Download as PDF 27302 Federal Register / Vol. 74, No. 109 / Tuesday, June 9, 2009 / Notices Docket No. ER09–369, PJM Interconnection LLC. Docket No. ER09–412, PJM Interconnection LLC. Docket No. ER09–497, et al., PJM Interconnection LLC. Docket No. ER09–585, PJM Interconnection LLC. Docket No. ER09–701, PJM Interconnection LLC. Docket No. ER09–730, PJM Interconnection LLC. Docket No. ER09–745, Baltimore Gas and Electric Company. Docket No. ER09–940, Northern Virginia Electric Cooperative, Inc. Docket No. ER09–996, PJM Interconnection LLC. Docket No. ER09–1063, PJM Interconnection LLC. Docket No. EL05–148, PJM Interconnection LLC. Docket No. EL08–12, PJM Industrial Customer Coalition v PJM Interconnection LLC. Docket No. EL08–44, PJM Interconnection LLC v Accord Energy, LLC et al. Docket No. EL08–47, Maryland Public Service Commission v PJM Interconnection LLC. Docket No. EL08–67, Maryland Public Service Commission et al. v PJM Interconnection LLC. Docket No. EL08–78, Commonwealth Edison Company. Docket No. EL09–39, First Energy Solutions Corp. The meetings are open to stakeholders. For more information regarding Commission participation, contact Morris Margolis, Office of Energy Markets Regulation, Federal Energy Regulatory Commission at (202) 502–8611 or morris.margolis@ferc.gov. Kimberly D. Bose, Secretary. [FR Doc. E9–13363 Filed 6–8–09; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP09–414–000] Natural Gas Pipeline Company of America LLC; Notice of Request Under Blanket Authorization June 2, 2009. Take notice that on May 19, 2009, Natural Gas Pipeline Company of America LLC (Natural), 3250 Lacey Road, Suite 700, Downers Grove, Illinois 60515, filed in the above Docket, a prior notice request pursuant to sections VerDate Nov<24>2008 14:45 Jun 08, 2009 Jkt 217001 157.205, 157.208 and 157.213 of the Commission’s regulations under the Natural Gas Act (NGA) for authorization to: (i) Convert up to 5 billion cubic feet (Bcf) of cushion gas to working gas over a three-year term period (2009 though 2011) which will allow Natural to provide an additional five Bcf of Nominated Storage Service to its shippers; (ii) increase the maximum certificated withdrawal capacity from 600 million standard cubit feet per day (MMscf/d) to 667 MMscf/d; and (iii) install over pressure protection equipment at Natural’s Sayre Storage field in Beckham County, Oklahoma. All as more fully set forth in the application which is on file with the Commission and open to public inspection. The filing may also be viewed on the Web at https:// www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov or toll free at (866) 208–3676, or TTY, contact (202) 502–8659. Any questions concerning this application may be directed to Russell Frame, Engineer, Gas Storage, Natural Gas Pipeline Company of America LLC, 3250 Lacey Road, 7th floor, Downers Grove, Illinois 60515 at (630) 725–3827. Any person may, within 60 days after the issuance of the instant notice by the Commission, file pursuant to Rule 214 of the Commission’s Procedural Rules (18 CFR 385.214) a motion to intervene or notice of intervention. Any person filing to intervene or the Commission’s staff may, pursuant to section 157.205 of the Commission’s Regulations under the Natural Gas Act (NGA) (18 CFR 157.205) file a protest to the request. If no protest is filed within the time allowed therefore, the proposed activity shall be deemed to be authorized effective the day after the time allowed for protest. If a protest is filed and not withdrawn within 30 days after the time allowed for filing a protest, the instant request shall be treated as an application for authorization pursuant to section 7 of the NGA. The Commission strongly encourages electronic filings of comments, protests, and interventions via the Internet in lieu of paper. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site (https:// www.ferc.gov) under the ‘‘e-Filing’’ link. Kimberly D. Bose, Secretary. [FR Doc. E9–13366 Filed 6–8–09; 8:45 am] BILLING CODE 6717–01–P PO 00000 Frm 00027 Fmt 4703 Sfmt 4703 DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filings No. 1 June 3, 2009. Take notice that the Commission has received the following Natural Gas Pipeline Rate and Refund Report filings: Docket Numbers: RP09–618–000. Applicants: Stingray Pipeline Company, LLC. Description: Stingray Pipeline Company, LLC submits Tenth Revised Sheet 199 to FERC Gas Tariff—Third Revised Volume 1, to be effective 8/1/ 09. Filed Date: 05/28/2009. Accession Number: 20090529–0092. Comment Date: 5 p.m. Eastern Time on Tuesday, June 9, 2009. Docket Numbers: RP09–622–000. Applicants: Garden Banks Gas Pipeline, LLC. Description: Garden Banks Gas Pipeline, LLC submits Eleventh Revised Sheet 136 et al. to FERC Gas Tariff— Original Volume 1, to be effective 8/1/ 09. Filed Date: 05/28/2009. Accession Number: 20090529–0088. Comment Date: 5 p.m. Eastern Time on Tuesday, June 9, 2009. Docket Numbers: RP09–623–000. Applicants: Mississippi Canyon Gas Pipeline, LLC. Description: Mississippi Canyon Gas Pipeline, LLC submits Sixth revised Sheet 151 et al. of its FERC Gas Tariff— First Revised Volume 1, to be effective 8/1/09. Filed Date: 05/28/2009. Accession Number: 20090529–0087. Comment Date: 5 p.m. Eastern Time on Tuesday, June 9, 2009. Docket Numbers: RP09–624–000. Applicants: Enbridge Pipelines (Midla) LLC. Description: Enbridge Pipelines (Midla) LLC submits Second Revised Sheet 188A et al. of its FERC Gas Tariff—Fifth Revised Volume 1 under RM96–1 et al. Filed Date: 05/28/2009. Accession Number: 20090529–0086. Comment Date: 5 p.m. Eastern Time on Tuesday, June 9, 2009. Docket Numbers: RP09–630–000. Applicants: Transcontinental Gas Pipe Line Company, Description: Transcontinental Gas Pipe Line Co, LLC submits First Revised Sheet 31 et al. to FERC Gas Tariff— Fourth Revised Volume 1, to be effective 7/1/09. Filed Date: 05/29/2009. E:\FR\FM\09JNN1.SGM 09JNN1

