Environmental Impacts Statements; Notice of Availability, 29208 [E9-14462]
Download as PDF
29208
Federal Register / Vol. 74, No. 117 / Friday, June 19, 2009 / Notices
ENVIRONMENTAL PROTECTION
AGENCY
[ER–FRL–8594–5]
mstockstill on PROD1PC66 with NOTICES
Environmental Impacts Statements;
Notice of Availability
Responsible Agency: Office of Federal
Activities, General Information (202)
564–1399 or https://www.epa.gov/
compliance/nepa/.
Weekly receipt of Environmental Impact
Statements
Filed 06/08/2009 Through 06/12/2009.
Pursuant to 40 CFR 1506.9.
EIS No. 20090188, Draft EIS, AFS, AZ,
Pinaleno Ecosystem Restoration
Project, Proposed On-the-Ground
Treatments to Improve Forest Health
and Improve or Protect Red Squirrel
Habitat, Coronado National Forest,
Graham County, AZ, Comment Period
Ends: 08/04/2009, Contact: Craig
Wilcox, 928–348–1961.
EIS No. 20090189, Draft EIS, AFS, CA,
Beaverslide Timber Sale and Fuel
Treatment Project, Proposing to
Harvest Commercial Timber and Treat
Hazardous Fuels, Six Rivers National
Forest, Mad River Ranger District,
Trinity County, CA, Comment Period
Ends: 08/04/2009, Contact: Keith A.
Menasco, 928–774–6594.
EIS No. 20090190, Draft EIS, AFS, OR,
Wallowa-Whitman National Forest
Travel Management Plan, Designate
Roads Trails and Areas for Motor
Vehicle User, Baker, Grant, Umatilla,
Union and Wallowa Counties, OR,
Comment Period Ends: 08/17/2009,
Contact: Cindy Whitlock, 541–962–
8501.
EIS No. 20090191, Final EIS, NOA, 00,
Amendment 1 to the Consolidated
Highly Migratory Species (HMS)
Fishery Management Plan, (FMP),
Updating and Revising Essential Fish
Habitat (EFH) for Atlantic Highly
Migratory Species (HMS) consider
additional Habitat Area of Particular
Concern (HAPC) and Analyze Fishing
Impacts, Chesapeake Bay, MD,
Delaware Bay, DE, Great Bay, NJ and
Outer Bank off NC, Wait Period Ends:
07/20/2009, Contact: Margo SchulzeHaugen 301–713–2347.
EIS No. 20090192, Draft EIS, FHW, ID,
Idaho 16, I–84 t0 Idaho 44
Environmental Study, Proposed
Action is to Increase the
Transportation Capacity, Funding,
Ada and Canyon Counties, ID,
Comment Period Ends: 08/07/2009,
Contact: Ross Blanchard, 203–334–
9180.
EIS No. 20090193, Final EIS, AFS, WI,
Camp Four Vegetation Project,
Proposes Vegetation and Road
VerDate Nov<24>2008
16:25 Jun 18, 2009
Jkt 217001
Management Activities, Desired
Future Condition (DFC), MedfordPark Falls Ranger District,
Chequamegon-Nicolet National
Forest, Price County, WI, Wait Period
Ends: 07/20/2009, Contact: Ann
Hoefferle, 715–748–4878 Ext 24.
EIS No. 20090194, Final EIS, AFS, CA,
Moonlight and Wheeler Fires
Recovery and Restoration Project,
Analysis of the No-Action and Action
Alternatives, Mt. Hough Ranger
District, Plumas National Forest,
Plumas County, CA, Wait Period
Ends: 07/20/2009, Contact: Rich
Bednarski, 530–283–7641.
EIS No. 20090195, Final EIS, COE, LA,
Mississippi River-Gulf Outlet
(MRGO), Louisiana, and Lake Borgne
Wetland Creation and Shoreline
Protection Project, Proposes to
Construct Shoreline Protection
Features Along the Lake Borgne
Shoreline to Restore and Nourish
Wetlands, Lake Borgne, LA, Wait
Period Ends: 07/20/2009, Contact: Dr.
