Environmental Impacts Statements; Notice of Availability, 21684-21685 [E9-10768]
Download as PDF
21684
Federal Register / Vol. 74, No. 88 / Friday, May 8, 2009 / Notices
02114–2023; Telephone number: (617)
918–1524; e-mail address:
bryson.jamesm@epa.gov.
SUPPLEMENTARY INFORMATION:
hsrobinson on PROD1PC76 with NOTICES
I. What Action Is the Agency Taking?
EPA is granting a waiver of the
asbestos-in-schools program to the State
of New Hampshire. This waiver is
issued under section 203(m) of the
Toxic Substances Control Act (TSCA)
and 40 CFR 763.98. Section 203 is
within Title II of TSCA, also known as
the Asbestos Hazard Emergency
Response Act (AHERA). The Agency
recognizes that a waiver granted to any
State would not encompass schools
operated under the defense dependents’
education system (the third type of local
education agency (LEA) defined at
TSCA section 202(7) and 40 CFR
763.83), which serve dependents in
overseas areas, and other elementary
and secondary schools outside a State’s
jurisdiction, which generally includes
schools in Indian country. Such schools
would remain subject to EPA’s asbestosin-schools program.
On December 19, 2008, (FRL–8754–4)
EPA published a notice of proposed
approval and request for comments. A
detailed description of this waiver
request and EPA’s rationale for
approving it was provided in that notice
and is not restated here.
II. What Is the Agency’s Authority for
Taking This Action?
In 1987, under TSCA section 203, the
Agency promulgated regulations that
require the identification and
management of asbestos-containing
material by LEAs in the nation’s
elementary and secondary school
buildings: The ‘‘AHERA Schools Rule’’
(40 CFR part 763, subpart E). Under
section 203(m) of TSCA and 40 CFR
763.98, upon request by a State
Governor and after notice and comment
and opportunity for a public hearing in
the State, EPA may waive, in whole or
in part, the requirements of the asbestosin-schools program (TSCA section 203
and the AHERA Schools Rule) if EPA
determines that the State has
established and is implementing or
intends to implement a program of
asbestos inspection and management
that contains requirements that are at
least as stringent as those in the
Agency’s asbestos-in-schools program.
A State seeking a waiver must submit its
request to the EPA Region in which that
State is located.
III. When Did New Hampshire Submit
Its Request for a Waiver?
On July 15, 2008, Governor John H.
Lynch submitted to the EPA Region 1
VerDate Nov<24>2008
17:51 May 07, 2009
Jkt 217001
Regional Administrator, a letter with
supporting documentation requesting a
full waiver of the requirements of EPA’s
asbestos-in-schools program pursuant to
the AHERA statute and 40 CFR 763.98.
The EPA Regional Administrator
indicated to New Hampshire, by letter
dated July 31, 2008, that the request was
received. On September 30, 2008, the
Manager of EPA’s Toxics and Pesticides
Unit submitted comments to the New
Hampshire Department of
Environmental Service’s Air Resources
Division regarding the AHERA waiver
request. The State provided EPA with a
response, dated October 10, 2008, in
which each of EPA’s comments was
addressed.
IV. Materials in the Official Record
The official record, under Docket ID
Number EPA–HQ–OPPT–2008–0790,
contains the New Hampshire waiver
request, and any other supporting or
relevant documents pertaining to the
approval, by EPA Region 1, of New
Hampshire’s AHERA waiver request.
List of Subjects
Environmental protection, Asbestos,
Hazardous substances, Occupational
health and safety, Reporting and
recordkeeping requirements, Schools.
Authority: 42 U.S.C. 7401 et seq.
Dated: March 30, 2009.
Ira W. Leighton,
Acting Regional Administrator, EPA New
England.
[FR Doc. E9–10770 Filed 5–7–09; 8:45 am]
BILLING CODE 6560–50–P
ENVIRONMENTAL PROTECTION
AGENCY
[ER–FRL–8593–2]
Environmental Impacts Statements;
Notice of Availability
Responsible Agency: Office of Federal
Activities, General Information (202)
564–1399 or https://www.epa.gov/
compliance/nepa/.
Weekly receipt of Environmental Impact
Statements.
Filed 04/27/2009 Through 05/01/2009.
Pursuant to 40 CFR 1506.9.
