New York Tidal Energy Company; Notice of Intent To File License Application, Filing of Draft Application, Request for Waivers of Integrated Licensing Process Regulations Necessary for Expedited Processing of a Hydrokinetic Pilot Project License Application, and Soliciting Comments, 28681-28682 [E9-14197]
Download as PDF
Federal Register / Vol. 74, No. 115 / Wednesday, June 17, 2009 / Notices
In
accordance with section 252(c)(1)(A)(i)
of the Energy Policy and Conservation
Act (42 U.S.C. 6272(c)(1)(A)(i)) (EPCA),
the following notice of meeting is
provided:
A meeting involving members of the
Industry Advisory Board (IAB) in
connection with the IEA’s Workshop on
Public Stock Release will be held at the
headquarters of the IEA, 9, rue de la
´ ´
Federation, Paris, France, on June 23,
2009, beginning at 10 a.m. The purpose
of the meeting is to share information
and experience between IEA member
countries in order to improve public oil
stock release mechanisms and ensure
that proposed stocks are taken up by the
market. A meeting of the IAB will be
held at the headquarters of the IEA on
June 24, 2009, commencing at 9:30 a.m.
The purpose of this notice is to permit
attendance by representatives of U.S.
company members of the IAB at a
meeting of the IEA’s Standing Group on
Emergency Questions (SEQ), which is
scheduled to be held at the same
location and time. The IAB will also
hold a preparatory meeting among
company representatives at the same
location at 8:30 a.m. on June 24. The
agenda for this preparatory meeting is to
review the agenda for the SEQ meeting
and to discuss the June 23 IEA
Workshop on Public Stock Release.
The agenda of the SEQ meeting is
under the control of the SEQ. It is
expected that the SEQ will adopt the
following agenda:
1. Adoption of the Agenda.
2. Approval of the Summary Record
of the 126th Meeting.
3. Status of Compliance with IEP
Stockholding Commitments.
4. Update on the Oil Market.
5. Emergency Response Exercise:
—Initial Results from the Workshop
on Public Stock Release, June 23,
2009.
6. Emergency Response Review
Program:
—Emergency Response Review of
Belgium;
—Schedule of Emergency Response
Reviews.
7. Policy and Other Developments in
Member Countries:
—Australia;
—United States.
8. Activities with International
Organizations and Non-Member
Countries:
—Update on the EU Directive on
Emergency Oil Stocks;
—Report on the Emergency Response
Exercises in Thailand, May 18–19,
2009:
—Report on the IEA/HANDA/EC
Workshop on Establishment of
dwashington3 on PROD1PC60 with NOTICES
SUPPLEMENTARY INFORMATION:
VerDate Nov<24>2008
15:33 Jun 16, 2009
Jkt 217001
Emergency Oil Stocks in Southeast
Europe, May 28–29, 2009, Croatia.
9. Update on the Natural Gas Market.
10. Emergency Policy for Natural Gas:
—Natural Gas Security.
11. Report from the Industry Advisory
Board.
12. Documents for Information:
—Emergency Reserve Situation of IEA
Member Countries on April 1, 2009;
—Base Period Final Consumption: 2Q
2008–1Q 2009;
—Monthly Oil Statistics: March 2009;
—Emergency Contacts List.
13. Other Business:
—Tentative Schedule of Meetings:
—October 20–21, 2009;
—March 23–25, 2010;
—June 29–30 and July 1, 2010;
—November 16–18, 2010.
As provided in section 252(c)(1)(A)(ii)
of the Energy Policy and Conservation
Act (42 U.S.C. 6272(c)(1)(A)(ii)), the
meetings of the IAB are open to
representatives of members of the IAB
and their counsel; representatives of
members of the IEA’s Standing Group
on Emergency Questions;
representatives of the Departments of
Energy, Justice, and State, the Federal
Trade Commission, the Government
Accountability Office, Committees of
Congress, the IEA, and the European
Commission; and invitees of the IAB,
the SEQ, or the IEA.
Issued in Washington, DC, June 10, 2009.
Diana D. Clark,
Assistant General Counsel for International
and National Security Programs.
[FR Doc. E9–14234 Filed 6–16–09; 8:45 am]
BILLING CODE 6450–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 12665–003]
New York Tidal Energy Company;
Notice of Intent To File License
Application, Filing of Draft Application,
Request for Waivers of Integrated
Licensing Process Regulations
Necessary for Expedited Processing of
a Hydrokinetic Pilot Project License
Application, and Soliciting Comments
June 10, 2009.
a. Type of Filing: Notice of Intent to
File a License Application for an
Original License for a Hydrokinetic Pilot
Project.
b. Project No.: 12665–003.
c. Dated Filed: June 1, 2009.
d. Submitted By: New York Tidal
Energy Company.
e. Name of Project: East River Tidal
Energy Pilot Project.