William P. Klein, Jr., 504–862–2540.
Dated: June 16, 2009.
Robert W. Hargrove,
Director, NEPA Compliance Division, Office
of Federal Activities.
[FR Doc. E9–14462 Filed 6–18–09; 8:45 am]
BILLING CODE 6560–50–P
ENVIRONMENTAL PROTECTION
AGENCY
[ER–FRL–8594–6]
Environmental Impact Statements and
Regulations; Availability of EPA
Comments
Availability of EPA comments
prepared pursuant to the Environmental
Review Process (ERP), under section
309 of the Clean Air Act and Section
102(2)(c) of the National Environmental
Policy Act as amended. Requests for
copies of EPA comments can be directed
to the Office of Federal Activities at
202–564–7146.
An explanation of the ratings assigned
to draft environmental impact
statements (EISs) was published in FR
dated April 17, 2009 (74 FR 17860).
Draft EISs
EIS No. 20090032, ERP No. D1–FHW–
F40446–IN, I–69 Evansville to
Indianapolis, Indiana Projec t, Section
3, Washington to Crane NSWC (US 50
to US 231), Daviess, Greene, Knox and
Martin Counties, IN.
Summary: While EPA has no
objections to the proposed action, it did
request clarification on some air quality,
PO 00000
Frm 00045
Fmt 4703
Sfmt 4703
floodplain and watershed/wetland
issues. Rating LO.
EIS No. 20090061, ERP No. D–AFS–
L65568–OR, D-Bug Hazard Reduction
Timber Sales Project, To Lessen the
Fuel and Safety Hazards Associated
with the On-going Outbreak of
Mountain Pine Beetles, Diamond Lake
Ranger District, Umpqua National
Forest, Douglas County, OR.
Summary: EPA does not object to the
proposed project. Rating LO.
EIS No. 20090101, ERP No. D–AFS–
K65360–CA, Lake Tahoe Basin
Management Unit South Shore Fuel
Reduction and Healthy Forest
Restoration, To Manage Fuel
Reduction and Forest Health in the
Wildland Urban Intermit (WUI), El
Dorado County, CA.
Summary: EPA expressed
environmental concerns about water
quality monitoring, cumulative
watershed effects, and impacts to stream
environment zones (SEZs). EPA
recommended consideration of an
alternative that further reduces adverse
effects on SEZs and watersheds already
over the cumulative watershed effects
threshold. Rating EC2.
EIS No. 20090112, ERP No. D–NPS–
K65362–00, Long Walk National
Historic Trail Feasibility Study, To
Evaluate the Suitability and
Feasibility of Designating the Routes,
Implementation, Apache, Coconino,
Navajo Counties, AZ; Bernalillo,
Cibola, De Baca, Guadalupe, Lincoln,
McKinley, Mora, Otero, Santa Fe,
Sandoval, Torrance, Valencia
Counties, NM.
Summary: EPA does not object to the
preferred plan of action. Rating LO.
EIS No. 20090117, ERP No. D–COE–
E39078–FL, C–111 Spreader Canal
Western Project, To Restore
Ecosystem Function in Taylor Slough
and Florida Bay Areas, Central and
Southern Florida Project,
Comprehensive Everglades
Restoration Plan (CERP), Everglades
National Park, Miami-Dade County,
FL.
Summary: While EPA has no
objections to the proposed action, it did
request clarification of some water
quality issues. Rating LO.
EIS No. 20090125, ERP No. D–SFW–
K99042–AZ, Town of Marana Habitat
Conservation Plan, Issuance of an
Incidental Take Permit (ITP) to
Authorize the Incidental Take of
Species Protected by the Endangered
Species Act (ESA), Pima County, AZ.
