Environmental Impact Statements; Notice of Availability, 24006-24007 [E9-12012]
Download as PDF
erowe on PROD1PC63 with NOTICES
24006
Federal Register / Vol. 74, No. 98 / Friday, May 22, 2009 / Notices
impact associated with the use of
cooling water intake structure(s).
Burden Statement: The annual
average reporting and recordkeeping
burden for the existing collection of
information by facilities responding to
the Section 316(b) Phase III rule is
estimated to be 921 hours per facility
respondent (i.e., an annual average of
34,080 hours of burden divided among
an annual average of 37 facilities).
Burden means the total time, effort, or
financial resources expended by persons
to generate, maintain, retain, or disclose
or provide information to or for a
Federal agency. This includes the time
needed to review instructions; develop,
acquire, install, and utilize technology
and systems for the purposes of
collecting, validating, and verifying
information, processing and
maintaining information, and disclosing
and providing information; adjust the
existing ways to comply with any
previously applicable instructions and
requirements which have subsequently
changed; train personnel to be able to
respond to a collection of information;
search data sources; complete and
review the collection of information;
and transmit or otherwise disclose the
information.
The ICR provides a detailed
explanation of the Agency’s estimate for
the existing ICR, which is only briefly
summarized here:
Estimated total number of potential
respondents: 37 facilities.
Frequency of response: Every five
years, ongoing.
Estimated total average number of
responses for each respondent: 4.2.
Estimated total annual burden hours:
34,080 hours.
Estimated total annual costs:
$2,433,612. This includes an estimated
labor burden cost of $1,836,559 and an
estimated cost of $597,053 for capital
investment or operations and
maintenance.
Change in the Estimates: This ICR
estimates an annual average respondent
burden of 34,080 hours, which
represents a 3-fold increase (22,842
hours) in burden currently identified in
the OMB Inventory of Approved ICR
Burdens. The change in burden results
mainly from the shift from the approval
period to the permit implementation
and renewal period of the Section
316(b) Phase III rule. Because NPDES
permits are issued every five years, this
ICR covers the last two years of the
initial permit approval period (i.e., years
four and five after promulgation) and
the first year of the renewal period (i.e.,
year six after promulgation). In this first
year of the renewal period facilities will
be applying for a permit for the first
VerDate Nov<24>2008
14:18 May 21, 2009
Jkt 217001
time or re-applying for permit coverage
that was obtained during the three years
covered by the previous ICR. The
activities to renew an NPDES permit are
assumed to be less burdensome than
those for issuing a permit for the first
time.
Dated: May 18, 2009.
John Moses,
Director, Collection Strategies Division.
[FR Doc. E9–12008 Filed 5–21–09; 8:45 am]
BILLING CODE 6560–50–P
ENVIRONMENTAL PROTECTION
AGENCY
[ER–FRL–8593–6]
Environmental Impact Statements;
Notice of Availability
Responsible Agency: Office of Federal
Activities, General Information (202)
564–1399 or https://www.epa.gov/
compliance/nepa/.
Weekly receipt of Environmental Impact
Statements
Filed ??? Through ???
Pursuant to 40 CFR 1506.9.
EIS No. 20090153, Final EIS, AFS, MT,
Grizzly Vegetation and Transportation
Management Project, Proposes Timber
Harvest, Prescribed Burning, Road
Maintenance, and Transportation
Management Actions, Three Rivers
Ranger District, Kootenai National
Forest, Lincoln County, MT, Wait
Period Ends: 06/22/2009, Contact:
Kathy Mohar 406–295–4693.
EIS No. 20090154, Draft EIS, NPS, AL,
Tuskegee Airmen National Historic
Site, General Management Plan,
Implementation, Tuskegee, AL,
Comment Period Ends: 07/20/2009,
Contact: Amy Wirsching 404–507–
5708.
EIS No. 20090155, Draft EIS, BIA, NY,
Cayuga Indian Nation of New York
Conveyance of Land into Trust
Project, Approval of a 125+ Acre FeeTo-Trust Property Transfer of Seven
Separate Parcels located in the Village
of Union Springs and Town of
Springport and Montezuma in Cayuga
County and the Town of Seneca Falls
in Seneca County, NY, Comment
Period Ends: 07/06/2009, Contact:
Kurt G. Chandler 615–564–6832.
