Verdant Power, LLC; Notice Concluding Pre-Filing Process and Approving Process Plan and Schedule, 21680 [E9-10695]
Download as PDF
21680
Federal Register / Vol. 74, No. 88 / Friday, May 8, 2009 / Notices
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 12611–003]
Verdant Power, LLC; Notice
Concluding Pre-Filing Process and
Approving Process Plan and Schedule
May 1, 2009.
a. Type of Filing: Notice of Intent to
File Application for License for a
Hydrokinetic Pilot Project.
b. Project No.: 12611–003.
c. Dated Filed: November 25, 2008.
d. Submitted By: Verdant Power, LLC.
e. Name of Project: Roosevelt Island
Tidal Energy (RITE) Project.
f. Location: In the east channel of the
East River in New York City, New York.
The project would not occupy federal
lands.
g. Filed Pursuant to: 18 CFR 5.3 of the
Commission’s regulations
h. Applicant Contact: Ronald F.
Smith, Verdant Power, LLC, The
Octagon, 888 Main Street, New York,
NY 10044 (212) 888–8887 ext. 601.
i. FERC Contact: Tom Dean (202) 502–
6041.
j. Verdant Power, LLC (Verdant
Power) has filed with the Commission:
(1) A notice of intent (NOI) to file an
application for a pilot hydrokinetic
hydropower project and a draft license
application with monitoring plans; (2) a
request for waivers of certain Integrated
Licensing Process (ILP) regulations
necessary for expedited processing of a
license application for a hydrokinetic
pilot project; (3) a proposed process
plan and schedule; and (4) a request to
be designated as the non-federal
representative for section 7 of the
Endangered Species Act consultation
and for section 106 consultation under
the National Historic Preservation Act.
k. A notice was issued on December
1, 2008, soliciting comments on the
draft license application from agencies
and stakeholders. Comments were filed
by federal and state agencies, and nongovernmental organizations. No
comments were filed opposing the
request to waive the integrated licensing
process regulations or the proposed
process plan and schedule.
l. The December 1, 2008, notice
approved Verdant Power’s request to be
designated as the non-federal
representative for section 7 of the
Endangered Species Act (ESA) with the
U.S. Fish and Wildlife Service and the
National Marine Fisheries Service, and
its request to initiate consultation under
section 106 of the National Historic
Preservation Act with the New York
State Historic Preservation Officer.
m. The proposed RITE Project would
consist of: (1) A field array of 30 35kilowatt, 5-meter-diameter axial flow
Kinetic Hydropower System (KHPS)
turbine-generator units mounted on ten
tri-frame mounts with a total capacity of
about 1 megawatt; (2) underwater cables
from each turbine to five shoreline
switchgear vaults that would
interconnect to a control room and
interconnection points; and (3)
appurtenant facilities for navigation
safety and operation. The estimated
annual generation of the proposed
project would be between 1,680 and
2,400 megawatt-hours.
n. The pre-filing process has been
concluded and the requisite regulations
have been waived such that the process
and schedule indicated below can be
implemented.
o. Post-filing process schedule. The
post-filing process will be conducted
pursuant to the following schedule.
Revisions to the schedule may be made
as needed.
Milestones
Dates
Final license application expected ............................................................................................................................................
Issue notice of acceptance and ready for environmental analysis and request for interventions ...........................................
Issue biological assessment ......................................................................................................................................................
Comments and interventions due .............................................................................................................................................
Issue notice of availability of environmental assessment .........................................................................................................
Comments due and 10(j) resolution, if needed .........................................................................................................................
July 31, 2009.
August 17, 2009.
August 17, 2009.
September 16, 2009.
November 16, 2009.
December 16, 2009.
p. Register online at https://ferc.gov/
esubscribenow.htm to be notified via
e-mail of new filing and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
Kimberly D. Bose,
Secretary.
[FR Doc. E9–10695 Filed 5–7–09; 8:45 am]
BILLING CODE P
ENVIRONMENTAL PROTECTION
AGENCY
hsrobinson on PROD1PC76 with NOTICES
[EPA–HQ–OAR–2003–0162; FRL–8902–8]
Agency Information Collection
Activities; Proposed Collection;
Comment Request; Regional Haze
Regulations; EPA ICR No. 1813.07,
OMB Control No. 2060–0412
AGENCY: Environmental Protection
Agency (EPA).
VerDate Nov<24>2008
17:51 May 07, 2009
Jkt 217001
ACTION:
Notice.
SUMMARY: In compliance with the
Paperwork Reduction Act (PRA) (44
U.S.C. 3501 et seq.), this document
announces that EPA is planning to
submit a request to renew an existing
approved Information Collection
Request (ICR) to the Office of
Management and Budget (OMB). This
ICR is scheduled to expire on October
31, 2009. Before submitting the ICR to
OMB for review and approval, EPA is
soliciting comments on specific aspects
of the proposed information collection
as described below.
DATES: Comments must be submitted on
or before July 7, 2009.
