Hydro Energy Technologies, LLC; Notice of Preliminary Permit Applications Accepted for Filing and Soliciting Comment, Motions To Intervene, and Competing Applications, 23847-23848 [E9-11792]
Download as PDF
Federal Register / Vol. 74, No. 97 / Thursday, May 21, 2009 / Notices
positive 1.076025 4 to compute their
index ceiling levels for July 1, 2009,
through June 30, 2010, in accordance
with 18 CFR 342.3(d). For guidance in
calculating the ceiling levels for each 12
month period beginning January 1,
l995,5 see Explorer Pipeline Company,
71 FERC 61,416 at n.6 (1995).
In addition to publishing the full text
of this Notice in the Federal Register,
the Commission provides all interested
persons an opportunity to view and/or
print this Notice via the Internet
through FERC’s Home Page (https://
www.ferc.gov) and in FERC’s Public
Reference Room during normal business
hours (8:30 a.m. to 5 p.m. Eastern time)
at 888 First Street, NE., Room 2A,
Washington, DC 20426. The full text of
this Notice is available on FERC’s Home
Page at the eLibrary link. To access this
document in eLibrary, type the docket
number excluding the last three digits of
this document in the docket number
field and follow other directions on the
search page.
User assistance is available for
eLibrary and other aspects of FERC’s
Web site during normal business hours.
For assistance, please contact the
Commission’s Online Support at 1–866–
208–3676 (toll free) or 202–502–6652 (email at FERCOnlineSupport@ferc.gov),
or the Public Reference Room at (202)
502–8371, TTY (202) 502–8659. E-Mail
the Public Reference Room at
public.referenceroom@ferc.gov.
Kimberly D. Bose,
Secretary.
[FR Doc. E9–11794 Filed 5–20–09; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 13464–000]
Hydro Energy Technologies, LLC;
Notice of Preliminary Permit
Applications Accepted for Filing and
Soliciting Comment, Motions To
Intervene, and Competing Applications
dwashington3 on PROD1PC60 with NOTICES
May 13, 2009.
On May 5, 2009, Hydro Energy
Technologies, LLC filed an application,
pursuant to section 4(f) of the Federal
Power Act, proposing to study the
feasibility of the Wills Creek
Hydroelectric Project, to be located on
41
+ 0.076025 = 1.076025.
5 For a listing of all prior multipliers issued by the
Commission, see the Commission’s Web site,
https://www.ferc.gov. The table of multipliers can be
found under the headings ‘‘Oil’’ and ‘‘Index.’’
VerDate Nov<24>2008
13:08 May 20, 2009
Jkt 217001
the Wills Creek, in Coshocton County,
Ohio.
The proposed Pleasant Hill
Hydroelectric Project would be located
at: (1) The existing U.S. Army Corps of
Engineers 1,950-foot-long, 87-foot-high
Wills Creek Dam; and (2) an existing
11,450-acre reservoir having a normal
water surface elevation of 742 feet mean
sea level.
The proposed project would consist
of: (1) A new powerhouse containing a
single turbine generating unit with an
installed capacity of 1.5 megawatts; (2)
a new 100-foot-long, 96-inch-diameter
penstock; (3) a new switchyard; (4) a
new 1-mile-long, 15-kilovolt
transmission line; and (5) appurtenant
facilities. The Wills Creek Project would
have an estimated average annual
generation of 9.2 gigawatt-hours, which
would be sold to a local utility.
Applicant Contact: Mr. Anthony J.
Marra Jr., President, Hydro Energy
Technologies, LLC, 31300 Solon Rd.
Suite 12, Solon, OH 44139, (440) 498–
1000.
FERC Contact: John Ramer, (202) 502–
8969.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Comments, motions to intervene,
notices of intent, and competing
applications may be filed electronically
via the Internet. See 18 CFR
385.2001(a)(1)(iii) and the instructions
on the Commission’s Website under the
‘‘e-Filing’’ link. If unable to be filed
electronically, documents may be paperfiled. To paper-file, an original and eight
copies should be mailed to: Kimberly D.