Summary: EPA expressed
environmental objections due to the
inclusion of incidental take coverage of
E:\FR\FM\19JNN1.SGM
19JNN1
Agencies
[Federal Register Volume 74, Number 117 (Friday, June 19, 2009)]
[Notices]
[Page 29208]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E9-14462]
[[Page 29208]]
-----------------------------------------------------------------------
ENVIRONMENTAL PROTECTION AGENCY
[ER-FRL-8594-5]
Environmental Impacts Statements; Notice of Availability
Responsible Agency: Office of Federal Activities, General
Information (202) 564-1399 or https://www.epa.gov/compliance/nepa/.
Weekly receipt of Environmental Impact Statements
Filed 06/08/2009 Through 06/12/2009.
Pursuant to 40 CFR 1506.9.
EIS No. 20090188, Draft EIS, AFS, AZ, Pinaleno Ecosystem Restoration
Project, Proposed On-the-Ground Treatments to Improve Forest Health and
Improve or Protect Red Squirrel Habitat, Coronado National Forest,
Graham County, AZ, Comment Period Ends: 08/04/2009, Contact: Craig
Wilcox, 928-348-1961.
EIS No. 20090189, Draft EIS, AFS, CA, Beaverslide Timber Sale and Fuel
Treatment Project, Proposing to Harvest Commercial Timber and Treat
Hazardous Fuels, Six Rivers National Forest, Mad River Ranger District,
Trinity County, CA, Comment Period Ends: 08/04/2009, Contact: Keith A.
Menasco, 928-774-6594.
EIS No. 20090190, Draft EIS, AFS, OR, Wallowa-Whitman National Forest
Travel Management Plan, Designate Roads Trails and Areas for Motor
Vehicle User, Baker, Grant, Umatilla, Union and Wallowa Counties, OR,
Comment Period Ends: 08/17/2009, Contact: Cindy Whitlock, 541-962-8501.
EIS No. 20090191, Final EIS, NOA, 00, Amendment 1 to the Consolidated
Highly Migratory Species (HMS) Fishery Management Plan, (FMP), Updating
and Revising Essential Fish Habitat (EFH) for Atlantic Highly Migratory
Species (HMS) consider additional Habitat Area of Particular Concern
(HAPC) and Analyze Fishing Impacts, Chesapeake Bay, MD, Delaware Bay,
DE, Great Bay, NJ and Outer Bank off NC, Wait Period Ends: 07/20/2009,
Contact: Margo Schulze-Haugen 301-713-2347.
EIS No. 20090192, Draft EIS, FHW, ID, Idaho 16, I-84 t0 Idaho 44
Environmental Study, Proposed Action is to Increase the Transportation
Capacity, Funding, Ada and Canyon Counties, ID, Comment Period Ends:
08/07/2009, Contact: Ross Blanchard, 203-334-9180.
EIS No. 20090193, Final EIS, AFS, WI, Camp Four Vegetation Project,
Proposes Vegetation and Road Management Activities, Desired Future
Condition (DFC), Medford-Park Falls Ranger District, Chequamegon-
Nicolet National Forest, Price County, WI, Wait Period Ends: 07/20/
2009, Contact: Ann Hoefferle, 715-748-4878 Ext 24.
EIS No. 20090194, Final EIS, AFS, CA, Moonlight and Wheeler Fires
Recovery and Restoration Project, Analysis of the No-Action and Action
Alternatives, Mt. Hough Ranger District, Plumas National Forest, Plumas
County, CA, Wait Period Ends: 07/20/2009, Contact: Rich Bednarski, 530-
283-7641.
EIS No. 20090195, Final EIS, COE, LA, Mississippi River-Gulf Outlet
(MRGO), Louisiana, and Lake Borgne Wetland Creation and Shoreline
Protection Project, Proposes to Construct Shoreline Protection Features
Along the Lake Borgne Shoreline to Restore and Nourish Wetlands, Lake
Borgne, LA, Wait Period Ends: 07/20/2009, Contact: Dr. William P.
Klein, Jr., 504-862-2540.
Dated: June 16, 2009.
Robert W. Hargrove,
Director, NEPA Compliance Division, Office of Federal Activities.
[FR Doc. E9-14462 Filed 6-18-09; 8:45 am]
BILLING CODE 6560-50-P