Notice of Attendance at PJM Meetings, 27301-27302 [E9-13363]
Download as PDF
Federal Register / Vol. 74, No. 109 / Tuesday, June 9, 2009 / Notices
27301
DEPARTMENT OF ENERGY
DEPARTMENT OF ENERGY
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Federal Energy Regulatory
Commission
Federal Energy Regulatory
Commission
[Project No. 3603–013]
Notice of Attendance at NYISO
Meetings
Notice of Attendance at PJM Meetings
June 2, 2009.
The Federal Energy Regulatory
Commission hereby gives notice that
members of the Commission and
Commission staff may attend the
following upcoming meetings of the
PJM Interconnection LLC. All meetings
are in Wilmington, DE unless noted
otherwise:
Pitkin County, CO, City of Aspen, CO;
Notice of Application for Transfer of
License, and Soliciting Comments,
Motions to Intervene, and Protests
On May 12, 2009, Pitkin County,
Colorado and City of Aspen, Colorado
(Transferors) and City of Aspen,
Colorado (Transferee) filed a joint
application for transfer of license of the
Ruedi Power Plant Project, located on
the Fryingpan River in Pitkin and Eagle
Counties, Colorado.
Applicants seek Commission approval
to transfer the license for Ruedi Power
Plant Project from Pitkin County,
Colorado and City of Aspen, Colorado to
City of Aspen, Colorado.
Applicant Contact: for Pitkin County:
Mr. John M. Ely, Pitkin County
Attorney, 530 E Main Street, Third
Floor, Aspen, CO 81611. For the City of
Aspen: Mr. Karl F. Kumli, III, Special
Counsel for the City of Aspen, Dietze
and Davis PC, 2060 Broadway, Suite
400, Boulder, CO 80302, phone (303)
447–1375.
FERC Contact: Robert Bell, (202) 502–
6062.
Deadline for filing comments,
protests, and motions to intervene: 30
days from the issuance of this notice.
Comments and motions to intervene
may be filed electronically via the
Internet. See 18 CFR 385.2001(a)(1)(iii)
and the instructions on the
Commission’s Web site under the
‘‘e-Filing’’ link. If unable to be filed
electronically, documents may be paperfiled. To paper-file, an original and eight
copies should be mailed to: Kimberly D.
Bose, Secretary, Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426. For
more information on how to submit
these types of filings please go to the
Commission’s Web site located at
https://www.ferc.gov/filingcomments.asp. More information about
this project can be viewed or printed on
the ‘‘eLibrary’’ link of Commission’s
Web site at https://www.ferc.gov/docsfiling/elibrary.asp. Enter the docket
number (P–3603–013) in the docket
number field to access the document.
For assistance, call toll-free 1–866–208–
3372.
The Federal Energy Regulatory
Commission hereby gives notice that
members of the Commission and
Commission staff may attend the
following upcoming NYISO meetings:
• NYISO Business Issues Committee.
• June 10 (Rensselaer, NY).
• July 22 (Rensselaer, NY).
• NYISO Management Committee.
• June 15 (Albany, NY).
• June 24 (Rensselaer, NY).
• July 27 (Rensselaer, NY).
• NYISO ICAP Working Group.
• June 5 (Rensselaer, NY).
• July 7 (Rensselaer, NY).
• NYISO Transmission Planning
Advisory Committee.
• July 7 (Rensselaer, NY).
• NYISO Joint Board of Directors &
Management Committee.
• June 16 (Albany, NY).
For additional meeting information,
see https://www.nyiso.com/public/
committees/calendar/index.jsp.
The discussions at each of the
meetings described above may address
matters at issue in the following
proceedings:
Docket No. ER09–945, New York
Independent System Operator, Inc.
Docket Nos. EL07–39 and ER08–695,
New York Independent System
Operator, Inc.
Docket No. ER09–1142, New York
Independent System Operator, Inc.
Docket Nos. ER01–3001–021/ER03–
647–012 and ER01–3001–022/ER03–
647–013, New York Independent
System Operator, Inc.
Docket No. ER09–405, New York
Independent System Operator, Inc.
Docket No. ER04–449, New York
Independent System Operator, Inc.
Docket No. OA08–52; New York
Independent System Operator, Inc.