EIS No. 20090156, Draft EIS, NIH, MD,
National Institutes of Health (NIH),
Transport of Laboratory Personnel
Potentially Exposed to Infectious
Agents from Fort Detrick, Frederick,
MD to the National Institutes of
Health Clinical Center, Bethesda, MD,
Comment Period Ends: 07/24/2009,
Contact: Mark Radtke 301–451–6467.
PO 00000
Frm 00023
Fmt 4703
Sfmt 4703
EIS No. 20090157, Draft EIS, AFS, WY,
Upper Greys Vegetation Management
Project, Proposes to Conduct Timber
Harvest on 362 Acres in Upper Greys
River Watershed, Greys River Ranger
District, Bridger-Teton National
Forest, Lincoln County, WY,
Comment Period Ends: 07/06/2009,
Contact: Heidi Whitlach 307–886–
5305.
EIS No. 20090158, Final EIS, FHW, IL,
Illinois Route 29 (FAP 318) Corridor
Study, Transportation Improvement
from Illinois 6 to Interstate 180,
Funding and US Army COE Section
404 Permit, Peoria, Marshall, Putnam
and Bureau Counties, IL, Wait Period
Ends: 06/22/2009, Contact: Matt
Fuller 217–492–4625.
EIS No. 20090159, Draft EIS, FHW, NC,
Gaston East-West Connector Project,
Construction (from I–85 west Gastonia
to I–485/NC 160 near the CharlotteDouglas International Airport, Gaston
and Mecklenburg Counties, NC,
Comment Period Ends: 07/17/2009,
Contact: John F. Sullivan 919–856–
4346.
EIS No. 20090160, Draft EIS, AFS, MN,
Border Project, Proposing Forest
Vegetation Management and Related
Transportation System Activities,
LaCroix Ranger District, Superior
National Forest, St. Louis County,
MN, Comment Period Ends: 07/06/
2009, Contact: Carol Booth 218–666–
0054.
EIS No. 20090161, Draft EIS, AFS, MT,
Marsh and Tarhead Allotment
Management Plans, Proposes to
Authorize Grazing of Livestock under
10-Year Permits, Lincoln Ranger
District, Helena National Forest,
Lewis and Clark County, MT,
Comment Period Ends: 07/06/2009,
Contact: Amber Kamps 406–362–
7002.
EIS No. 20090162, Final EIS, SFW, CA,
Cullinan Ranch Unit Restoration
Project, Proposing a Restoration Plan
for 1,500 Acres of Former Hayfield
Farm Land, San Pablo Bay, Issuance
of Permits and/or Approval from
Section 7 Endangered Species Act and
U.S. Army COE Section 404 Permit,
San Pablo Bay National Wildlife
Refuge, Solano and Napa Counties,
CA, Wait Period Ends: 06/22/2009,
Contact: Christy Smith 707–769–
4200.
EIS No. 20090163, Final EIS, NPS, SD,
Minuteman Missile National Historic
Site, General Management Plan,
Implementation, Jackson and
Pennington Counties, SD, Wait Period
Ends: 06/22/2009, Contact: Nick
Chevance 402–661–1844.
EIS No. 20090164, Draft EIS, FRC, ME,
Downeast Liquefied Natural Gas
E:\FR\FM\22MYN1.SGM
22MYN1
Federal Register / Vol. 74, No. 98 / Friday, May 22, 2009 / Notices
(LNG) Project, Construction and
Operation, Proposed Liquefied
Natural Gas (LNG) Terminal, Natural
Gas Pipeline and Associated
Facilities, Washington County, ME,
Comment Period Ends: 07/06/2009,
Contact: Patricia Schaub 1–866–208–
3372.
EIS No. 20090165, Final EIS, AFS, UT,
Dixie National Forest Motorized
Travel Plan, Implementation, Dixie
National and the Teasdale portion of
the Fremont River Ranger District on
the Fishlake National Forest, Garfield,
Iron, Kane, Piute, Washington and
Wayne Counties, UT, Wait Period
Ends: 06/22/2009, Contact: Andi
Falsetto 435–896–9233.
EIS No. 20090166, Draft Supplement,
COE, LA, Calcasieu River and Pass,
Louisiana Dredged Material
Management Plan, Implementation,
Calcasieu Ship Channel, Port of Lake
Charles, Calcasieu and Cameron
Parishes, LA, Wait Period Ends: 07/
06/2009, Contact: Sandra Stiles 504–
862–1583.
