Environmental Impacts Statements; Notice of Availability, 27034 [E9-13159]

Download as PDF 27034 Federal Register / Vol. 74, No. 107 / Friday, June 5, 2009 / Notices ENVIRONMENTAL PROTECTION AGENCY [ER–FRL–8594–1] erowe on PROD1PC63 with NOTICES Environmental Impacts Statements; Notice of Availability Responsible Agency: Office of Federal Activities, General Information (202) 564–1399 or https://www.epa.gov/ compliance/nepa/. Weekly Receipt of Environmental Impact Statements Filed 05/25/2009 Through 05/29/2009 Pursuant to 40 CFR 1506.9. EIS No. 20090175, Final EIS, NRC, 00, GENERIC—In-Situ Leach Uranium Milling Facilities (NUREG–1910), Construction, Operation, Aquifer Restoration and Decommissioning, Potentially Location in Portions of WY, NE, SD and NM, Wait Period Ends: 07/06/2009, Contact: James Park 301–415–6935. EIS No. 20090176, Draft EIS, FHW, WA, WA–502 Corridor Widening Project, Proposes Improvements to Five Miles of WA–502 (NE–219th Street) between NE. 15th Avenue and NE. 102nd Avenue, Funding, Clark County, WA, Comment Period Ends: 07/20/2009, Contact: Dean Moberg 360–534–9344. EIS No. 20090177, Draft EIS, AFS, CA, Lassen National Forest, Motorized Travel Management Plan, Implementation, Butte, Lassen, Modoc, Plumas, Shasta, Siskiyou, Tehama Counties, CA, Comment Period Ends: 07/20/2009, Contact: Christopher O’Brien 530–257–2151. EIS No. 20090178, Draft EIS, IBR, CA, North Bay Water Recycling Program (NBWRP), (Formerly North San Pablo Bay Restoration and Reuse Project), Proposed to Promote the Expanded Beneficial Use of Recycled Water, Northern Marin Water District, Napa County, CA, Comment Period Ends: 07/20/2009, Contact: David White 916–978–5074. EIS No. 20090179, Draft EIS, AFS, CA, Klamath National Forest Motorized Route Designation, Motorized Travel Management, (Formerly Motorized Route Designation), Implementation, Siskiyou County, CA, Comment Period Ends: 07/20/2009, Contact: Jan Ford 530–842–6131. EIS No. 20090180, Final EIS, STA, 00, Alberta Clipper Pipeline Project, Application for a Presidential Permit to Construction, Operation and Maintenance of Facilities in ND, MN and WI, Wait Period Ends: 07/06/ 2009, Contact: Elizabeth Orlando 202– 647–4284. EIS No. 20090181, Draft EIS, AFS, CA, Lower Trinity and Mad River VerDate Nov<24>2008 14:06 Jun 04, 2009 Jkt 217001 Motorized Travel Management, Proposed to Prohibit Cross-County Motor Vehicle Travel Off Designated National Forest Transportation System (NFTS) Roads and Motorized Trails, Six River National Forest, CA, Comment Period Ends: 07/20/2009, Contact: Leslie Burkhart 707–441– 3520. EIS No. 20090182, Final EIS, USA, HI, Makua Military Reservation (MMR) Project, Proposed Military Training Activities, To Conduct the Necessary Type, Level, Duration, and Intensity of Live-Fire and Other Military Training Activities, in Particular Company-Level Combined-Arms, Live-Fire Exercises (CALFEX), 25th Infantry Division (Light) and U.S. Army, HI, Wait Period Ends: 07/06/ 2009, Contact: Kristin Evenstad 703– 692–6427. Amended Notices EIS No. 20090048, Draft EIS, AFS, MT, Montanore Project, Proposes to Construct a Copper and Silver Underground Mine and Associated Facilities, Including