PO 00000
Frm 00019
Fmt 4703
Sfmt 4703
28681
f. Location: In the East River at Hell
Gate, in New York City, New York. The
project would not occupy federal lands.
g. Filed Pursuant to: 18 CFR 5.3 of the
Commission’s regulations.
h. Applicant Contact: Mike Hoover,
New York Tidal Energy Company, 1785
Massachusetts Ave., NW., Suite 100,
Washington, DC 20036, (202) 772–0099.
i. FERC Contact: Timothy Konnert
(202) 502–6359.
j. New York Tidal Energy Company
(NYTEC) has filed with the
Commission: (1) A notice of intent (NOI)
to file an application for an original
license for a kinetic hydropower pilot
project and a draft license application
with monitoring plans; (2) a request for
waivers of the integrated licensing
process regulations necessary for
expedited processing of a hydrokinetic
pilot project license application; (3) a
proposed process plan and schedule; (4)
a request to be designated as the nonfederal representative for section 7 of
the Endangered Species Act
consultation; and (5) a request to be
designated as the non-federal
representative for section 106
consultation under the National Historic
Preservation Act (collectively the prefiling materials).
k. With this notice, we are soliciting
comments on the pre-filing materials
listed in paragraph j above, including
the draft license application and
monitoring plans. All comments should
be sent to the address above in
paragraph h. In addition, all comments
(original and eight copies) must be filed
with the Commission at the following
address: Kimberly D. Bose, Secretary,
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426. All filings with the Commission
must include on the first page, the
project name (East River Tidal Energy
Pilot Project) and number (P–12665–
003), and bear the heading ‘‘Comments
on the proposed East River Tidal Energy
Pilot Project.’’ Any individual or entity
interested in submitting comments on
the pre-filing materials must do so by
July 10, 2009.
Comments may be filed electronically
via the Internet in lieu of paper. The
Commission strongly encourages
electronic filings. See 18 CFR
385.2001(a)(1)(iii) and the instructions
on the Commission’s Web site (https://
www.ferc.gov) under the ‘‘e-filing’’ link.
l. With this notice, we are approving
NYTEC’s request to be designated as the
non-federal representative for section 7
of the Endangered Species Act (ESA)
and its request to initiate consultation
under section 106 of the National
Historic Preservation Act; and
recommending that it begin informal
E:\FR\FM\17JNN1.SGM
17JNN1
28682
Federal Register / Vol. 74, No. 115 / Wednesday, June 17, 2009 / Notices
consultation with: (a) The U.S. Fish and
Wildlife Service and the National
Marine Fisheries Service as required by
section 7 of ESA; and (b) the New York
State Historic Preservation Officer, as
required by section 106, National
Historical Preservation Act, and the
implementing regulations of the
Advisory Council on Historic
Preservation at 36 CFR 800.2.
m. This notice does not constitute the
Commission’s approval of NYTEC’s
request to use the Pilot Project Licensing
Procedures. Upon its review of the
project’s overall characteristics relative
to the pilot project criteria, the draft
license application contents, and any
comments filed, the Commission will
determine whether there is adequate
information to conclude the pre-filing
process.
n. The proposed East River Tidal
Energy Pilot Project would consist of:
(1) A 2-meter-diameter 20 kW capacity
hydrokinetic device during Phase 1,
which would be replaced by a 6-meterdiameter 200 kW device in Phase 2; (2)
an underwater cable connecting the
hydrokinetic device to shore at one of
two proposed locations; and (3)
appurtenant facilities for operating and
maintaining the project. NYTEC does
not provide an estimate of annual
generation of the proposed pilot project.
o. A copy of the draft license
application and all pre-filing materials
are available for review at the
Commission in the Public Reference
Room or may be viewed on the
Commission’s Web site (https://
www.ferc.gov), using the ‘‘eLibrary’’
link. Enter the docket number,
excluding the last three digits in the
docket number field to access the
document. For assistance, contact FERC
Online Support at
FERCONlineSupport@ferc.gov or toll
free at 1–866–208–3676, of for TTY,
(202) 502–8659. A copy is also available
for inspection and reproduction at the
address in paragraph h.
p. Pre-filing process schedule. The
pre-filing process will be conducted
pursuant to the following tentative
schedule. Revisions to the schedule may
be made as appropriate.
Milestone
Date
Comments on pre-filing materials due .....................................................
Issuance of meeting notice (if needed) ....................................................
Public meeting/technical conference (if needed) .....................................
Issuance of notice concluding pre-filing process and ILP waiver request
determination.
