Public Utility District No. 1 of Snohomish County; Notice of Application Tendered for Filing With the Commission and Establishing Procedural Schedule for Licensing and Deadline for Submission of Final Amendments, 28036-28037 [E9-13787]
Download as PDF
28036
Federal Register / Vol. 74, No. 112 / Friday, June 12, 2009 / Notices
period, as extended, will be considered
during preparation of the Final EIS.
FOR FURTHER INFORMATION CONTACT: For
information regarding the WVDP or this
Draft EIS, contact Catherine Bohan at
the above address. The following Web
sites may also be accessed for additional
information on the Draft EIS or the West
Valley Site: https://
www.westvalleyeis.com or https://
www.wv.doe.gov.
Issued in Washington, DC, on June 5, 2009.
Michael C. Moore,
Director, Office of Small Sites.
[FR Doc. E9–13837 Filed 6–11–09; 8:45 am]
BILLING CODE 6450–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. P–2157–188]
Public Utility District No. 1 of
Snohomish County; Notice of
Application Tendered for Filing With
the Commission and Establishing
Procedural Schedule for Licensing and
Deadline for Submission of Final
Amendments
June 5, 2009.
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection.
a. Type of Application: New Major
License.
b. Project No.: P–2157–188.
c. Date Filed: June 1, 2009.
d. Applicant: Public Utility District
No. 1 of Snohomish County.
e. Name of Project: Henry M Jackson
Hydroelectric Project.
f. Location: The existing project is
located on the Sultan River in
Snohomish County, Washington, about
20 miles east of Everett, Washington.
The project penstock underlies 10.9
acres of Mount Baker-Snoqualmie
National Forest.
g. Filed Pursuant to: Federal Power
Act 16 U.S.C. 791(a)–825(r).
h. Applicant Contact: Public Utility
District No. 1 of Snohomish County
(District), Steven J. Klein, General
Manager, 2320 California Street, P.O.
Box 1107, Everett, WA 98206–1107.
i. FERC Contact: David Turner (202)
502–6091 or via e-mail at
david.turner@ferc.gov.
j. This application is not ready for
environmental analysis at this time.
k. Project Description: The existing
project consists of the following: (1)
Spada Lake, with a surface area of 1,802
acres at a normal maximum water
surface elevation of 1,445 feet msl; (2)
Culmback dam, a 640-foot-long, 262foot-high earth and rockfill dam with a
crest elevation of 1,470 feet msl located
at River Mile (RM) 16.5 on the Sultan
River; (3) a concrete morning glory
spillway with a crest elevation of 1,450
feet msl located approximately 250 feet
from the right bank; (4) a system of
conduits and valves under the dam
which provide the minimum flow
downstream of Culmback dam; (5) a
110-foot-tall concrete powerhouse
intake structure located approximately
250 feet upstream of the dam with three
20-foot movable panels to allow
withdrawal from different depths; (6) a
penstock consisting of a 3.8-mile-long,
14-foot-diameter unlined tunnel leading
to a 3.7-mile-long, 10-foot-diameter
underground pipeline; (7) a two-story
reinforced-concrete powerhouse located
at RM 4.3; (8) four generating units with
a total installed capacity of 111.8 MW;
Units 1 and 2 are 47.5 MW Pelton
turbines, which discharge water directly
into a 40-foot-long discharge canal to
the Sultan River; Units 3 and 4 are 8.4
MW Francis turbines, which discharge
water through the Lake Chaplain water
supply pipeline; (9) the approximately
3.5-mile-long, 72-inch-diameter Lake
Chaplain water supply pipeline, which
routes water from the Francis turbines
to the Portal 2 structure at Lake
Chaplain; (10) the Portal 2 structure,
which diverts flows from the Lake
Chaplain pipeline to Lake Chaplain (a
450-acre reservoir which serves as the
City of Everett’s water supply) or to the
diversion dam tunnel and pipeline; (11)
a 1.5-mile-long, concrete-lined tunnel
and a 2,000-foot-long, 72-inch-diameter
concrete pipeline connecting Lake
Chaplain and the Sultan River
immediately upstream of the diversion
dam; (12) a 120-foot-long, 20-foot-high,
concrete gravity diversion dam which
was originally constructed to divert
water from the Sultan River to Lake
Chaplain; and (13) other appurtenant
equipment. Project operations are
guided by reservoir rule curves which
are designed to minimize spill at Spada
Lake while providing minimum flow
releases to the Sultan River downstream
of the diversion dam. The District
proposes the following changes to the
project: (1) Modifications to the project
boundary that include additional land
and exclude certain land included in
the existing project boundary; (2) a new
Operations Plan based on revised Spada
Lake rule curves; (3) aquatic habitat
enhancement measures; (4) measures to
protect and enhance wildlife habitat; (5)
measures to enhance recreational
opportunities; and (6) measures to
protect historic properties.
