Sunshine Act Meeting Notice, 23402-23403 [E9-11694]

Download as PDF 23402 Federal Register / Vol. 74, No. 95 / Tuesday, May 19, 2009 / Notices Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Comment Date: 5 p.m. Eastern Time on May 26, 2009. Kimberly D. Bose, Secretary. [FR Doc. E9–11572 Filed 5–18–09; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Sunshine Act Meeting Notice May 14, 2009. The following notice of meeting is published pursuant to section 3(a) of the government in the Sunshine Act (Pub. L. No. 94–409), 5 U.S.C. 552b: AGENCY HOLDING MEETING: Federal Energy Regulatory Commission. DATE AND TIME: May 21, 2009, 10 a.m. PLACE: Room 2C, 888 First Street, NE., Washington, DC 20426. STATUS: Open. MATTERS TO BE CONSIDERED: Agenda. Note: Items listed on the agenda may be deleted without further notice. Item No. Docket No. CONTACT PERSON FOR MORE INFORMATION: Kimberly D. Bose, Secretary, Telephone (202) 502–8400. For a recorded message listing items struck from or added to the meeting, call (202) 502–8627. This is a list of matters to be considered by the Commission. It does not include a listing of all documents relevant to the items on the agenda. All public documents, however, may be viewed on-line at the Commission’s Web site at https://www.ferc.gov using the eLibrary link, or may be examined in the Commission’s Public Reference Room. 948TH—Meeting Regular Meeting May 21, 2009. 10 a.m. Company Administrative A–1 ........ A–2 ........ A–3 ........ AD02–1–000 ................................................ AD02–7–000 ................................................ AD06–3–000 ................................................ Agency Administrative Matters. Customer Matters, Reliability, Security and Market Operations. Energy Market Update. Electric E–1 E–2 E–3 E–4 E–5 ........ ........ ........ ........ ........ E–6 ........ E–7 ........ E–8 ........ OA08–21–001 OA08–32–002 OA08–35–002 OA08–41–001 OA08–53–001 OA08–42–001 ............................................. ............................................. ............................................. ............................................. ............................................. ............................................. E–9 ........ E–10 ...... E–11 ...... E–12 ...... OA08–58–002 ............................................. OA08–61–001 ............................................. OA08–62–002, OA08–62–003, ≤OA08–62– 004. NJ08–3–001 ................................................ EC09–32–000 .............................................. OMITTED. RM04–7–006 ............................................... E–13 ...... E–14 ...... RM08–13–000 ............................................. RM08–12–000 ............................................. E–15 ...... E–16 ...... E–17 ...... OMITTED. RM07–21–002 ............................................. RM08–16–000 ............................................. E–18 ...... AD09–7–000 ................................................ E–19 E–20 E–21 E–22 E–23 E–24 E–25 OA08–116–000 ........................................... ER09–864–000 ............................................ ER09–241–001 ............................................ ER01–2636–005 .......................................... OMITTED. EL09–21–000 .............................................. EL00–95–000 .............................................. ...... ...... ...... ...... ...... ...... ...... mstockstill on PROD1PC66 with NOTICES EL00–98–000 .............................................. E–26 ...... EL02–18–002 .............................................. EL00–95–223 .............................................. EL00–98–208 .............................................. VerDate Nov<24>2008 16:48 May 18, 2009 Jkt 217001 PO 00000 Maine Public Service Company. PJM Interconnection, L.L.C. Xcel Energy Services, Inc.