R.E. Ginna Nuclear Power Plant, LLC; R.E. Ginna Nuclear Power Plant Notice of Consideration of Approval of Application Regarding Proposed Corporate Restructuring and of Indirect Transfer of Licenses Pursuant to 10 CFR 50.80 and Opportunity for a Hearing, 21013-21014 [E9-10456]
Download as PDF
Federal Register / Vol. 74, No. 86 / Wednesday, May 6, 2009 / Notices
Assessment (EA) or Environmental
Impact Study (EIS) under NEPA. The
extraordinary circumstances are
considered prior to grants approval.
Applicability: This protocol applies to
all grants awarded with ARRA funds by
the National Endowment for the Arts.
The protocol will be effective
immediately and we will consider
comments submitted on the protocol
when developing the NEA NEPA
regulation that will include this
categorical exclusion.
Responsibilities
The Chairman of the NEA has the
final authority over the NEA’s
responsibilities over the NEPA process
and has approved this protocol and will
approve the NEA NEPA regulation.
The Senior Deputy Chairman is the
Senior Environmental Advisor to the
Chairman and is responsible for NEPA
policy, guidance, and oversight. The
Senior Deputy Chairman will oversee
the application of the categorical
exclusion and development of the NEA
NEPA regulation. In the absence of the
Senior Deputy Chairman, the General
Counsel will oversee the application of
the categorical exclusion and
development of the NEA NEPA
regulation.
The General Counsel is responsible
for providing legal guidance as to NEPA,
including correspondence from CEQ
and other agencies concerning matters
related to NEPA.
Extraordinary Circumstances for ARRA
Grant Categorical Exclusion
mstockstill on PROD1PC66 with NOTICES
Any of the following circumstances
preclude the use of this CE:
(a) Reasonable likelihood of
significant effects on public health,
safety, or the environment.
(b) Reasonable likelihood of
significant environmental effects (direct,
indirect, and cumulative).
(c) Imposition of uncertain or unique
environmental risks.
(d) Greater scope or size than is
normal for this category of action.
Dated: April 30, 2009.
Kathy Plowitz-Worden,
Panel Coordinator, Panel Operations,
National Endowment for the Arts.
[FR Doc. E9–10398 Filed 5–5–09; 8:45 am]
BILLING CODE 7537–01–P
VerDate Nov<24>2008
18:36 May 05, 2009
Jkt 217001
NUCLEAR REGULATORY
COMMISSION
[Docket No. 50–244; NRC–2009–0192]
R.E. Ginna Nuclear Power Plant, LLC;
R.E. Ginna Nuclear Power Plant Notice
of Consideration of Approval of
Application Regarding Proposed
Corporate Restructuring and of
Indirect Transfer of Licenses Pursuant
to 10 CFR 50.80 and Opportunity for a
Hearing
The U.S. Nuclear Regulatory
Commission (NRC, the Commission) is
considering the issuance of an Order
under 10 CFR 50.80 approving the
indirect transfer of Renewed Facility
Operating License, No. DPR–18, for the
R.E. Ginna Nuclear Power Plant,
currently held by R.E. Ginna Nuclear
Power Plant, LLC, as owner and
licensed operator. R.E. Ginna Nuclear
Power Plant, LLC, is owned by
Constellation Nuclear Power Plants,
Inc., which is owned by Constellation
Energy Nuclear Group, LLC (CENG).
CENG is a wholly-owned subsidiary of
Constellation Energy Group, Inc. (CEG).
According to an application dated
January 22, 2009, filed by CENG, on
behalf of R.E. Ginna Nuclear Power
Plant, LLC, and EDF Development, Inc.
(EDF Development), as supplemented
by letters dated February 26 and April
8, 2009, the applicants seek approval
pursuant to 10 CFR 50.80 of the indirect
transfer of control of the subject license
held by R.E. Ginna Nuclear Power Plant,
LLC, to the extent such would result
from certain proposed corporate
restructuring actions in connection with
a planned investment by EDF
Development whereby it would acquire
a 49.99% ownership interest in CENG.
EDF Development is a U.S. corporation
organized under the laws of the State of
Delaware and a wholly-owned
subsidiary of E.D.F. International S.A., a
public limited company organized
under the laws of France, which is in
turn a wholly-owned subsidiary of
´
´
Electricite de France S.A., a French
limited company.
Following the proposed transaction,
CEG will hold a 50.01% ownership
interest in CENG through two new
intermediate parent companies which
will be formed for non-operational
purposes. In addition, the intermediate
holding company, Constellation Nuclear
Power Plants, Inc., which exists
between CENG and R.E. Ginna Nuclear
Power Plant, LLC, will be converted
from a corporation to a limited liability
company. No physical changes to the
facilities or operational changes are
being proposed in the application.
PO 00000
Frm 00115
Fmt 4703
Sfmt 4703
21013
Pursuant to 10 CFR 50.80, no license,
or any right thereunder, shall be
transferred, directly or indirectly,
through transfer of control of the
license, unless the Commission shall
give its consent in writing. The
Commission will approve an
application for the indirect transfer of a
license, if the Commission determines
that the proposed underlying
transaction, i.e., the proposed corporate
restructuring, will not affect the
qualifications of the licensee to hold the
license, and that the transfer is
otherwise consistent with applicable
provisions of law, regulations, and
Orders issued by the Commission
pursuant thereto.
The filing of requests for hearing and
petitions for leave to intervene, and
written comments with regard to the
license transfer application, are
discussed below.
Within 20 days from the date of
publication of this notice, any person(s)
whose interest may be affected by the
Commission’s action on the application
may request a hearing and intervention
through the NRC E-filing system.
