Pipeline Siting and Stakeholder Involvement Workshop; Notice of Pipeline Siting and Stakeholder Involvement Workshop, 24849 [E9-12083]

Download as PDF Federal Register / Vol. 74, No. 99 / Tuesday, May 26, 2009 / Notices link to log on and submit the intervention or protests. Persons unable to file electronically should submit an original and 14 copies of the intervention or protest to the Federal Energy Regulatory Commission, 888 First St., NE., Washington, DC 20426. The filings in the above-referenced proceeding are accessible in the Commission’s eLibrary system by clicking on the appropriate link in the above list. They are also available for review in the Commission’s Public Reference Room in Washington, DC. There is an eSubscription link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov. or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Kimberly D. Bose, Secretary. [FR Doc. E9–12079 Filed 5–22–09; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. ER09–1133–000] Palmco Power PA, LLC; Supplemental Notice That Initial Market-Based Rate Filing Includes Request for Blanket Section 204 Authorization Kimberly D. Bose, Secretary. [FR Doc. E9–12087 Filed 5–22–09; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY May 18, 2009. This is a supplemental notice in the above-referenced proceeding, of Palmco Power PA, LLC’s application for marketbased rate authority, with an accompanying rate schedule, noting that such application includes a request for blanket authorization, under 18 CFR part 34, of future issuances of securities and assumptions of liability. Any person desiring to intervene or to protest should file with the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426, in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Anyone filing a motion to intervene or protest must serve a copy of that document on the Applicant. Notice is hereby given that the deadline for filing protests with regard to the applicant’s request for blanket authorization, under 18 CFR part 34, of future issuances of securities and assumptions of liability is June 8, 2009. VerDate Nov<24>2008 The Commission encourages electronic submission of protests and interventions in lieu of paper, using the FERC Online links at https:// www.ferc.gov. To facilitate electronic service, persons with Internet access who will eFile a document and/or be listed as a contact for an intervenor must create and validate an eRegistration account using the eRegistration link. Select the eFiling link to log on and submit the intervention or protests. Persons unable to file electronically should submit an original and 14 copies of the intervention or protest to the Federal Energy Regulatory Commission, 888 First St., NE., Washington, DC 20426. The filings in the above-referenced proceeding(s) are accessible in the Commission’s eLibrary system by clicking on the appropriate link in the above list. They are also available for review in the Commission’s Public Reference Room in Washington, DC. There is an eSubscription link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov. or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. 20:08 May 22, 2009 Jkt 217001 Federal Energy Regulatory Commission [Docket No. AD09–6–000] Pipeline Siting and Stakeholder Involvement Workshop; Notice of Pipeline Siting and Stakeholder Involvement Workshop May 15, 2009. On June 1, 2009, the Federal Energy Regulatory Commission (FERC or Commission) will hold a workshop, hosted by Commissioner Philip Moeller, on natural gas pipeline siting. The workshop will focus on the importance of pipeline companies working collaboratively with affected stakeholders throughout the environmental review and certification process to successfully site new pipeline infrastructure. A case study of a recent major pipeline project will be presented by the pipeline company representatives. In addition, a panel of PO 00000 Frm 00081 Fmt 4703 Sfmt 4703 24849 outreach experts from the industry and FERC staff will provide perspectives on innovative approaches to stakeholder outreach and the importance of outreach efforts in the siting process. The workshop will be held at the Commission’s Headquarters, 888 First St., NE., Washington, DC 20426 in the Commission Meeting Room from 1 p.m. until 4:15 p.m. EST. All interested parties may attend. The workshop will not be transcribed, and telephone participation will not be available. Commission workshops and conferences are accessible under section 508 of the Rehabilitation Act of 1973. For accessibility accommodations please send an e-mail to accessibility@ferc.gov or call toll free 1– 866–208–3372 (voice) or 202–208–8659 (TTY), or send a FAX to 202–208–2106 with the required accommodations. The agenda for the siting workshop is attached. For additional information concerning this event, please contact Lauren O’Donnell at 202–502–8325 or Berne Mosley at 202–502–8625. Kimberly D. Bose, Secretary. Pipeline Siting and Stakeholder Involvement Workshop Agenda 1 p.m. Welcome and Opening Remarks. 1:15 p.m. Case Study of CenterPoint Energy’s Carthage to Perryville Pipeline Project. Debbie Ristig, Vice President, Engineering and Compliance, CenterPoint Energy. 2:15 p.m. Break. 2:30 p.m. Stakeholder Outreach Panel Discussion. Julee Stephenson, Director, Regulatory and Government Affairs, NiSource Gas Transmission & Storage. Cindy Ivey, Manager, Public Outreach, Transcontinental Gas Pipeline. Susan Waller, Vice President, Stakeholder Outreach, Spectra Energy Transmission. Douglas Sipe, Outreach Coordinator, Federal Energy Regulatory Commission. 3:45 p.m. Questions and Closing Remarks. 4:15 p.m. Adjourn. [FR Doc. E9–12083 Filed 5–22–09; 8:45 am] BILLING CODE 6717–01–P E:\FR\FM\26MYN1.SGM 26MYN1