Docket No. OA09–26; New York
Independent System Operator, Inc.
The meetings are open to
stakeholders. For more information,
contact Jesse Hensley, Office of Energy
Markets Regulation, Federal Energy
Regulatory Commission at (202) 502–
6228 or Jesse.Hensley@ferc.gov.
Kimberly D. Bose,
Secretary.
[FR Doc. E9–13362 Filed 6–8–09; 8:45 am]
Kimberly D. Bose,
Secretary.
[FR Doc. E9–13364 Filed 6–8–09; 8:45 am]
BILLING CODE 6717–01–P
BILLING CODE 6717–01–P
June 2, 2009.
VerDate Nov<24>2008
14:45 Jun 08, 2009
Jkt 217001
PO 00000
Frm 00026
Fmt 4703
Sfmt 4703
June 2, 2009.
Members Committee (MC)
• June 4, 2009.
• August 13, 2009.
• September 24, 2009 (BWI Airport).
Markets and Reliability Committee
(MRC)
• June 17, 2009.
• July 30, 2009.
• September 23, 2009 (BWI Airport).
Market Implementation Committee
(MIC)
• June 11, 2009.
• July 14, 2009.
• August 14, 2009.
• September 10, 2009.
Planning Committee (PC)
• June 9, 2009.
• July 15, 2009.
• August 12, 2009.
• September 16, 2009 (Norristown,
PA).
Capacity Market Evolution Committee
(CMEC)
• July 17, 2009.
• August 5, 2009.
• August 24, 2009.
Additional meeting information and
schedules may be found at https://
www.pjm.com/committees-andgroups.aspx.
The discussions at each of the
meetings described above may address
matters at issue in the following
proceedings:
Docket No. ER05–1410, PJM
Interconnection LLC.
Docket No. ER06–456 et al., PJM
Interconnection LLC.
Docket No. ER08–194, Duquesne Light
Co.
Docket No. ER08–386, PotomacAppalachian Transmission Highline,
LLC.
Docket No. ER08–686, Pepco Holdings,
Inc.
Docket No. ER08–1370, Midwest
Independent Transmission System
Operator, Inc. and Duquesne Light Co.
Docket No. ER09–75, Pioneer
Transmission LLC.
E:\FR\FM\09JNN1.SGM
09JNN1
27302
Federal Register / Vol. 74, No. 109 / Tuesday, June 9, 2009 / Notices
Docket No. ER09–369, PJM
Interconnection LLC.
Docket No. ER09–412, PJM
Interconnection LLC.
Docket No. ER09–497, et al., PJM
Interconnection LLC.
Docket No. ER09–585, PJM
Interconnection LLC.
Docket No. ER09–701, PJM
Interconnection LLC.
Docket No. ER09–730, PJM
Interconnection LLC.
Docket No. ER09–745, Baltimore Gas
and Electric Company.
Docket No. ER09–940, Northern Virginia
Electric Cooperative, Inc.
Docket No. ER09–996, PJM
Interconnection LLC.
Docket No. ER09–1063, PJM
Interconnection LLC.
Docket No. EL05–148, PJM
Interconnection LLC.
Docket No. EL08–12, PJM Industrial
Customer Coalition v PJM
Interconnection LLC.
Docket No. EL08–44, PJM
Interconnection LLC v Accord Energy,
LLC et al.
Docket No. EL08–47, Maryland Public
Service Commission v PJM
Interconnection LLC.
Docket No. EL08–67, Maryland Public
Service Commission et al. v PJM
Interconnection LLC.
Docket No. EL08–78, Commonwealth
Edison Company.
Docket No. EL09–39, First Energy
Solutions Corp.
The meetings are open to
stakeholders. For more information
regarding Commission participation,
contact Morris Margolis, Office of
Energy Markets Regulation, Federal
Energy Regulatory Commission at (202)
502–8611 or morris.margolis@ferc.gov.
Kimberly D. Bose,
Secretary.
[FR Doc. E9–13363 Filed 6–8–09; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP09–414–000]
Natural Gas Pipeline Company of
America LLC; Notice of Request Under
Blanket Authorization
June 2, 2009.
