Download as PDF Federal Register / Vol. 74, No. 109 / Tuesday, June 9, 2009 / Notices 27301 DEPARTMENT OF ENERGY DEPARTMENT OF ENERGY DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Federal Energy Regulatory Commission Federal Energy Regulatory Commission [Project No. 3603–013] Notice of Attendance at NYISO Meetings Notice of Attendance at PJM Meetings June 2, 2009. The Federal Energy Regulatory Commission hereby gives notice that members of the Commission and Commission staff may attend the following upcoming meetings of the PJM Interconnection LLC. All meetings are in Wilmington, DE unless noted otherwise: Pitkin County, CO, City of Aspen, CO; Notice of Application for Transfer of License, and Soliciting Comments, Motions to Intervene, and Protests On May 12, 2009, Pitkin County, Colorado and City of Aspen, Colorado (Transferors) and City of Aspen, Colorado (Transferee) filed a joint application for transfer of license of the Ruedi Power Plant Project, located on the Fryingpan River in Pitkin and Eagle Counties, Colorado. Applicants seek Commission approval to transfer the license for Ruedi Power Plant Project from Pitkin County, Colorado and City of Aspen, Colorado to City of Aspen, Colorado. Applicant Contact: for Pitkin County: Mr. John M. Ely, Pitkin County Attorney, 530 E Main Street, Third Floor, Aspen, CO 81611. For the City of Aspen: Mr. Karl F. Kumli, III, Special Counsel for the City of Aspen, Dietze and Davis PC, 2060 Broadway, Suite 400, Boulder, CO 80302, phone (303) 447–1375. FERC Contact: Robert Bell, (202) 502– 6062. Deadline for filing comments, protests, and motions to intervene: 30 days from the issuance of this notice. Comments and motions to intervene may be filed electronically via the Internet. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site under the ‘‘e-Filing’’ link. If unable to be filed electronically, documents may be paperfiled. To paper-file, an original and eight copies should be mailed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. For more information on how to submit these types of filings please go to the Commission’s Web site located at https://www.ferc.gov/filingcomments.asp. More information about this project can be viewed or printed on the ‘‘eLibrary’’ link of Commission’s Web site at https://www.ferc.gov/docsfiling/elibrary.asp. Enter the docket number (P–3603–013) in the docket number field to access the document. For assistance, call toll-free 1–866–208– 3372. The Federal Energy Regulatory Commission hereby gives notice that members of the Commission and Commission staff may attend the following upcoming NYISO meetings: • NYISO Business Issues Committee. • June 10 (Rensselaer, NY). • July 22 (Rensselaer, NY). • NYISO Management Committee. • June 15 (Albany, NY). • June 24 (Rensselaer, NY). • July 27 (Rensselaer, NY). • NYISO ICAP Working Group. • June 5 (Rensselaer, NY). • July 7 (Rensselaer, NY). • NYISO Transmission Planning Advisory Committee. • July 7 (Rensselaer, NY). • NYISO Joint Board of Directors & Management Committee. • June 16 (Albany, NY). For additional meeting information, see https://www.nyiso.com/public/ committees/calendar/index.jsp. The discussions at each of the meetings described above may address matters at issue in the following proceedings: Docket No. ER09–945, New York Independent System Operator, Inc. Docket Nos. EL07–39 and ER08–695, New York Independent System Operator, Inc. Docket No. ER09–1142, New York Independent System Operator, Inc. Docket Nos. ER01–3001–021/ER03– 647–012 and ER01–3001–022/ER03– 647–013, New York Independent System Operator, Inc. Docket No. ER09–405, New York Independent System Operator, Inc. Docket No. ER04–449, New York Independent System Operator, Inc. Docket No. OA08–52; New York Independent System Operator, Inc. Docket No. OA09–26; New