Bose, Secretary, Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426. For
more information on how to submit
these types of filings please go to the
Commission’s Website located at https://
www.ferc.gov/filing-comments.asp.
More information about this project can
be viewed or printed on the ‘‘eLibrary’’
link of Commission’s Web site at https://
www.ferc.gov/docs-filing/elibrary.asp.
Enter the docket number (P–13464) in
the docket number field to access the
document. For assistance, call toll-free
1–866–208–3372.
Kimberly D. Bose,
Secretary.
[FR Doc. E9–11786 Filed 5–19–09; 8:45 am]
BILLING CODE 6717–01–P
PO 00000
Frm 00010
Fmt 4703
Sfmt 4703
23847
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 13463–000]
Hydro Energy Technologies, LLC;
Notice of Preliminary Permit
Applications Accepted for Filing and
Soliciting Comment, Motions To
Intervene, and Competing Applications
May 13, 2009.
On May 5, 2009, Hydro Energy
Technologies, LLC filed an application,
pursuant to section 4(f) of the Federal
Power Act, proposing to study the
feasibility of the Pleasant Hill
Hydroelectric Project, to be located on
the Clear Fork of Mohican River, in
Ashland County, Ohio.
The proposed Pleasant Hill
Hydroelectric Project would be located
at: (1) The existing U.S. Army Corps of
Engineers 775-foot-long, 113-foot-high
Pleasant Hill Dam; and (2) an existing
2,600-acre reservoir with a normal water
surface elevation of 1,020 feet mean sea
level.
The proposed project would consist
of: (1) A new powerhouse containing a
single turbine generating unit with an
installed capacity of 1.5 megawatts; (2)
a new 200-foot-long, 60-inch-diameter
penstock; (3) a new switchyard; (4) a
new 1-mile-long, 25-kilovolt
transmission line; and (5) appurtenant
facilities. The Pleasant Hill Project
would have an estimated average annual
generation of 5.4 gigawatt-hours, which
would be sold to a local utility.
Applicant Contact: Mr. Anthony J.
Marra Jr., President, Hydro Energy
Technologies, LLC, 31300 Solon Rd.
Suite 12, Solon, OH 44139, (440) 498–
1000.
FERC Contact: John Ramer, (202) 502–
8969.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Comments, motions to intervene,
notices of intent, and competing
applications may be filed electronically
via the Internet. See 18 CFR
385.2001(a)(1)(iii) and the instructions
on the Commission’s Web site under the
‘‘e-Filing’’ link. If unable to be filed
electronically, documents may be paperfiled. To paper-file, an original and eight
copies should be mailed to: Kimberly D.
Bose, Secretary, Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426. For
more information on how to submit
these types of filings please go to the
Commission’s Web site located at https://
E:\FR\FM\21MYN1.SGM
21MYN1
23848
Federal Register / Vol. 74, No. 97 / Thursday, May 21, 2009 / Notices
www.ferc.gov/filing-comments.asp.
More information about this project can
be viewed or printed on the ‘‘eLibrary’’
link of Commission’s Web site at https://
www.ferc.gov/docs-filing/elibrary.asp.
Enter the docket number (P–13463) in
the docket number field to access the
document. For assistance, call toll-free
1–866–208–3372.
Kimberly D. Bose,
Secretary.
[FR Doc. E9–11792 Filed 5–20–09; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 13338–000]
FFP Kansas 1 LLC d/b/a FFP Lock &
Dam No. 9; Notice of Preliminary
Permit Application Accepted for Filing
and Soliciting Comment, Motions To
Intervene, and Competing Applications
dwashington3 on PROD1PC60 with NOTICES
May 14, 2009.
On November 24, 2008, FFP Kansas 1
LLC d/b/a FFP Lock & Dam No. 9 filed
an application, pursuant to section 4(f)
of the Federal Power Act, proposing to
study the feasibility of the Mississippi
River Lock and Dam No. 9 Water Power
Project (Lock & Dam 9 Project), to be
located at River Mile 647.9 on the
Mississippi River in Allamakee County,
Iowa, and Crawford, Wisconsin, and
near the town of Lynxville, WI. Also,
the reservoir runs through a portion of
the Upper Mississippi River National
Wildlife and Fish Refuge.