Take notice that on May 19, 2009,
Natural Gas Pipeline Company of
America LLC (Natural), 3250 Lacey
Road, Suite 700, Downers Grove, Illinois
60515, filed in the above Docket, a prior
notice request pursuant to sections
VerDate Nov<24>2008
14:45 Jun 08, 2009
Jkt 217001
157.205, 157.208 and 157.213 of the
Commission’s regulations under the
Natural Gas Act (NGA) for authorization
to: (i) Convert up to 5 billion cubic feet
(Bcf) of cushion gas to working gas over
a three-year term period (2009 though
2011) which will allow Natural to
provide an additional five Bcf of
Nominated Storage Service to its
shippers; (ii) increase the maximum
certificated withdrawal capacity from
600 million standard cubit feet per day
(MMscf/d) to 667 MMscf/d; and (iii)
install over pressure protection
equipment at Natural’s Sayre Storage
field in Beckham County, Oklahoma.
All as more fully set forth in the
application which is on file with the
Commission and open to public
inspection. The filing may also be
viewed on the Web at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
assistance, please contact FERC Online
Support at
FERCOnlineSupport@ferc.gov or toll
free at (866) 208–3676, or TTY, contact
(202) 502–8659.
Any questions concerning this
application may be directed to Russell
Frame, Engineer, Gas Storage, Natural
Gas Pipeline Company of America LLC,
3250 Lacey Road, 7th floor, Downers
Grove, Illinois 60515 at (630) 725–3827.
Any person may, within 60 days after
the issuance of the instant notice by the
Commission, file pursuant to Rule 214
of the Commission’s Procedural Rules
(18 CFR 385.214) a motion to intervene
or notice of intervention. Any person
filing to intervene or the Commission’s
staff may, pursuant to section 157.205 of
the Commission’s Regulations under the
Natural Gas Act (NGA) (18 CFR 157.205)
file a protest to the request. If no protest
is filed within the time allowed
therefore, the proposed activity shall be
deemed to be authorized effective the
day after the time allowed for protest. If
a protest is filed and not withdrawn
within 30 days after the time allowed
for filing a protest, the instant request
shall be treated as an application for
authorization pursuant to section 7 of
the NGA.
The Commission strongly encourages
electronic filings of comments, protests,
and interventions via the Internet in lieu
of paper. See 18 CFR 385.2001(a)(1)(iii)
and the instructions on the
Commission’s Web site (https://
www.ferc.gov) under the ‘‘e-Filing’’ link.
Kimberly D. Bose,
Secretary.
[FR Doc. E9–13366 Filed 6–8–09; 8:45 am]
BILLING CODE 6717–01–P
PO 00000
Frm 00027
Fmt 4703
Sfmt 4703
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings No. 1
June 3, 2009.
Take notice that the Commission has
received the following Natural Gas
Pipeline Rate and Refund Report filings:
Docket Numbers: RP09–618–000.
Applicants: Stingray Pipeline
Company, LLC.
Description: Stingray Pipeline
Company, LLC submits Tenth Revised
Sheet 199 to FERC Gas Tariff—Third
Revised Volume 1, to be effective 8/1/
09.
Filed Date: 05/28/2009.
Accession Number: 20090529–0092.
Comment Date: 5 p.m. Eastern Time
on Tuesday, June 9, 2009.
Docket Numbers: RP09–622–000.
Applicants: Garden Banks Gas
Pipeline, LLC.
Description: Garden Banks Gas
Pipeline, LLC submits Eleventh Revised
Sheet 136 et al. to FERC Gas Tariff—
Original Volume 1, to be effective 8/1/
09.
Filed Date: 05/28/2009.
Accession Number: 20090529–0088.
Comment Date: 5 p.m. Eastern Time
on Tuesday, June 9, 2009.
Docket Numbers: RP09–623–000.
Applicants: Mississippi Canyon Gas
Pipeline, LLC.
Description: Mississippi Canyon Gas
Pipeline, LLC submits Sixth revised
Sheet 151 et al. of its FERC Gas Tariff—
First Revised Volume 1, to be effective
8/1/09.
Filed Date: 05/28/2009.
Accession Number: 20090529–0087.
Comment Date: 5 p.m. Eastern Time
on Tuesday, June 9, 2009.
Docket Numbers: RP09–624–000.
