Hydro Energy Technologies, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications, 21679 [E9-10698]

Download as PDF Federal Register / Vol. 74, No. 88 / Friday, May 8, 2009 / Notices copies should be mailed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. For more information on how to submit these types of filings please go to the Commission’s Web site located at https://www.ferc.gov/filingcomments.asp. More information about this project can be viewed or printed on the ‘‘eLibrary’’ link of Commission’s Web site at https://www.ferc.gov/docsfiling/elibrary.asp. Enter the docket number (P–13383) in the docket number field to access the document. For assistance, call toll-free 1–866–208– 3372. Kimberly D. Bose, Secretary. [FR Doc. E9–10696 Filed 5–7–09; 8:45 am] BILLING CODE P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13401–000] Hydro Energy Technologies, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications hsrobinson on PROD1PC76 with NOTICES Kimberly D. Bose, Secretary. [FR Doc. E9–10698 Filed 5–7–09; 8:45 am] BILLING CODE P May 1, 2009. On March 19, 2009, Hydro Energy Technologies, LLC filed an application, pursuant to section 4(f) of the Federal Power Act, proposing to study the feasibility of the Southerly Waste Water Treatment Plant Hydroelectric Project, to be located on Cuyahoga River, in Cuyahoga County, Ohio. The proposed Southerly Waste Water Treatment Plant Hydroelectric Project would be located at the existing Southerly Waste Water Treatment Plant outfall and box culvert owned by the Northeast Ohio Regional Sewer District. The proposed project would consist of: (1) One or more turbine/generators with total installed capacity of 250 megawatts to be attached directly to the treatment plant’s outfall; (2) a new 20foot-long transmission line; and (3) appurtenant facilities. The Southerly Waste Water Treatment Plant Project would have an estimated average annual generation of 1,166 megawatts-hours, which would be sold to a local utility. Applicant Contact: Mr. Anthony J. Marra Jr., President, Hydro Energy Technologies, LLC, 31300 Solon Rd. Suite 12, Solon, OH 44139, (440) 498– 1000. FERC Contact: John Ramer, (202) 502– 8969. VerDate Nov<24>2008 Deadline for filing comments, motions to intervene, competing applications (without notices of intent), or notices of intent to file competing applications: 60 days from the issuance of this notice. Comments, motions to intervene, notices of intent, and competing applications may be filed electronically via the Internet. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site under the ‘‘e-Filing’’ link. If unable to be filed electronically, documents may be paperfiled. To paper-file, an original and eight copies should be mailed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street, NE, Washington, DC 20426. For more information on how to submit these types of filings please go to the Commission’s Web site located at https://www.ferc.gov/filingcomments.asp. More information about this project can be viewed or printed on the ‘‘eLibrary’’ link of Commission’s Web site at https://www.ferc.gov/docs-filing/ elibrary.asp. Enter the docket number (P–13401) in the docket number field to access the document. For assistance, call toll-free 1–866–208–3372. 17:51 May 07, 2009 Jkt 217001 DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13388–000] Northeast Hydrodevelopment, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications May 1, 2009. On March 6, 2009, Northeast Hydrodevelopment, LLC filed an application, pursuant to section 4(f) of the Federal Power Act, proposing to study the feasibility of the Milton Three Ponds Dam Hydroelectric Project, to be located on the Salmon Falls River, in Strafford County, New Hampshire. The proposed Milton Three Ponds Project would be located along the Salmon Falls River channel below an existing electromechanically operated Obermeyer crest gate unit, which is adjacent to an existing gatehouse atop an existing dam owned by the State of New Hampshire Department of Environmental Services. The existing dam is 156 feet long and 19 feet high PO 00000 Frm 00061 Fmt 4703 Sfmt 4703 21679 and impounds the Salmon Falls River to form three distinct ponds: Milton Pond, Northeast Pond, and Town House Pond. The proposed project would consist of: (1) Either a new approximately 80foot-long power canal or dual 80-footlong concrete penstocks located below the existing Obermeyer outlet gate; (2) a new powerhouse containing one or two submersible or tubular-type turbinegenerators with a total hydraulic capacity of 300 cubic feet per second and a total installed generating capacity of 0.21 megawatts; (3) a newly excavated 150-foot-long tailrace; (4) an approximately 400-foot-long transmission line; and (5) appurtenant facilities. The Milton Three Ponds Project would have an estimated average annual generation of 1,000 megawattshours, which would be sold to Public Service of New Hampshire. Applicant Contact: Mr. Norm Herbert, Manager, Northeast Hydrodevelopment, LLC, 100 State Route 101A, Building C, Suite 270, Amherst, New Hampshire 03031, (603) 672–8210. FERC Contact: John Ramer, (202) 502– 8969. Deadline for filing comments, motions to intervene, competing applications (without notices of intent), or notices of intent to file competing applications: 60 days from the issuance of this notice. Comments, motions to intervene, notices of intent, and competing applications may be filed electronically via the Internet. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site under the ‘‘e-Filing’’ link. If unable to be filed electronically, documents may be paperfiled. To paper-file, an original and eight copies should be mailed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. For more information on how to submit these types of filings please go to the Commission’s Web site located at https://www.ferc.gov/filingcomments.asp. More information about this project can be viewed or printed on the ‘‘eLibrary’’ link of Commission’s Web site at https://www.ferc.gov/docsfiling/elibrary.asp. Enter the docket number (P–13388) in the docket number field to access the document. For assistance, call toll-free 1–866–208– 3372. Kimberly D. Bose, Secretary. [FR Doc. E9–10697 Filed 5–7–09; 8:45 am] BILLING CODE P E:\FR\FM\08MYN1.SGM 08MYN1

