Environmental Impact Statements and Regulations; Availability of EPA Comments, 28045 [E9-13861]
Download as PDF
Federal Register / Vol. 74, No. 112 / Friday, June 12, 2009 / Notices
instructions on the Commission’s Web
site under the ‘‘e-Filing’’ link. The
Commission strongly encourages
intervenors to file electronically.
Any person or the Commission’s staff
may, within 60 days after issuance of
the instant notice by the Commission,
file pursuant to Rule 214 of the
Commission’s Procedural Rules (18 CFR
385.214) a motion to intervene or notice
of intervention and pursuant to Section
157.205 of the regulations under the
NGA (18 CFR 157.205), a protest to the
request. If no protest is filed within the
time allowed therefore, the proposed
activity shall be deemed to be
authorized effective the day after the
time allowed for filing a protest. If a
protest is filed and not withdrawn
within 30 days after the allowed time
for filing a protest, the instant request
shall be treated as an application for
authorization pursuant to Section 7 of
the NGA.
Kimberly D. Bose,
Secretary.
[FR Doc. E9–13788 Filed 6–11–09; 8:45 am]
BILLING CODE 6717–01–P
ENVIRONMENTAL PROTECTION
AGENCY
[ER–FRL–8594–4]
Environmental Impact Statements and
Regulations; Availability of EPA
Comments
Availability of EPA comments
prepared pursuant to the Environmental
Review Process (ERP), under section
309 of the Clean Air Act and Section
102(2)(c) of the National Environmental
Policy Act as amended. Requests for
copies of EPA comments can be directed
to the Office of Federal Activities at
202–564–7146.
An explanation of the ratings assigned
to draft environmental impact
statements (EISs) was published in
Federal Register dated April 17, 2009
(74 FR 17860).
Draft EISs
EIS No. 20050084, ERP No. D–FRC–
L03012–WA, Capacity Replacement
Project, Construction and Operation
of 79.5 miles Pipeline; Modify 5
Existing Compressor Stations, U.S.
Army COE 10 and 404 Permits,
Whatcom, Skagit, Snohomish, King,
Pierce and Thurston Counties, WA.
Summary: EPA expressed
environmental concerns because
wetland impacts have not been fully
mitigated; and recommended the
implementation of a project-specific
erosion control plan. Rating EC2.
VerDate Nov<24>2008
17:53 Jun 11, 2009
Jkt 217001
EIS No. 20090102, ERP No. D–FAA–
A12046–00, PROGRAMMATIC—
Streamlining the Processing of
Experimental Permit Applications,
Issuing Experimental Permits for the
Launch and Reentry of Useable
Suborbital Rockets.
Summary: EPA has no objection to the
proposed action. Rating LO.
EIS No. 20090131, ERP No. D–AFS–
F65074–WI, Grub Hoe Vegetation and
Transportation Management Project,
Proposes to Implement Vegetation
Management Activities, Eagle River
Florence Ranger District,
Chequamegon-Nicolet National
Forest, Florence County, WI.
Summary: EPA does not object to the
proposed project. Rating LO.
Final EISs
EIS No. 20080419, ERP No. F–NHT–
A86245–00, Corporate Average Fuel
Economy (CAFE) Proposed Standards
for Model Year 2011–2015 Passenger
Cars and Light Trucks,
Implementation.
Summary: EPA expressed
environmental concerns about limited
information in the FEIS on the technical
assumptions and inputs upon which the
document is based.
EIS No. 20090110, ERP No. F–USN–
C11023–NJ, Laurelwood Housing
Area, Access at Naval Weapons
Station Earle, Lease Agreement,
Monmouth County, NJ.
Summary: No formal comment letter
was sent to the preparing agency.
EIS No. 20090118, ERP No. F–AFS–
L65544–AK, Navy Timber Sale
Project, To Address the Potential
Effects of Timber Harvesting on Etolin
Island, Wrangell Ranger District,
Tongass National Forest, AK.
Summary: EPA has no objection to the
proposed action.