Applicants: Enbridge Pipelines
(Midla) LLC.
Description: Enbridge Pipelines
(Midla) LLC submits Second Revised
Sheet 188A et al. of its FERC Gas
Tariff—Fifth Revised Volume 1 under
RM96–1 et al.
Filed Date: 05/28/2009.
Accession Number: 20090529–0086.
Comment Date: 5 p.m. Eastern Time
on Tuesday, June 9, 2009.
Docket Numbers: RP09–630–000.
Applicants: Transcontinental Gas
Pipe Line Company,
Description: Transcontinental Gas
Pipe Line Co, LLC submits First Revised
Sheet 31 et al. to FERC Gas Tariff—
Fourth Revised Volume 1, to be effective
7/1/09.
Filed Date: 05/29/2009.
E:\FR\FM\09JNN1.SGM
09JNN1
Agencies
[Federal Register Volume 74, Number 109 (Tuesday, June 9, 2009)]
[Notices]
[Pages 27301-27302]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E9-13363]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Notice of Attendance at PJM Meetings
June 2, 2009.
The Federal Energy Regulatory Commission hereby gives notice that
members of the Commission and Commission staff may attend the following
upcoming meetings of the PJM Interconnection LLC. All meetings are in
Wilmington, DE unless noted otherwise:
Members Committee (MC)
June 4, 2009.
August 13, 2009.
September 24, 2009 (BWI Airport).
Markets and Reliability Committee (MRC)
June 17, 2009.
July 30, 2009.
September 23, 2009 (BWI Airport).
Market Implementation Committee (MIC)
June 11, 2009.
July 14, 2009.
August 14, 2009.
September 10, 2009.
Planning Committee (PC)
June 9, 2009.
July 15, 2009.
August 12, 2009.
September 16, 2009 (Norristown, PA).
Capacity Market Evolution Committee (CMEC)
July 17, 2009.
August 5, 2009.
August 24, 2009.
Additional meeting information and schedules may be found at https://www.pjm.com/committees-and-groups.aspx.
The discussions at each of the meetings described above may address
matters at issue in the following proceedings:
Docket No. ER05-1410, PJM Interconnection LLC.
Docket No. ER06-456 et al., PJM Interconnection LLC.
Docket No. ER08-194, Duquesne Light Co.
Docket No. ER08-386, Potomac-Appalachian Transmission Highline, LLC.
Docket No. ER08-686, Pepco Holdings, Inc.
Docket No. ER08-1370, Midwest Independent Transmission System Operator,
Inc. and Duquesne Light Co.
Docket No. ER09-75, Pioneer Transmission LLC.
[[Page 27302]]
Docket No. ER09-369, PJM Interconnection LLC.
Docket No. ER09-412, PJM Interconnection LLC.
Docket No. ER09-497, et al., PJM Interconnection LLC.
Docket No. ER09-585, PJM Interconnection LLC.
Docket No. ER09-701, PJM Interconnection LLC.
Docket No. ER09-730, PJM Interconnection LLC.
Docket No. ER09-745, Baltimore Gas and Electric Company.
Docket No. ER09-940, Northern Virginia Electric Cooperative, Inc.
Docket No. ER09-996, PJM Interconnection LLC.
Docket No. ER09-1063, PJM Interconnection LLC.
Docket No. EL05-148, PJM Interconnection LLC.
Docket No. EL08-12, PJM Industrial Customer Coalition v PJM
Interconnection LLC.
Docket No. EL08-44, PJM Interconnection LLC v Accord Energy, LLC et al.
Docket No. EL08-47, Maryland Public Service Commission v PJM
Interconnection LLC.
Docket No. EL08-67, Maryland Public Service Commission et al. v PJM
Interconnection LLC.
Docket No. EL08-78, Commonwealth Edison Company.
Docket No. EL09-39, First Energy Solutions Corp.
The meetings are open to stakeholders. For more information
regarding Commission participation, contact Morris Margolis, Office of
Energy Markets Regulation, Federal Energy Regulatory Commission at
(202) 502-8611 or morris.margolis@ferc.gov.
Kimberly D. Bose,
Secretary.
[FR Doc. E9-13363 Filed 6-8-09; 8:45 am]