July 10, 2009.
July 24, 2009.
August 24, 2009.
August 10, 2009 (if no meeting is needed) September 7, 2009 (if meeting is needed).
q. Register online at https://ferc.gov/
esubscribenow.htm to be notified via email of new filing and issuances related
to this or other pending projects. For
assistance, contact FERC Online
Support.
Kimberly D. Bose,
Secretary.
[FR Doc. E9–14197 Filed 6–16–09; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 13416–000]
Gunderson Lutheran Hydro LLC;
Notice of Preliminary Permit
Application Accepted for Filing and
Soliciting Comments, Motions To
Intervene, and Competing Applications
dwashington3 on PROD1PC60 with NOTICES
June 10, 2009.
On March 30, 2009, Gunderson
Lutheran Hydro LLC filed an
application, pursuant to section 4(f) of
the Federal Power Act, proposing to
study the feasibility of the Mississippi
River Lock and Dam No. 7 (Lock & Dam
7 Project), to be located at River Mile
702.5 on the Mississippi River in
Winona County, Minnesota, and La
Crosse, Wisconsin, and near the town of
La Crescent, MN.
The proposed Lock & Dam 7 Project
would be integral with the existing U.S.
Army Corps of Engineers (Corps) Lock
& Dam No. 7 which is comprised of a
VerDate Nov<24>2008
15:33 Jun 16, 2009
Jkt 217001
940-foot-long gated dam section with 5
roller gates and 11 Taintor gates, a 600
foot-long lock, and a 8,100-foot-long
earth dike. The Corps project reservoir
occupies a portion of the Upper
Mississippi River National Wildlife and
Fish Refuge.
The proposed hydro project would
consist of: (1) 7 uni-directional turbines
installed in an auxiliary lock with
generators having a total installed
capacity of 4,963 kilowatts (kW); (2) a
new transformer; and (3) a new 500foot-long transmission line to an
existing above ground local distribution
system. The project would have an
estimated average annual generation of
41.33 gigawatt-hours.
Applicant Contact: Mr. Jeff Rich,
Gunderson Lutheran Hydro LLC, 1900
South Avenue, LaCrosse, WI 54601,
phone (608) 775–6970.
FERC Contact: Michael Spencer, (202)
502–6093.
Competing Application: This
application competes with Project No.
13337–000 filed November 24, 2008.
Competing applications must be filed on
or before July 13, 2009.
Deadline for filing comments, motions
to intervene: 60 days from the issuance
of this notice. Comments, motions to
intervene, notices of intent, and
competing applications may be filed
electronically via the Internet. See 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site under the ‘‘e-Filing’’ link. If unable
to be filed electronically, documents
may be paper-filed. To paper-file, an
PO 00000
Frm 00020
Fmt 4703
Sfmt 4703
original and eight copies should be
mailed to: Kimberly D. Bose, Secretary,
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426. For more information on how to
submit these types of filings please go
to the Commission’s Web site located at
https://www.ferc.gov/filingcomments.asp. More information about
this project can be viewed or printed on
the ‘‘eLibrary’’ link of Commission’s
Web site at https://www.ferc.gov/docsfiling/elibrary.asp. Enter the docket
number (P–13337) in the docket number
field to access the document. For
assistance, call toll-free 1–866–208–
3372.
Kimberly D. Bose,
Secretary.
[FR Doc. E9–14198 Filed 6–16–09; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP09–428–000]
Blue Sky Gas Storage, LLC; Notice of
Application
June 10, 2009.
Take notice that on June 5, 2009, Blue
Sky Gas Storage, LLC (Blue Sky), 1000
Louisiana Street, Suite 6905, Houston,
TX 77002, filed in the above referenced
docket an abbreviated application
pursuant to section 7(c) of the Natural
E:\FR\FM\17JNN1.SGM
17JNN1
Agencies
[Federal Register Volume 74, Number 115 (Wednesday, June 17, 2009)]
[Notices]
[Pages 28681-28682]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E9-14197]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 12665-003]
New York Tidal Energy Company; Notice of Intent To File License
Application, Filing of Draft Application, Request for Waivers of
Integrated Licensing Process Regulations Necessary for Expedited
Processing of a Hydrokinetic Pilot Project License Application, and
Soliciting Comments
June 10, 2009.
a. Type of Filing: Notice of Intent to File a License Application
for an Original License for a Hydrokinetic Pilot Project.
b. Project No.: 12665-003.
c. Dated Filed: June 1, 2009.
d. Submitted By: New York Tidal Energy Company.
e. Name of Project: East River Tidal Energy Pilot Project.
f. Location: In the East River at Hell Gate, in New York City, New
York. The project would not occupy federal lands.
