Download as PDF 21794 Federal Register / Vol. 74, No. 89 / Monday, May 11, 2009 / Notices DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13418–000] Northeast Hydrodevelopment, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications May 4, 2009. On March 30, 2009, Northeast Hydrodevelopment, LLC filed an application, pursuant to section 4(f) of the Federal Power Act, proposing to study the feasibility of the Goffs Falls Dam Hydroelectric Project, to be located on the Great Cohas Brook, in Hillsborough County, New Hampshire. The proposed Goffs Falls Dam Project would be located along the Great Cohas Brook channel below the existing outlet works at an existing dam owned by the City of Manchester, New Hampshire. The existing dam, which impounds the Great Cohas Brook, is 150 feet long and 19 feet high and includes a 75-foot-long spillway and a 4 foot by 9 foot low level sluice gate. The impoundment encompasses about 54 surface acres. The proposed project would consist of: (1) A newly constructed powerhouse below the existing outlet works; (2) a 260-foot-long to 1,060-foot-long penstock; (3) two submersible or tubular-type turbine-generators with a total hydraulic capacity of 246 cubic feet per second and a total installed generating capacity of between 0.265 megawatts (MW) and .585 MW; (4) a newly excavated 125-foot-long tailrace; (5) between an approximately 150-footlong to 750-foot-long transmission line; and (6) appurtenant facilities. The Goffs Falls Dam Project would have an estimated average annual generation of between 850 megawatts-hours (MWh) and 1,850 MWh, which would be sold to Public Service of New Hampshire. Applicant Contact: Mr. Norm Herbert, Manager, Northeast Hydrodevelopment, LLC, 100 State Route 101A, Building C, Suite 270, Amherst, New Hampshire 03031, (603) 672–8210. FERC Contact: John Ramer, (202) 502– 8969. Deadline for filing comments, motions to intervene, competing applications (without notices of intent), or notices of intent to file competing applications: 60 days from the issuance of this notice. Comments, motions to intervene, notices of intent, and competing applications may be filed electronically via the Internet. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site under the VerDate Nov<24>2008 15:05 May 08, 2009 Jkt 217001 ‘‘e-Filing’’ link. If unable to be filed electronically, documents may be paperfiled. To paper-file, an original and eight copies should be mailed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. For more information on how to submit these types of filings please go to the Commission’s Web site located at http: //www.ferc.gov/filing-comments.asp. More information about this project can be viewed or printed on the ‘‘eLibrary’’ link the of Commission’s Web site at https://www.ferc.gov/docs-filing/ elibrary.asp. Enter the docket number (P–13418) in the docket number field to access the document. For assistance, call toll-free 1–866–208–3372. Kimberly D. Bose, Secretary. [FR Doc. E9–10854 Filed 5–8–09; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13402–000] Hydro Energy Technologies, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications May 4, 2009. On March 20, 2009, Hydro Energy Technologies, LLC filed an application, pursuant to section 4(f) of the Federal Power Act, proposing to study the feasibility of the Lake Milton Hydroelectric Project, to be located on Mahoning River, in Mahoning County, Ohio. The proposed Lake Milton Hydroelectric Project would be located at the existing Lake Milton Dam owned by the Ohio Department of Natural Resources. The dam operations are supervised by the U.S. Army Corps of Engineers. The Lake Milton Dam is 760feet-long and 54-feet-high, which includes a 650-long spillway and four 60-inch-diameter gate valves. The proposed project would consist of: (1) A new powerhouse at the base of the existing outlet works; (2) one or more turbine/generators with total installed capacity of 1.2 megawatts; (3) two 60-inch-diameter, 7-foot-long penstocks; (4) a new 320-foot-long transmission line; and (5) appurtenant facilities. The Lake Milton Dam Project would have an estimated average annual generation of 6,929 megawatts-hours, which would be sold to a local utility. PO 00000 Frm 00020 Fmt 4703 Sfmt 4703 Applicant Contact: Mr. Anthony J. Marra Jr., President, Hydro Energy Technologies, LLC, 31300 Solon Rd. Suite 12, Solon, OH 44139, (440) 498– 1000. FERC Contact: John Ramer, (202) 502– 8969. Deadline for filing comments, motions to intervene, competing applications (without notices of intent), or notices of intent to file competing applications: 60 days from the issuance of this notice. Comments, motions to intervene, notices of intent, and competing applications may be filed electronically via the Internet. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site under the ‘‘e-Filing’’ link. If unable to be filed electronically, documents may be paperfiled. To paper-file, an original and eight copies should be mailed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. For more information on how to submit these types of filings please go to the Commission’s Web site located at https://www.ferc.gov/filingcomments.asp. More information about this project can be viewed or printed on the ‘‘eLibrary’’ link of Commission’s Web site at https://www.ferc.gov/docs-filing/ elibrary.asp. Enter the docket number (P–13402) in the docket number field to access the document. For assistance, call toll-free 1–866–208–3372. Kimberly D. Bose, Secretary. [FR Doc. E9–10851 Filed 5–8–09; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13396–000] Northeast Hydrodevelopment, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications May 4, 2009. On March 13, 2009, Northeast Hydrodevelopment, LLC filed an application, pursuant to section 4(f) of the Federal Power Act, proposing to study the feasibility of the Alton Power Dam Hydroelectric Project, to be located on the Merrymeeting River, in Belknap County, New Hampshire. The proposed Alton Power Dam Project would be located along the Merrymeeting River channel below the E:\FR\FM\11MYN1.SGM 11MYN1