EIS No. 20090167, Final EIS, FAA, AK,
Sitka Rocky Gutierrez Airport Master
Plan, Improvements to the Runway
Safety Area, Taxiway, Seaplane
Pullout, Approach Lighting System,
and the Seawall, U.S. Army COE
Section 10 and 404 Permits, NPDES
Permit, AK, Wait Period Ends: 06/22/
2009, Contact: Patricia Sullivan 907–
271–5454.
erowe on PROD1PC63 with NOTICES
Amended Notices
EIS No. 20090048, Draft EIS, AFS, MT,
Montanore Project, Proposes to
Construct a Copper and Silver
Underground Mine and Associated
Facilities, Including a New
Transmission Line, Plan-of-Operation
Permit, Kootenai National Forest,
Sanders County, MT, Wait Period
Ends: 07/27/2009, Contact: Bobbie
Lacklen 406–283–7681. Revision to
FR Notice Published 02/27/2009:
Extending Comment Period from
05/28/2009 to 07/27/2009.
EIS No. 20090123, Draft EIS, FHW, MS,
Greenville Connector Project, from
Relocated U.S. 82 to Proposed I–69
Corridor south of Benoit, City of
Greenville, Washington and Bolivar
Counties, MS, Wait Period Ends:
07/06/2009, Contact: Andrew Hughes,
P.E. 601–965–4217. Revision of FR
Notice Published 04/24/2009:
Extending Comment Period from
06/08/2009 to 07/06/2009.
VerDate Nov<24>2008
14:18 May 21, 2009
Jkt 217001
24007
Dated: May 19, 2009.
Ken Mittelholtz,
Environmental Protection Specialist, Office
of Federal Activities.
[FR Doc. E9–12012 Filed 5–21–09; 8:45 am]
Dated: May 19, 2009.
Ken Mittelholtz,
Environmental Protection Specialist, Office
of Federal Activities.
[FR Doc. E9–12011 Filed 5–21–09; 8:45 am]
BILLING CODE 6560–50–P
BILLING CODE 6560–50–P
ENVIRONMENTAL PROTECTION
AGENCY
ENVIRONMENTAL PROTECTION
AGENCY
[ER–FRL–8593–7]
DEPARTMENT OF TRANSPORTATION
Environmental Impact Statements and
Regulations; Availability of EPA
Comments
Availability of EPA comments
prepared pursuant to the Environmental
Review Process (ERP), under section
309 of the Clean Air Act and Section
102(2)(c) of the National Environmental
Policy Act as amended. Requests for
copies of EPA comments can be directed
to the Office of Federal Activities at
202–564–7146.
An explanation of the ratings assigned
to draft environmental impact
statements (EISs) was published in FR
dated April 17, 2009 (74 FR 17860).
Draft EISs
EIS No. 20090054, ERP No. D–AFS–
K65358–CA, Stanislaus National
Forest Motorized Travel Management
(17305) Plan, Implementation,
Stanislaus National Forest, CA.
Summary: EPA expressed
environmental concerns about adverse
impacts on water quality, sensitive
species and habitat. Additional
information is needed on seasonal
closures, monitoring, and enforcement
commitments. Rating EC2.
EIS No. 20090062, ERP No. D–FRC–
E05104–00, Catawba-Wateree
Hydroelectric Project (FERC No.
2232), Application for Hydroelectric
License, Catawba and Wateree Rivers
in Burke, McDowell, Caldwell,
Catawba, Alexander, Iredell,
Mecklenburg, Lincoln and Gaston
Counties, NC and York, Lancaster,
Chester, Fairfield and Kershaw
Counties, SC.
Summary: EPA expressed
environmental concerns impacts to
aquatic species. Rating EC1.
Final EISs
EIS No. 20090110, ERP No. F–USN–
C11023–NJ, Laurelwood Housing
Area, Access at Naval Weapons
Station Earle, Lease Agreement,
Monmouth County, NJ.
Summary: No formal comment letter
was sent to the preparing agency.
PO 00000
Frm 00024
Fmt 4703
Sfmt 4703
[FRL–8909–3]
RIN 2060–ZA15
Notice of Upcoming Joint Rulemaking
To Establish Vehicle GHG Emissions
and CAFE Standards
AGENCIES: Environmental Protection
Agency (EPA) and Department of
Transportation (DOT).
ACTION: Notice of Intent to conduct a
joint rulemaking.
