Download as PDF Federal Register / Vol. 74, No. 95 / Tuesday, May 19, 2009 / Notices o. Final amendments to the application must be filed with the Commission no later than 30 days from the issuance date of the notice of ready for environmental analysis. Kimberly D. Bose, Secretary. [FR Doc. E9–11570 Filed 5–18–09; 8:45 am] BILLING CODE 6717–01–P Online service, please e-mail FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Comment Date: 5 p.m. Eastern Time on June 5, 2009. Kimberly D. Bose, Secretary. [FR Doc. E9–11568 Filed 5–18–09; 8:45 am] BILLING CODE 6717–01–P 23401 There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive email notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Comment Date: 5 p.m. Eastern Time on May 15, 2009. DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Kimberly D. Bose, Secretary. [FR Doc. E9–11569 Filed 5–18–09; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. QM09–4–000] [Docket Nos. ER09–88–002] Wolverine Power Supply Cooperative, Inc.; Notice of Filing mstockstill on PROD1PC66 with NOTICES May 12, 2009. Take notice that on May 8, 2009, Wolverine Power Supply Cooperative, Inc. filed an application requesting authorization to terminate the mandatory purchase obligation from qualifying facilities with net capacity over twenty megawatts on a service territory-wide basis, pursuant to section 292.310(a). Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211, 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed on or before the comment date. On or before the comment date, it is not necessary to serve motions to intervene or protests on persons other than the Applicant. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 14 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC VerDate Nov<24>2008 16:48 May 18, 2009 Jkt 217001 DEPARTMENT OF ENERGY Southern Company Services, Inc.; Notice of Filing May 12, 2009. Take notice that on April 23, 2009, the Southern Company Services, Inc., acting as agent for Alabama Power Company, Georgia Power Company, Gulf Power Company, Mississippi Power Company and Southern Power Company (collectively Southern Companies), filed tariff sheets to its Market Based Rate Tariff, to be effective April 23, 2009, pursuant to the Commission’s, March 25, 2009, Order, Southern Co. Svcs., Inc., 126 FERC ¶ 61,274 (2009) (March 25 Order). Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211, 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed on or before the comment date. Anyone filing a motion to intervene or protest must serve a copy of that document on the Applicant and all the parties in this proceeding. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 14 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. PO 00000 Frm 00013 Fmt 4703 Sfmt 4703 Federal Energy Regulatory Commission [Docket Nos. EL07–56–008; EL07–58–008] Organization of PJM States, Inc. v. PJM Interconnection, L.L.C.; Notice of Filing May 12, 2009. Take notice that on May 11, 2009, the Pennsylvania Public Utility Commission filed a State of Certification as required by sections 18.17.4 of the Amended and Restated Operating Agreement of PJM Interconnection, L.L.C. and the Commission’s Order, Organization of PJM States, Inc. v. PJM Interconnection, L.L.C., 123 FERC ¶ 61,235 (2008). Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211, 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed on or before the comment date. Anyone filing a motion to intervene or protest must serve a copy of that document on the Applicant and all the parties in this proceeding. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 14 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public E:\FR\FM\19MYN1.SGM 19MYN1 23402 Federal Register / Vol. 74, No. 95 / Tuesday, May 19, 2009 / Notices Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Comment Date: 5 p.m. Eastern Time on May 26, 2009. Kimberly D. Bose, Secretary. [FR Doc. E9–11572 Filed 5–18–09; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Sunshine Act Meeting Notice May 14, 2009. The following notice of meeting is published pursuant to section 3(a) of the government in the Sunshine Act (Pub. L. No. 94–409), 5 U.S.C. 552b: AGENCY HOLDING MEETING: Federal Energy Regulatory Commission. DATE AND TIME: May 21, 2009, 10 a.m. PLACE: Room 2C, 888 First Street, NE., Washington, DC 20426. STATUS: Open. MATTERS TO BE CONSIDERED: Agenda. Note: Items listed on the agenda may be deleted without further notice. Item No. Docket No. CONTACT PERSON FOR MORE INFORMATION: Kimberly D. Bose, Secretary, Telephone (202) 502–8400. For a recorded message listing items struck from or added to the meeting, call (202) 502–8627. This is a list of matters to be considered by the Commission. It does not include a listing of all documents relevant to the items on the agenda. All public documents, however, may be viewed on-line at the Commission’s Web site at https://www.ferc.gov using the eLibrary link, or may be examined in the Commission’s Public Reference Room. 948TH—Meeting Regular Meeting May 21, 2009. 10 a.m. Company Administrative A–1 ........ A–2 ........ A–3 ........ AD02–1–000 ................................................ AD02–7–000 ................................................ AD06–3–000 ................................................ Agency Administrative Matters. Customer Matters, Reliability, Security and Market Operations. Energy Market Update. Electric E–1 E–2 E–3 E–4 E–5 ........ ........ ........ ........ ........ E–6 ........ E–7 ........ E–8 ........ OA08–21–001 OA08–32–002 OA08–35–002 OA08–41–001 OA08–53–001 OA08–42–001 ............................................. ............................................. ............................................. ............................................. ............................................. ............................................. E–9 ........ E–10 ...... E–11 ...... E–12 ...... OA08–58–002 ............................................. OA08–61–001 ............................................. OA08–62–002, OA08–62–003, ≤OA08–62– 004. NJ08–3–001 ................................................ EC09–32–000 .............................................. OMITTED. RM04–7–006 ............................................... E–13 ...... E–14 ...... RM08–13–000 ............................................. RM08–12–000 ............................................. E–15 ...... E–16 ...... E–17 ...... OMITTED. RM07–21–002 ............................................. RM08–16–000 ............................................. E–18 ...... AD09–7–000 ................................................ E–19 E–20 E–21 E–22 E–23 E–24 E–25 OA08–116–000 ........................................... ER09–864–000 ............................................ ER09–241–001 ............................................ ER01–2636–005 .......................................... OMITTED. EL09–21–000 .............................................. EL00–95–000 .............................................. ...... ...... ...... ...... ...... ...... ...... mstockstill on PROD1PC66 with NOTICES EL00–98–000 .............................................. E–26 ...... EL02–18–002 .............................................. EL00–95–223 .............................................. EL00–98–208 .............................................. VerDate Nov<24>2008 16:48 May 18, 2009 Jkt 217001 PO 00000 Maine Public Service Company. PJM Interconnection, L.L.C. Xcel Energy Services, Inc.—Southwestern Public Service Company. MidAmerican Energy Company. Midwest Independent Transmission System Operator, Inc. Midwest Independent Transmission System Operator, Inc. and American Transmission Company, LLC. ISO New England Inc. Southwest Power Pool, Inc. California Independent System Operator Corporation. Southwestern Power Administration. Exelon Corporation. Market-Based Rates For Wholesale Sales of Electric Energy, Capacity and Ancillary Services by Public Utilities. Transmission Relay Loadability Reliability Standard. Western Electricity Coordinating Council Regional Reliability Standard Regarding Automatic Time Error Correction. Blanket Authorization Under FPA Section 203. Electric Reliability Organization Interpretations of Specific Requirements of Frequency Response and Bias and Voltage and Reactive Control Reliability Standards. Material Changes in Facts Underlying Waiver of Order No. 889 Part 358 of the Commission’s Regulations. Wolverine Power Supply Cooperative, Inc. ISO New England Inc. and New England Power Pool Participants Committee. California Independent System Operator Corporation. ALLETE, Inc. PacifiCorp. San Diego Gas & Electric Company v. Sellers of Energy and Ancillary Services into Markets Operated by the California Independent System Operator Corporation and the California Power Exchange Corporation. Investigation of Practices of the California Independent System Operator Corporation and the California Power Exchange Corporation. NEO California Power LLC. San Diego Gas & Electric Company v. Sellers of Energy and Ancillary Services into Markets Operated by the California Independent System Operator Corporation and the California Power Exchange Corporation. Investigation of Practices of the California Independent System Operator Corporation and the California Power Exchange Corporation. Frm 00014 Fmt 4703 Sfmt 4703 E:\FR\FM\19MYN1.SGM 19MYN1

