Natural Gas Pipeline Company of America LLC; Notice of Request Under Blanket Authorization, 27302 [E9-13366]
Download as PDF
27302
Federal Register / Vol. 74, No. 109 / Tuesday, June 9, 2009 / Notices
Docket No. ER09–369, PJM
Interconnection LLC.
Docket No. ER09–412, PJM
Interconnection LLC.
Docket No. ER09–497, et al., PJM
Interconnection LLC.
Docket No. ER09–585, PJM
Interconnection LLC.
Docket No. ER09–701, PJM
Interconnection LLC.
Docket No. ER09–730, PJM
Interconnection LLC.
Docket No. ER09–745, Baltimore Gas
and Electric Company.
Docket No. ER09–940, Northern Virginia
Electric Cooperative, Inc.
Docket No. ER09–996, PJM
Interconnection LLC.
Docket No. ER09–1063, PJM
Interconnection LLC.
Docket No. EL05–148, PJM
Interconnection LLC.
Docket No. EL08–12, PJM Industrial
Customer Coalition v PJM
Interconnection LLC.
Docket No. EL08–44, PJM
Interconnection LLC v Accord Energy,
LLC et al.
Docket No. EL08–47, Maryland Public
Service Commission v PJM
Interconnection LLC.
Docket No. EL08–67, Maryland Public
Service Commission et al. v PJM
Interconnection LLC.
Docket No. EL08–78, Commonwealth
Edison Company.
Docket No. EL09–39, First Energy
Solutions Corp.
The meetings are open to
stakeholders. For more information
regarding Commission participation,
contact Morris Margolis, Office of
Energy Markets Regulation, Federal
Energy Regulatory Commission at (202)
502–8611 or morris.margolis@ferc.gov.
Kimberly D. Bose,
Secretary.
[FR Doc. E9–13363 Filed 6–8–09; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP09–414–000]
Natural Gas Pipeline Company of
America LLC; Notice of Request Under
Blanket Authorization
June 2, 2009.
Take notice that on May 19, 2009,
Natural Gas Pipeline Company of
America LLC (Natural), 3250 Lacey
Road, Suite 700, Downers Grove, Illinois
60515, filed in the above Docket, a prior
notice request pursuant to sections
VerDate Nov<24>2008
14:45 Jun 08, 2009
Jkt 217001
157.205, 157.208 and 157.213 of the
Commission’s regulations under the
Natural Gas Act (NGA) for authorization
to: (i) Convert up to 5 billion cubic feet
(Bcf) of cushion gas to working gas over
a three-year term period (2009 though
2011) which will allow Natural to
provide an additional five Bcf of
Nominated Storage Service to its
shippers; (ii) increase the maximum
certificated withdrawal capacity from
600 million standard cubit feet per day
(MMscf/d) to 667 MMscf/d; and (iii)
install over pressure protection
equipment at Natural’s Sayre Storage
field in Beckham County, Oklahoma.
All as more fully set forth in the
application which is on file with the
Commission and open to public
inspection. The filing may also be
viewed on the Web at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
assistance, please contact FERC Online
Support at
FERCOnlineSupport@ferc.gov or toll
free at (866) 208–3676, or TTY, contact
(202) 502–8659.
Any questions concerning this
application may be directed to Russell
Frame, Engineer, Gas Storage, Natural
Gas Pipeline Company of America LLC,
3250 Lacey Road, 7th floor, Downers
Grove, Illinois 60515 at (630) 725–3827.
Any person may, within 60 days after
the issuance of the instant notice by the
Commission, file pursuant to Rule 214
of the Commission’s Procedural Rules
(18 CFR 385.214) a motion to intervene
or notice of intervention. Any person
filing to intervene or the Commission’s
staff may, pursuant to section 157.205 of
the Commission’s Regulations under the
Natural Gas Act (NGA) (18 CFR 157.205)
file a protest to the request. If no protest
is filed within the time allowed
therefore, the proposed activity shall be
deemed to be authorized effective the
day after the time allowed for protest. If
a protest is filed and not withdrawn
within 30 days after the time allowed
for filing a protest, the instant request
shall be treated as an application for
authorization pursuant to section 7 of
the NGA.
The Commission strongly encourages
electronic filings of comments, protests,
and interventions via the Internet in lieu
of paper. See 18 CFR 385.2001(a)(1)(iii)
and the instructions on the
Commission’s Web site (https://
www.ferc.gov) under the ‘‘e-Filing’’ link.
Kimberly D. Bose,
Secretary.
[FR Doc. E9–13366 Filed 6–8–09; 8:45 am]
BILLING CODE 6717–01–P
PO 00000
Frm 00027
Fmt 4703
Sfmt 4703
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings No. 1
June 3, 2009.
Take notice that the Commission has
received the following Natural Gas
Pipeline Rate and Refund Report filings:
Docket Numbers: RP09–618–000.
Applicants: Stingray Pipeline
Company, LLC.