—Southwestern Public Service Company. MidAmerican Energy Company. Midwest Independent Transmission System Operator, Inc. Midwest Independent Transmission System Operator, Inc. and American Transmission Company, LLC. ISO New England Inc. Southwest Power Pool, Inc. California Independent System Operator Corporation. Southwestern Power Administration. Exelon Corporation. Market-Based Rates For Wholesale Sales of Electric Energy, Capacity and Ancillary Services by Public Utilities. Transmission Relay Loadability Reliability Standard. Western Electricity Coordinating Council Regional Reliability Standard Regarding Automatic Time Error Correction. Blanket Authorization Under FPA Section 203. Electric Reliability Organization Interpretations of Specific Requirements of Frequency Response and Bias and Voltage and Reactive Control Reliability Standards. Material Changes in Facts Underlying Waiver of Order No. 889 Part 358 of the Commission’s Regulations. Wolverine Power Supply Cooperative, Inc. ISO New England Inc. and New England Power Pool Participants Committee. California Independent System Operator Corporation. ALLETE, Inc. PacifiCorp. San Diego Gas & Electric Company v. Sellers of Energy and Ancillary Services into Markets Operated by the California Independent System Operator Corporation and the California Power Exchange Corporation. Investigation of Practices of the California Independent System Operator Corporation and the California Power Exchange Corporation. NEO California Power LLC. San Diego Gas & Electric Company v. Sellers of Energy and Ancillary Services into Markets Operated by the California Independent System Operator Corporation and the California Power Exchange Corporation. Investigation of Practices of the California Independent System Operator Corporation and the California Power Exchange Corporation. Frm 00014 Fmt 4703 Sfmt 4703 E:\FR\FM\19MYN1.SGM 19MYN1 Federal Register / Vol. 74, No. 95 / Tuesday, May 19, 2009 / Notices Item No. E–27 E–28 E–29 E–30 E–31 E–32 ...... ...... ...... ...... ...... ...... E–33 ...... Docket No. 23403 Company ER08–1317–001 .......................................... ER08–140–001 ............................................ OMITTED. ER08–1281–002 .......................................... OMITTED. ER02–2001–011 .......................................... ER06–250–000 ............................................ ER05–294–000 ............................................ EL09–20–000 .............................................. California Independent System Operator Corporation. California Independent System Operator Corporation. New York Independent System Operator, Inc. Electric Quarterly Reports. Knedergy, LLC. Westbank Energy Capital, LLC. Northeast Utilities Service Company and NSTAR Electric Company. Gas G–1 ........ G–2 ........ G–3 ........ RP08–295–001 ............................................ RP09–282–002, ≤RP09–282–001 .............. RP07–504–000, RP07–504–001, RP07– 504–002. Columbia Gas Transmission Company. Tennessee Gas Pipeline Company. Algonquin Gas Transmission, LLC. Hydro H–1 ........ H–2 ........ H–3 ........ EL06–91–002, P–12252–029, P–12252– 030. P–13282–001 .............................................. P–2145–092 ................................................ Albany Engineering Corporation v. Hudson River-Black River Regulating District. Hudson River-Black River Regulating District. Renaissance Ketchikan Group, LLC. Public Utility District No. 1 of Chelan County, Washington. Certificates C–1 C–2 C–3 C–4 C–5 C–6 C–7 ........ ........ ........ ........ ........ ........ ........ C–8 ........ C–9 ........ OMITTED. CP08–463–000 ............................................ OMITTED. OMITTED. CP09–25–000 .............................................. CP09–34–001 .............................................. CP08–6–001 ................................................ CP08–9–001 ................................................ CP08–441–001 ............................................ CP08–444–001 ............................................ CP08–100–001 ............................................ CenterPoint Energy Gas Transmission Company. New Mexico Gas Company, Inc. and Public Service Company of New Mexico. ConocoPhillips Alaska Natural Gas Corporation and Marathon Oil Company. Midcontinent Express Pipeline LLC. Enogex Inc. CenterPoint Energy Gas Transmission Company. Texas Eastern Transmission, LP. Texas Eastern Transmission, LP. mstockstill on PROD1PC66 with NOTICES Kimberly D. Bose, Secretary. not be telecast through the Capitol Connection service. A free Webcast of this event is available through https://www.ferc.gov. Anyone with Internet access who desires to view this event can do so by navigating to https://www.ferc.gov’s Calendar of Events and locating this event in the Calendar. The event will contain a link to its Webcast. The Capitol Connection provides technical support for the free Webcasts. It also offers access to this event via television in the DC area and via phone bridge for a fee. If you have any questions, visit https://www.CapitolConnection.org or contact Danelle Springer or David Reininger at 703–993–3100. Immediately following the conclusion of the Commission Meeting, a press briefing will be held in the Commission Meeting Room. Members of the public may view this briefing in the designated overflow room. This statement is intended to notify the public that the press briefings that follow Commission meetings may now be viewed remotely at Commission headquarters, but will [FR Doc. E9–11694 Filed 5–15–09; 11:15 am] VerDate Nov<24>2008 16:48 May 18, 2009 Jkt 217001 which is abstracted below, describes the nature of the information collection and its estimated burden and cost. BILLING CODE 6717–01–P DATES: Additional comments may be submitted on or before June 18, 2009. ENVIRONMENTAL PROTECTION AGENCY ADDRESSES: Submit your comments, referencing Docket ID No. EPA–HQ– RCRA–2008–0914, to (1) EPA, either online using https://www.regulations.gov (our preferred method), or by e-mail to rcra-docket@epa.gov, or by mail to: RCRA Docket (28221T), U.S. Environmental Protection Agency, 1200 Pennsylvania Avenue, NW., Washington, DC 20460; and (2) OMB, by mail to: Office of Information and Regulatory Affairs, Office of Management and Budget (OMB), Attention: Desk Officer for EPA, 725 17th Street, NW., Washington, DC 20503. [EPA–HQ–RCRA–2008–0914, FRL–8907–5] Agency Information Collection Activities; Submission to OMB for Review and Approval; Comment Request; EPA’s National Partnership for Environmental Priorities (Renewal), EPA ICR Number 2076.03, OMB Control Number 2050–0190 AGENCY: Environmental Protection Agency (EPA). ACTION: Notice. SUMMARY: In compliance with the Paperwork Reduction Act (PRA)(44 U.S.C. 3501 et seq.), this document announces that an Information Collection Request (ICR) has been forwarded to the Office of Management and Budget (OMB) for review and approval. This is a request to renew an existing approved collection. The ICR, PO 00000 Frm 00015 Fmt 4703 Sfmt 4703 FOR FURTHER INFORMATION CONTACT: Newman Smith, Office of Resource Conservation and Recovery (5306P), Environmental Protection Agency, 1200 Pennsylvania Ave., NW., Washington, DC 20460; telephone number: 703–308– 8757; fax number: 703–308–8433; email address: smith.newman@epa.gov. E:\FR\FM\19MYN1.SGM 19MYN1

