Hydro Energy Technologies, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications, 21679 [E9-10698]
Download as PDF
Federal Register / Vol. 74, No. 88 / Friday, May 8, 2009 / Notices
copies should be mailed to: Kimberly D.
Bose, Secretary, Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426.
For more information on how to
submit these types of filings please go
to the Commission’s Web site located at
https://www.ferc.gov/filingcomments.asp. More information about
this project can be viewed or printed on
the ‘‘eLibrary’’ link of Commission’s
Web site at https://www.ferc.gov/docsfiling/elibrary.asp. Enter the docket
number (P–13383) in the docket number
field to access the document. For
assistance, call toll-free 1–866–208–
3372.
Kimberly D. Bose,
Secretary.
[FR Doc. E9–10696 Filed 5–7–09; 8:45 am]
BILLING CODE P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 13401–000]
Hydro Energy Technologies, LLC;
Notice of Preliminary Permit
Application Accepted for Filing and
Soliciting Comments, Motions To
Intervene, and Competing Applications
hsrobinson on PROD1PC76 with NOTICES
Kimberly D. Bose,
Secretary.
[FR Doc. E9–10698 Filed 5–7–09; 8:45 am]
BILLING CODE P
May 1, 2009.
On March 19, 2009, Hydro Energy
Technologies, LLC filed an application,
pursuant to section 4(f) of the Federal
Power Act, proposing to study the
feasibility of the Southerly Waste Water
Treatment Plant Hydroelectric Project,
to be located on Cuyahoga River, in
Cuyahoga County, Ohio.
The proposed Southerly Waste Water
Treatment Plant Hydroelectric Project
would be located at the existing
Southerly Waste Water Treatment Plant
outfall and box culvert owned by the
Northeast Ohio Regional Sewer District.
The proposed project would consist
of: (1) One or more turbine/generators
with total installed capacity of 250
megawatts to be attached directly to the
treatment plant’s outfall; (2) a new 20foot-long transmission line; and (3)
appurtenant facilities. The Southerly
Waste Water Treatment Plant Project
would have an estimated average annual
generation of 1,166 megawatts-hours,
which would be sold to a local utility.
Applicant Contact: Mr. Anthony J.
Marra Jr., President, Hydro Energy
Technologies, LLC, 31300 Solon Rd.
Suite 12, Solon, OH 44139, (440) 498–
1000.
FERC Contact: John Ramer, (202) 502–
8969.
VerDate Nov<24>2008
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Comments, motions to intervene,
notices of intent, and competing
applications may be filed electronically
via the Internet. See 18 CFR
385.2001(a)(1)(iii) and the instructions
on the Commission’s Web site under the
‘‘e-Filing’’ link. If unable to be filed
electronically, documents may be paperfiled. To paper-file, an original and eight
copies should be mailed to: Kimberly D.
Bose, Secretary, Federal Energy
Regulatory Commission, 888 First
Street, NE, Washington, DC 20426. For
more information on how to submit
these types of filings please go to the
Commission’s Web site located at
https://www.ferc.gov/filingcomments.asp.
More information about this project
can be viewed or printed on the
‘‘eLibrary’’ link of Commission’s Web
site at https://www.ferc.gov/docs-filing/
elibrary.asp. Enter the docket number
(P–13401) in the docket number field to
access the document. For assistance,
call toll-free 1–866–208–3372.
17:51 May 07, 2009
Jkt 217001
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 13388–000]
Northeast Hydrodevelopment, LLC;
Notice of Preliminary Permit
Application Accepted for Filing and
Soliciting Comments, Motions To
Intervene, and Competing Applications
May 1, 2009.
On March 6, 2009, Northeast
Hydrodevelopment, LLC filed an
application, pursuant to section 4(f) of
the Federal Power Act, proposing to
study the feasibility of the Milton Three
Ponds Dam Hydroelectric Project, to be
located on the Salmon Falls River, in
Strafford County, New Hampshire.
The proposed Milton Three Ponds
Project would be located along the
Salmon Falls River channel below an
existing electromechanically operated
Obermeyer crest gate unit, which is
adjacent to an existing gatehouse atop
an existing dam owned by the State of
New Hampshire Department of
Environmental Services. The existing
dam is 156 feet long and 19 feet high
PO 00000
Frm 00061
Fmt 4703
Sfmt 4703
21679
and impounds the Salmon Falls River to
form three distinct ponds: Milton Pond,
Northeast Pond, and Town House Pond.
