Download as PDF 26668 Federal Register / Vol. 74, No. 105 / Wednesday, June 3, 2009 / Notices Comments, protests, or requests to intervene should be addressed as follows: Office of Electricity Delivery and Energy Reliability, Mail Code: OE–20, U.S. Department of Energy, 1000 Independence Avenue, SW., Washington, DC 20585–0350 (FAX 202– 586–8008). FOR FURTHER INFORMATION CONTACT: Ellen Russell (Program Office) 202–586– 9624 or Michael Skinker (Program Attorney) 202–586–2793. SUPPLEMENTARY INFORMATION: Exports of electricity from the United States to a foreign country are regulated by the Department of Energy (DOE) pursuant to sections 301(b) and 402(f) of the Department of Energy Organization Act (42 U.S.C. 7151(b), 7172(f)) and require authorization under section 202(e) of the FPA (16 U.S.C. 824a(e)). On May 26, 2009, DOE received an application from JPMCCC for authority to transmit electric energy from the United States to Canada as a power marketer. The energy to be exported would be delivered to Canada over existing transmission interconnections between the United States and Canada over any facility determined by DOE to be appropriate for third-party use. The electric energy which JPMCCC proposes to export to Canada would be surplus to the needs of the selling entities. JPMCCC has requested an electricity export authorization with a 5-year term. Procedural Matters: Any person desiring to become a party to these proceedings or to be heard by filing comments or protests to this application should file a petition to intervene, comment, or protest at the address provided above in accordance with 385.211 or 385.214 of the Federal Energy Regulatory Commission’s Rules of Practice and Procedures (18 CFR 385.211, 385.214). Fifteen copies of each petition and protest should be filed with DOE on or before the date listed above. Comments on the JPMCC application to export electric energy to Canada should be clearly marked with Docket No. EA–356. Additional copies are to be filed directly with Ike Gibbs, Compliance Director & Assistant General Counsel, JPMorgan Chase Bank, NM.A., 700 Louisiana Street, Suite 1000, Houston, TX 77002. A final decision will be made on this application after the environmental impacts have been evaluated pursuant to the National Environmental Policy Act of 1969, and a determination is made by DOE that the proposed action will not adversely impact on the reliability of the U.S. electric power supply system. PWALKER on PROD1PC71 with NOTICES ADDRESSES: VerDate Nov<24>2008 16:08 Jun 02, 2009 Jkt 217001 Copies of this application will be made available, upon request, for public inspection and copying at the address provided above, by accessing the program Web site at https:// www.oe.energy.gov/ permits_pending.htm, or by e-mailing Odessa Hopkins at Odessa.hopkins@hq.doe.gov. Issued in Washington, DC, on May 29, 2009. Anthony J. Como, Director, Permitting and Siting, Office of Electricity Delivery and Energy Reliability. [FR Doc. E9–12921 Filed 6–2–09; 8:45 am] BILLING CODE 6450–01–P DEPARTMENT OF ENERGY [OE Docket No. EA–354] Application to Export Electric Energy; Endure Energy, L.L.C. AGENCY: Office of Electricity Delivery and Energy Reliability, DOE. ACTION: Notice of application. SUMMARY: Endure Energy, L.L.C. (Endure Energy) has applied for authority to transmit electric energy from the United States to Canada pursuant to section 202(e) of the Federal Power Act. DATES: Comments, protests, or requests to intervene must be submitted on or before July 6, 2009. ADDRESSES: Comments, protests, or requests to intervene should be addressed as follows: Office of Electricity Delivery and Energy Reliability, Mail Code: OE–20, U.S. Department of Energy, 1000 Independence Avenue, SW., Washington, DC 20585–0350 (FAX 202– 586–8008). FOR FURTHER INFORMATION CONTACT: Ellen Russell (Program Office) 202–586– 9624 or Michael Skinker (Program Attorney) 202–586–2793. SUPPLEMENTARY INFORMATION: Exports of electricity from the United States to a foreign country are regulated by the Department of Energy (DOE) pursuant to sections 301(b) and 402(f) of the Department of Energy Organization Act (42 U.S.C. 7151(b), 7172(f)) and require authorization under section 202(e) of the FPA (16 U.S.C. 824a(e)). On May 15, 2009, DOE received an application from Endure Energy for authority to transmit electric energy from the United States to Canada as a power marketer. The energy to be exported would be delivered to Canada over international electric transmission facilities deemed to be appropriate by DOE for third party transportation. The PO 00000 Frm 00021 Fmt 4703 Sfmt 4703 electric energy which Endure Energy proposes to export to Canada would be surplus energy purchased from electric utilities, Federal power marketing agencies, and other entities within the United States. Endure Energy has requested an electricity export authorization with a 5-year term. Procedural Matters: Any person desiring to become a party to these proceedings or to be heard by filing comments or protests to this application should file a petition to intervene, comment, or protest at the address provided above in accordance with §§ 385.211 or 385.214 of the Federal Energy Regulatory Commission’s Rules of Practice and Procedures (18 CFR 385.211, 385.214). Fifteen copies of each petition and protest should be filed with DOE on or before the date listed above. Comments on the Endure Energy application to export electric energy to Canada should be clearly marked with Docket No. EA–354. Additional copies are to be filed directly with Mark A. Blackton, Executive Vice President, Endure Energy, L.L.C., 7300 College Boulevard, Suite 600, Overland Park, KS 66210 and William A. Mogel, Attorney at Law, 5812 Madaket Road, Bethesda, MD 20816. A final decision will be made on this application after the environmental impacts have been evaluated pursuant to the National Environmental Policy Act of 1969, and a determination is made by DOE that the proposed action will not adversely impact on the reliability of the U.S. electric power supply system. Copies of this application will be made available, upon request, for public inspection and copying at the address provided above, by accessing the program Web site at https:// www.oe.energy.gov/ permits_pending.htm, or by e-mailing Odessa Hopkins at Odessa.hopkins@hq.doe.gov. Issued in Washington, DC, on May 28, 2009. Anthony J. Como, Director, Permitting and Siting, Office of Electricity Delivery and Energy Reliability. [FR Doc. E9–12916 Filed 6–2–09; 8:45 am] BILLING CODE 6450–01–P DEPARTMENT OF ENERGY [OE Docket No. EA–355] Application to Export Electric Energy; Scotia Capital Energy Inc. AGENCY: Office of Electricity Delivery and Energy Reliability, DOE. ACTION: Notice of application. E:\FR\FM\03JNN1.SGM 03JNN1