g. Filed Pursuant to: 18 CFR 5.3 of the Commission's regulations.
h. Applicant Contact: Mike Hoover, New York Tidal Energy Company,
1785 Massachusetts Ave., NW., Suite 100, Washington, DC 20036, (202)
772-0099.
i. FERC Contact: Timothy Konnert (202) 502-6359.
j. New York Tidal Energy Company (NYTEC) has filed with the
Commission: (1) A notice of intent (NOI) to file an application for an
original license for a kinetic hydropower pilot project and a draft
license application with monitoring plans; (2) a request for waivers of
the integrated licensing process regulations necessary for expedited
processing of a hydrokinetic pilot project license application; (3) a
proposed process plan and schedule; (4) a request to be designated as
the non-federal representative for section 7 of the Endangered Species
Act consultation; and (5) a request to be designated as the non-federal
representative for section 106 consultation under the National Historic
Preservation Act (collectively the pre-filing materials).
k. With this notice, we are soliciting comments on the pre-filing
materials listed in paragraph j above, including the draft license
application and monitoring plans. All comments should be sent to the
address above in paragraph h. In addition, all comments (original and
eight copies) must be filed with the Commission at the following
address: Kimberly D. Bose, Secretary, Federal Energy Regulatory
Commission, 888 First Street, NE., Washington, DC 20426. All filings
with the Commission must include on the first page, the project name
(East River Tidal Energy Pilot Project) and number (P-12665-003), and
bear the heading ``Comments on the proposed East River Tidal Energy
Pilot Project.'' Any individual or entity interested in submitting
comments on the pre-filing materials must do so by July 10, 2009.
Comments may be filed electronically via the Internet in lieu of
paper. The Commission strongly encourages electronic filings. See 18
CFR 385.2001(a)(1)(iii) and the instructions on the Commission's Web
site (https://www.ferc.gov) under the ``e-filing'' link.
l. With this notice, we are approving NYTEC's request to be
designated as the non-federal representative for section 7 of the
Endangered Species Act (ESA) and its request to initiate consultation
under section 106 of the National Historic Preservation Act; and
recommending that it begin informal
[[Page 28682]]
consultation with: (a) The U.S. Fish and Wildlife Service and the
National Marine Fisheries Service as required by section 7 of ESA; and
(b) the New York State Historic Preservation Officer, as required by
section 106, National Historical Preservation Act, and the implementing
regulations of the Advisory Council on Historic Preservation at 36 CFR
800.2.
m. This notice does not constitute the Commission's approval of
NYTEC's request to use the Pilot Project Licensing Procedures. Upon its
review of the project's overall characteristics relative to the pilot
project criteria, the draft license application contents, and any
comments filed, the Commission will determine whether there is adequate
information to conclude the pre-filing process.
n. The proposed East River Tidal Energy Pilot Project would consist
of: (1) A 2-meter-diameter 20 kW capacity hydrokinetic device during
Phase 1, which would be replaced by a 6-meter-diameter 200 kW device in
Phase 2; (2) an underwater cable connecting the hydrokinetic device to
shore at one of two proposed locations; and (3) appurtenant facilities
for operating and maintaining the project. NYTEC does not provide an
estimate of annual generation of the proposed pilot project.
o. A copy of the draft license application and all pre-filing
materials are available for review at the Commission in the Public
Reference Room or may be viewed on the Commission's Web site (https://www.ferc.gov), using the ``eLibrary'' link. Enter the docket number,
excluding the last three digits in the docket number field to access
the document. For assistance, contact FERC Online Support at
FERCONlineSupport@ferc.gov or toll free at 1-866-208-3676, of for TTY,
(202) 502-8659. A copy is also available for inspection and
reproduction at the address in paragraph h.
p. Pre-filing process schedule. The pre-filing process will be
conducted pursuant to the following tentative schedule. Revisions to
the schedule may be made as appropriate.
------------------------------------------------------------------------
Milestone Date
------------------------------------------------------------------------
Comments on pre-filing materials due... July 10, 2009.
Issuance of meeting notice (if needed). July 24, 2009.
Public meeting/technical conference (if August 24, 2009.
needed).
Issuance of notice concluding pre- August 10, 2009 (if no meeting
filing process and ILP waiver request is needed) September 7, 2009
determination. (if meeting is needed).
------------------------------------------------------------------------
q. Register online at https://ferc.gov/esubscribenow.htm to be
notified via e-mail of new filing and issuances related to this or
other pending projects. For assistance, contact FERC Online Support.
Kimberly D. Bose,
Secretary.
[FR Doc. E9-14197 Filed 6-16-09; 8:45 am]