Environmental Impacts Statements; Notice of Availability, 27034 [E9-13159]
Download as PDF
27034
Federal Register / Vol. 74, No. 107 / Friday, June 5, 2009 / Notices
ENVIRONMENTAL PROTECTION
AGENCY
[ER–FRL–8594–1]
erowe on PROD1PC63 with NOTICES
Environmental Impacts Statements;
Notice of Availability
Responsible Agency: Office of Federal
Activities, General Information (202)
564–1399 or https://www.epa.gov/
compliance/nepa/.
Weekly Receipt of Environmental
Impact Statements
Filed 05/25/2009 Through 05/29/2009
Pursuant to 40 CFR 1506.9.
EIS No. 20090175, Final EIS, NRC, 00,
GENERIC—In-Situ Leach Uranium
Milling Facilities (NUREG–1910),
Construction, Operation, Aquifer
Restoration and Decommissioning,
Potentially Location in Portions of
WY, NE, SD and NM, Wait Period
Ends: 07/06/2009, Contact: James Park
301–415–6935.
EIS No. 20090176, Draft EIS, FHW, WA,
WA–502 Corridor Widening Project,
Proposes Improvements to Five Miles
of WA–502 (NE–219th Street)
between NE. 15th Avenue and NE.
102nd Avenue, Funding, Clark
County, WA, Comment Period Ends:
07/20/2009, Contact: Dean Moberg
360–534–9344.
EIS No. 20090177, Draft EIS, AFS, CA,
Lassen National Forest, Motorized
Travel Management Plan,
Implementation, Butte, Lassen,
Modoc, Plumas, Shasta, Siskiyou,
Tehama Counties, CA, Comment
Period Ends: 07/20/2009, Contact:
Christopher O’Brien 530–257–2151.
EIS No. 20090178, Draft EIS, IBR, CA,
North Bay Water Recycling Program
(NBWRP), (Formerly North San Pablo
Bay Restoration and Reuse Project),
Proposed to Promote the Expanded
Beneficial Use of Recycled Water,
Northern Marin Water District, Napa
County, CA, Comment Period Ends:
07/20/2009, Contact: David White
916–978–5074.
EIS No. 20090179, Draft EIS, AFS, CA,
Klamath National Forest Motorized
Route Designation, Motorized Travel
Management, (Formerly Motorized
Route Designation), Implementation,
Siskiyou County, CA, Comment
Period Ends: 07/20/2009, Contact: Jan
Ford 530–842–6131.
EIS No. 20090180, Final EIS, STA, 00,
Alberta Clipper Pipeline Project,
Application for a Presidential Permit
to Construction, Operation and
Maintenance of Facilities in ND, MN
and WI, Wait Period Ends: 07/06/
2009, Contact: Elizabeth Orlando 202–
647–4284.
EIS No. 20090181, Draft EIS, AFS, CA,
Lower Trinity and Mad River
VerDate Nov<24>2008
14:06 Jun 04, 2009
Jkt 217001
Motorized Travel Management,
Proposed to Prohibit Cross-County
Motor Vehicle Travel Off Designated
National Forest Transportation
System (NFTS) Roads and Motorized
Trails, Six River National Forest, CA,
Comment Period Ends: 07/20/2009,
Contact: Leslie Burkhart 707–441–
3520.
EIS No. 20090182, Final EIS, USA, HI,
Makua Military Reservation (MMR)
Project, Proposed Military Training
Activities, To Conduct the Necessary
Type, Level, Duration, and Intensity
of Live-Fire and Other Military
Training Activities, in Particular
Company-Level Combined-Arms,
Live-Fire Exercises (CALFEX), 25th
Infantry Division (Light) and U.S.
Army, HI, Wait Period Ends: 07/06/
2009, Contact: Kristin Evenstad 703–
692–6427.
Amended Notices
EIS No. 20090048, Draft EIS, AFS, MT,
Montanore Project, Proposes to
Construct a Copper and Silver
Underground Mine and Associated
Facilities, Including a New
Transmission Line, Plan-of-Operation
Permit, Kootenai National Forest,
Sanders County, MT, Comment
Period Ends: 06/29/2009, Contact:
Bobbie Lacklen 406–283–7681.
Revision to FR Notice Published 02/
27/2009: Correction to Extending
Comment Period from 07/27/2009 to 06/
29/2009.
EIS No. 20090088, Draft EIS, BLM, UT,
Greens Hollow Coal Lease Tract
Project, Proposed Federal Coal
Leasing and Subsequent Underground
Coal Mining, Funding and Lease
Application, Fishlake and Manti-La
Sal National Forest, Sanpete and
Sevier Counties, UT, Comment Period
Ends: 06/01/2009, Contact: Steve
Rigby 435–636–3604.