EIS No. 20090136, Draft EIS, USA, AK,
U.S. Army Alaska (USARAK) Project,
Proposes the Stationing and Training
of Increased Aviation Assets, Fort
Wainwright, Fairbank, AK, Comment
Period Ends: 06/22/2009, Contact:
Jennifer Shore 703–602–4238.
EIS No. 20090137, Draft EIS, AFS, CA,
Sierra National Forest Travel
Management Plan, To Prohibit
Motorized Vehicle Travel Off
PO 00000
Frm 00066
Fmt 4703
Sfmt 4703
Designated National Forest
Transportation System (NFIS) Roads,
Trails and Area, Fresno, Mariposa,
Madera Counties, CA, Comment
Period Ends: 06/22/2009, Contact:
Gayne Sears 559–877–2218 Ext. 3182.
EIS No. 20090138, Second Final
Supplement, COE, CA, Santa Ana
River Interceptor (SARI) Protection/
Relocation Project, Reduce the Risk of
Damage to the SARI to allow for the
Operation of Santa Ana River Project
(SARP), and Releases from Prado Dam
of up to 30,000 cubic feet per second
(cfs), Right-of-Way Permit and US
COE Section 404 Permit, Orange and
Riverside Counties, CA, Wait Period
Ends: 06/08/2009, Contact: Raina
Fulton 213–452–3872.
EIS No. 20090139, Draft Supplement,
AFS, 00, PROGRAMMATIC—
Kootenai, Idaho Panhandle, and Lolo
National Forest Plan Amendments for
Access Management within the
Selkirk and Cabinet-Yaak Grizzly Bear
Recovery Zones, Alternative E
Updated has been Identified as the
Forest Service’s Preferred Alternative,
ID, WA, MT, Comment Period Ends:
06/22/2009, Contact: Karl Dekome
208–765–7479.
EIS No. 20090140, Final EIS, NOA, 00,
Amendment 29 Reef Fish Fishery
Management Plan, Effort Management
in the Commercial Grouper and
Tilefish Fisheries, Reducing
Overcapacity, Gulf of Mexico, Wait
Period Ends: 06/08/2009, Contact:
Roy E. Crabtree 727–824–5305.
EIS No. 20090141, Draft EIS, USA, NM,
White Sands Missile Range (WSMR),
Development and Implementation of
Range-Wide Mission and Major
Capabilities, NM, Comment Period
Ends: 06/22/2009, Contact: Jennifer
Shore 703–602–4238.
EIS No. 20090142, Draft EIS, NPS, CA,
Yosemite National Park Project,
Construction of Yosemite Institute
Environment Education Campus,
Implementation, Mariposa County,
CA, Comment Period Ends: 07/15/
2009, Contact: Ann Roberts 209–379–
1383.
EIS No. 20090143, Final EIS, FRC, OR,
Jordan Cove Energy and Pacific
Connector Gas Pipeline Project,
Construction and Operation,
Liquefied Natural Gas (LNG) Import
Terminal and Natural Gas Pipeline
Facilities, Coos, Douglas, Jackson and
Klamath Counties, OR, Wait Period
Ends: 06/08/2009, Contact: Patricia
Schaub 1–866–208–3372.
EIS No. 20090144, Draft EIS, GSA, CA,
San Ysidro Land Port of Entry (LPOE)
Improvement Project, Propose the
Configuration and Expansion of the
Existing (LPOE), San Ysidro, CA,
E:\FR\FM\08MYN1.SGM
08MYN1
Federal Register / Vol. 74, No. 88 / Friday, May 8, 2009 / Notices
Comment Period Ends: 06/22/2009,
Contact: Osmahn Kadri 415–522–
3617.
EIS No. 20090145, Draft EIS, NPS, IA,
Effigy Mounds National Monument
General Management Plan,
Implementation, Clayton and
Allamakee Counties, IA, Comment
Period Ends: 07/08/2009, Contact:
Phyllis Ewing 563–873–3491.
EIS No. 20090146, Final EIS, COE, OH,
Lorain Harbor, Ohio Federal
Navigation Project, Dredged Material
Management Plan, Implementation,
Lorain Harbor, Lorain County, Ohio,
Wait Period Ends: 06/08/2009,
Contact: Joshua J. Feldmann 716–879–
4393.