Agencies

[Federal Register Volume 74, Number 105 (Wednesday, June 3, 2009)]
[Notices]
[Page 26668]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E9-12916]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

[OE Docket No. EA-354]


Application to Export Electric Energy; Endure Energy, L.L.C.

AGENCY: Office of Electricity Delivery and Energy Reliability, DOE.

ACTION: Notice of application.

-----------------------------------------------------------------------

SUMMARY: Endure Energy, L.L.C. (Endure Energy) has applied for 
authority to transmit electric energy from the United States to Canada 
pursuant to section 202(e) of the Federal Power Act.

DATES: Comments, protests, or requests to intervene must be submitted 
on or before July 6, 2009.

ADDRESSES: Comments, protests, or requests to intervene should be 
addressed as follows: Office of Electricity Delivery and Energy 
Reliability, Mail Code: OE-20, U.S. Department of Energy, 1000 
Independence Avenue, SW., Washington, DC 20585-0350 (FAX 202-586-8008).

FOR FURTHER INFORMATION CONTACT: Ellen Russell (Program Office) 202-
586-9624 or Michael Skinker (Program Attorney) 202-586-2793.

SUPPLEMENTARY INFORMATION: Exports of electricity from the United 
States to a foreign country are regulated by the Department of Energy 
(DOE) pursuant to sections 301(b) and 402(f) of the Department of 
Energy Organization Act (42 U.S.C. 7151(b), 7172(f)) and require 
authorization under section 202(e) of the FPA (16 U.S.C. 824a(e)).
    On May 15, 2009, DOE received an application from Endure Energy for 
authority to transmit electric energy from the United States to Canada 
as a power marketer. The energy to be exported would be delivered to 
Canada over international electric transmission facilities deemed to be 
appropriate by DOE for third party transportation. The electric energy 
which Endure Energy proposes to export to Canada would be surplus 
energy purchased from electric utilities, Federal power marketing 
agencies, and other entities within the United States. Endure Energy 
has requested an electricity export authorization with a 5-year term.
    Procedural Matters: Any person desiring to become a party to these 
proceedings or to be heard by filing comments or protests to this 
application should file a petition to intervene, comment, or protest at 
the address provided above in accordance with Sec. Sec.  385.211 or 
385.214 of the Federal Energy Regulatory Commission's Rules of Practice 
and Procedures (18 CFR 385.211, 385.214). Fifteen copies of each 
petition and protest should be filed with DOE on or before the date 
listed above.
    Comments on the Endure Energy application to export electric energy 
to Canada should be clearly marked with Docket No. EA-354. Additional 
copies are to be filed directly with Mark A. Blackton, Executive Vice 
President, Endure Energy, L.L.C., 7300 College Boulevard, Suite 600, 
Overland Park, KS 66210 and William A. Mogel, Attorney at Law, 5812 
Madaket Road, Bethesda, MD 20816. A final decision will be made on this 
application after the environmental impacts have been evaluated 
pursuant to the National Environmental Policy Act of 1969, and a 
determination is made by DOE that the proposed action will not 
adversely impact on the reliability of the U.S. electric power supply 
system.
    Copies of this application will be made available, upon request, 
for public inspection and copying at the address provided above, by 
accessing the program Web site at https://www.oe.energy.gov/permits_pending.htm, or by e-mailing Odessa Hopkins at 
Odessa.hopkins@hq.doe.gov.

    Issued in Washington, DC, on May 28, 2009.
Anthony J. Como,
Director, Permitting and Siting, Office of Electricity Delivery and 
Energy Reliability.
[FR Doc. E9-12916 Filed 6-2-09; 8:45 am]