Northeast Hydrodevelopment, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications, 21789-21790 [E9-10847]
Download as PDF
Federal Register / Vol. 74, No. 89 / Monday, May 11, 2009 / Notices
Requests may also be electronically
mailed to the Internet address
ICDocketMgr@ed.gov or faxed to 202–
401–0920. Please specify the complete
title of the information collection when
making your request.
Comments regarding burden and/or
the collection activity requirements
should be electronically mailed to
ICDocketMgr@ed.gov. Individuals who
use a telecommunications device for the
deaf (TDD) may call the Federal
Information Relay Service (FIRS) at 1–
800–877–8339.
[FR Doc. E9–10957 Filed 5–8–09; 8:45 am]
BILLING CODE 4000–01–P
ELECTION ASSISTANCE COMMISSION
Sunshine Act Notice
AGENCY: U.S. Election Assistance
Commission.
ACTION: Notice of Public Meeting and
Hearing Agenda.
DATE & TIME: Tuesday, May 19, 2009, 1
p.m.–4 p.m. EDT (Meeting & Hearing).
PLACE: U.S. Election Assistance
Commission, 1225 New York Ave., NW.,
Suite 150, Washington, DC 20005,
(Metro Stop: Metro Center).
AGENDA: The Commission will hold a
public meeting to consider
administrative matters. The Commission
will conduct a public hearing to receive
presentations on the following topic:
Military and Overseas Citizens:
Counting Their Votes—Part 1.
Members of the public who wish to
speak at the hearing regarding their
experience as a Uniformed and Overseas
Citizens Absentee Voting Act
(UOCAVA) voter may send a request to
participate to the EAC by 5 p.m. EDT on
Thursday, May 14, 2009. Due to time
constraints, the EAC can select no more
than 15 participants amongst the
volunteers who request to participate.
The selected volunteers will be allotted
3 minutes each to share their
experiences as a UOCAVA voter.
Participants will be selected on a firstcome, first-served basis. However, to
maximize diversity of input, only one
participant per organization or entity
will be chosen if necessary. Participants
will receive confirmation by 12 p.m.
EDT on Friday, May 15, 2009. Those
who are not selected to speak may
submit written testimony. Requests to
speak may be sent to the EAC via e-mail
at testimony@eac.gov, via mail
addressed to the U.S. Election
Assistance Commission, 1225 New York
Avenue, NW., Suite 1100, Washington,
DC 20005, or by fax at 202–566–1389.
All requests must include a description
VerDate Nov<24>2008
15:05 May 08, 2009
Jkt 217001
of what will be said, contact information
which will be used to notify the
requestor with status of request (phone
number on which a message may be left
or e-mail), and include the subject/
attention line (or on the envelope if by
mail): UOCAVA Hearing Request to
Participate. Please note that these
comments will be made available to the
public at https://www.eac.gov.
Written testimony from members of
the public, regarding UOCAVA voting,
will also be accepted. This testimony
will be included as part of the written
record of the hearing, and available on
our Web site. Written testimony must be
received by 5 p.m. EDT on Friday, May
15, 2009, and should be submitted via
e-mail at testimony@eac.gov, via mail
addressed to the U.S. Election
Assistance Commission, 1225 New York
Avenue, NW., Suite 1100, Washington,
DC 20005, or by fax at 202–566–1389.
All correspondence that contains
written testimony must have in the
subject/attention line (or on the
envelope if by mail): Written Testimony
for UOCAVA Hearing.
Members of the public may observe
but not participate in EAC meetings
unless this notice provides otherwise.
Members of the public may use small
electronic audio recording devices to
record the proceedings. The use of other
recording equipment and cameras
requires advance notice to and
coordination with the Commission’s
Communications Office.*
This meeting and hearing will be
open to the public.
PERSON TO CONTACT FOR INFORMATION:
Bryan Whitener, Telephone: (202) 566–
3100.
Donetta Davidson,
Commissioner, U.S. Election Assistance
Commission.