EIS No. 20090147, Draft Supplement,
NSF, HI, Advanced Technology Solar
Telescope Project, Issuing Special Use
Permit to Operate Commercial
Vehicles on Haleakala National Park
Road during the Construction of Site
at the University of Hawai’i Institute
for Astronomy, Haleakala High
Altitude Observatory (HO) Site, Island
of Maui, HI, Comment Period Ends:
06/22/2009, Contact: Craig Foltz, PhD
703–292–4909.
EIS No. 20090148, Final Supplement,
COE, FL, Rock Mining in the Lake Belt
Region Plan, Continuance of
Limestone Mining Construction,
Section 404 Permit, Miami-Dade
County, FL, Wait Period Ends: 06/08/
2009, Contact: Leah Oberlin 561–472–
3506.
EIS No. 20090149, Final EIS, NOA, 00,
Amendment 1 to the Tilefish Fishery
Management Plan, Proposed
Individual Fishing Quota (IFQ)
Program, To Reduce Overcapacity in
the Commercial Tilefish Fishery,
Maine to North Carolina, Wait Period
Ends: 06/08/2009, Contact: Patricia A.
Kurkul 978–281–9250.
Amended Notices
hsrobinson on PROD1PC76 with NOTICES
EIS No. 20090011, Draft EIS, SFW, CA,
Tehachapi Uplands Multiple Species
Habitat Conservation Plan
(TUMSHCP), Propose Issuance of a
50–Year Incidental Take Permit for 27
Federal- and State-Listed and
Unlisted Species, Kern County, CA,
Comment Period Ends: 07/07/2009,
Contact: Mary Grim 916–414–6464.
Revision to FR Notice Published 01/
23/2009: Extending Comment Period
from 04/22/2009 to 07/07/2009.
Dated: May 5, 2009.
Robert W. Hargrove,
Director, NEPA Compliance Division, Office
of Federal Activities.
[FR Doc. E9–10768 Filed 5–7–09; 8:45 am]
BILLING CODE 6560–50–P
VerDate Nov<24>2008
17:51 May 07, 2009
Jkt 217001
FEDERAL RESERVE SYSTEM
Change in Bank Control Notices;
Acquisition of Shares of Bank or Bank
Holding Companies
The notificants listed below have
applied under the Change in Bank
Control Act (12 U.S.C. 1817(j)) and
§ 225.41 of the Board’s Regulation Y (12
CFR 225.41) to acquire a bank or bank
holding company. The factors that are
considered in acting on the notices are
set forth in paragraph 7 of the Act (12
U.S.C. 1817(j)(7)).
The notices are available for
immediate inspection at the Federal
Reserve Bank indicated. The notices
also will be available for inspection at
the office of the Board of Governors.
Interested persons may express their
views in writing to the Reserve Bank
indicated for that notice or to the offices
of the Board of Governors. Comments
must be received not later than May 26,
2009
A. Federal Reserve Bank of
Minneapolis (Jacqueline G. King,
Community Affairs Officer) 90
Hennepin Avenue, Minneapolis,
Minnesota 55480-0291:
1. Gary R. Howell, Malta, Montana, to
acquire voting shares of Milk River
Banquo, Inc., Malta, Montana, which
controls Malta Banquo, Inc., and thereby
indirectly gain control of First Security
Bank of Malta, Malta,Montana and
Valley Bank of Glasgow, Glasgow,
Montana
Board of Governors of the Federal Reserve
System, May 5, 2009.
Robert deV. Frierson,
Deputy Secretary of the Board.
[FR Doc. E9–10754 Filed 5–7–09; 8:45 am]
BILLING CODE 6210–01–S
21685
inspection at the Federal Reserve Bank
indicated. The applications also will be
available for inspection at the offices of
the Board of Governors. Interested
persons may express their views in
writing on the standards enumerated in
the BHC Act (12 U.S.C. 1842(c)). If the
proposal also involves the acquisition of
a nonbanking company, the review also
includes whether the acquisition of the
nonbanking company complies with the
standards in section 4 of the BHC Act
(12 U.S.C. 1843). Unless otherwise
noted, nonbanking activities will be
conducted throughout the United States.
Additional information on all bank
holding companies may be obtained
from the National Information Center
website at www.ffiec.gov/nic/.
Unless otherwise noted, comments
regarding each of these applications
must be received at the Reserve Bank
indicated or the offices of the Board of
Governors not later than June 4, 2009.