Agencies

[Federal Register Volume 74, Number 95 (Tuesday, May 19, 2009)]
[Notices]
[Pages 23402-23403]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E9-11694]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission


Sunshine Act Meeting Notice

May 14, 2009.
    The following notice of meeting is published pursuant to section 
3(a) of the government in the Sunshine Act (Pub. L. No. 94-409), 5 
U.S.C. 552b:

Agency Holding Meeting: Federal Energy Regulatory Commission.

Date and Time: May 21, 2009, 10 a.m.

Place: Room 2C, 888 First Street, NE., Washington, DC 20426.

Status: Open.

Matters to be Considered:  Agenda.

    Note: Items listed on the agenda may be deleted without further 
notice.


CONTACT PERSON FOR MORE INFORMATION: Kimberly D. Bose, Secretary, 
Telephone (202) 502-8400.
    For a recorded message listing items struck from or added to the 
meeting, call (202) 502-8627.
    This is a list of matters to be considered by the Commission. It 
does not include a listing of all documents relevant to the items on 
the agenda. All public documents, however, may be viewed on-line at the 
Commission's Web site at https://www.ferc.gov using the eLibrary link, 
or may be examined in the Commission's Public Reference Room.

948TH--Meeting

Regular Meeting May 21, 2009. 10 a.m.

----------------------------------------------------------------------------------------------------------------
        Item No.                     Docket No.                                    Company
----------------------------------------------------------------------------------------------------------------
                                                 Administrative
----------------------------------------------------------------------------------------------------------------
A-1.....................  AD02-1-000......................  Agency Administrative Matters.
A-2.....................  AD02-7-000......................  Customer Matters, Reliability, Security and Market
                                                             Operations.
A-3.....................  AD06-3-000......................  Energy Market Update.
----------------------------------------------------------------------------------------------------------------
                                                    Electric
----------------------------------------------------------------------------------------------------------------
E-1.....................  OA08-21-001.....................  Maine Public Service Company.
E-2.....................  OA08-32-002.....................  PJM Interconnection, L.L.C.
E-3.....................  OA08-35-002.....................  Xcel Energy Services, Inc.--Southwestern Public
                                                             Service Company.
E-4.....................  OA08-41-001.....................  MidAmerican Energy Company.
E-5.....................  OA08-53-001.....................  Midwest Independent Transmission System Operator,
                                                             Inc.
                          OA08-42-001.....................  Midwest Independent Transmission System Operator,
                                                             Inc. and American Transmission Company, LLC.
E-6.....................  OA08-58-002.....................  ISO New England Inc.
E-7.....................  OA08-61-001.....................  Southwest Power Pool, Inc.
E-8.....................  OA08-62-002, OA08-62-003, >OA08-  California Independent System Operator Corporation.
                           62-004.
E-9.....................  NJ08-3-001......................  Southwestern Power Administration.
E-10....................  EC09-32-000.....................  Exelon Corporation.
E-11....................  OMITTED.........................
E-12....................  RM04-7-006......................  Market-Based Rates For Wholesale Sales of Electric
                                                             Energy, Capacity and Ancillary Services by Public
                                                             Utilities.
E-13....................  RM08-13-000.....................  Transmission Relay Loadability Reliability Standard.
E-14....................  RM08-12-000.....................  Western Electricity Coordinating Council Regional
                                                             Reliability Standard Regarding Automatic Time Error
                                                             Correction.
E-15....................  OMITTED.........................
E-16....................  RM07-21-002.....................  Blanket Authorization Under FPA Section 203.
E-17....................  RM08-16-000.....................  Electric Reliability Organization Interpretations of
                                                             Specific Requirements of Frequency Response and
                                                             Bias and Voltage and Reactive Control Reliability
                                                             Standards.
E-18....................  AD09-7-000......................  Material Changes in Facts Underlying Waiver of Order
                                                             No. 889 Part 358 of the Commission's Regulations.
E-19....................  OA08-116-000....................  Wolverine Power Supply Cooperative, Inc.
E-20....................  ER09-864-000....................  ISO New England Inc. and New England Power Pool
                                                             Participants Committee.
E-21....................  ER09-241-001....................  California Independent System Operator Corporation.
E-22....................  ER01-2636-005...................  ALLETE, Inc.
E-23....................  OMITTED.........................
E-24....................  EL09-21-000.....................  PacifiCorp.
E-25....................  EL00-95-000.....................  San Diego Gas & Electric Company v. Sellers of
                                                             Energy and Ancillary Services into Markets Operated
                                                             by the California Independent System Operator
                                                             Corporation and the California Power Exchange
                                                             Corporation.
                          EL00-98-000.....................  Investigation of Practices of the California
                                                             Independent System Operator Corporation and the
                                                             California Power Exchange Corporation.
E-26....................  EL02-18-002.....................  NEO California Power LLC.
                          EL00-95-223.....................  San Diego Gas & Electric Company v. Sellers of
                                                             Energy and Ancillary Services into Markets Operated
                                                             by the California Independent System Operator
                                                             Corporation and the California Power Exchange
                                                             Corporation.
                          EL00-98-208.....................  Investigation of Practices of the California
                                                             Independent System Operator Corporation and the
                                                             California Power Exchange Corporation.