Agencies

[Federal Register Volume 74, Number 88 (Friday, May 8, 2009)]
[Notices]
[Page 21679]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E9-10698]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 13401-000]


Hydro Energy Technologies, LLC; Notice of Preliminary Permit 
Application Accepted for Filing and Soliciting Comments, Motions To 
Intervene, and Competing Applications

May 1, 2009.
    On March 19, 2009, Hydro Energy Technologies, LLC filed an 
application, pursuant to section 4(f) of the Federal Power Act, 
proposing to study the feasibility of the Southerly Waste Water 
Treatment Plant Hydroelectric Project, to be located on Cuyahoga River, 
in Cuyahoga County, Ohio.
    The proposed Southerly Waste Water Treatment Plant Hydroelectric 
Project would be located at the existing Southerly Waste Water 
Treatment Plant outfall and box culvert owned by the Northeast Ohio 
Regional Sewer District.
    The proposed project would consist of: (1) One or more turbine/
generators with total installed capacity of 250 megawatts to be 
attached directly to the treatment plant's outfall; (2) a new 20-foot-
long transmission line; and (3) appurtenant facilities. The Southerly 
Waste Water Treatment Plant Project would have an estimated average 
annual generation of 1,166 megawatts-hours, which would be sold to a 
local utility.
    Applicant Contact: Mr. Anthony J. Marra Jr., President, Hydro 
Energy Technologies, LLC, 31300 Solon Rd. Suite 12, Solon, OH 44139, 
(440) 498-1000.
    FERC Contact: John Ramer, (202) 502-8969.
    Deadline for filing comments, motions to intervene, competing 
applications (without notices of intent), or notices of intent to file 
competing applications: 60 days from the issuance of this notice. 
Comments, motions to intervene, notices of intent, and competing 
applications may be filed electronically via the Internet. See 18 CFR 
385.2001(a)(1)(iii) and the instructions on the Commission's Web site 
under the ``e-Filing'' link. If unable to be filed electronically, 
documents may be paper-filed. To paper-file, an original and eight 
copies should be mailed to: Kimberly D. Bose, Secretary, Federal Energy 
Regulatory Commission, 888 First Street, NE, Washington, DC 20426. For 
more information on how to submit these types of filings please go to 
the Commission's Web site located at  https://www.ferc.gov/filing-comments.asp.
    More information about this project can be viewed or printed on the 
``eLibrary'' link of Commission's Web site at https://www.ferc.gov/docs-filing/elibrary.asp. Enter the docket number (P-13401) in the docket 
number field to access the document. For assistance, call toll-free 1-
866-208-3372.

Kimberly D. Bose,
Secretary.
[FR Doc. E9-10698 Filed 5-7-09; 8:45 am]
BILLING CODE P