Agencies

[Federal Register Volume 74, Number 89 (Monday, May 11, 2009)]
[Notices]
[Page 21794]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E9-10851]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 13402-000]


Hydro Energy Technologies, LLC; Notice of Preliminary Permit 
Application Accepted for Filing and Soliciting Comments, Motions To 
Intervene, and Competing Applications

May 4, 2009.
    On March 20, 2009, Hydro Energy Technologies, LLC filed an 
application, pursuant to section 4(f) of the Federal Power Act, 
proposing to study the feasibility of the Lake Milton Hydroelectric 
Project, to be located on Mahoning River, in Mahoning County, Ohio.
    The proposed Lake Milton Hydroelectric Project would be located at 
the existing Lake Milton Dam owned by the Ohio Department of Natural 
Resources. The dam operations are supervised by the U.S. Army Corps of 
Engineers. The Lake Milton Dam is 760-feet-long and 54-feet-high, which 
includes a 650-long spillway and four 60-inch-diameter gate valves.
    The proposed project would consist of: (1) A new powerhouse at the 
base of the existing outlet works; (2) one or more turbine/generators 
with total installed capacity of 1.2 megawatts; (3) two 60-inch-
diameter, 7-foot-long penstocks; (4) a new 320-foot-long transmission 
line; and (5) appurtenant facilities. The Lake Milton Dam Project would 
have an estimated average annual generation of 6,929 megawatts-hours, 
which would be sold to a local utility.
    Applicant Contact: Mr. Anthony J. Marra Jr., President, Hydro 
Energy Technologies, LLC, 31300 Solon Rd. Suite 12, Solon, OH 44139, 
(440) 498-1000.
    FERC Contact: John Ramer, (202) 502-8969.
    Deadline for filing comments, motions to intervene, competing 
applications (without notices of intent), or notices of intent to file 
competing applications: 60 days from the issuance of this notice. 
Comments, motions to intervene, notices of intent, and competing 
applications may be filed electronically via the Internet. See 18 CFR 
385.2001(a)(1)(iii) and the instructions on the Commission's Web site 
under the ``e-Filing'' link. If unable to be filed electronically, 
documents may be paper-filed. To paper-file, an original and eight 
copies should be mailed to: Kimberly D. Bose, Secretary, Federal Energy 
Regulatory Commission, 888 First Street, NE., Washington, DC 20426. For 
more information on how to submit these types of filings please go to 
the Commission's Web site located at https://www.ferc.gov/filing-comments.asp. More information about this project can be viewed or 
printed on the ``eLibrary'' link of Commission's Web site at https://
www.ferc.gov/docs-filing/elibrary.asp. Enter the docket number (P-
13402) in the docket number field to access the document. For 
assistance, call toll-free 1-866-208-3372.

Kimberly D. Bose,
Secretary.
[FR Doc. E9-10851 Filed 5-8-09; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.