Wolverine Power Supply Cooperative, Inc.; Notice of Filing, 23401 [E9-11568]
Download as PDF
Federal Register / Vol. 74, No. 95 / Tuesday, May 19, 2009 / Notices
o. Final amendments to the
application must be filed with the
Commission no later than 30 days from
the issuance date of the notice of ready
for environmental analysis.
Kimberly D. Bose,
Secretary.
[FR Doc. E9–11570 Filed 5–18–09; 8:45 am]
BILLING CODE 6717–01–P
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5 p.m. Eastern Time
on June 5, 2009.
Kimberly D. Bose,
Secretary.
[FR Doc. E9–11568 Filed 5–18–09; 8:45 am]
BILLING CODE 6717–01–P
23401
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5 p.m. Eastern Time
on May 15, 2009.
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Kimberly D. Bose,
Secretary.
[FR Doc. E9–11569 Filed 5–18–09; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. QM09–4–000]
[Docket Nos. ER09–88–002]
Wolverine Power Supply Cooperative,
Inc.; Notice of Filing
mstockstill on PROD1PC66 with NOTICES
May 12, 2009.
Take notice that on May 8, 2009,
Wolverine Power Supply Cooperative,
Inc. filed an application requesting
authorization to terminate the
mandatory purchase obligation from
qualifying facilities with net capacity
over twenty megawatts on a service
territory-wide basis, pursuant to section
292.310(a).
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211, 385.214).
Protests will be considered by the
Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed on or before the
comment date. On or before the
comment date, it is not necessary to
serve motions to intervene or protests
on persons other than the Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 14 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
VerDate Nov<24>2008
16:48 May 18, 2009
Jkt 217001
DEPARTMENT OF ENERGY
Southern Company Services, Inc.;
Notice of Filing
May 12, 2009.
Take notice that on April 23, 2009,
the Southern Company Services, Inc.,
acting as agent for Alabama Power
Company, Georgia Power Company,
Gulf Power Company, Mississippi
Power Company and Southern Power
Company (collectively Southern
Companies), filed tariff sheets to its
Market Based Rate Tariff, to be effective
April 23, 2009, pursuant to the
Commission’s, March 25, 2009, Order,
Southern Co. Svcs., Inc., 126 FERC
¶ 61,274 (2009) (March 25 Order).
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211, 385.214).
Protests will be considered by the
Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed on or before the
comment date. Anyone filing a motion
to intervene or protest must serve a copy
of that document on the Applicant and
all the parties in this proceeding.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 14 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
PO 00000
Frm 00013
Fmt 4703
Sfmt 4703
Federal Energy Regulatory
Commission
[Docket Nos. EL07–56–008; EL07–58–008]
Organization of PJM States, Inc. v. PJM
Interconnection, L.L.C.; Notice of Filing
May 12, 2009.
Take notice that on May 11, 2009, the
Pennsylvania Public Utility Commission
filed a State of Certification as required
by sections 18.17.4 of the Amended and
Restated Operating Agreement of PJM
Interconnection, L.L.C. and the
Commission’s Order, Organization of
PJM States, Inc. v. PJM Interconnection,
L.L.C., 123 FERC ¶ 61,235 (2008).
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211, 385.214).
Protests will be considered by the
Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed on or before the
comment date. Anyone filing a motion
to intervene or protest must serve a copy
of that document on the Applicant and
all the parties in this proceeding.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 14 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
E:\FR\FM\19MYN1.SGM
19MYN1
Agencies
[Federal Register Volume 74, Number 95 (Tuesday, May 19, 2009)]
[Notices]
[Page 23401]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E9-11568]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. QM09-4-000]
Wolverine Power Supply Cooperative, Inc.; Notice of Filing
May 12, 2009.
Take notice that on May 8, 2009, Wolverine Power Supply
Cooperative, Inc. filed an application requesting authorization to
terminate the mandatory purchase obligation from qualifying facilities
with net capacity over twenty megawatts on a service territory-wide
basis, pursuant to section 292.310(a).
Any person desiring to intervene or to protest this filing must
file in accordance with Rules 211 and 214 of the Commission's Rules of
Practice and Procedure (18 CFR 385.211, 385.214). Protests will be
considered by the Commission in determining the appropriate action to
be taken, but will not serve to make protestants parties to the
proceeding. Any person wishing to become a party must file a notice of
intervention or motion to intervene, as appropriate. Such notices,
motions, or protests must be filed on or before the comment date. On or
before the comment date, it is not necessary to serve motions to
intervene or protests on persons other than the Applicant.
The Commission encourages electronic submission of protests and
interventions in lieu of paper using the ``eFiling'' link at https://www.ferc.gov. Persons unable to file electronically should submit an
original and 14 copies of the protest or intervention to the Federal
Energy Regulatory Commission, 888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at https://www.ferc.gov, using the
``eLibrary'' link and is available for review in the Commission's
Public Reference Room in Washington, DC. There is an ``eSubscription''
link on the Web site that enables subscribers to receive e-mail
notification when a document is added to a subscribed docket(s). For
assistance with any FERC Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call (866) 208-3676 (toll free). For
TTY, call (202) 502-8659.
Comment Date: 5 p.m. Eastern Time on June 5, 2009.
Kimberly D. Bose,
Secretary.
[FR Doc. E9-11568 Filed 5-18-09; 8:45 am]
BILLING CODE 6717-01-P