090213, Final EIS, USN, 00, Undersea Warfare Training Range Project, Installation and Operation, Preferred Site Jacksonville Operating Area, FL and Alternative Sites (within the Charleston, SC; Cherry Point, NC; and VACAPES Operating Areas, VA, Wait Period Ends: 07/27/2009, Contact: Lesley Leonard 757–322– 4645. EIS No. 20090214, Final EIS, CGD, 00, PROGRAMMATIC—Vessel and Facility Response Plans for Oil: 2003 Removal Equipment Requirements and Alternative Technology Revisions, To Increase the Oil Removal Capability, U.S. Exclusive Economic Zone (EEZ), United States, Alaska, Guam, Puerto Rico and other U.S. Territories, Wait Period Ends: 07/ 27/2009, Contact: Greg Kirkbride 202– 372–1479. E:\FR\FM\26JNN1.SGM 26JNN1 Federal Register / Vol. 74, No. 122 / Friday, June 26, 2009 / Notices Dated: June 23, 2009. Robert W. Hargrove, Director, NEPA Compliance Division, Office of Federal Activities. [FR Doc. E9–15141 Filed 6–25–09; 8:45 am] BILLING CODE 6560–50–P FEDERAL COMMUNICATIONS COMMISSION Notice of Public Information Collection(s) Being Reviewed by the Federal Communications Commission for Extension Under Delegated Authority, Comments Requested June 17, 2009. SUMMARY: The Federal Communications Commission, as part of its continuing effort to reduce paperwork burden invites the general public and other Federal agencies to take this opportunity to comment on the following information collection(s), as required by the Paperwork Reduction Act of 1995, 44 U.S.C. 3501–3520. An agency may not conduct or sponsor a collection of information unless it displays a currently valid control number. No person shall be subject to any penalty for failing to comply with a collection of information subject to the Paperwork Reduction Act (PRA) that does not display a valid control number. Comments are requested concerning (a) Whether the proposed collection of information is necessary for the proper performance of the functions of the Commission, including whether the information shall have practical utility; (b) the accuracy of the Commission’s burden estimate; (c) ways to enhance the quality, utility, and clarity of the information collected; and (d) ways to minimize the burden of the collection of information on the respondents, including the use of automated collection techniques or other forms of information technology. DATES: Persons wishing to comment on this information collection should submit comments August 25, 2009. If you anticipate that you will be submitting comments, but find it difficult to do so within the period of time allowed by this notice, you should advise the contact listed below as soon as possible. ADDRESSES: Direct all PRA comments to Nicholas A. Fraser, Office of Management and Budget (OMB), via fax at 202–395–5167, or via the Internet at Nicholas_A._Fraser@omb.eop.gov and to Judith-B.Herman@fcc.gov, Federal Communications Commission (FCC). To submit your comments by e-mail send them to: PRA@fcc.gov. To view a copy VerDate Nov<24>2008 16:39 Jun 25, 2009 Jkt 217001 of this information collection request (ICR) submitted to OMB: (1) Go to the Web page https://www.reginfo.gov/ public/do/PRAMain, (2) look for the section of the Web page called ‘‘Currently Under Review’’, (3) click the downward-pointing arrow in the ‘‘Select Agency’’ box below the ‘‘Currently Under Review’’ heading, (4) select ‘‘Federal Communications Commission’’ from the list of agencies presented in the ‘‘Select Agency’’ box, (5) click the ‘‘Submit’’ button to the right of the ‘‘Select Agency’’ box and (6) when the list of FCC ICRs currently under review appears, look for the title of this ICR (or its OMB Control Number, if there is one) and then click on the ICR Reference Number to view detailed information about this ICR. FOR FURTHER INFORMATION CONTACT: For additional information, send an e-mail to Judith B. Herman at