Gunderson Lutheran Hydro LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications, 28682 [E9-14198]
Download as PDF
28682
Federal Register / Vol. 74, No. 115 / Wednesday, June 17, 2009 / Notices
consultation with: (a) The U.S. Fish and
Wildlife Service and the National
Marine Fisheries Service as required by
section 7 of ESA; and (b) the New York
State Historic Preservation Officer, as
required by section 106, National
Historical Preservation Act, and the
implementing regulations of the
Advisory Council on Historic
Preservation at 36 CFR 800.2.
m. This notice does not constitute the
Commission’s approval of NYTEC’s
request to use the Pilot Project Licensing
Procedures. Upon its review of the
project’s overall characteristics relative
to the pilot project criteria, the draft
license application contents, and any
comments filed, the Commission will
determine whether there is adequate
information to conclude the pre-filing
process.
n. The proposed East River Tidal
Energy Pilot Project would consist of:
(1) A 2-meter-diameter 20 kW capacity
hydrokinetic device during Phase 1,
which would be replaced by a 6-meterdiameter 200 kW device in Phase 2; (2)
an underwater cable connecting the
hydrokinetic device to shore at one of
two proposed locations; and (3)
appurtenant facilities for operating and
maintaining the project. NYTEC does
not provide an estimate of annual
generation of the proposed pilot project.
o. A copy of the draft license
application and all pre-filing materials
are available for review at the
Commission in the Public Reference
Room or may be viewed on the
Commission’s Web site (https://
www.ferc.gov), using the ‘‘eLibrary’’
link. Enter the docket number,
excluding the last three digits in the
docket number field to access the
document. For assistance, contact FERC
Online Support at
FERCONlineSupport@ferc.gov or toll
free at 1–866–208–3676, of for TTY,
(202) 502–8659. A copy is also available
for inspection and reproduction at the
address in paragraph h.
p. Pre-filing process schedule. The
pre-filing process will be conducted
pursuant to the following tentative
schedule. Revisions to the schedule may
be made as appropriate.
Milestone
Date
Comments on pre-filing materials due .....................................................
Issuance of meeting notice (if needed) ....................................................
Public meeting/technical conference (if needed) .....................................
Issuance of notice concluding pre-filing process and ILP waiver request
determination.
July 10, 2009.
July 24, 2009.
August 24, 2009.
August 10, 2009 (if no meeting is needed) September 7, 2009 (if meeting is needed).
q. Register online at https://ferc.gov/
esubscribenow.htm to be notified via email of new filing and issuances related
to this or other pending projects. For
assistance, contact FERC Online
Support.
Kimberly D. Bose,
Secretary.
[FR Doc. E9–14197 Filed 6–16–09; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 13416–000]
Gunderson Lutheran Hydro LLC;
Notice of Preliminary Permit
Application Accepted for Filing and
Soliciting Comments, Motions To
Intervene, and Competing Applications
dwashington3 on PROD1PC60 with NOTICES
June 10, 2009.
On March 30, 2009, Gunderson
Lutheran Hydro LLC filed an
application, pursuant to section 4(f) of
the Federal Power Act, proposing to
study the feasibility of the Mississippi
River Lock and Dam No. 7 (Lock & Dam
7 Project), to be located at River Mile
702.5 on the Mississippi River in
Winona County, Minnesota, and La
Crosse, Wisconsin, and near the town of
La Crescent, MN.
The proposed Lock & Dam 7 Project
would be integral with the existing U.S.
Army Corps of Engineers (Corps) Lock
& Dam No. 7 which is comprised of a
VerDate Nov<24>2008
15:33 Jun 16, 2009
Jkt 217001
940-foot-long gated dam section with 5
roller gates and 11 Taintor gates, a 600
foot-long lock, and a 8,100-foot-long
earth dike. The Corps project reservoir
occupies a portion of the Upper
Mississippi River National Wildlife and
Fish Refuge.
The proposed hydro project would
consist of: (1) 7 uni-directional turbines
installed in an auxiliary lock with
generators having a total installed
capacity of 4,963 kilowatts (kW); (2) a
new transformer; and (3) a new 500foot-long transmission line to an
existing above ground local distribution
system. The project would have an
estimated average annual generation of
41.33 gigawatt-hours.
Applicant Contact: Mr. Jeff Rich,
Gunderson Lutheran Hydro LLC, 1900
South Avenue, LaCrosse, WI 54601,
phone (608) 775–6970.
FERC Contact: Michael Spencer, (202)
502–6093.