EIS No. 20090129, ERP No. F–AFS–
K65346–CA, Round Valley Fuels
Reduction and Vegetation
Management Project, Proposes to
Reduce Fuel and Manage Vegetation,
Funding, Goosenest Ranger District,
Klamath National Forest, Siskiyou
County, CA.
Summary: No formal comment letter
was sent to the preparing agency.
EIS No. 20090130, ERP No. F–NPS–
E65079–TN, Great Smoky Mountains
National Park General Management
Plan Amendment, Implementation,
Elkmont Historic District, Sevier
County, TN.
Summary: EPA has no objection to the
proposed action.
EIS No. 20090135, ERP No. F–BLM–
K60041–NV, Lincoln County Land Act
(LCLA) Groundwater Development
and Utility Right-of-Way Project,
PO 00000
Frm 00051
Fmt 4703
Sfmt 4703
28045
Implementation, To Grant a Right-ofWay Permit for Groundwater
Development and Utility Facilities,
Lincoln County, NV.
Summary: EPA expressed
environmental concerns about the longterm availability of the water supply,
conservation and water use efficiency,
and indirect and cumulative impacts.
EPA recommends continued
collaboration through a regional
groundwater framework to ensure
efficient long-term sustainable use of the
deep carbonate-rock aquifer, and
evaluation and consideration of specific
climate change adaptation measures and
back-up water supplies.
EIS No. 20090149, ERP No. F–NOA–
A91077–00, Amendment 1 to the
Tilefish Fishery Management Plan,
Proposed Individual Fishing Quota
(IFQ) Program, To Reduce
Overcapacity in the Commercial
Tilefish Fishery, Maine to North
Carolina.
Summary: EPA has no objection to the
proposed action.
EIS No. 20090169, ERP No. FS–FHW–
H40397–MO, Interstate 70 Corridor
Improvements, Kansas City to St.
Louis, Updated Information,
Evaluates if a Truck-Only Lane
Strategy is Viable, Kansas City to St.
Louis, MO.
Summary: EPA’s previous issues have
been resolved; therefore, EPA has no
objection to the proposed action.
Dated: June 9, 2009.
Robert W. Hargrove,
Director, NEPA Compliance Division, Office
of Federal Activities.
[FR Doc. E9–13861 Filed 6–11–09; 8:45 am]
BILLING CODE 6560–50–P
ENVIRONMENTAL PROTECTION
AGENCY
[ER–FRL–8594–3]
Environmental Impacts Statements;
Notice of Availability
Responsible Agency: Office of Federal
Activities, General Information (202)
564–1399 or https://www.epa.gov/
compliance/nepa/.
Weekly receipt of Environmental Impact
Statements
Filed 06/01/2009 Through 06/05/2009
Pursuant to 40 CFR 1506.9
EIS No. 20090183, Final EIS, NRC, PA,
Generic—License Renewal of Nuclear
Plants, Supplement 36 to NUREG–
1437, Regarding Beaver Valley Power
Station, Units 1 and 2, Plant-Specific,
Issuing Nuclear Power Plant
Operating License for an Additional
20-Year Period, PA, Wait Period Ends:
E:\FR\FM\12JNN1.SGM
12JNN1
Agencies
[Federal Register Volume 74, Number 112 (Friday, June 12, 2009)]
[Notices]
[Page 28045]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E9-13861]
=======================================================================
-----------------------------------------------------------------------
ENVIRONMENTAL PROTECTION AGENCY
[ER-FRL-8594-4]
Environmental Impact Statements and Regulations; Availability of
EPA Comments
Availability of EPA comments prepared pursuant to the Environmental
Review Process (ERP), under section 309 of the Clean Air Act and
Section 102(2)(c) of the National Environmental Policy Act as amended.
Requests for copies of EPA comments can be directed to the Office of
Federal Activities at 202-564-7146.
An explanation of the ratings assigned to draft environmental
impact statements (EISs) was published in Federal Register dated April
17, 2009 (74 FR 17860).
Draft EISs
EIS No. 20050084, ERP No. D-FRC-L03012-WA, Capacity Replacement
Project, Construction and Operation of 79.5 miles Pipeline; Modify 5
Existing Compressor Stations, U.S. Army COE 10 and 404 Permits,
Whatcom, Skagit, Snohomish, King, Pierce and Thurston Counties, WA.