York Independent System Operator, Inc. The meetings are open to stakeholders. For more information, contact Jesse Hensley, Office of Energy Markets Regulation, Federal Energy Regulatory Commission at (202) 502– 6228 or Jesse.Hensley@ferc.gov. Kimberly D. Bose, Secretary. [FR Doc. E9–13362 Filed 6–8–09; 8:45 am] Kimberly D. Bose, Secretary. [FR Doc. E9–13364 Filed 6–8–09; 8:45 am] BILLING CODE 6717–01–P BILLING CODE 6717–01–P June 2, 2009. VerDate Nov<24>2008 14:45 Jun 08, 2009 Jkt 217001 PO 00000 Frm 00026 Fmt 4703 Sfmt 4703 June 2, 2009. Members Committee (MC) • June 4, 2009. • August 13, 2009. • September 24, 2009 (BWI Airport). Markets and Reliability Committee (MRC) • June 17, 2009. • July 30, 2009. • September 23, 2009 (BWI Airport). Market Implementation Committee (MIC) • June 11, 2009. • July 14, 2009. • August 14, 2009. • September 10, 2009. Planning Committee (PC) • June 9, 2009. • July 15, 2009. • August 12, 2009. • September 16, 2009 (Norristown, PA). Capacity Market Evolution Committee (CMEC) • July 17, 2009. • August 5, 2009. • August 24, 2009. Additional meeting information and schedules may be found at https:// www.pjm.com/committees-andgroups.aspx. The discussions at each of the meetings described above may address matters at issue in the following proceedings: Docket No. ER05–1410, PJM Interconnection LLC. Docket No. ER06–456 et al., PJM Interconnection LLC. Docket No. ER08–194, Duquesne Light Co. Docket No. ER08–386, PotomacAppalachian Transmission Highline, LLC. Docket No. ER08–686, Pepco Holdings, Inc. Docket No. ER08–1370, Midwest Independent Transmission System Operator, Inc. and Duquesne Light Co. Docket No. ER09–75, Pioneer Transmission LLC. E:\FR\FM\09JNN1.SGM 09JNN1 27302 Federal Register / Vol. 74, No. 109 / Tuesday, June 9, 2009 / Notices Docket No. ER09–369, PJM Interconnection LLC. Docket No. ER09–412, PJM Interconnection LLC. Docket No. ER09–497, et al., PJM Interconnection LLC. Docket No. ER09–585, PJM Interconnection LLC. Docket No. ER09–701, PJM Interconnection LLC. Docket No. ER09–730, PJM Interconnection LLC. Docket No. ER09–745, Baltimore Gas and Electric Company. Docket No. ER09–940, Northern Virginia Electric Cooperative, Inc. Docket No. ER09–996, PJM Interconnection LLC. Docket No. ER09–1063, PJM Interconnection LLC. Docket No. EL05–148, PJM Interconnection LLC. Docket No. EL08–12, PJM Industrial Customer Coalition v PJM Interconnection LLC. Docket No. EL08–44, PJM Interconnection LLC v Accord Energy, LLC et al. Docket No. EL08–47, Maryland Public Service Commission v PJM Interconnection LLC. Docket No. EL08–67, Maryland Public Service Commission et al. v PJM Interconnection LLC. Docket No. EL08–78, Commonwealth Edison Company. Docket No. EL09–39, First Energy Solutions Corp. The meetings are open to stakeholders. For more information regarding Commission participation, contact Morris Margolis, Office of Energy Markets Regulation, Federal Energy Regulatory Commission at (202) 502–8611 or morris.margolis@ferc.gov. Kimberly D. Bose, Secretary. [FR Doc. E9–13363 Filed 6–8–09; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP09–414–000] Natural Gas Pipeline Company of America LLC; Notice of Request Under Blanket Authorization June 2, 2009. Take notice that on May 19, 2009, Natural Gas Pipeline Company of America LLC (Natural), 3250 Lacey Road, Suite 700, Downers Grove, Illinois 60515, filed in the above Docket, a prior notice request pursuant to sections VerDate Nov<24>2008 14:45 Jun 08, 2009 Jkt 217001 157.205, 157.208 and 157.213 of the Commission’s regulations under the Natural Gas Act (NGA) for authorization to: (i) Convert up to 5 billion cubic feet (Bcf) of cushion gas to working gas over a three-year term period (2009 though 2011) which will allow Natural to provide an additional five Bcf of Nominated