Description: Stingray Pipeline
Company, LLC submits Tenth Revised
Sheet 199 to FERC Gas Tariff—Third
Revised Volume 1, to be effective 8/1/
09.
Filed Date: 05/28/2009.
Accession Number: 20090529–0092.
Comment Date: 5 p.m. Eastern Time
on Tuesday, June 9, 2009.
Docket Numbers: RP09–622–000.
Applicants: Garden Banks Gas
Pipeline, LLC.
Description: Garden Banks Gas
Pipeline, LLC submits Eleventh Revised
Sheet 136 et al. to FERC Gas Tariff—
Original Volume 1, to be effective 8/1/
09.
Filed Date: 05/28/2009.
Accession Number: 20090529–0088.
Comment Date: 5 p.m. Eastern Time
on Tuesday, June 9, 2009.
Docket Numbers: RP09–623–000.
Applicants: Mississippi Canyon Gas
Pipeline, LLC.
Description: Mississippi Canyon Gas
Pipeline, LLC submits Sixth revised
Sheet 151 et al. of its FERC Gas Tariff—
First Revised Volume 1, to be effective
8/1/09.
Filed Date: 05/28/2009.
Accession Number: 20090529–0087.
Comment Date: 5 p.m. Eastern Time
on Tuesday, June 9, 2009.
Docket Numbers: RP09–624–000.
Applicants: Enbridge Pipelines
(Midla) LLC.
Description: Enbridge Pipelines
(Midla) LLC submits Second Revised
Sheet 188A et al. of its FERC Gas
Tariff—Fifth Revised Volume 1 under
RM96–1 et al.
Filed Date: 05/28/2009.
Accession Number: 20090529–0086.
Comment Date: 5 p.m. Eastern Time
on Tuesday, June 9, 2009.
Docket Numbers: RP09–630–000.
Applicants: Transcontinental Gas
Pipe Line Company,
Description: Transcontinental Gas
Pipe Line Co, LLC submits First Revised
Sheet 31 et al. to FERC Gas Tariff—
Fourth Revised Volume 1, to be effective
7/1/09.
Filed Date: 05/29/2009.
E:\FR\FM\09JNN1.SGM
09JNN1
Agencies
[Federal Register Volume 74, Number 109 (Tuesday, June 9, 2009)]
[Notices]
[Page 27302]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E9-13366]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP09-414-000]
Natural Gas Pipeline Company of America LLC; Notice of Request
Under Blanket Authorization
June 2, 2009.
Take notice that on May 19, 2009, Natural Gas Pipeline Company of
America LLC (Natural), 3250 Lacey Road, Suite 700, Downers Grove,
Illinois 60515, filed in the above Docket, a prior notice request
pursuant to sections 157.205, 157.208 and 157.213 of the Commission's
regulations under the Natural Gas Act (NGA) for authorization to: (i)
Convert up to 5 billion cubic feet (Bcf) of cushion gas to working gas
over a three-year term period (2009 though 2011) which will allow
Natural to provide an additional five Bcf of Nominated Storage Service
to its shippers; (ii) increase the maximum certificated withdrawal
capacity from 600 million standard cubit feet per day (MMscf/d) to 667
MMscf/d; and (iii) install over pressure protection equipment at
Natural's Sayre Storage field in Beckham County, Oklahoma. All as more
fully set forth in the application which is on file with the Commission
and open to public inspection. The filing may also be viewed on the Web
at https://www.ferc.gov using the ``eLibrary'' link. Enter the docket
number excluding the last three digits in the docket number field to
access the document. For assistance, please contact FERC Online Support
at FERCOnlineSupport@ferc.gov or toll free at (866) 208-3676, or TTY,
contact (202) 502-8659.
Any questions concerning this application may be directed to
Russell Frame, Engineer, Gas Storage, Natural Gas Pipeline Company of
America LLC, 3250 Lacey Road, 7th floor, Downers Grove, Illinois 60515
at (630) 725-3827.
Any person may, within 60 days after the issuance of the instant
notice by the Commission, file pursuant to Rule 214 of the Commission's
Procedural Rules (18 CFR 385.214) a motion to intervene or notice of
intervention. Any person filing to intervene or the Commission's staff
may, pursuant to section 157.205 of the Commission's Regulations under
the Natural Gas Act (NGA) (18 CFR 157.205) file a protest to the
request. If no protest is filed within the time allowed therefore, the
proposed activity shall be deemed to be authorized effective the day
after the time allowed for protest. If a protest is filed and not
withdrawn within 30 days after the time allowed for filing a protest,
the instant request shall be treated as an application for
authorization pursuant to section 7 of the NGA.
The Commission strongly encourages electronic filings of comments,
protests, and interventions via the Internet in lieu of paper. See 18
CFR 385.2001(a)(1)(iii) and the instructions on the Commission's Web
site (https://www.ferc.gov) under the ``e-Filing'' link.
Kimberly D. Bose,
Secretary.
[FR Doc. E9-13366 Filed 6-8-09; 8:45 am]
BILLING CODE 6717-01-P