A. Federal Reserve Bank of Dallas (E.
Anne Worthy, Vice President) 2200
North Pearl Street, Dallas, Texas 752012272:
1. Tall City Bancshares, Inc., Midland,
Texas; to become a bank holding
company by acquiring 100 percent of
the voting shares of Kent County State
Bank, Jayton, Texas.
Board of Governors of the Federal Reserve
System, May 5, 2009.
Robert deV. Frierson,
Deputy Secretary of the Board.
[FR Doc. E9–10753 Filed 5–7–09; 8:45 am]
BILLING CODE 6210–01–S
FEDERAL RESERVE SYSTEM
Formations of, Acquisitions by, and
Mergers of Bank Holding Companies
Notice of Proposals to Engage in
Permissible Nonbanking Activities or
to Acquire Companies that are
Engaged in Permissible Nonbanking
Activities
The companies listed in this notice
have applied to the Board for approval,
pursuant to the Bank Holding Company
Act of 1956 (12 U.S.C. 1841 et seq.)
(BHC Act), Regulation Y (12 CFR Part
225), and all other applicable statutes
and regulations to become a bank
holding company and/or to acquire the
assets or the ownership of, control of, or
the power to vote shares of a bank or
bank holding company and all of the
banks and nonbanking companies
owned by the bank holding company,
including the companies listed below.
The applications listed below, as well
as other related filings required by the
Board, are available for immediate
The companies listed in this notice
have given notice under section 4 of the
Bank Holding Company Act (12 U.S.C.
1843) (BHC Act) and Regulation Y (12
CFR Part 225) to engage de novo, or to
acquire or control voting securities or
assets of a company, including the
companies listed below, that engages
either directly or through a subsidiary or
other company, in a nonbanking activity
that is listed in § 225.28 of Regulation Y
(12 CFR 225.28) or that the Board has
determined by Order to be closely
related to banking and permissible for
bank holding companies. Unless
otherwise noted, these activities will be
conducted throughout the United States.
FEDERAL RESERVE SYSTEM
PO 00000
Frm 00067
Fmt 4703
Sfmt 4703
E:\FR\FM\08MYN1.SGM
08MYN1
Agencies
[Federal Register Volume 74, Number 88 (Friday, May 8, 2009)]
[Notices]
[Pages 21684-21685]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E9-10768]
-----------------------------------------------------------------------
ENVIRONMENTAL PROTECTION AGENCY
[ER-FRL-8593-2]
Environmental Impacts Statements; Notice of Availability
Responsible Agency: Office of Federal Activities, General
Information (202) 564-1399 or https://www.epa.gov/compliance/nepa/.
Weekly receipt of Environmental Impact Statements.
Filed 04/27/2009 Through 05/01/2009.
Pursuant to 40 CFR 1506.9.
EIS No. 20090136, Draft EIS, USA, AK, U.S. Army Alaska (USARAK)
Project, Proposes the Stationing and Training of Increased Aviation
Assets, Fort Wainwright, Fairbank, AK, Comment Period Ends: 06/22/2009,
Contact: Jennifer Shore 703-602-4238.
EIS No. 20090137, Draft EIS, AFS, CA, Sierra National Forest Travel
Management Plan, To Prohibit Motorized Vehicle Travel Off Designated
National Forest Transportation System (NFIS) Roads, Trails and Area,
Fresno, Mariposa, Madera Counties, CA, Comment Period Ends: 06/22/2009,
Contact: Gayne Sears 559-877-2218 Ext. 3182.
EIS No. 20090138, Second Final Supplement, COE, CA, Santa Ana River
Interceptor (SARI) Protection/Relocation Project, Reduce the Risk of
Damage to the SARI to allow for the Operation of Santa Ana River
Project (SARP), and Releases from Prado Dam of up to 30,000 cubic feet
per second (cfs), Right-of-Way Permit and US COE Section 404 Permit,
Orange and Riverside Counties, CA, Wait Period Ends: 06/08/2009,
Contact: Raina Fulton 213-452-3872.
EIS No. 20090139, Draft Supplement, AFS, 00, PROGRAMMATIC--Kootenai,
Idaho Panhandle, and Lolo National Forest Plan Amendments for Access
Management within the Selkirk and Cabinet-Yaak Grizzly Bear Recovery
Zones, Alternative E Updated has been Identified as the Forest
Service's Preferred Alternative, ID, WA, MT, Comment Period Ends: 06/
22/2009, Contact: Karl Dekome 208-765-7479.