Storage Service to its shippers; (ii) increase the maximum certificated withdrawal capacity from 600 million standard cubit feet per day (MMscf/d) to 667 MMscf/d; and (iii) install over pressure protection equipment at Natural’s Sayre Storage field in Beckham County, Oklahoma. All as more fully set forth in the application which is on file with the Commission and open to public inspection. The filing may also be viewed on the Web at https:// www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov or toll free at (866) 208–3676, or TTY, contact (202) 502–8659. Any questions concerning this application may be directed to Russell Frame, Engineer, Gas Storage, Natural Gas Pipeline Company of America LLC, 3250 Lacey Road, 7th floor, Downers Grove, Illinois 60515 at (630) 725–3827. Any person may, within 60 days after the issuance of the instant notice by the Commission, file pursuant to Rule 214 of the Commission’s Procedural Rules (18 CFR 385.214) a motion to intervene or notice of intervention. Any person filing to intervene or the Commission’s staff may, pursuant to section 157.205 of the Commission’s Regulations under the Natural Gas Act (NGA) (18 CFR 157.205) file a protest to the request. If no protest is filed within the time allowed therefore, the proposed activity shall be deemed to be authorized effective the day after the time allowed for protest. If a protest is filed and not withdrawn within 30 days after the time allowed for filing a protest, the instant request shall be treated as an application for authorization pursuant to section 7 of the NGA. The Commission strongly encourages electronic filings of comments, protests, and interventions via the Internet in lieu of paper. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site (https:// www.ferc.gov) under the ‘‘e-Filing’’ link. Kimberly D. Bose, Secretary. [FR Doc. E9–13366 Filed 6–8–09; 8:45 am] BILLING CODE 6717–01–P PO 00000 Frm 00027 Fmt 4703 Sfmt 4703 DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filings No. 1 June 3, 2009. Take notice that the Commission has received the following Natural Gas Pipeline Rate and Refund Report filings: Docket Numbers: RP09–618–000. Applicants: Stingray Pipeline Company, LLC. Description: Stingray Pipeline Company, LLC submits Tenth Revised Sheet 199 to FERC Gas Tariff—Third Revised Volume 1, to be effective 8/1/ 09. Filed Date: 05/28/2009. Accession Number: 20090529–0092. Comment Date: 5 p.m. Eastern Time on Tuesday, June 9, 2009. Docket Numbers: RP09–622–000. Applicants: Garden Banks Gas Pipeline, LLC. Description: Garden Banks Gas Pipeline, LLC submits Eleventh Revised Sheet 136 et al. to FERC Gas Tariff— Original Volume 1, to be effective 8/1/ 09. Filed Date: 05/28/2009. Accession Number: 20090529–0088. Comment Date: 5 p.m. Eastern Time on Tuesday, June 9, 2009. Docket Numbers: RP09–623–000. Applicants: Mississippi Canyon Gas Pipeline, LLC. Description: Mississippi Canyon Gas Pipeline, LLC submits Sixth revised Sheet 151 et al. of its FERC Gas Tariff— First Revised Volume 1, to be effective 8/1/09. Filed Date: 05/28/2009. Accession Number: 20090529–0087. Comment Date: 5 p.m. Eastern Time on Tuesday, June 9, 2009. Docket Numbers: RP09–624–000. Applicants: Enbridge Pipelines (Midla) LLC. Description: Enbridge Pipelines (Midla) LLC submits Second Revised Sheet 188A et al. of its FERC Gas Tariff—Fifth Revised Volume 1 under RM96–1 et al. Filed Date: 05/28/2009. Accession Number: 20090529–0086. Comment Date: 5 p.m. Eastern Time on Tuesday, June 9, 2009. Docket Numbers: RP09–630–000. Applicants: Transcontinental Gas Pipe Line Company, Description: Transcontinental Gas Pipe Line Co, LLC submits First Revised Sheet 31 et al. to FERC Gas Tariff— Fourth Revised Volume 1, to be effective 7/1/09. Filed Date: 05/29/2009. E:\FR\FM\09JNN1.SGM 09JNN1