The proposed project would consist
of: (1) Either a new approximately 80foot-long power canal or dual 80-footlong concrete penstocks located below
the existing Obermeyer outlet gate; (2) a
new powerhouse containing one or two
submersible or tubular-type turbinegenerators with a total hydraulic
capacity of 300 cubic feet per second
and a total installed generating capacity
of 0.21 megawatts; (3) a newly
excavated 150-foot-long tailrace; (4) an
approximately 400-foot-long
transmission line; and (5) appurtenant
facilities. The Milton Three Ponds
Project would have an estimated average
annual generation of 1,000 megawattshours, which would be sold to Public
Service of New Hampshire.
Applicant Contact: Mr. Norm Herbert,
Manager, Northeast Hydrodevelopment,
LLC, 100 State Route 101A, Building C,
Suite 270, Amherst, New Hampshire
03031, (603) 672–8210.
FERC Contact: John Ramer, (202) 502–
8969.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Comments, motions to intervene,
notices of intent, and competing
applications may be filed electronically
via the Internet. See 18 CFR
385.2001(a)(1)(iii) and the instructions
on the Commission’s Web site under the
‘‘e-Filing’’ link. If unable to be filed
electronically, documents may be paperfiled. To paper-file, an original and eight
copies should be mailed to: Kimberly D.
Bose, Secretary, Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426. For
more information on how to submit
these types of filings please go to the
Commission’s Web site located at
https://www.ferc.gov/filingcomments.asp. More information about
this project can be viewed or printed on
the ‘‘eLibrary’’ link of Commission’s
Web site at https://www.ferc.gov/docsfiling/elibrary.asp. Enter the docket
number (P–13388) in the docket number
field to access the document. For
assistance, call toll-free 1–866–208–
3372.
Kimberly D. Bose,
Secretary.
[FR Doc. E9–10697 Filed 5–7–09; 8:45 am]
BILLING CODE P
E:\FR\FM\08MYN1.SGM
08MYN1
Agencies
[Federal Register Volume 74, Number 88 (Friday, May 8, 2009)]
[Notices]
[Page 21679]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E9-10698]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 13401-000]
Hydro Energy Technologies, LLC; Notice of Preliminary Permit
Application Accepted for Filing and Soliciting Comments, Motions To
Intervene, and Competing Applications
May 1, 2009.
On March 19, 2009, Hydro Energy Technologies, LLC filed an
application, pursuant to section 4(f) of the Federal Power Act,
proposing to study the feasibility of the Southerly Waste Water
Treatment Plant Hydroelectric Project, to be located on Cuyahoga River,
in Cuyahoga County, Ohio.
The proposed Southerly Waste Water Treatment Plant Hydroelectric
Project would be located at the existing Southerly Waste Water
Treatment Plant outfall and box culvert owned by the Northeast Ohio
Regional Sewer District.
The proposed project would consist of: (1) One or more turbine/
generators with total installed capacity of 250 megawatts to be
attached directly to the treatment plant's outfall; (2) a new 20-foot-
long transmission line; and (3) appurtenant facilities. The Southerly
Waste Water Treatment Plant Project would have an estimated average
annual generation of 1,166 megawatts-hours, which would be sold to a
local utility.
Applicant Contact: Mr. Anthony J. Marra Jr., President, Hydro
Energy Technologies, LLC, 31300 Solon Rd. Suite 12, Solon, OH 44139,
(440) 498-1000.
FERC Contact: John Ramer, (202) 502-8969.
Deadline for filing comments, motions to intervene, competing
applications (without notices of intent), or notices of intent to file
competing applications: 60 days from the issuance of this notice.
Comments, motions to intervene, notices of intent, and competing
applications may be filed electronically via the Internet. See 18 CFR
385.2001(a)(1)(iii) and the instructions on the Commission's Web site
under the ``e-Filing'' link. If unable to be filed electronically,
documents may be paper-filed. To paper-file, an original and eight
copies should be mailed to: Kimberly D. Bose, Secretary, Federal Energy
Regulatory Commission, 888 First Street, NE, Washington, DC 20426. For
more information on how to submit these types of filings please go to
the Commission's Web site located at https://www.ferc.gov/filing-comments.asp.
More information about this project can be viewed or printed on the
``eLibrary'' link of Commission's Web site at https://www.ferc.gov/docs-filing/elibrary.asp. Enter the docket number (P-13401) in the docket
number field to access the document. For assistance, call toll-free 1-
866-208-3372.
Kimberly D. Bose,
Secretary.
[FR Doc. E9-10698 Filed 5-7-09; 8:45 am]
BILLING CODE P