SUMMARY: There is a critically important
need for our country to address global
climate change and to reduce oil
consumption. In this context, EPA and
DOT currently intend to work in
coordination to propose standards for
control of emissions of greenhouse gases
and for fuel economy, respectively. If
proposed and finalized, these standards
would apply to passenger cars, lightduty trucks, and medium-duty
passenger vehicles (light-duty vehicles)
built in model years 2012 through 2016.
Together, these vehicle categories,
which include passenger cars, sport
utility vehicles, minivans, and pickup
trucks, are responsible for almost 60
percent of all U.S. transportation-related
greenhouse gas emissions. If ultimately
adopted, these standards would
represent a harmonized and consistent
national policy pursuant to the separate
statutory frameworks under which EPA
and DOT operate. The approach
addressed in this Notice, if ultimately
adopted, is intended to allow
manufacturers to build a single lightduty national fleet that would satisfy all
requirements under both programs and
would provide significant reductions in
both greenhouse gas emissions and oil
consumption.
FOR FURTHER INFORMATION CONTACT:
EPA: Christopher Lieske, Office of
Transportation and Air Quality,
Assessment and Standards Division,
Environmental Protection Agency, 2000
Traverwood Drive, Ann Arbor, MI
48105; telephone number: 734–214–
4584; fax number: 734–214–4816; e-mail
address: lieske.christopher@epa.gov, or
Assessment and Standards Division
Hotline; telephone number (734) 214–
E:\FR\FM\22MYN1.SGM
22MYN1
Agencies
[Federal Register Volume 74, Number 98 (Friday, May 22, 2009)]
[Notices]
[Pages 24006-24007]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E9-12012]
-----------------------------------------------------------------------
ENVIRONMENTAL PROTECTION AGENCY
[ER-FRL-8593-6]
Environmental Impact Statements; Notice of Availability
Responsible Agency: Office of Federal Activities, General
Information (202) 564-1399 or https://www.epa.gov/compliance/nepa/.
Weekly receipt of Environmental Impact Statements
Filed ??? Through ???
Pursuant to 40 CFR 1506.9.
EIS No. 20090153, Final EIS, AFS, MT, Grizzly Vegetation and
Transportation Management Project, Proposes Timber Harvest, Prescribed
Burning, Road Maintenance, and Transportation Management Actions, Three
Rivers Ranger District, Kootenai National Forest, Lincoln County, MT,
Wait Period Ends: 06/22/2009, Contact: Kathy Mohar 406-295-4693.
EIS No. 20090154, Draft EIS, NPS, AL, Tuskegee Airmen National Historic
Site, General Management Plan, Implementation, Tuskegee, AL, Comment
Period Ends: 07/20/2009, Contact: Amy Wirsching 404-507-5708.
EIS No. 20090155, Draft EIS, BIA, NY, Cayuga Indian Nation of New York
Conveyance of Land into Trust Project, Approval of a 125+ Acre Fee-To-
Trust Property Transfer of Seven Separate Parcels located in the
Village of Union Springs and Town of Springport and Montezuma in Cayuga
County and the Town of Seneca Falls in Seneca County, NY, Comment
Period Ends: 07/06/2009, Contact: Kurt G. Chandler 615-564-6832.
EIS No. 20090156, Draft EIS, NIH, MD, National Institutes of Health
(NIH), Transport of Laboratory Personnel Potentially Exposed to
Infectious Agents from Fort Detrick, Frederick, MD to the National
Institutes of Health Clinical Center, Bethesda, MD, Comment Period
Ends: 07/24/2009, Contact: Mark Radtke 301-451-6467.
EIS No. 20090157, Draft EIS, AFS, WY, Upper Greys Vegetation Management
Project, Proposes to Conduct Timber Harvest on 362 Acres in Upper Greys
River Watershed, Greys River Ranger District, Bridger-Teton National
Forest, Lincoln County, WY, Comment Period Ends: 07/06/2009, Contact:
Heidi Whitlach 307-886-5305.
EIS No. 20090158, Final EIS, FHW, IL, Illinois Route 29 (FAP 318)
Corridor Study, Transportation Improvement from Illinois 6 to
Interstate 180, Funding and US Army COE Section 404 Permit, Peoria,
Marshall, Putnam and Bureau Counties, IL, Wait Period Ends: 06/22/2009,
Contact: Matt Fuller 217-492-4625.