Revision to FR Notice Published 04/
03/2009: Extending Comment from 05/
18/2009 to 06/01/2009.
EIS No. 20090113, Draft EIS, AFS, 00,
Ashley National Forest Motorized
Travel Plan, To Improve Management
of Public Summer Motorized Use by
Designating Roads and Motorized
Trails and Limiting Dispersed
Camping to Areas, Duchesne, Daggett,
Uintah Counties, Utah and
Sweetwater County, Wyoming,
Comment Period Ends: 07/16/2009,
Contact: Lesley Tullis 435–781–5137.
Revision to FR Notice Published 04/
17/2009: Extending Comment Period
from 06/01/2009 to 07/16/2009.
EIS No. 20090173, Draft EIS, UCG, 00,
Goethals Bridge Replacement Project,
Construction of Bridge across the
PO 00000
Frm 00029
Fmt 4703
Sfmt 4703
Arthur Kill between Staten Island
New York and Elizabeth, New Jersey,
Funding and USCG Bridge Permit, NY
and NJ, Comment Period Ends: 07/28/
2009, Contact: Shelly Sugarman 202–
372–1521.
Revision to FR Published 05/29/2009:
Extending Comment Period from 07/13/
2009 to 07/28/2009.
Dated: June 2, 2009.
Robert W. Hargrove,
Director, NEPA Compliance Division, Office
of Federal Activities.
[FR Doc. E9–13159 Filed 6–4–09; 8:45 am]
BILLING CODE 6560–50–P
ENVIRONMENTAL PROTECTION
AGENCY
[ER–FRL–8594–2]
Environmental Impact Statements and
Regulations; Availability of EPA
Comments
Availability of EPA comments
prepared pursuant to the Environmental
Review Process (ERP), under section
309 of the Clean Air Act and Section
102(2)(c) of the National Environmental
Policy Act as amended. Requests for
copies of EPA comments can be directed
to the Office of Federal Activities at
202–564–7146. An explanation of the
ratings assigned to draft environmental
impact statements (EISs) was published
in FR dated April 17, 2009 (74 FR
17860).
Draft EISs
EIS No. 20090046, ERP No. D–BLM–
L65566–OR, Timber Mountain
Recreation Management Plan,
Managing Off-Highway Vehicle
(OHV), Medford District Office,
Jackson County, OR.
Summary: EPA expressed
environmental concerns about potential
impacts to aquatic resources, sensitive
plants and wildlife, and recommended
additional implementation and adaptive
management planning. Rating EC2.
EIS No. 20090108, ERP No. D–AFS–
K65361–CA, Thom-Seider Vegetation
Management and Fuels Reduction
Project, To Respond to the Increasing
Density and Fuels Hazard Evident
along the Klamath River between
Hamburg and Happy Camp, Klamath
National Forest, Siskiyou County, CA.
Summary: EPA expressed
environmental concerns about treatment
prescriptions, naturally occurring
asbestos, air quality, and climate
change. Rating EC2.
E:\FR\FM\05JNN1.SGM
05JNN1
Agencies
[Federal Register Volume 74, Number 107 (Friday, June 5, 2009)]
[Notices]
[Page 27034]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E9-13159]
[[Page 27034]]
=======================================================================
-----------------------------------------------------------------------
ENVIRONMENTAL PROTECTION AGENCY
[ER-FRL-8594-1]
Environmental Impacts Statements; Notice of Availability
Responsible Agency: Office of Federal Activities, General
Information (202) 564-1399 or https://www.epa.gov/compliance/nepa/.
Weekly Receipt of Environmental Impact Statements
Filed 05/25/2009 Through 05/29/2009
Pursuant to 40 CFR 1506.9.
EIS No. 20090175, Final EIS, NRC, 00, GENERIC--In-Situ Leach Uranium
Milling Facilities (NUREG-1910), Construction, Operation, Aquifer
Restoration and Decommissioning, Potentially Location in Portions of
WY, NE, SD and NM, Wait Period Ends: 07/06/2009, Contact: James Park
301-415-6935.
EIS No. 20090176, Draft EIS, FHW, WA, WA-502 Corridor Widening Project,
Proposes Improvements to Five Miles of WA-502 (NE-219th Street) between
NE. 15th Avenue and NE. 102nd Avenue, Funding, Clark County, WA,
Comment Period Ends: 07/20/2009, Contact: Dean Moberg 360-534-9344.