a New Transmission Line, Plan-of-Operation Permit, Kootenai National Forest, Sanders County, MT, Comment Period Ends: 06/29/2009, Contact: Bobbie Lacklen 406–283–7681. Revision to FR Notice Published 02/ 27/2009: Correction to Extending Comment Period from 07/27/2009 to 06/ 29/2009. EIS No. 20090088, Draft EIS, BLM, UT, Greens Hollow Coal Lease Tract Project, Proposed Federal Coal Leasing and Subsequent Underground Coal Mining, Funding and Lease Application, Fishlake and Manti-La Sal National Forest, Sanpete and Sevier Counties, UT, Comment Period Ends: 06/01/2009, Contact: Steve Rigby 435–636–3604. Revision to FR Notice Published 04/ 03/2009: Extending Comment from 05/ 18/2009 to 06/01/2009. EIS No. 20090113, Draft EIS, AFS, 00, Ashley National Forest Motorized Travel Plan, To Improve Management of Public Summer Motorized Use by Designating Roads and Motorized Trails and Limiting Dispersed Camping to Areas, Duchesne, Daggett, Uintah Counties, Utah and Sweetwater County, Wyoming, Comment Period Ends: 07/16/2009, Contact: Lesley Tullis 435–781–5137. Revision to FR Notice Published 04/ 17/2009: Extending Comment Period from 06/01/2009 to 07/16/2009. EIS No. 20090173, Draft EIS, UCG, 00, Goethals Bridge Replacement Project, Construction of Bridge across the PO 00000 Frm 00029 Fmt 4703 Sfmt 4703 Arthur Kill between Staten Island New York and Elizabeth, New Jersey, Funding and USCG Bridge Permit, NY and NJ, Comment Period Ends: 07/28/ 2009, Contact: Shelly Sugarman 202– 372–1521. Revision to FR Published 05/29/2009: Extending Comment Period from 07/13/ 2009 to 07/28/2009. Dated: June 2, 2009. Robert W. Hargrove, Director, NEPA Compliance Division, Office of Federal Activities. [FR Doc. E9–13159 Filed 6–4–09; 8:45 am] BILLING CODE 6560–50–P ENVIRONMENTAL PROTECTION AGENCY [ER–FRL–8594–2] Environmental Impact Statements and Regulations; Availability of EPA Comments Availability of EPA comments prepared pursuant to the Environmental Review Process (ERP), under section 309 of the Clean Air Act and Section 102(2)(c) of the National Environmental Policy Act as amended. Requests for copies of EPA comments can be directed to the Office of Federal Activities at 202–564–7146. An explanation of the ratings assigned to draft environmental impact statements (EISs) was published in FR dated April 17, 2009 (74 FR 17860). Draft EISs EIS No. 20090046, ERP No. D–BLM– L65566–OR, Timber Mountain Recreation Management Plan, Managing Off-Highway Vehicle (OHV), Medford District Office, Jackson County, OR. Summary: EPA expressed environmental concerns about potential impacts to aquatic resources, sensitive plants and wildlife, and recommended additional implementation and adaptive management planning. Rating EC2. EIS No. 20090108, ERP No. D–AFS– K65361–CA, Thom-Seider Vegetation Management and Fuels Reduction Project, To Respond to the Increasing Density and Fuels Hazard Evident along the Klamath River between Hamburg and Happy Camp, Klamath National Forest, Siskiyou County, CA. Summary: EPA expressed environmental concerns about treatment prescriptions, naturally occurring asbestos, air quality, and climate change. Rating EC2. E:\FR\FM\05JNN1.SGM 05JNN1