Agencies

[Federal Register Volume 74, Number 95 (Tuesday, May 19, 2009)]
[Notices]
[Pages 23401-23402]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E9-11572]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket Nos. EL07-56-008; EL07-58-008]


Organization of PJM States, Inc. v. PJM Interconnection, L.L.C.; 
Notice of Filing

May 12, 2009.
    Take notice that on May 11, 2009, the Pennsylvania Public Utility 
Commission filed a State of Certification as required by sections 
18.17.4 of the Amended and Restated Operating Agreement of PJM 
Interconnection, L.L.C. and the Commission's Order, Organization of PJM 
States, Inc. v. PJM Interconnection, L.L.C., 123 FERC ] 61,235 (2008).
    Any person desiring to intervene or to protest this filing must 
file in accordance with Rules 211 and 214 of the Commission's Rules of 
Practice and Procedure (18 CFR 385.211, 385.214). Protests will be 
considered by the Commission in determining the appropriate action to 
be taken, but will not serve to make protestants parties to the 
proceeding. Any person wishing to become a party must file a notice of 
intervention or motion to intervene, as appropriate. Such notices, 
motions, or protests must be filed on or before the comment date. 
Anyone filing a motion to intervene or protest must serve a copy of 
that document on the Applicant and all the parties in this proceeding.
    The Commission encourages electronic submission of protests and 
interventions in lieu of paper using the ``eFiling'' link at https://www.ferc.gov. Persons unable to file electronically should submit an 
original and 14 copies of the protest or intervention to the Federal 
Energy Regulatory Commission, 888 First Street, NE., Washington, DC 
20426.
    This filing is accessible on-line at https://www.ferc.gov, using the 
``eLibrary'' link and is available for review in the Commission's 
Public

[[Page 23402]]

Reference Room in Washington, DC. There is an ``eSubscription'' link on 
the Web site that enables subscribers to receive e-mail notification 
when a document is added to a subscribed docket(s). For assistance with 
any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or 
call (866) 208-3676 (toll free). For TTY, call (202) 502-8659.
    Comment Date: 5 p.m. Eastern Time on May 26, 2009.

Kimberly D. Bose,
Secretary.