Agencies

[Federal Register Volume 74, Number 109 (Tuesday, June 9, 2009)]
[Notices]
[Page 27302]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E9-13366]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. CP09-414-000]


Natural Gas Pipeline Company of America LLC; Notice of Request 
Under Blanket Authorization

June 2, 2009.
    Take notice that on May 19, 2009, Natural Gas Pipeline Company of 
America LLC (Natural), 3250 Lacey Road, Suite 700, Downers Grove, 
Illinois 60515, filed in the above Docket, a prior notice request 
pursuant to sections 157.205, 157.208 and 157.213 of the Commission's 
regulations under the Natural Gas Act (NGA) for authorization to: (i) 
Convert up to 5 billion cubic feet (Bcf) of cushion gas to working gas 
over a three-year term period (2009 though 2011) which will allow 
Natural to provide an additional five Bcf of Nominated Storage Service 
to its shippers; (ii) increase the maximum certificated withdrawal 
capacity from 600 million standard cubit feet per day (MMscf/d) to 667 
MMscf/d; and (iii) install over pressure protection equipment at 
Natural's Sayre Storage field in Beckham County, Oklahoma. All as more 
fully set forth in the application which is on file with the Commission 
and open to public inspection. The filing may also be viewed on the Web 
at https://www.ferc.gov using the ``eLibrary'' link. Enter the docket 
number excluding the last three digits in the docket number field to 
access the document. For assistance, please contact FERC Online Support 
at FERCOnlineSupport@ferc.gov or toll free at (866) 208-3676, or TTY, 
contact (202) 502-8659.
    Any questions concerning this application may be directed to 
Russell Frame, Engineer, Gas Storage, Natural Gas Pipeline Company of 
America LLC, 3250 Lacey Road, 7th floor, Downers Grove, Illinois 60515 
at (630) 725-3827.
    Any person may, within 60 days after the issuance of the instant 
notice by the Commission, file pursuant to Rule 214 of the Commission's 
Procedural Rules (18 CFR 385.214) a motion to intervene or notice of 
intervention. Any person filing to intervene or the Commission's staff 
may, pursuant to section 157.205 of the Commission's Regulations under 
the Natural Gas Act (NGA) (18 CFR 157.205) file a protest to the 
request. If no protest is filed within the time allowed therefore, the 
proposed activity shall be deemed to be authorized effective the day 
after the time allowed for protest. If a protest is filed and not 
withdrawn within 30 days after the time allowed for filing a protest, 
the instant request shall be treated as an application for 
authorization pursuant to section 7 of the NGA.
    The Commission strongly encourages electronic filings of comments, 
protests, and interventions via the Internet in lieu of paper. See 18 
CFR 385.2001(a)(1)(iii) and the instructions on the Commission's Web 
site (https://www.ferc.gov) under the ``e-Filing'' link.

Kimberly D. Bose,
Secretary.
[FR Doc. E9-13366 Filed 6-8-09; 8:45 am]
BILLING CODE 6717-01-P