[FR Doc. E9–11064 Filed 5–7–09; 4:15 pm]
BILLING CODE 6820–KF–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 13390–000]
Northeast Hydrodevelopment, LLC;
Notice of Preliminary Permit
Application Accepted for Filing and
Soliciting Comments, Motions To
Intervene, and Competing Applications
May 4, 2009.
On March 6, 2009, Northeast
Hydrodevelopment, LLC filed an
* View EAC Regulations Implementing
Government in the Sunshine Act.
PO 00000
Frm 00015
Fmt 4703
Sfmt 4703
21789
application, pursuant to section 4(f) of
the Federal Power Act, proposing to
study the feasibility of the Bucks Street
Dams Hydroelectric Project, to be
located on the Suncook River, in
Merrimack County, New Hampshire. On
March 25, 2009, the applicant filed
corrections to their original preliminary
permit application for the Buck Street
Dams Project.
The proposed Buck Street Dams
Project would be located along the
Suncook River channel below the
existing outlet works at an existing dam
owned by the New Hampshire
Department of Environmental Services.
The existing dams are 198 feet long and
15 feet high and impound the Suncook
River.
The proposed project would consist
of: (1) Either a new approximately 120foot-long power canal or dual 7-footdiameter penstocks located below the
existing outlet facilities below East Buck
Street Dam; (2) a new powerhouse
containing two or three submersible or
tubular-type turbine-generators with a
total hydraulic capacity of 600 cubic
feet per second and a either a total
installed generating capacity of 0.394
megawatts; (3) a newly excavated 150foot-long tailrace; (4) an approximately
200-foot-long transmission line; (5) one
foot of new flashboards would be added
to West Buck Street Dam; and (6)
appurtenant facilities. The Buck street
Dams Project would have an estimated
average annual generation of 1,750
megawatts-hours (MWh), which would
be sold to Public Service of New
Hampshire.
Applicant Contact: Mr. Norm Herbert,
Manager, Northeast Hydrodevelopment,
LLC, 100 State Route 101A, Building C,
Suite 270, Amherst, New Hampshire
03031, (603) 672–8210.
FERC Contact: John Ramer, (202) 502–
8969.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Comments, motions to intervene,
notices of intent, and competing
applications may be filed electronically
via the Internet. See 18 CFR
385.2001(a)(1)(iii) and the instructions
on the Commission’s Web site under the
‘‘e-Filing’’ link. If unable to be filed
electronically, documents may be paperfiled. To paper-file, an original and eight
copies should be mailed to: Kimberly D.
Bose, Secretary, Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426. For
more information on how to submit
these types of filings please go to the
Commission’s Web site located at
E:\FR\FM\11MYN1.SGM
11MYN1
21790
Federal Register / Vol. 74, No. 89 / Monday, May 11, 2009 / Notices
https://www.ferc.gov/filingcomments.asp. More information about
this project can be viewed or printed on
the ‘‘eLibrary’’ link of Commission’s
Web site at
https://www.ferc.gov/docs-filing/
elibrary.asp. Enter the docket number
(P–13390) in the docket number field to
access the document. For assistance,
call toll-free 1–866–208–3372.
Kimberly D. Bose,
Secretary.
[FR Doc. E9–10847 Filed 5–8–09; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 13397–000]
Northeast Hydrodevelopment, LLC;
Notice of Preliminary Permit
Application Accepted for Filing and
Soliciting Comments, Motions To
Intervene, and Competing Applications
May 4, 2009.
On March 13, 2009, Northeast
Hydrodevelopment, LLC filed an
application, pursuant to section 4(f) of
the Federal Power Act, proposing to
study the feasibility of the Mascoma
Lake Dam Hydroelectric Project, to be
located on the Mascoma River, in
Grafton County, New Hampshire. On
April 7, 2009, the applicant filed revised
Exhibits 1, 4–1a, and 4–3b for the
proposed project.
The proposed Mascoma Lake Dam
Project would be located Mascoma River
channel below the existing outlet works
at an existing dam owned by the Granite
State Electric Company. The existing
dam, which impounds the Mascoma
River, is 575 feet long and 18 feet high
and includes four 6-foot-wide outlet
gates, seven 35-foot-wide stoplog bays
atop a 125-foot-long concrete spillway.