JudithB.Herman@fcc.gov or call 202–418– 0214. SUPPLEMENTARY INFORMATION: OMB Control Number: 3060–0790. Title: Section 68.110(c), Availability of Inside Wiring Information. Form No.: N/A. Type of Review: Extension of a currently approved collection. Respondents: Business or other forprofit. Number of Respondents: 1,200 respondents; 1,200 responses. Estimated Time per Response: 1 hour. Frequency of Response: Recordkeeping requirement and third party disclosure requirement. Obligation to Respond: Mandatory. Statutory authority for this information collection is contained in 47 U.S.C. Sections 151, 154, 201–205, 218, 220 and 405 and 5 U.S.C. Sections 552 and 553. Total Annual Burden: 1,200 hours. Total Annual Cost: $5,000. Privacy Act Impact Assessment: N/A. Nature and Extent of Confidentiality: The Commission is not requesting that the respondents submit confidential information to the FCC. Needs and Uses: The Commission will submit this information collection to the Office of Management and Budget (OMB) after this 60-day comment period in order to obtain the full three-year clearance from them. The Commission is requesting an extension (no change in the recordkeeping and/or third party disclosure requirements) of this information collection. There is no change to the estimated number of respondents/responses, annual burden hours, and/or annual costs. Section 68.110(c) requires that any available technical information PO 00000 Frm 00072 Fmt 4703 Sfmt 4703 30571 concerning carrier-installed wiring on the customer’s side of the demarcation point, including copies of existing schematic diagrams and service records, shall be provided by the telephone company upon request of the building owner or agent thereof. The telephone company may charge the building owner a reasonable fee for this service, which shall not exceed the cost involved in locating and copying the documents. In the alternative, the telephone company may make these documents available for review and copying by the building owner. In this case, the telephone company may charge a reasonable fee, which shall not exceed the cost involved in making the documents available, and may also require the building owner to pay a deposit to guarantee the document’s return. Section 68.110(c) requires the disclosure of any available technical information concerning carrier-installed inside wiring, including existing schematic diagrams and service records, for duplication by building owners or their agents for a reasonable fee to be determined by the carrier. The information is needed so that building owners may choose to contract with an installer of their choice or inside wiring maintenance and installation service, or elect to contract with the telephone company to modify existing wiring or assist with the installation of additional inside wiring. OMB Control Number: 3060–0791. Title: Section 32.7300, Accounting for Judgments and other Costs Associated with Litigation. Form No.: N/A. Type of Review: Extension of a currently approved collection. Respondents: Business or other forprofit. Number of Respondents: 2 respondents; 2 responses. Estimated Time per Response: 4–36 hours. Frequency of Response: On occasion reporting requirement and recordkeeping requirement. Obligation to Respond: Required to obtain or retain benefits. Statutory authority for this information collection is contained in 47 U.S.C. Sections 151, 152, 154, 161, 201–205, and 218–220. Total Annual Burden: 1,200 hours. Total Annual Cost: N/A. Privacy Act Impact Assessment: N/A. Nature and Extent of Confidentiality: The Commission is not requesting that the respondents submit confidential information to the FCC. Needs and Uses: The Commission will submit this information collection to the Office of Management and Budget (OMB) after this 60-day comment period E:\FR\FM\26JNN1.SGM 26JNN1