EIS No. 20090159, Draft EIS, FHW, NC, Gaston East-West Connector
Project, Construction (from I-85 west Gastonia to I-485/NC 160 near the
Charlotte-Douglas International Airport, Gaston and Mecklenburg
Counties, NC, Comment Period Ends: 07/17/2009, Contact: John F.
Sullivan 919-856-4346.
EIS No. 20090160, Draft EIS, AFS, MN, Border Project, Proposing Forest
Vegetation Management and Related Transportation System Activities,
LaCroix Ranger District, Superior National Forest, St. Louis County,
MN, Comment Period Ends: 07/06/2009, Contact: Carol Booth 218-666-0054.
EIS No. 20090161, Draft EIS, AFS, MT, Marsh and Tarhead Allotment
Management Plans, Proposes to Authorize Grazing of Livestock under 10-
Year Permits, Lincoln Ranger District, Helena National Forest, Lewis
and Clark County, MT, Comment Period Ends: 07/06/2009, Contact: Amber
Kamps 406-362-7002.
EIS No. 20090162, Final EIS, SFW, CA, Cullinan Ranch Unit Restoration
Project, Proposing a Restoration Plan for 1,500 Acres of Former
Hayfield Farm Land, San Pablo Bay, Issuance of Permits and/or Approval
from Section 7 Endangered Species Act and U.S. Army COE Section 404
Permit, San Pablo Bay National Wildlife Refuge, Solano and Napa
Counties, CA, Wait Period Ends: 06/22/2009, Contact: Christy Smith 707-
769-4200.
EIS No. 20090163, Final EIS, NPS, SD, Minuteman Missile National
Historic Site, General Management Plan, Implementation, Jackson and
Pennington Counties, SD, Wait Period Ends: 06/22/2009, Contact: Nick
Chevance 402-661-1844.
EIS No. 20090164, Draft EIS, FRC, ME, Downeast Liquefied Natural Gas
[[Page 24007]]
(LNG) Project, Construction and Operation, Proposed Liquefied Natural
Gas (LNG) Terminal, Natural Gas Pipeline and Associated Facilities,
Washington County, ME, Comment Period Ends: 07/06/2009, Contact:
Patricia Schaub 1-866-208-3372.
EIS No. 20090165, Final EIS, AFS, UT, Dixie National Forest Motorized
Travel Plan, Implementation, Dixie National and the Teasdale portion of
the Fremont River Ranger District on the Fishlake National Forest,
Garfield, Iron, Kane, Piute, Washington and Wayne Counties, UT, Wait
Period Ends: 06/22/2009, Contact: Andi Falsetto 435-896-9233.
EIS No. 20090166, Draft Supplement, COE, LA, Calcasieu River and Pass,
Louisiana Dredged Material Management Plan, Implementation, Calcasieu
Ship Channel, Port of Lake Charles, Calcasieu and Cameron Parishes, LA,
Wait Period Ends: 07/06/2009, Contact: Sandra Stiles 504-862-1583.
EIS No. 20090167, Final EIS, FAA, AK, Sitka Rocky Gutierrez Airport
Master Plan, Improvements to the Runway Safety Area, Taxiway, Seaplane
Pullout, Approach Lighting System, and the Seawall, U.S. Army COE
Section 10 and 404 Permits, NPDES Permit, AK, Wait Period Ends: 06/22/
2009, Contact: Patricia Sullivan 907-271-5454.
Amended Notices
EIS No. 20090048, Draft EIS, AFS, MT, Montanore Project, Proposes to
Construct a Copper and Silver Underground Mine and Associated
Facilities, Including a New Transmission Line, Plan-of-Operation
Permit, Kootenai National Forest, Sanders County, MT, Wait Period Ends:
07/27/2009, Contact: Bobbie Lacklen 406-283-7681. Revision to FR Notice
Published 02/27/2009: Extending Comment Period from 05/28/2009 to 07/
27/2009.
EIS No. 20090123, Draft EIS, FHW, MS, Greenville Connector Project,
from Relocated U.S. 82 to Proposed I-69 Corridor south of Benoit, City
of Greenville, Washington and Bolivar Counties, MS, Wait Period Ends:
07/06/2009, Contact: Andrew Hughes, P.E. 601-965-4217. Revision of FR
Notice Published 04/24/2009: Extending Comment Period from 06/08/2009
to 07/06/2009.
Dated: May 19, 2009.
Ken Mittelholtz,
Environmental Protection Specialist, Office of Federal Activities.
[FR Doc. E9-12012 Filed 5-21-09; 8:45 am]