The proposed Lock & Dam 9 Project
would be integral with: (1) The existing
U.S. Army Corps of Engineers Lock &
Dam No. 9 comprised of an 811-footlong gated dam section with 5 roller
gates and 8 tainter gates, and a 600 footlong lock, and; (2) an existing 17-milelong reservoir extending from River
Mile 648 to River Mile 679 at a normal
pool elevation of 620.0 feet mean sea
level.
The proposed project would consist
of: (1) 25 Very Low Head (VHL)
generating units and 50 hydrokinetic
generating units totaling 13.4 megawatts
(MW) installed capacity; (2) a new 69kilovolt transmission line connected to
an existing above ground local
distribution system; and (3) appurtenant
facilities. The project would have an
estimated average annual generation of
68,400 megawatt-hours.
Applicant Contact: Mr. Daniel R.
Irvin, Free Flow Power Corporation, 33
Commercial Street, Gloucester, MA
01930, phone (978) 252–7631.
VerDate Nov<24>2008
13:08 May 20, 2009
Jkt 217001
FERC Contact: Patrick Murphy, (202)
502–8755.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Comments, motions to intervene,
notices of intent, and competing
applications may be filed electronically
via the Internet. See 18 CFR
385.2001(a)(1)(iii) and the instructions
on the Commission’s Web site under the
‘‘e-Filing’’ link. If unable to be filed
electronically, documents may be paperfiled. To paper-file, an original and eight
copies should be mailed to: Kimberly D.
Bose, Secretary, Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426. For
more information on how to submit
these types of filings please go to the
Commission’s Web site located at https://
www.ferc.gov/filing-comments.asp.
More information about this project can
be viewed or printed on the ‘‘eLibrary’’
link of Commission’s Web site at https://
www.ferc.gov/docs-filing/elibrary.asp.
Enter the docket number (P–13338) in
the docket number field to access the
document. For assistance, call toll-free
1–866–208–3372.
Kimberly D. Bose,
Secretary.
[FR Doc. E9–11803 Filed 5–20–09; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 13337–000]
FFP Project 34, LLC; Notice of
Preliminary Permit Application
Accepted for Filing and Soliciting
Comment, Motions To Intervene, and
Competing Applications
May 14, 2009.
On November 24, 2008, FFP Project
34, LLC filed an application, pursuant to
section 4(f) of the Federal Power Act,
proposing to study the feasibility of the
Mississippi River Lock and Dam No. 7
Water Power Project (Lock & Dam 7
Project), to be located at River Mile
702.5 on the Mississippi River in
Winona County, Minnesota, and La
Crosse, Wisconsin, and near the town of
La Crescent, MN. Also, the reservoir
runs through a portion of the Upper
Mississippi River National Wildlife and
Fish Refuge.
The proposed Lock & Dam 7 Project
would be integral with: (1) The existing
U.S. Army Corps of Engineers Lock &
PO 00000
Frm 00011
Fmt 4703
Sfmt 4703
Dam No. 7 comprised of a 940-foot-long
gated dam section with 5 roller gates
and 11 tainter gates, a 600 foot-long
lock, and a 8,100-foot-long earth dike;
and (2) an existing 21-square-mile
reservoir at a normal pool elevation of
639.0 feet mean sea level and 79,000
acre-feet of storage.
The proposed project would consist
of: (1) 25 Very Low Head (VHL)
generating units and 75 hydrokinetic
generating units totaling 14.5 megawatts
(MW) installed capacity; (2) a new 69kilovolt transmission line connected to
an existing above ground local
distribution system; and (3) appurtenant
facilities. The project would have an
estimated average annual generation of
73,600 megawatt-hours.
Applicant Contact: Mr. Daniel R.