l. Locations of the Application: A
copy of the application is available for
review at the Commission in the Public
Reference Room or may be viewed on
the Commission’s Web site at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
assistance, contact FERC Online
Support at
FERCOnlineSupport@ferc.gov or tollfree at (866) 208–3676, or for TTY, (202)
502–8659. A copy is also available for
inspection and reproduction at the
address in item (h) above.
m. You may also register online at
https://www.ferc.gov/esubscribenow.htm
to be notified via email of new filings
and issuances related to this or other
pending projects. For assistance, contact
FERC Online Support.
n. Procedural Schedule:
The application will be processed
according to the following Hydro
Licensing Schedule. Revisions to the
schedule may be made as appropriate.
For example, issuance of the Ready for
Environmental Analysis Notice is based
on the assumption that there will be no
additional information.
Milestone
Date
Application Deficiency Determination Letter and Issuance of Additional Information Requests (AIRs) ...............................
Notice of Acceptance/Notice of Ready for Environmental Analysis ......................................................................................
Filing of Interventions, Recommendations, Terms and Conditions, and Fishway Prescriptions ..........................................
Reply Comments Due ............................................................................................................................................................
Issuance of Draft EA ..............................................................................................................................................................
Comments on Draft EA Due ..................................................................................................................................................
Filing of Modified Terms and Conditions ...............................................................................................................................
Issuance of Final EA ..............................................................................................................................................................
VerDate Nov<24>2008
17:53 Jun 11, 2009
Jkt 217001
PO 00000
Frm 00042
Fmt 4703
Sfmt 4703
E:\FR\FM\12JNN1.SGM
12JNN1
July 2009.
July 2009.
September 2009.
November 2009.
March 2010.
April 2010.
June 2010.
September 2010.
Federal Register / Vol. 74, No. 112 / Friday, June 12, 2009 / Notices
o. Final amendments to the
application must be filed with the
Commission no later than 30 days from
the issuance date of the notice of ready
for environmental analysis.
Kimberly D. Bose,
Secretary.
[FR Doc. E9–13787 Filed 6–11–09; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings
June 4, 2009.
Take notice that the Commission has
received the following Natural Gas
Pipeline Rate and Refund Report filings:
Docket Numbers: RP09–683–000.
Applicants: Caledonia Energy
Partners, LLC.
Description: Caledonia Energy
Partners, LLC submits First Revised
Sheet No 55 et al. to its FERC Gas Tariff,
Original Volume No. 1 to be effective
8/1/09.
Filed Date: 06/01/2009.
Accession Number: 20090603–0032.
Comment Date: 5 p.m. Eastern Time
on Monday, June 15, 2009.
Docket Numbers: RP09–684–000.
Applicants: Gas Transmission
Northwest Corporation.
Description: Gas Transmission
Northwest Corporation submits Fourth
Revised Sheet 101 et al. to its FERC Gas
Tariff, Third Revised Volume 1–A, to be
effective 8/1/09.
Filed Date: 06/01/2009.
Accession Number: 20090603–0039.
Comment Date: 5 p.m. Eastern Time
on Monday, June 15, 2009.
Docket Numbers: RP09–685–000.
Applicants: Eastern Shore Natural Gas
Company.