EIS No. 20090140, Final EIS, NOA, 00, Amendment 29 Reef Fish Fishery
Management Plan, Effort Management in the Commercial Grouper and
Tilefish Fisheries, Reducing Overcapacity, Gulf of Mexico, Wait Period
Ends: 06/08/2009, Contact: Roy E. Crabtree 727-824-5305.
EIS No. 20090141, Draft EIS, USA, NM, White Sands Missile Range (WSMR),
Development and Implementation of Range-Wide Mission and Major
Capabilities, NM, Comment Period Ends: 06/22/2009, Contact: Jennifer
Shore 703-602-4238.
EIS No. 20090142, Draft EIS, NPS, CA, Yosemite National Park Project,
Construction of Yosemite Institute Environment Education Campus,
Implementation, Mariposa County, CA, Comment Period Ends: 07/15/2009,
Contact: Ann Roberts 209-379-1383.
EIS No. 20090143, Final EIS, FRC, OR, Jordan Cove Energy and Pacific
Connector Gas Pipeline Project, Construction and Operation, Liquefied
Natural Gas (LNG) Import Terminal and Natural Gas Pipeline Facilities,
Coos, Douglas, Jackson and Klamath Counties, OR, Wait Period Ends: 06/
08/2009, Contact: Patricia Schaub 1-866-208-3372.
EIS No. 20090144, Draft EIS, GSA, CA, San Ysidro Land Port of Entry
(LPOE) Improvement Project, Propose the Configuration and Expansion of
the Existing (LPOE), San Ysidro, CA,
[[Page 21685]]
Comment Period Ends: 06/22/2009, Contact: Osmahn Kadri 415-522-3617.
EIS No. 20090145, Draft EIS, NPS, IA, Effigy Mounds National Monument
General Management Plan, Implementation, Clayton and Allamakee
Counties, IA, Comment Period Ends: 07/08/2009, Contact: Phyllis Ewing
563-873-3491.
EIS No. 20090146, Final EIS, COE, OH, Lorain Harbor, Ohio Federal
Navigation Project, Dredged Material Management Plan, Implementation,
Lorain Harbor, Lorain County, Ohio, Wait Period Ends: 06/08/2009,
Contact: Joshua J. Feldmann 716-879-4393.
EIS No. 20090147, Draft Supplement, NSF, HI, Advanced Technology Solar
Telescope Project, Issuing Special Use Permit to Operate Commercial
Vehicles on Haleakala National Park Road during the Construction of
Site at the University of Hawai'i Institute for Astronomy, Haleakala
High Altitude Observatory (HO) Site, Island of Maui, HI, Comment Period
Ends: 06/22/2009, Contact: Craig Foltz, PhD 703-292-4909.
EIS No. 20090148, Final Supplement, COE, FL, Rock Mining in the Lake
Belt Region Plan, Continuance of Limestone Mining Construction, Section
404 Permit, Miami-Dade County, FL, Wait Period Ends: 06/08/2009,
Contact: Leah Oberlin 561-472-3506.
EIS No. 20090149, Final EIS, NOA, 00, Amendment 1 to the Tilefish
Fishery Management Plan, Proposed Individual Fishing Quota (IFQ)
Program, To Reduce Overcapacity in the Commercial Tilefish Fishery,
Maine to North Carolina, Wait Period Ends: 06/08/2009, Contact:
Patricia A. Kurkul 978-281-9250.
Amended Notices
EIS No. 20090011, Draft EIS, SFW, CA, Tehachapi Uplands Multiple
Species Habitat Conservation Plan (TUMSHCP), Propose Issuance of a 50-
Year Incidental Take Permit for 27 Federal- and State-Listed and
Unlisted Species, Kern County, CA, Comment Period Ends: 07/07/2009,
Contact: Mary Grim 916-414-6464.
Revision to FR Notice Published 01/23/2009: Extending Comment
Period from 04/22/2009 to 07/07/2009.
Dated: May 5, 2009.
Robert W. Hargrove,
Director, NEPA Compliance Division, Office of Federal Activities.
[FR Doc. E9-10768 Filed 5-7-09; 8:45 am]
BILLING CODE 6560-50-P