Irvin, Free Flow Power Corporation, 33
Commercial Street, Gloucester, MA
01930, phone (978) 252–7631.
FERC Contact: Patrick Murphy, (202)
502–8755.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Comments, motions to intervene,
notices of intent, and competing
applications may be filed electronically
via the Internet. See 18 CFR
385.2001(a)(1)(iii) and the instructions
on the Commission’s Web site under the
‘‘e-Filing’’ link. If unable to be filed
electronically, documents may be paperfiled. To paper-file, an original and eight
copies should be mailed to: Kimberly D.
Bose, Secretary, Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426. For
more information on how to submit
these types of filings please go to the
Commission’s Web site located at https://
www.ferc.gov/filing-comments.asp.
More information about this project can
be viewed or printed on the ‘‘eLibrary’’
link of Commission’s Web site at https://
www.ferc.gov/docs-filing/elibrary.asp.
Enter the docket number (P–13337) in
the docket number field to access the
document. For assistance, call toll-free
1–866–208–3372.
Kimberly D. Bose,
Secretary.
[FR Doc. E9–11802 Filed 5–20–09; 8:45 am]
BILLING CODE 6717–01–P
E:\FR\FM\21MYN1.SGM
21MYN1
Agencies
[Federal Register Volume 74, Number 97 (Thursday, May 21, 2009)]
[Notices]
[Pages 23847-23848]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E9-11792]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 13463-000]
Hydro Energy Technologies, LLC; Notice of Preliminary Permit
Applications Accepted for Filing and Soliciting Comment, Motions To
Intervene, and Competing Applications
May 13, 2009.
On May 5, 2009, Hydro Energy Technologies, LLC filed an
application, pursuant to section 4(f) of the Federal Power Act,
proposing to study the feasibility of the Pleasant Hill Hydroelectric
Project, to be located on the Clear Fork of Mohican River, in Ashland
County, Ohio.
The proposed Pleasant Hill Hydroelectric Project would be located
at: (1) The existing U.S. Army Corps of Engineers 775-foot-long, 113-
foot-high Pleasant Hill Dam; and (2) an existing 2,600-acre reservoir
with a normal water surface elevation of 1,020 feet mean sea level.
The proposed project would consist of: (1) A new powerhouse
containing a single turbine generating unit with an installed capacity
of 1.5 megawatts; (2) a new 200-foot-long, 60-inch-diameter penstock;
(3) a new switchyard; (4) a new 1-mile-long, 25-kilovolt transmission
line; and (5) appurtenant facilities. The Pleasant Hill Project would
have an estimated average annual generation of 5.4 gigawatt-hours,
which would be sold to a local utility.
Applicant Contact: Mr. Anthony J. Marra Jr., President, Hydro
Energy Technologies, LLC, 31300 Solon Rd. Suite 12, Solon, OH 44139,
(440) 498-1000.
FERC Contact: John Ramer, (202) 502-8969.
Deadline for filing comments, motions to intervene, competing
applications (without notices of intent), or notices of intent to file
competing applications: 60 days from the issuance of this notice.
Comments, motions to intervene, notices of intent, and competing
applications may be filed electronically via the Internet. See 18 CFR
385.2001(a)(1)(iii) and the instructions on the Commission's Web site
under the ``e-Filing'' link. If unable to be filed electronically,
documents may be paper-filed. To paper-file, an original and eight
copies should be mailed to: Kimberly D. Bose, Secretary, Federal Energy
Regulatory Commission, 888 First Street, NE., Washington, DC 20426. For
more information on how to submit these types of filings please go to
the Commission's Web site located at https://
[[Page 23848]]
www.ferc.gov/filing-comments.asp. More information about this project
can be viewed or printed on the ``eLibrary'' link of Commission's Web
site at https://www.ferc.gov/docs-filing/elibrary.asp. Enter the docket
number (P-13463) in the docket number field to access the document. For
assistance, call toll-free 1-866-208-3372.
Kimberly D. Bose,
Secretary.
[FR Doc. E9-11792 Filed 5-20-09; 8:45 am]