The impoundment encompasses about
1155 surface acres.
The proposed project would consist of
either scenario A: (1) a newly
constructed powerhouse at the end of a
80-foot-long canal built in the channel
below the existing outlet works; (2) one
or two submersible or tubular-type
turbine-generators, plus an
‘‘environmental’’ turbine to pass a
minimum flow, with a total hydraulic
capacity of 500 cubic feet per second
and a total installed generating capacity
of 0.314 megawatts; (3) a newly
excavated 150-foot-long tailrace; (4) an
approximately 700-foot-long
transmission line; and (5) appurtenant
facilities; or scenario B: (1) A new
VerDate Nov<24>2008
15:05 May 08, 2009
Jkt 217001
powerhouse would be located at the end
of an 800-foot-long penstcock; (2) one or
two submersible or tubular-type turbinegenerators, plus an ‘‘environmental’’
turbine to pass a minimum flow, with
a total hydraulic capacity of 500 cubic
feet per second and a total installed
generating capacity of 0.539 megawatts;
(3) a newly excavated 200-foot-long
tailrace; (4) an approximately 400-footlong transmission line; and (5)
appurtenant facilities. The Mascoma
Lake Dam Project would have an
estimated average annual generation of
2,156 megawatts-hours (MWh), which
would be sold to Public Service of New
Hampshire.
Applicant Contact: Mr. Norm Herbert,
Manager, Northeast Hydrodevelopment,
LLC, 100 State Route 101A, Building C,
Suite 270, Amherst, New Hampshire
03031, (603) 672–8210.
FERC Contact: John Ramer, (202) 502–
8969.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Comments, motions to intervene,
notices of intent, and competing
applications may be filed electronically
via the Internet. See 18 CFR
385.2001(a)(1)(iii) and the instructions
on the Commission’s Web site under the
‘‘e-Filing’’ link. If unable to be filed
electronically, documents may be paperfiled. To paper-file, an original and eight
copies should be mailed to: Kimberly D.
Bose, Secretary, Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426. For
more information on how to submit
these types of filings please go to the
Commission’s Web site located at
https://www.ferc.gov/filingcomments.asp. More information about
this project can be viewed or printed on
the ‘‘eLibrary’’ link of Commission’s
Web site at https://www.ferc.gov/docsfiling/elibrary.asp. Enter the docket
number (P–13397) in the docket number
field to access the document. For
assistance, call toll-free 1–866–208–
3372.
Kimberly D. Bose,
Secretary.
[FR Doc. E9–10850 Filed 5–8–09; 8:45 am]
BILLING CODE 6717–01–P
PO 00000
Frm 00016
Fmt 4703
Sfmt 4703
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 13413–000]
Northeast Hydrodevelopment, LLC;
Notice of Preliminary Permit
Application Accepted for Filing and
Soliciting Comments, Motions To
Intervene, and Competing Applications
May 4, 2009.
On March 13, 2009, Northeast
Hydrodevelopment, LLC filed an
application, pursuant to section 4(f) of
the Federal Power Act, proposing to
study the feasibility of the Weare
Reservoir Dam Hydroelectric Project, to
be located on the Piscataquog River, in
Hillsborough County, New Hampshire.
The proposed Weare Reservoir Dam
Project would be located along the
Picatauog River channel below the
existing outlet works at an existing dam
owned by the New Hampshire
Department of Environmental Services.
The existing dam, which impounds the
Piscataquog River, is 340 feet long and
34 feet high and includes a 36-inchdiameter steel penstock control by
outlet gatehouse, five 5-foot-wide
stoplog bays atop a 157-foot-long
concrete spillway. The impoundment
encompasses about 323 surface acres.