Summary: EPA expressed environmental concerns because wetland
impacts have not been fully mitigated; and recommended the
implementation of a project-specific erosion control plan. Rating EC2.
EIS No. 20090102, ERP No. D-FAA-A12046-00, PROGRAMMATIC--Streamlining
the Processing of Experimental Permit Applications, Issuing
Experimental Permits for the Launch and Reentry of Useable Suborbital
Rockets.
Summary: EPA has no objection to the proposed action. Rating LO.
EIS No. 20090131, ERP No. D-AFS-F65074-WI, Grub Hoe Vegetation and
Transportation Management Project, Proposes to Implement Vegetation
Management Activities, Eagle River Florence Ranger District,
Chequamegon-Nicolet National Forest, Florence County, WI.
Summary: EPA does not object to the proposed project. Rating LO.
Final EISs
EIS No. 20080419, ERP No. F-NHT-A86245-00, Corporate Average Fuel
Economy (CAFE) Proposed Standards for Model Year 2011-2015 Passenger
Cars and Light Trucks, Implementation.
Summary: EPA expressed environmental concerns about limited
information in the FEIS on the technical assumptions and inputs upon
which the document is based.
EIS No. 20090110, ERP No. F-USN-C11023-NJ, Laurelwood Housing Area,
Access at Naval Weapons Station Earle, Lease Agreement, Monmouth
County, NJ.
Summary: No formal comment letter was sent to the preparing agency.
EIS No. 20090118, ERP No. F-AFS-L65544-AK, Navy Timber Sale Project, To
Address the Potential Effects of Timber Harvesting on Etolin Island,
Wrangell Ranger District, Tongass National Forest, AK.
Summary: EPA has no objection to the proposed action.
EIS No. 20090129, ERP No. F-AFS-K65346-CA, Round Valley Fuels Reduction
and Vegetation Management Project, Proposes to Reduce Fuel and Manage
Vegetation, Funding, Goosenest Ranger District, Klamath National
Forest, Siskiyou County, CA.
Summary: No formal comment letter was sent to the preparing agency.
EIS No. 20090130, ERP No. F-NPS-E65079-TN, Great Smoky Mountains
National Park General Management Plan Amendment, Implementation,
Elkmont Historic District, Sevier County, TN.
Summary: EPA has no objection to the proposed action.
EIS No. 20090135, ERP No. F-BLM-K60041-NV, Lincoln County Land Act
(LCLA) Groundwater Development and Utility Right-of-Way Project,
Implementation, To Grant a Right-of-Way Permit for Groundwater
Development and Utility Facilities, Lincoln County, NV.
Summary: EPA expressed environmental concerns about the long-term
availability of the water supply, conservation and water use
efficiency, and indirect and cumulative impacts. EPA recommends
continued collaboration through a regional groundwater framework to
ensure efficient long-term sustainable use of the deep carbonate-rock
aquifer, and evaluation and consideration of specific climate change
adaptation measures and back-up water supplies.
EIS No. 20090149, ERP No. F-NOA-A91077-00, Amendment 1 to the Tilefish
Fishery Management Plan, Proposed Individual Fishing Quota (IFQ)
Program, To Reduce Overcapacity in the Commercial Tilefish Fishery,
Maine to North Carolina.
Summary: EPA has no objection to the proposed action.
EIS No. 20090169, ERP No. FS-FHW-H40397-MO, Interstate 70 Corridor
Improvements, Kansas City to St. Louis, Updated Information, Evaluates
if a Truck-Only Lane Strategy is Viable, Kansas City to St. Louis, MO.
Summary: EPA's previous issues have been resolved; therefore, EPA
has no objection to the proposed action.
Dated: June 9, 2009.
Robert W. Hargrove,
Director, NEPA Compliance Division, Office of Federal Activities.
[FR Doc. E9-13861 Filed 6-11-09; 8:45 am]
BILLING CODE 6560-50-P