Agencies

[Federal Register Volume 74, Number 122 (Friday, June 26, 2009)]
[Notices]
[Pages 30569-30571]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E9-15141]


-----------------------------------------------------------------------

ENVIRONMENTAL PROTECTION AGENCY

[ER-FRL-8594-7]


Environmental Impact Statements; Notice of Availability

    Responsible Agency: Office of Federal Activities, General 
Information (202) 564-1399 or https://www.epa.gov/compliance/nepa/


[[Page 30570]]


Weekly receipt of Environmental Impact Statements filed 06/15/2009 
through 06/19/2009 pursuant to 40 CFR 1506.9.

EIS No. 20090196, Draft EIS, SFW, MT, Montana Department of Natural and 
Resources and Conservation Plan (HCP), Forested State Trust Lands, 
Designed to Minimize and Mitigate Any Such Take of Endangered or 
Threatened Species, Application for an Incidental Take Permit, MT, 
Comment Period Ends: 09/23/2009, Contact: Amelia Orton-Palmer 303-236-
4211.
EIS No. 20090197, Final EIS, WAP, MN, Big Stone II Power Plant and 
Transmission Project, Addresses the Impacts of Changes to the Proposed 
Action Relative to Cooling Alternatives and the Use of Groundwater as 
Backup Water Source, US Army COE Section 10 and 404 Permits, Grant 
County, SD and Big Stone County, MN, Wait Period Ends: 07/27/2009, 
Contact: Matt Blevins 720-962-7261.
EIS No. 20090198, Draft EIS, AFS, CA, Shasta-Trinity National Forest 
Motorized Travel Management Project, Proposal to Prohibit Cross-County 
Motor Vehicle Travel off Designated National Forest Transportation 
System (NFTS) Roads, Motorized Trails and Areas by the Public Except as 
Allowed by Permit or Other Authorization (excluding snowmobile use), 
CA, Comment Period Ends: 08/10/2009, Contact: Robert Remillard 530-226-
2421.
EIS No. 20090199, Draft EIS, AFS, OR, Westside Rangeland Analysis 
Project, Proposal to Allocate Forage for Commercial Livestock Grazing 
on Six Alternatives, Mud and Tope Creeks, Wallowa Valley Ranger 
District, Wallowa-Whitman National Forest, Wallowa County, OR, Comment 
Period Ends: 08/10/2009, Contact: Alicia Glassford 541-426-5689.
EIS No. 20090200, Draft EIS, AFS, MI, Niagara Project, To Address Site-
Specific Vegetation and Transportation System Needs in the Project 
Areas, Hiawatha National Forest, St. Ignace and Sault Ste. Marie Ranger 
Districts, Mackinac and Chippewa Counties, MI, Comment Period Ends: 08/
10/2009, Contact: Martha Sjogren 906-643-7900 Ext. 117.
EIS No. 20090201, Final Supplement, AFS, CA, Brown Project, Revised 
Proposal To Improve Forest Health by Reducing Overcrowded Forest Stand 
Conditions, Trinity River Management Unit, Shasta-Trinity National 
Forest, Weaverville Ranger District, Trinity County, CA, Wait Period 
Ends: 07/27/2009, Contact: Robert Remillard 530-226-2421.
EIS No. 20090202, Final EIS, AFS, MT, Ashland Ranger District Travel 
Management Project, Proposing to Designate Routes for Public Motorized 
Use, Ashland Ranger District, Custer National Forest, Rosebud and Power 
River Counties, MT, Wait Period Ends: 07/27/2009, Contact: Doug Epperly 
406-657-6202 Ext. 225.
EIS No. 20090203, Final EIS, NOA, 00, Snapper Grouper Amendment 15B, 
Fishery Management Plan, Updated Information on the Economic Analysis 
for the Bag Limit Sales Provision, Update Management Reference Point 
for Golden Tilefish (Lopholatilus chamaeleonticeps); Define Allocations 
for Snowy Grouper (Epinephelus niveatus) and Red Porgy (Pagrus pagrus), 
NC, SC, FL and GA, Wait Period Ends: 07/27/2009, Contact: Dr. Roy E. 
Crabtree 727-824-5305.
EIS No. 20090204, Final EIS, AFS, 00, Sioux Ranger District Travel 
Management Project, To Designate the Road and Trail and Areas Suitable 