The proposed project would consist
of: (1) A newly constructed powerhouse
below the existing outlet works; (2) a
100-foot-long, 36-inch-diameter
penstock with electrically controlled
butterfly valve; (3) two submersible or
tubular-type turbine-generators with a
total hydraulic capacity of 85 cubic feet
per second and a total installed
generating capacity of 0.150 megawatts;
(4) a newly excavated 125-foot-long
tailrace; (5) an approximately 400-footlong transmission line; and (6)
appurtenant facilities. The Weare
Reservoir Dam Project would have an
estimated average annual generation of
600 megawatts-hours (MWh), which
would be sold to Public Service of New
Hampshire.
Applicant Contact: Mr. Norm Herbert,
Manager, Northeast Hydrodevelopment,
LLC, 100 State Route 101A, Building C,
Suite 270, Amherst, New Hampshire
03031, (603) 672–8210.
FERC Contact: John Ramer, (202) 502–
8969.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Comments, motions to intervene,
notices of intent, and competing
applications may be filed electronically
E:\FR\FM\11MYN1.SGM
11MYN1
Agencies
[Federal Register Volume 74, Number 89 (Monday, May 11, 2009)]
[Notices]
[Pages 21789-21790]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E9-10847]
=======================================================================
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 13390-000]
Northeast Hydrodevelopment, LLC; Notice of Preliminary Permit
Application Accepted for Filing and Soliciting Comments, Motions To
Intervene, and Competing Applications
May 4, 2009.
On March 6, 2009, Northeast Hydrodevelopment, LLC filed an
application, pursuant to section 4(f) of the Federal Power Act,
proposing to study the feasibility of the Bucks Street Dams
Hydroelectric Project, to be located on the Suncook River, in Merrimack
County, New Hampshire. On March 25, 2009, the applicant filed
corrections to their original preliminary permit application for the
Buck Street Dams Project.
The proposed Buck Street Dams Project would be located along the
Suncook River channel below the existing outlet works at an existing
dam owned by the New Hampshire Department of Environmental Services.
The existing dams are 198 feet long and 15 feet high and impound the
Suncook River.
The proposed project would consist of: (1) Either a new
approximately 120-foot-long power canal or dual 7-foot-diameter
penstocks located below the existing outlet facilities below East Buck
Street Dam; (2) a new powerhouse containing two or three submersible or
tubular-type turbine-generators with a total hydraulic capacity of 600
cubic feet per second and a either a total installed generating
capacity of 0.394 megawatts; (3) a newly excavated 150-foot-long
tailrace; (4) an approximately 200-foot-long transmission line; (5) one
foot of new flashboards would be added to West Buck Street Dam; and (6)
appurtenant facilities. The Buck street Dams Project would have an
estimated average annual generation of 1,750 megawatts-hours (MWh),
which would be sold to Public Service of New Hampshire.
Applicant Contact: Mr. Norm Herbert, Manager, Northeast
Hydrodevelopment, LLC, 100 State Route 101A, Building C, Suite 270,
Amherst, New Hampshire 03031, (603) 672-8210.
FERC Contact: John Ramer, (202) 502-8969.
Deadline for filing comments, motions to intervene, competing
applications (without notices of intent), or notices of intent to file
competing applications: 60 days from the issuance of this notice.
Comments, motions to intervene, notices of intent, and competing
applications may be filed electronically via the Internet. See 18 CFR
385.2001(a)(1)(iii) and the instructions on the Commission's Web site
under the ``e-Filing'' link. If unable to be filed electronically,
documents may be paper-filed. To paper-file, an original and eight
copies should be mailed to: Kimberly D. Bose, Secretary, Federal Energy
Regulatory Commission, 888 First Street, NE., Washington, DC 20426. For
more information on how to submit these types of filings please go to
the Commission's Web site located at
[[Page 21790]]
https://www.ferc.gov/filing-comments.asp. More information about this
project can be viewed or printed on the ``eLibrary'' link of
Commission's Web site at https://www.ferc.gov/docs-filing/elibrary.asp.
Enter the docket number (P-13390) in the docket number field to access
the document. For assistance, call toll-free 1-866-208-3372.
Kimberly D. Bose,
Secretary.
[FR Doc. E9-10847 Filed 5-8-09; 8:45 am]