Agencies

[Federal Register Volume 74, Number 99 (Tuesday, May 26, 2009)]
[Notices]
[Page 24849]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E9-12083]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. AD09-6-000]


Pipeline Siting and Stakeholder Involvement Workshop; Notice of 
Pipeline Siting and Stakeholder Involvement Workshop

May 15, 2009.
    On June 1, 2009, the Federal Energy Regulatory Commission (FERC or 
Commission) will hold a workshop, hosted by Commissioner Philip 
Moeller, on natural gas pipeline siting. The workshop will focus on the 
importance of pipeline companies working collaboratively with affected 
stakeholders throughout the environmental review and certification 
process to successfully site new pipeline infrastructure. A case study 
of a recent major pipeline project will be presented by the pipeline 
company representatives. In addition, a panel of outreach experts from 
the industry and FERC staff will provide perspectives on innovative 
approaches to stakeholder outreach and the importance of outreach 
efforts in the siting process.
    The workshop will be held at the Commission's Headquarters, 888 
First St., NE., Washington, DC 20426 in the Commission Meeting Room 
from 1 p.m. until 4:15 p.m. EST. All interested parties may attend. The 
workshop will not be transcribed, and telephone participation will not 
be available.
    Commission workshops and conferences are accessible under section 
508 of the Rehabilitation Act of 1973. For accessibility accommodations 
please send an e-mail to accessibility@ferc.gov or call toll free 1-
866-208-3372 (voice) or 202-208-8659 (TTY), or send a FAX to 202-208-
2106 with the required accommodations.
    The agenda for the siting workshop is attached. For additional 
information concerning this event, please contact Lauren O'Donnell at 
202-502-8325 or Berne Mosley at 202-502-8625.

Kimberly D. Bose,
Secretary.

Pipeline Siting and Stakeholder Involvement Workshop Agenda

1 p.m. Welcome and Opening Remarks.
1:15 p.m. Case Study of CenterPoint Energy's Carthage to Perryville 
Pipeline Project.
Debbie Ristig, Vice President, Engineering and Compliance, CenterPoint 
Energy.
2:15 p.m. Break.
2:30 p.m. Stakeholder Outreach Panel Discussion.
Julee Stephenson, Director, Regulatory and Government Affairs, NiSource 
Gas Transmission & Storage.
Cindy Ivey, Manager, Public Outreach, Transcontinental Gas Pipeline.
Susan Waller, Vice President, Stakeholder Outreach, Spectra Energy 
Transmission.
Douglas Sipe, Outreach Coordinator, Federal Energy Regulatory 
Commission.
3:45 p.m. Questions and Closing Remarks.
4:15 p.m. Adjourn.

[FR Doc. E9-12083 Filed 5-22-09; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.