Description: Eastern Shore Natural
Gas Company submits Second Revised
Sheet 91 et al. to its FERC Gas Tariff,
Second Revised Volume 1 to be effective
8/1/09.
Filed Date: 06/01/2009.
Accession Number: 20090603–0033.
Comment Date: 5 p.m. Eastern Time
on Monday, June 15, 2009.
Docket Numbers: RP09–686–000.
Applicants: Portland Natural Gas
Transmission System.
Description: Portland Natural Gas
Transmission System submits First
Revised Sheet 323 et al. to its FERC Gas
Tariff, Second Revised Volume 1 to be
effective 8/1/09.
Filed Date: 06/01/2009.
Accession Number: 20090603–0040.
VerDate Nov<24>2008
17:53 Jun 11, 2009
Jkt 217001
Comment Date: 5 p.m. Eastern Time
on Monday, June 15, 2009.
Docket Numbers: RP09–687–000.
Applicants: Equitrans, L.P.
Description: Equitrans, L.P. submits
Second Revised Sheet 286 et al. to its
FERC Gas Tariff, Original Volume 1 to
be effective 8/1/09.
Filed Date: 06/01/2009.
Accession Number: 20090603–0034.
Comment Date: 5 p.m. Eastern Time
on Monday, June 15, 2009.
Docket Numbers: RP09–688–000.
Applicants: WestGas InterState, Inc.
Description: WestGas InterState, Inc.
submits Eighth Revised Sheet 92 et al.
to its FERC Gas Tariff, First Revised
Volume 1 to be effective 8/1/09.
Filed Date: 06/01/2009.
Accession Number: 20090603–0035.
Comment Date: 5 p.m. Eastern Time
on Monday, June 15, 2009.
Docket Numbers: RP09–689–000.
Applicants: North Baja Pipeline, LLC.
Description: North Baja Pipeline, LLC
submits Third Revised Sheet 101 et al.
to its FERC Gas Tariff, Original Volume
1 to be effective 8/1/09.
Filed Date: 06/01/2009.
Accession Number: 20090603–0036.
Comment Date: 5 p.m. Eastern Time
on Monday, June 15, 2009.
Docket Numbers: RP09–690–000.
Applicants: Trans-Union Interstate
Pipeline, L.P.
Description: Trans-Union Interstate
Pipeline, L.P. submits First Revised
Sheet 111 et al. to FERC Gas Tariff,
Original Volume 1, to be effective 8/1/
09.
Filed Date: 06/01/2009.
Accession Number: 20090603–0041.
Comment Date: 5 p.m. Eastern Time
on Monday, June 15, 2009.
Docket Numbers: RP09–691–000.
Applicants: Freebird Gas Storage,
LLC.
Description: Freebird Gas Storage,
LLC submits First Revised Sheet 146 et
al. to FERC Gas Tariff, First Revised
Volume 1 to be effective 8/1/09.
Filed Date: 06/01/2009.
Accession Number: 20090603–0042.
Comment Date: 5 p.m. Eastern Time
on Monday, June 15, 2009.
Docket Numbers: RP09–692–000.
Applicants: Transcontinental Gas
Pipe Line Corporation.
Description: Transcontinental Gas
Pipe Line Corporation submits First
Revised Sheet 433 et al. to its FERC Gas
Tariff, Fourth Revised Volume 1 to be
effective 8/1/09.
Filed Date: 06/01/2009.
Accession Number: 20090603–0037.
Comment Date: 5 p.m. Eastern Time
on Monday, June 15, 2009.
PO 00000
Frm 00043
Fmt 4703
Sfmt 4703
28037
Docket Numbers: RP09–693–000.
Applicants: Pine Needle LNG
Company, LLC.
Description: Pine Needle LNG
Company submits Sixth Revised Sheet
89 et al. to its FERC Gas Tariff, Original
Volume 1 effective 8/1/09.
Filed Date: 06/01/2009.
Accession Number: 20090603–0038.
Comment Date: 5 p.m. Eastern Time
on Monday, June 15, 2009.
Docket Numbers: RP09–694–000.