EIS No. 20090177, Draft EIS, AFS, CA, Lassen National Forest, Motorized
Travel Management Plan, Implementation, Butte, Lassen, Modoc, Plumas,
Shasta, Siskiyou, Tehama Counties, CA, Comment Period Ends: 07/20/2009,
Contact: Christopher O'Brien 530-257-2151.
EIS No. 20090178, Draft EIS, IBR, CA, North Bay Water Recycling Program
(NBWRP), (Formerly North San Pablo Bay Restoration and Reuse Project),
Proposed to Promote the Expanded Beneficial Use of Recycled Water,
Northern Marin Water District, Napa County, CA, Comment Period Ends:
07/20/2009, Contact: David White 916-978-5074.
EIS No. 20090179, Draft EIS, AFS, CA, Klamath National Forest Motorized
Route Designation, Motorized Travel Management, (Formerly Motorized
Route Designation), Implementation, Siskiyou County, CA, Comment Period
Ends: 07/20/2009, Contact: Jan Ford 530-842-6131.
EIS No. 20090180, Final EIS, STA, 00, Alberta Clipper Pipeline Project,
Application for a Presidential Permit to Construction, Operation and
Maintenance of Facilities in ND, MN and WI, Wait Period Ends: 07/06/
2009, Contact: Elizabeth Orlando 202-647-4284.
EIS No. 20090181, Draft EIS, AFS, CA, Lower Trinity and Mad River
Motorized Travel Management, Proposed to Prohibit Cross-County Motor
Vehicle Travel Off Designated National Forest Transportation System
(NFTS) Roads and Motorized Trails, Six River National Forest, CA,
Comment Period Ends: 07/20/2009, Contact: Leslie Burkhart 707-441-3520.
EIS No. 20090182, Final EIS, USA, HI, Makua Military Reservation (MMR)
Project, Proposed Military Training Activities, To Conduct the
Necessary Type, Level, Duration, and Intensity of Live-Fire and Other
Military Training Activities, in Particular Company-Level Combined-
Arms, Live-Fire Exercises (CALFEX), 25th Infantry Division (Light) and
U.S. Army, HI, Wait Period Ends: 07/06/2009, Contact: Kristin Evenstad
703-692-6427.
Amended Notices
EIS No. 20090048, Draft EIS, AFS, MT, Montanore Project, Proposes to
Construct a Copper and Silver Underground Mine and Associated
Facilities, Including a New Transmission Line, Plan-of-Operation
Permit, Kootenai National Forest, Sanders County, MT, Comment Period
Ends: 06/29/2009, Contact: Bobbie Lacklen 406-283-7681.
Revision to FR Notice Published 02/27/2009: Correction to Extending
Comment Period from 07/27/2009 to 06/29/2009.
EIS No. 20090088, Draft EIS, BLM, UT, Greens Hollow Coal Lease Tract
Project, Proposed Federal Coal Leasing and Subsequent Underground Coal
Mining, Funding and Lease Application, Fishlake and Manti-La Sal
National Forest, Sanpete and Sevier Counties, UT, Comment Period Ends:
06/01/2009, Contact: Steve Rigby 435-636-3604.
Revision to FR Notice Published 04/03/2009: Extending Comment from
05/18/2009 to 06/01/2009.
EIS No. 20090113, Draft EIS, AFS, 00, Ashley National Forest Motorized
Travel Plan, To Improve Management of Public Summer Motorized Use by
Designating Roads and Motorized Trails and Limiting Dispersed Camping
to Areas, Duchesne, Daggett, Uintah Counties, Utah and Sweetwater
County, Wyoming, Comment Period Ends: 07/16/2009, Contact: Lesley
Tullis 435-781-5137.
Revision to FR Notice Published 04/17/2009: Extending Comment
Period from 06/01/2009 to 07/16/2009.
EIS No. 20090173, Draft EIS, UCG, 00, Goethals Bridge Replacement
Project, Construction of Bridge across the Arthur Kill between Staten
Island New York and Elizabeth, New Jersey, Funding and USCG Bridge
Permit, NY and NJ, Comment Period Ends: 07/28/2009, Contact: Shelly
Sugarman 202-372-1521.
Revision to FR Published 05/29/2009: Extending Comment Period from
07/13/2009 to 07/28/2009.
Dated: June 2, 2009.
Robert W. Hargrove,
Director, NEPA Compliance Division, Office of Federal Activities.
[FR Doc. E9-13159 Filed 6-4-09; 8:45 am]
BILLING CODE 6560-50-P