Competing Application: This
application competes with Project No.
13337–000 filed November 24, 2008.
Competing applications must be filed on
or before July 13, 2009.
Deadline for filing comments, motions
to intervene: 60 days from the issuance
of this notice. Comments, motions to
intervene, notices of intent, and
competing applications may be filed
electronically via the Internet. See 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site under the ‘‘e-Filing’’ link. If unable
to be filed electronically, documents
may be paper-filed. To paper-file, an
PO 00000
Frm 00020
Fmt 4703
Sfmt 4703
original and eight copies should be
mailed to: Kimberly D. Bose, Secretary,
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426. For more information on how to
submit these types of filings please go
to the Commission’s Web site located at
https://www.ferc.gov/filingcomments.asp. More information about
this project can be viewed or printed on
the ‘‘eLibrary’’ link of Commission’s
Web site at https://www.ferc.gov/docsfiling/elibrary.asp. Enter the docket
number (P–13337) in the docket number
field to access the document. For
assistance, call toll-free 1–866–208–
3372.
Kimberly D. Bose,
Secretary.
[FR Doc. E9–14198 Filed 6–16–09; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP09–428–000]
Blue Sky Gas Storage, LLC; Notice of
Application
June 10, 2009.
Take notice that on June 5, 2009, Blue
Sky Gas Storage, LLC (Blue Sky), 1000
Louisiana Street, Suite 6905, Houston,
TX 77002, filed in the above referenced
docket an abbreviated application
pursuant to section 7(c) of the Natural
E:\FR\FM\17JNN1.SGM
17JNN1
Agencies
[Federal Register Volume 74, Number 115 (Wednesday, June 17, 2009)]
[Notices]
[Page 28682]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E9-14198]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 13416-000]
Gunderson Lutheran Hydro LLC; Notice of Preliminary Permit
Application Accepted for Filing and Soliciting Comments, Motions To
Intervene, and Competing Applications
June 10, 2009.
On March 30, 2009, Gunderson Lutheran Hydro LLC filed an
application, pursuant to section 4(f) of the Federal Power Act,
proposing to study the feasibility of the Mississippi River Lock and
Dam No. 7 (Lock & Dam 7 Project), to be located at River Mile 702.5 on
the Mississippi River in Winona County, Minnesota, and La Crosse,
Wisconsin, and near the town of La Crescent, MN.
The proposed Lock & Dam 7 Project would be integral with the
existing U.S. Army Corps of Engineers (Corps) Lock & Dam No. 7 which is
comprised of a 940-foot-long gated dam section with 5 roller gates and
11 Taintor gates, a 600 foot-long lock, and a 8,100-foot-long earth
dike. The Corps project reservoir occupies a portion of the Upper
Mississippi River National Wildlife and Fish Refuge.
The proposed hydro project would consist of: (1) 7 uni-directional
turbines installed in an auxiliary lock with generators having a total
installed capacity of 4,963 kilowatts (kW); (2) a new transformer; and
(3) a new 500-foot-long transmission line to an existing above ground
local distribution system. The project would have an estimated average
annual generation of 41.33 gigawatt-hours.
Applicant Contact: Mr. Jeff Rich, Gunderson Lutheran Hydro LLC,
1900 South Avenue, LaCrosse, WI 54601, phone (608) 775-6970.
FERC Contact: Michael Spencer, (202) 502-6093.
Competing Application: This application competes with Project No.
13337-000 filed November 24, 2008. Competing applications must be filed
on or before July 13, 2009.
Deadline for filing comments, motions to intervene: 60 days from
the issuance of this notice. Comments, motions to intervene, notices of
intent, and competing applications may be filed electronically via the
Internet. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the
Commission's Web site under the ``e-Filing'' link. If unable to be
filed electronically, documents may be paper-filed. To paper-file, an
original and eight copies should be mailed to: Kimberly D. Bose,
Secretary, Federal Energy Regulatory Commission, 888 First Street, NE.,
Washington, DC 20426. For more information on how to submit these types
of filings please go to the Commission's Web site located at https://www.ferc.gov/filing-comments.asp. More information about this project
can be viewed or printed on the ``eLibrary'' link of Commission's Web
site at https://www.ferc.gov/docs-filing/elibrary.asp. Enter the docket
number (P-13337) in the docket number field to access the document. For
assistance, call toll-free 1-866-208-3372.
Kimberly D. Bose,
Secretary.
[FR Doc. E9-14198 Filed 6-16-09; 8:45 am]
BILLING CODE 6717-01-P