Drawbridge Operation Regulation; Atlantic Intracoastal Waterway, New Smyrna Beach, FL, 27442 [E9-13640]

Download as PDF 27442 Federal Register / Vol. 74, No. 110 / Wednesday, June 10, 2009 / Rules and Regulations River, Boston Inner Harbor, for 100 yards upstream and downstream of the center of the Chelsea Street Draw span (in the approximate position of latitude 42°23′10.3″ N., longitude 71°01′21.2″ W.). [NAD83]. * * * * * (b) * * * (4) Restrictions when the Chelsea River channel is obstructed by vessel(s) moored at the Northeast Petroleum Terminal located downstream of the Chelsea Street Bridge on the Chelsea, MA side of the Chelsea River—hereafter referred to as the Jenny Dock (approximate position latitude 42°23′05.2″ N., longitude 71°01′35.8″ W.)—or the Mobile Oil Terminal located on the East Boston Side of the Chelsea River downstream of the Chelsea Street Bridge (approximate position latitude 42°23′04.9″ N., longitude 71°01′28.52″ W.): [NAD83]. * * * * * § 165.1407 [Amended] 44. In § 165.1407(c)(2), following the numbers ‘‘(808) 842–2600’’ add ‘‘and (808) 842–2601, fax (808) 842–2624’’. ■ PART 169—SHIP REPORTING SYSTEMS 45. The authority citation for part 169 continues to read as follows: ■ Authority: 33 U.S.C. 1230(d), Department of Homeland Security Delegation No. 0170.1. § 169.1 [Amended] 46. In § 169.1, add a note at the end of the current section to read as follows: ■ § 169.1 * * What is the purpose of this part? * * * Note to § 169.1: For ship reporting system requirements not established by the Coast Guard, see 50 CFR Part 404. Dated: June 3, 2009. Stefan G. Venckus, Chief, Office of Regulations and Administrative Law, United States Coast Guard. [FR Doc. E9–13370 Filed 6–9–09; 8:45 am] mstockstill on PROD1PC66 with RULES BILLING CODE 4910–15–P VerDate Nov<24>2008 14:06 Jun 09, 2009 Jkt 217001 DEPARTMENT OF HOMELAND SECURITY Coast Guard 33 CFR Part 117 [Docket No. USCG–2009–0415] RIN 1625–AA09 Drawbridge Operation Regulation; Atlantic Intracoastal Waterway, New Smyrna Beach, FL Coast Guard, DHS. Notice of temporary deviation from regulations. AGENCY: ACTION: SUMMARY: The Commander, Seventh Coast Guard District, has issued a temporary deviation from the regulation governing the operation of the Coronado Beach Bridge (SR 44) across the Atlantic Intracoastal Waterway, mile 854, at New Smyrna Beach, FL. The deviation is necessary to repair the bridge. This deviation allows the bridge to remain closed to navigation during the deviation period. DATES: This deviation is effective from 6 a.m. on June 30, 2009 through 6 a.m. on July 3, 2009. ADDRESSES: Documents mentioned in this preamble as being available in the docket are part of docket USCG–2009– 0415 and are available online by going to https://www.regulations.gov, selecting the Advanced Docket Search option on the right side of the screen, inserting USCG–2009–0415 in the Docket ID box, pressing Enter, and then clicking on the item in the Docket ID column. This material is also available for inspection or copying at the Docket Management Facility (M–30), U.S. Department of Transportation, West Building Ground Floor, Room W12–140, 1200 New Jersey Avenue, SE., Washington, DC 20590, between 9 a.m. and 5 p.m., Monday through Friday, except Federal holidays. FOR FURTHER INFORMATION CONTACT: If you have questions on this rule, call or e-mail Mr. Michael Lieberum, Bridge Branch, Seventh Coast Guard District, telephone 305–415–6744, e-mail Michael.b.lieberum@uscg.mil. If you have questions on viewing the docket, call Renee V. Wright, Program Manager, Docket Operations, telephone 202–366– 9826. SUPPLEMENTARY INFORMATION: M&J Construction Company of behalf of the bridge owner, Florida Department of Transportation (FDOT), has requested a deviation to the regulation of the Coronado Beach/George C. Musson (SR 44) Bridge across the Atlantic Intracoastal Waterway, mile 854.0, New PO 00000 Frm 00020 Fmt 4700 Sfmt 4700 Smyrna, FL. The bridge provides a vertical clearance of 24 feet in the closed position. As required by 33 CFR 117.261(h), the bridge shall open on signal, except that from 7 a.m. until 7 p.m., each day of the week, the draw need only open on the hour, twenty minutes past the hour and forty minutes past the hour. The deviation is from 6 a.m. on June 30, 2009 through 6 a.m. on July 3, 2009. During the deviation this bridge will remain closed to navigation. Vessels not requiring an opening may pass at any time. This action is necessary because the bridge will be inoperable in a jacked-up state to perform repairs. The action will affect all vessels requiring an opening during this time period. Vessels unable to transit through this area may transit via an ocean route or schedule their transit prior to or after the repair work is completed. In accordance with 33 CFR 117.35(e), the drawbridge must return to its regular operating schedule immediately at the end of the designated time period. This deviation from the operating regulations is authorized under 33 CFR 117.35. Dated: May 26, 2009. R.S. Branham, Rear Admiral, U.S. Coast Guard, Commander, Coast Guard Seventh District. [FR Doc. E9–13640 Filed 6–9–09; 8:45 am] BILLING CODE 4910–15–P ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 [EPA–R05–OAR–2006–0004; FRL–8900–5] Approval and Promulgation of Air Quality Implementation Plans; Indiana AGENCY: Environmental Protection Agency (EPA). ACTION: Final rule. SUMMARY: Pursuant to provisions in the Clean Air Act (Act) which allow EPA to correct State Implementation Plan (SIP) actions made in error, EPA is taking final action to correct an error in part of its June 12, 2006 approval of an amendment to Indiana’s ozone SIP. In today’s action, EPA is rescinding its approval of the inclusion of the state’s codified definition of hazardous air pollutant (HAP) in Indiana’s ozone SIP. DATES: This final rule is effective on July 10, 2009. ADDRESSES: EPA has established a docket for this action under Docket ID No. EPA–R05–OAR–2006–0004. All documents in the docket are listed on the https://www.regulations.gov Web E:\FR\FM\10JNR1.SGM 10JNR1