Agencies

[Federal Register Volume 74, Number 107 (Friday, June 5, 2009)]
[Notices]
[Page 27034]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E9-13159]



[[Page 27034]]

=======================================================================
-----------------------------------------------------------------------

ENVIRONMENTAL PROTECTION AGENCY

[ER-FRL-8594-1]


Environmental Impacts Statements; Notice of Availability

    Responsible Agency: Office of Federal Activities, General 
Information (202) 564-1399 or https://www.epa.gov/compliance/nepa/.

Weekly Receipt of Environmental Impact Statements
Filed 05/25/2009 Through 05/29/2009
Pursuant to 40 CFR 1506.9.

EIS No. 20090175, Final EIS, NRC, 00, GENERIC--In-Situ Leach Uranium 
Milling Facilities (NUREG-1910), Construction, Operation, Aquifer 
Restoration and Decommissioning, Potentially Location in Portions of 
WY, NE, SD and NM, Wait Period Ends: 07/06/2009, Contact: James Park 
301-415-6935.
EIS No. 20090176, Draft EIS, FHW, WA, WA-502 Corridor Widening Project, 
Proposes Improvements to Five Miles of WA-502 (NE-219th Street) between 
NE. 15th Avenue and NE. 102nd Avenue, Funding, Clark County, WA, 
Comment Period Ends: 07/20/2009, Contact: Dean Moberg 360-534-9344.
EIS No. 20090177, Draft EIS, AFS, CA, Lassen National Forest, Motorized 
Travel Management Plan, Implementation, Butte, Lassen, Modoc, Plumas, 
Shasta, Siskiyou, Tehama Counties, CA, Comment Period Ends: 07/20/2009, 
Contact: Christopher O'Brien 530-257-2151.
EIS No. 20090178, Draft EIS, IBR, CA, North Bay Water Recycling Program 
(NBWRP), (Formerly North San Pablo Bay Restoration and Reuse Project), 
Proposed to Promote the Expanded Beneficial Use of Recycled Water, 
Northern Marin Water District, Napa County, CA, Comment Period Ends: 
07/20/2009, Contact: David White 916-978-5074.
EIS No. 20090179, Draft EIS, AFS, CA, Klamath National Forest Motorized 
Route Designation, Motorized Travel Management, (Formerly Motorized 
Route Designation), Implementation, Siskiyou County, CA, Comment Period 
Ends: 07/20/2009, Contact: Jan Ford 530-842-6131.
EIS No. 20090180, Final EIS, STA, 00, Alberta Clipper Pipeline Project, 
Application for a Presidential Permit to Construction, Operation and 
Maintenance of Facilities in ND, MN and WI, Wait Period Ends: 07/06/
2009, Contact: Elizabeth Orlando 202-647-4284.
EIS No. 20090181, Draft EIS, AFS, CA, Lower Trinity and Mad River 
Motorized Travel Management, Proposed to Prohibit Cross-County Motor 
Vehicle Travel Off Designated National Forest Transportation System 
(NFTS) Roads and Motorized Trails, Six River National Forest, CA, 
Comment Period Ends: 07/20/2009, Contact: Leslie Burkhart 707-441-3520.
EIS No. 20090182, Final EIS, USA, HI, Makua Military Reservation (MMR) 
Project, Proposed Military Training Activities, To Conduct the 
Necessary Type, Level, Duration, and Intensity of Live-Fire and Other 
Military Training Activities, in Particular Company-Level Combined-
Arms, Live-Fire Exercises (CALFEX), 25th Infantry Division (Light) and 
U.S. Army, HI, Wait Period Ends: 07/06/2009, Contact: Kristin Evenstad 
703-692-6427.

Amended Notices

EIS No. 20090048, Draft EIS, AFS, MT, Montanore Project, Proposes to 
Construct a Copper and Silver Underground Mine and Associated 
Facilities, Including a New Transmission Line, Plan-of-Operation 
Permit, Kootenai National Forest, Sanders County, MT, Comment Period 
Ends: 06/29/2009, Contact: Bobbie Lacklen 406-283-7681.

    Revision to FR Notice Published 02/27/2009: Correction to Extending 
Comment Period from 07/27/2009 to 06/29/2009.
EIS No. 20090088, Draft EIS, BLM, UT, Greens Hollow Coal Lease Tract 
Project, Proposed Federal Coal Leasing and Subsequent Underground Coal 
Mining, Funding and Lease Application, Fishlake and Manti-La Sal 
National Forest, Sanpete and Sevier Counties, UT, Comment Period Ends: 
06/01/2009, Contact: Steve Rigby 435-636-3604.

    Revision to FR Notice Published 04/03/2009: Extending Comment from 
05/18/2009 to 06/01/2009.
EIS No. 20090113, Draft EIS, AFS, 00, Ashley National Forest Motorized 
Travel Plan, To Improve Management of Public Summer Motorized Use by 
Designating Roads and Motorized Trails and Limiting Dispersed Camping 
to Areas, Duchesne, Daggett, Uintah Counties, Utah and Sweetwater 
County, Wyoming, Comment Period Ends: 07/16/2009, Contact: Lesley 
Tullis 435-781-5137.

    Revision to FR Notice Published 04/17/2009: Extending Comment 
Period from 06/01/2009 to 07/16/2009.

EIS No. 20090173, Draft EIS, UCG, 00, Goethals Bridge Replacement 
Project, Construction of Bridge across the Arthur Kill between Staten 
Island New York and Elizabeth, New Jersey, Funding and USCG Bridge 
Permit, NY and NJ, Comment Period Ends: 07/28/2009, Contact: Shelly 
Sugarman 202-372-1521.

    Revision to FR Published 05/29/2009: Extending Comment Period from 
07/13/2009 to 07/28/2009.

    Dated: June 2, 2009.
Robert W. Hargrove,
Director, NEPA Compliance Division, Office of Federal Activities.
[FR Doc. E9-13159 Filed 6-4-09; 8:45 am]
BILLING CODE 6560-50-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.