Agencies

[Federal Register Volume 74, Number 109 (Tuesday, June 9, 2009)]
[Notices]
[Pages 27301-27302]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E9-13363]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission


Notice of Attendance at PJM Meetings

June 2, 2009.
    The Federal Energy Regulatory Commission hereby gives notice that 
members of the Commission and Commission staff may attend the following 
upcoming meetings of the PJM Interconnection LLC. All meetings are in 
Wilmington, DE unless noted otherwise:

Members Committee (MC)

     June 4, 2009.
     August 13, 2009.
     September 24, 2009 (BWI Airport).

Markets and Reliability Committee (MRC)

     June 17, 2009.
     July 30, 2009.
     September 23, 2009 (BWI Airport).

Market Implementation Committee (MIC)

     June 11, 2009.
     July 14, 2009.
     August 14, 2009.
     September 10, 2009.

Planning Committee (PC)

     June 9, 2009.
     July 15, 2009.
     August 12, 2009.
     September 16, 2009 (Norristown, PA).

Capacity Market Evolution Committee (CMEC)

     July 17, 2009.
     August 5, 2009.
     August 24, 2009.
    Additional meeting information and schedules may be found at https://www.pjm.com/committees-and-groups.aspx.
    The discussions at each of the meetings described above may address 
matters at issue in the following proceedings:
Docket No. ER05-1410, PJM Interconnection LLC.
Docket No. ER06-456 et al., PJM Interconnection LLC.
Docket No. ER08-194, Duquesne Light Co.
Docket No. ER08-386, Potomac-Appalachian Transmission Highline, LLC.
Docket No. ER08-686, Pepco Holdings, Inc.
Docket No. ER08-1370, Midwest Independent Transmission System Operator, 
Inc. and Duquesne Light Co.
Docket No. ER09-75, Pioneer Transmission LLC.

[[Page 27302]]

Docket No. ER09-369, PJM Interconnection LLC.
Docket No. ER09-412, PJM Interconnection LLC.
Docket No. ER09-497, et al., PJM Interconnection LLC.
Docket No. ER09-585, PJM Interconnection LLC.
Docket No. ER09-701, PJM Interconnection LLC.
Docket No. ER09-730, PJM Interconnection LLC.
Docket No. ER09-745, Baltimore Gas and Electric Company.
Docket No. ER09-940, Northern Virginia Electric Cooperative, Inc.
Docket No. ER09-996, PJM Interconnection LLC.
Docket No. ER09-1063, PJM Interconnection LLC.
Docket No. EL05-148, PJM Interconnection LLC.
Docket No. EL08-12, PJM Industrial Customer Coalition v PJM 
Interconnection LLC.
Docket No. EL08-44, PJM Interconnection LLC v Accord Energy, LLC et al.
Docket No. EL08-47, Maryland Public Service Commission v PJM 
Interconnection LLC.
Docket No. EL08-67, Maryland Public Service Commission et al. v PJM 
Interconnection LLC.
Docket No. EL08-78, Commonwealth Edison Company.
Docket No. EL09-39, First Energy Solutions Corp.
    The meetings are open to stakeholders. For more information 
regarding Commission participation, contact Morris Margolis, Office of 
Energy Markets Regulation, Federal Energy Regulatory Commission at 
(202) 502-8611 or morris.margolis@ferc.gov.

Kimberly D. Bose,
Secretary.
[FR Doc. E9-13363 Filed 6-8-09; 8:45 am]
BILLING CODE 6717-01-P