Agencies

[Federal Register Volume 74, Number 110 (Wednesday, June 10, 2009)]
[Rules and Regulations]
[Page 27442]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E9-13640]


-----------------------------------------------------------------------

DEPARTMENT OF HOMELAND SECURITY

Coast Guard

33 CFR Part 117

[Docket No. USCG-2009-0415]
RIN 1625-AA09


Drawbridge Operation Regulation; Atlantic Intracoastal Waterway, 
New Smyrna Beach, FL

AGENCY: Coast Guard, DHS.

ACTION: Notice of temporary deviation from regulations.

-----------------------------------------------------------------------

SUMMARY: The Commander, Seventh Coast Guard District, has issued a 
temporary deviation from the regulation governing the operation of the 
Coronado Beach Bridge (SR 44) across the Atlantic Intracoastal 
Waterway, mile 854, at New Smyrna Beach, FL. The deviation is necessary 
to repair the bridge. This deviation allows the bridge to remain closed 
to navigation during the deviation period.

DATES: This deviation is effective from 6 a.m. on June 30, 2009 through 
6 a.m. on July 3, 2009.

ADDRESSES: Documents mentioned in this preamble as being available in 
the docket are part of docket USCG-2009-0415 and are available online 
by going to https://www.regulations.gov, selecting the Advanced Docket 
Search option on the right side of the screen, inserting USCG-2009-0415 
in the Docket ID box, pressing Enter, and then clicking on the item in 
the Docket ID column. This material is also available for inspection or 
copying at the Docket Management Facility (M-30), U.S. Department of 
Transportation, West Building Ground Floor, Room W12-140, 1200 New 
Jersey Avenue, SE., Washington, DC 20590, between 9 a.m. and 5 p.m., 
Monday through Friday, except Federal holidays.

FOR FURTHER INFORMATION CONTACT: If you have questions on this rule, 
call or e-mail Mr. Michael Lieberum, Bridge Branch, Seventh Coast Guard 
District, telephone 305-415-6744, e-mail Michael.b.lieberum@uscg.mil. 
If you have questions on viewing the docket, call Renee V. Wright, 
Program Manager, Docket Operations, telephone 202-366-9826.

SUPPLEMENTARY INFORMATION: M&J Construction Company of behalf of the 
bridge owner, Florida Department of Transportation (FDOT), has 
requested a deviation to the regulation of the Coronado Beach/George C. 
Musson (SR 44) Bridge across the Atlantic Intracoastal Waterway, mile 
854.0, New Smyrna, FL. The bridge provides a vertical clearance of 24 
feet in the closed position. As required by 33 CFR 117.261(h), the 
bridge shall open on signal, except that from 7 a.m. until 7 p.m., each 
day of the week, the draw need only open on the hour, twenty minutes 
past the hour and forty minutes past the hour. The deviation is from 6 
a.m. on June 30, 2009 through 6 a.m. on July 3, 2009. During the 
deviation this bridge will remain closed to navigation. Vessels not 
requiring an opening may pass at any time. This action is necessary 
because the bridge will be inoperable in a jacked-up state to perform 
repairs. The action will affect all vessels requiring an opening during 
this time period. Vessels unable to transit through this area may 
transit via an ocean route or schedule their transit prior to or after 
the repair work is completed.
    In accordance with 33 CFR 117.35(e), the drawbridge must return to 
its regular operating schedule immediately at the end of the designated 
time period. This deviation from the operating regulations is 
authorized under 33 CFR 117.35.

    Dated: May 26, 2009.
R.S. Branham,
Rear Admiral, U.S. Coast Guard, Commander, Coast Guard Seventh 
District.
[FR Doc. E9-13640 Filed 6-9-09; 8:45 am]
BILLING CODE 4910-15-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.