Applicants: National Fuel Gas Supply
Corporation.
Description: National Fuel Gas Supply
Corporation submits Ninth Revised
Sheet 457 and Seventh Revised Sheet
458 to FERC Gas Tariff, Fourth Revised
Volume 1, to be effective 8/1/09.
Filed Date: 06/01/2009.
Accession Number: 20090603–0148.
Comment Date: 5 p.m. Eastern Time
on Monday, June 15, 2009.
Docket Numbers: RP09–695–000.
Applicants: Dauphin Island Gathering
Partners.
Description: Dauphin Island
Gathering Partners submits Second
Revised Sheet 168 et al. to its FERC Gas
Tariff, First Revised Volume 1 to be
effective 8/1/09.
Filed Date: 06/01/2009.
Accession Number: 20090603–0130.
Comment Date: 5 p.m. Eastern Time
on Monday, June 15, 2009.
Docket Numbers: RP09–696–000.
Applicants: Cimarron River Pipeline,
LLC.
Description: Cimarron River Pipeline,
LLC submits First Revised Sheet 335 et
al. to its FERC Gas Tariff, Original
Volume 1 to be effective 8/1/09.
Filed Date: 06/01/2009.
Accession Number: 20090603–0129.
Comment Date: 5 p.m. Eastern Time
on Monday, June 15, 2009.
Docket Numbers: RP09–697–000.
Applicants: Midcontinent Express
Pipeline LLC.
Description: Midcontinent Express
Pipeline LLC submits First Revised
Sheet No 254 et al. to its FERC Gas
Tariff, Original Volume No 1 to be
effective 8/1/09.
Filed Date: 06/01/2009.
Accession Number: 20090603–0128.
Comment Date: 5 p.m. Eastern Time
on Monday, June 15, 2009.
Docket Numbers: RP09–698–000.
Applicants: Portland General Electric
Company.
Description: Portland General Electric
Company submits Second Revised Sheet
27 et al. to its FERC Gas Tariff, Original
Volume 1 to be effective 8/1/09.
Filed Date: 06/01/2009.
Accession Number: 20090603–0127.
Comment Date: 5 p.m. Eastern Time
on Monday, June 15, 2009.
E:\FR\FM\12JNN1.SGM
12JNN1
Agencies
[Federal Register Volume 74, Number 112 (Friday, June 12, 2009)]
[Notices]
[Pages 28036-28037]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E9-13787]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. P-2157-188]
Public Utility District No. 1 of Snohomish County; Notice of
Application Tendered for Filing With the Commission and Establishing
Procedural Schedule for Licensing and Deadline for Submission of Final
Amendments
June 5, 2009.
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection.
a. Type of Application: New Major License.
b. Project No.: P-2157-188.
c. Date Filed: June 1, 2009.
d. Applicant: Public Utility District No. 1 of Snohomish County.
e. Name of Project: Henry M Jackson Hydroelectric Project.
f. Location: The existing project is located on the Sultan River in
Snohomish County, Washington, about 20 miles east of Everett,
Washington. The project penstock underlies 10.9 acres of Mount Baker-
Snoqualmie National Forest.
g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791(a)-825(r).
h. Applicant Contact: Public Utility District No. 1 of Snohomish
County (District), Steven J. Klein, General Manager, 2320 California
Street, P.O. Box 1107, Everett, WA 98206-1107.
i. FERC Contact: David Turner (202) 502-6091 or via e-mail at
david.turner@ferc.gov.
j. This application is not ready for environmental analysis at this
time.