for Public Motorized Travel, Sioux Ranger District, Custer National 
Forest, Carter County of MT and Harding County of South Dakota, Wait 
Period Ends: 07/27/2009, Contact: Doug Epperly 406-657-6205 Ext 225.
EIS No. 20090205, Draft Supplement, AFS, OR, Invasive Plant Treatments 
Within the Deschutes and Ochoco National Forests and the Crooked River 
National Grassland, Updated Information on Three New Alternatives, 
Proposal for Treatment of Invasive Plant Infestation and Protection of 
Uninfested Areas, Implementation, Several Cos., OR, Comment Period 
Ends: 08/10/2009, Contact: Beth Peer 541-383-4769.
EIS No. 20090206, Final EIS, NOA, 00, PROGRAMMATIC EIS--Fishery 
Management Plan for Regulating Offshore Marine Aquaculture in the Gulf 
of Mexico, To Increase the Maximum Sustainable Yield (MSY) and Optimun 
Yield (OY), Implementation, Wait Period Ends: 07/27/2009, Contact: Dr. 
Roy E. Crabtree 727-551-5755.
EIS No. 20090207, Final EIS, FHW, UT, SR-262; Montezuma Creek to Aneth 
Project, Improvements to the Intersection of SR-162, SR-262, and County 
Road (CR) 450 in Montezuma Cree, Funding, Navajo Nation, San Juan 
County, UT, Wait Period Ends: 07/27/2009, Contact: Ed Woolford 801-963-
0182.
EIS No. 20090208, Draft EIS, FHW, IL, Illinois 336 Corridor Project, 
(Federal Aid Primary Route 315), Proposed Macomb Bypass in McDonough 
County, to I-474 west of Peoria in Peoria County, Funding, McDonough, 
Fulton and Peoria Counties, IL, Comment Period Ends: 08/24/2009, 
Contact: Norman Stoner, P.E. 217-492-4600.
EIS No. 20090209, Draft EIS, BLM, WY, Wright Area Coal Lease Project, 
Applications for Leasing Six Tracts of Federal Coal Reserves Adjacent 
to the Black Thunder, Jacob Ranch, and North Antelope Rochelle Mines, 
Wyoming Powder River Basin, Campbell County, WY, Comment Period Ends: 
08/24/2009, Contact: Sarah Bucklin 307-261-7541.
EIS No. 20090210, Draft EIS, FRC, 00, Ruby Pipeline Project, Proposed 
Natural Gas Pipeline Facilities, Right-of-Way Grants (and/or Temporary 
Use or Special Use Permits), WY, UT, NV and OR, Comment Period Ends: 
08/10/2009, Contact: Patricia Schaub 1-866-208-3372.
EIS No. 20090211, Draft Supplement, AFS, CO, Vail Ski Area's 2007 
Improvement Project, Proposed On-Mountain Restaurant from the top of 
Vail Mountain to Mid Vail, Special-Use-Permit, Eagle/Holy Cross Ranger 
District, White River National Forest, Eagle County, CO, Comment Period 
Ends: 08/10/2009, Contact: Don Dressler 970-827-5157.
EIS No. 20090212, Final EIS, FTA, MN, Central Corridor Project, 
Selected the Preferred Alternative, 11 miles Light Rail Transit between 
downtown Minneapolis and downtown St. Paul, Minnesota, Twin Cities 
Metropolitan Area, MN, Wait Period Ends: 07/27/2009, Contact: William 
Wheeler 312-353-2639.
EIS No. 20090213, Final EIS, USN, 00, Undersea Warfare Training Range 
Project, Installation and Operation, Preferred Site Jacksonville 
Operating Area, FL and Alternative Sites (within the Charleston, SC; 
Cherry Point, NC; and VACAPES Operating Areas, VA, Wait Period Ends: 
07/27/2009, Contact: Lesley Leonard 757-322-4645.
EIS No. 20090214, Final EIS, CGD, 00, PROGRAMMATIC--Vessel and Facility 
Response Plans for Oil: 2003 Removal Equipment Requirements and 
Alternative Technology Revisions, To Increase the Oil Removal 
Capability, U.S. Exclusive Economic Zone (EEZ), United States, Alaska, 
Guam, Puerto Rico and other U.S. Territories, Wait Period Ends: 07/27/
2009, Contact: Greg Kirkbride 202-372-1479.


[[Page 30571]]


    Dated: June 23, 2009.
Robert W. Hargrove,
Director, NEPA Compliance Division, Office of Federal Activities.
[FR Doc. E9-15141 Filed 6-25-09; 8:45 am]