[[Page 23403]]

 
E-27....................  ER08-1317-001...................  California Independent System Operator Corporation.
E-28....................  ER08-140-001....................  California Independent System Operator Corporation.
E-29....................  OMITTED.........................
E-30....................  ER08-1281-002...................  New York Independent System Operator, Inc.
E-31....................  OMITTED.........................
E-32....................  ER02-2001-011...................  Electric Quarterly Reports.
                          ER06-250-000....................  Knedergy, LLC.
                          ER05-294-000....................  Westbank Energy Capital, LLC.
E-33....................  EL09-20-000.....................  Northeast Utilities Service Company and NSTAR
                                                             Electric Company.
----------------------------------------------------------------------------------------------------------------
                                                       Gas
----------------------------------------------------------------------------------------------------------------
G-1.....................  RP08-295-001....................  Columbia Gas Transmission Company.
G-2.....................  RP09-282-002, >RP09-282-001.....  Tennessee Gas Pipeline Company.
G-3.....................  RP07-504-000, RP07-504-001, RP07- Algonquin Gas Transmission, LLC.
                           504-002.
----------------------------------------------------------------------------------------------------------------
                                                      Hydro
----------------------------------------------------------------------------------------------------------------
H-1.....................  EL06-91-002, P-12252-029, P-      Albany Engineering Corporation v. Hudson River-Black
                           12252-030.                        River Regulating District. Hudson River-Black River
                                                             Regulating District.
H-2.....................  P-13282-001.....................  Renaissance Ketchikan Group, LLC.
H-3.....................  P-2145-092......................  Public Utility District No. 1 of Chelan County,
                                                             Washington.
----------------------------------------------------------------------------------------------------------------
                                                  Certificates
----------------------------------------------------------------------------------------------------------------
C-1.....................  OMITTED.........................
C-2.....................  CP08-463-000....................  CenterPoint Energy Gas Transmission Company.
C-3.....................  OMITTED.........................
C-4.....................  OMITTED.........................
C-5.....................  CP09-25-000.....................  New Mexico Gas Company, Inc. and Public Service
                                                             Company of New Mexico.
C-6.....................  CP09-34-001.....................  ConocoPhillips Alaska Natural Gas Corporation and
                                                             Marathon Oil Company.
C-7.....................  CP08-6-001......................  Midcontinent Express Pipeline LLC.
                          CP08-9-001......................  Enogex Inc.
C-8.....................  CP08-441-001....................  CenterPoint Energy Gas Transmission Company.
                          CP08-444-001....................  Texas Eastern Transmission, LP.
C-9.....................  CP08-100-001....................  Texas Eastern Transmission, LP.
----------------------------------------------------------------------------------------------------------------


Kimberly D. Bose,
Secretary.
    A free Webcast of this event is available through https://www.ferc.gov. Anyone with Internet access who desires to view this 
event can do so by navigating to https://www.ferc.gov's Calendar of 
Events and locating this event in the Calendar. The event will contain 
a link to its Webcast. The Capitol Connection provides technical 
support for the free Webcasts. It also offers access to this event via 
television in the DC area and via phone bridge for a fee. If you have 
any questions, visit https://www.CapitolConnection.org or contact 
Danelle Springer or David Reininger at 703-993-3100.
    Immediately following the conclusion of the Commission Meeting, a 
press briefing will be held in the Commission Meeting Room. Members of 
the public may view this briefing in the designated overflow room. This 
statement is intended to notify the public that the press briefings 
that follow Commission meetings may now be viewed remotely at 
Commission headquarters, but will not be telecast through the Capitol 
Connection service.
[FR Doc. E9-11694 Filed 5-15-09; 11:15 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.