k. Project Description: The existing project consists of the
following: (1) Spada Lake, with a surface area of 1,802 acres at a
normal maximum water surface elevation of 1,445 feet msl; (2) Culmback
dam, a 640-foot-long, 262-foot-high earth and rockfill dam with a crest
elevation of 1,470 feet msl located at River Mile (RM) 16.5 on the
Sultan River; (3) a concrete morning glory spillway with a crest
elevation of 1,450 feet msl located approximately 250 feet from the
right bank; (4) a system of conduits and valves under the dam which
provide the minimum flow downstream of Culmback dam; (5) a 110-foot-
tall concrete powerhouse intake structure located approximately 250
feet upstream of the dam with three 20-foot movable panels to allow
withdrawal from different depths; (6) a penstock consisting of a 3.8-
mile-long, 14-foot-diameter unlined tunnel leading to a 3.7-mile-long,
10-foot-diameter underground pipeline; (7) a two-story reinforced-
concrete powerhouse located at RM 4.3; (8) four generating units with a
total installed capacity of 111.8 MW; Units 1 and 2 are 47.5 MW Pelton
turbines, which discharge water directly into a 40-foot-long discharge
canal to the Sultan River; Units 3 and 4 are 8.4 MW Francis turbines,
which discharge water through the Lake Chaplain water supply pipeline;
(9) the approximately 3.5-mile-long, 72-inch-diameter Lake Chaplain
water supply pipeline, which routes water from the Francis turbines to
the Portal 2 structure at Lake Chaplain; (10) the Portal 2 structure,
which diverts flows from the Lake Chaplain pipeline to Lake Chaplain (a
450-acre reservoir which serves as the City of Everett's water supply)
or to the diversion dam tunnel and pipeline; (11) a 1.5-mile-long,
concrete-lined tunnel and a 2,000-foot-long, 72-inch-diameter concrete
pipeline connecting Lake Chaplain and the Sultan River immediately
upstream of the diversion dam; (12) a 120-foot-long, 20-foot-high,
concrete gravity diversion dam which was originally constructed to
divert water from the Sultan River to Lake Chaplain; and (13) other
appurtenant equipment. Project operations are guided by reservoir rule
curves which are designed to minimize spill at Spada Lake while
providing minimum flow releases to the Sultan River downstream of the
diversion dam. The District proposes the following changes to the
project: (1) Modifications to the project boundary that include
additional land and exclude certain land included in the existing
project boundary; (2) a new Operations Plan based on revised Spada Lake
rule curves; (3) aquatic habitat enhancement measures; (4) measures to
protect and enhance wildlife habitat; (5) measures to enhance
recreational opportunities; and (6) measures to protect historic
properties.
l. Locations of the Application: A copy of the application is
available for review at the Commission in the Public Reference Room or
may be viewed on the Commission's Web site at https://www.ferc.gov using
the ``eLibrary'' link. Enter the docket number excluding the last three
digits in the docket number field to access the document. For
assistance, contact FERC Online Support at FERCOnlineSupport@ferc.gov
or toll-free at (866) 208-3676, or for TTY, (202) 502-8659. A copy is
also available for inspection and reproduction at the address in item
(h) above.
m. You may also register online at https://www.ferc.gov/esubscribenow.htm to be notified via email of new filings and issuances
related to this or other pending projects. For assistance, contact FERC
Online Support.
n. Procedural Schedule:
The application will be processed according to the following Hydro
Licensing Schedule. Revisions to the schedule may be made as
appropriate. For example, issuance of the Ready for Environmental
Analysis Notice is based on the assumption that there will be no
additional information.
------------------------------------------------------------------------
Milestone Date
------------------------------------------------------------------------
Application Deficiency Determination July 2009.
Letter and Issuance of Additional
Information Requests (AIRs).
Notice of Acceptance/Notice of Ready July 2009.
for Environmental Analysis.
Filing of Interventions, September 2009.
Recommendations, Terms and
Conditions, and Fishway
Prescriptions.
Reply Comments Due.................. November 2009.
Issuance of Draft EA................ March 2010.
Comments on Draft EA Due............ April 2010.
Filing of Modified Terms and June 2010.
Conditions.
Issuance of Final EA................ September 2010.
------------------------------------------------------------------------
[[Page 28037]]
o. Final amendments to the application must be filed with the
Commission no later than 30 days from the issuance date of the notice
of ready for environmental analysis.
Kimberly D. Bose,
Secretary.
[FR Doc. E9-13787 Filed 6-11-09; 8:45 am]
BILLING CODE 6717-01-P