ADDRESSES: Submit your comments,
identified by Docket ID No. EPA–HQ–
OAR–2003–0162 by one of the following
methods:
• www.regulations.gov: Follow the
on-line instructions for submitting
comments.
• Email: a-and-r-docket@epa.gov.
PO 00000
Frm 00062
Fmt 4703
Sfmt 4703
• Fax: (202) 566–9744.
• Mail: Agency Information
Collection Request Activities: Proposed
Collection and Comment Request for the
Regional Haze Regulations Docket,
Environmental Protection Agency, Air
and Radiation Docket and Information
Center, Mailcode: 2822T, 1200
Pennsylvania Ave., NW., Washington,
DC 20460. Please include a total of two
copies.
• Hand Delivery: EPA Docket Center,
Public Reading Room, EPA West, Room
3334, 1301 Constitution Ave., NW.,
Washington, DC 20460. Such deliveries
are only accepted during the Docket’s
normal hours of operation, and special
arrangements should be made for
deliveries of boxed information.
Instructions: Direct your comments to
Docket ID No. EPA–HQ–OAR–2003–
0162. EPA’s policy is that all comments
received will be included in the public
docket without change and may be
made available online at
www.regulations.gov, including any
E:\FR\FM\08MYN1.SGM
08MYN1
Agencies
[Federal Register Volume 74, Number 88 (Friday, May 8, 2009)]
[Notices]
[Page 21680]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E9-10695]
[[Page 21680]]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 12611-003]
Verdant Power, LLC; Notice Concluding Pre-Filing Process and
Approving Process Plan and Schedule
May 1, 2009.
a. Type of Filing: Notice of Intent to File Application for License
for a Hydrokinetic Pilot Project.
b. Project No.: 12611-003.
c. Dated Filed: November 25, 2008.
d. Submitted By: Verdant Power, LLC.
e. Name of Project: Roosevelt Island Tidal Energy (RITE) Project.
f. Location: In the east channel of the East River in New York
City, New York. The project would not occupy federal lands.
g. Filed Pursuant to: 18 CFR 5.3 of the Commission's regulations
h. Applicant Contact: Ronald F. Smith, Verdant Power, LLC, The
Octagon, 888 Main Street, New York, NY 10044 (212) 888-8887 ext. 601.
i. FERC Contact: Tom Dean (202) 502-6041.
j. Verdant Power, LLC (Verdant Power) has filed with the
Commission: (1) A notice of intent (NOI) to file an application for a
pilot hydrokinetic hydropower project and a draft license application
with monitoring plans; (2) a request for waivers of certain Integrated
Licensing Process (ILP) regulations necessary for expedited processing
of a license application for a hydrokinetic pilot project; (3) a
proposed process plan and schedule; and (4) a request to be designated
as the non-federal representative for section 7 of the Endangered
Species Act consultation and for section 106 consultation under the
National Historic Preservation Act.
k. A notice was issued on December 1, 2008, soliciting comments on
the draft license application from agencies and stakeholders. Comments
were filed by federal and state agencies, and non-governmental
organizations. No comments were filed opposing the request to waive the
integrated licensing process regulations or the proposed process plan
and schedule.
l. The December 1, 2008, notice approved Verdant Power's request to
be designated as the non-federal representative for section 7 of the
Endangered Species Act (ESA) with the U.S. Fish and Wildlife Service
and the National Marine Fisheries Service, and its request to initiate
consultation under section 106 of the National Historic Preservation
Act with the New York State Historic Preservation Officer.
m. The proposed RITE Project would consist of: (1) A field array of
30 35-kilowatt, 5-meter-diameter axial flow Kinetic Hydropower System
(KHPS) turbine-generator units mounted on ten tri-frame mounts with a
total capacity of about 1 megawatt; (2) underwater cables from each
turbine to five shoreline switchgear vaults that would interconnect to
a control room and interconnection points; and (3) appurtenant
facilities for navigation safety and operation. The estimated annual
generation of the proposed project would be between 1,680 and 2,400
megawatt-hours.
n. The pre-filing process has been concluded and the requisite
regulations have been waived such that the process and schedule
indicated below can be implemented.
o. Post-filing process schedule. The post-filing process will be
conducted pursuant to the following schedule. Revisions to the schedule
may be made as needed.
------------------------------------------------------------------------
Milestones Dates
------------------------------------------------------------------------
Final license application expected......... July 31, 2009.
Issue notice of acceptance and ready for August 17, 2009.
environmental analysis and request for
interventions.
Issue biological assessment................ August 17, 2009.
Comments and interventions due............. September 16, 2009.
Issue notice of availability of November 16, 2009.
environmental assessment.
Comments due and 10(j) resolution, if December 16, 2009.
needed.
------------------------------------------------------------------------
p. Register online at https://ferc.gov/esubscribenow.htm to be
notified via e-mail of new filing and issuances related to this or
other pending projects. For assistance, contact FERC Online Support.
Kimberly D. Bose,
Secretary.
[FR Doc. E9-10695 Filed 5-7-09; 8:45 am]
BILLING CODE P