Requests for a hearing and petitions for
leave to intervene should be filed in
accordance with the Commission’s rules
of practice set forth in Subpart C ‘‘Rules
of General Applicability: Hearing
Requests, Petitions to Intervene,
Availability of Documents, Selection of
Specific Hearing Procedures, Presiding
Officer Powers, and General Hearing
Management for NRC Adjudicatory
Hearings,’’ of 10 CFR Part 2. In
particular, such requests and petitions
must comply with the requirements set
forth in 10 CFR 2.309. Untimely
requests and petitions may be denied, as
provided in 10 CFR 2.309(c)(1), unless
good cause for failure to file on time is
established. In addition, an untimely
request or petition should address the
factors that the Commission will also
consider, in reviewing untimely
requests or petitions, set forth in 10 CFR
2.309(c)(1)(i)–(viii).
All documents filed in NRC
adjudicatory proceedings, including a
request for hearing, a petition for leave
to intervene, any motion or other
document filed in the proceeding prior
to the submission of a request for
hearing or petition to intervene, and
documents filed by interested
governmental entities participating
under 10 CFR 2.315(c), must be filed in
accordance with the NRC E-Filing rule,
which the NRC promulgated in August
2007 (72 FR 49139). The E-Filing
process requires participants to submit
and serve documents over the Internet,
or in some cases to mail copies on
electronic storage media. Participants
E:\FR\FM\06MYN1.SGM
06MYN1
mstockstill on PROD1PC66 with NOTICES
21014
Federal Register / Vol. 74, No. 86 / Wednesday, May 6, 2009 / Notices
may not submit paper copies of their
filings unless they seek an exemption in
accordance with the procedures
described below.
To comply with the procedural
requirements of E-Filing, at least ten
(10) days prior to the filing deadline, the
petitioner/requestor should contact the
Office of the Secretary by e-mail at
HEARING.DOCKET@NRC.GOV, or by
calling (301) 415–1677, to request (1) a
digital ID certificate, which allows the
participant (or its counsel or
representative) to digitally sign
documents and access the E-Submittal
server for any proceeding in which it is
participating; and/or (2) creation of an
electronic docket for the proceeding
(even in instances in which the
petitioner/requestor (or its counsel or
representative) already holds an NRCissued digital ID certificate). Each
petitioner/requestor will need to
download the Workplace Forms
ViewerTM to access the Electronic
Information Exchange (EIE), a
component of the E-Filing system. The
Workplace Forms ViewerTM is free and
is available at
https://www.nrc.gov/site-help/esubmittals/install-viewer.html.
Information about applying for a digital
ID certificate is available on NRC’s
public Web site at https://www.nrc.gov/
site-help/e-submittals/applycertificates.html.
Once a petitioner/requestor has
obtained a digital ID certificate, had a
docket created, and downloaded the EIE
viewer, it can then submit a request for
hearing or petition for leave to
intervene. Submissions should be in
Portable Document Format (PDF) in
accordance with NRC guidance
available on the NRC public Web site at
https://www.nrc.gov/site-help/esubmittals.html. A filing is considered
complete at the time the filer submits its
documents through EIE. To be timely,
an electronic filing must be submitted to
the EIE system no later than 11:59 p.m.
Eastern Time on the due date. Upon
receipt of a transmission, the E-Filing
system time-stamps the document and
sends the submitter an e-mail notice
confirming receipt of the document. The
EIE system also distributes an e-mail
notice that provides access to the
document to the NRC Office of the
General Counsel and any others who
have advised the Office of the Secretary
that they wish to participate in the
proceeding, so that the filer need not
serve the documents on those
participants separately. Therefore,
applicants and other participants (or
their counsel or representative) must
apply for and receive a digital ID
certificate before a hearing request/
VerDate Nov<24>2008
18:36 May 05, 2009
Jkt 217001
petition to intervene is filed so that they
can obtain access to the document via
the E-Filing system.
A person filing electronically may
seek assistance through the ‘‘Contact
Us’’ link located on the NRC Web site
at https://www.nrc.gov/site-help/esubmittals.html or by calling the NRC
technical help line, which is available
between 8:30 a.m. and 8 p.m., Eastern
Time, Monday through Friday,
excluding government holidays. The
electronic filing Help Desk can be
contacted by telephone at 1–866–672–
7640 or by e-mail at
MHSD.Resource@nrc.gov.
Participants who believe that they
have a good cause for not submitting
documents electronically must file an
exemption request, in accordance with
10 CFR 2.302(g), with their initial paper
filing requesting authorization to
continue to submit documents in paper
format. Such filings must be submitted
by: (1) First class mail addressed to the
Office of the Secretary of the
Commission, U.S. Nuclear Regulatory
Commission, Washington, DC 20555–
0001, Attention: Rulemaking and
Adjudications Staff; or (2) courier,
express mail, or expedited delivery
service to the Office of the Secretary,
Sixteenth Floor, One White Flint North,
11555 Rockville Pike, Rockville,
Maryland 20852, Attention: Rulemaking
and Adjudications Staff. Participants
filing a document in this manner are
responsible for serving the document on
all other participants. Filing is
considered complete by first-class mail
as of the time of deposit in the mail, or
by courier, express mail, or expedited
delivery service upon depositing the
document with the provider of the
service.
Documents submitted in adjudicatory
proceedings will appear in NRC’s
electronic hearing docket which is
available to the public at https://
ehd.nrc.gov/EHD_Proceeding/home.asp,
unless excluded pursuant to an order of
the Commission, an Atomic Safety and
Licensing Board, or a Presiding Officer.
Participants are requested not to include
personal privacy information, such as
social security numbers, home
addresses, or home phone numbers in
their filings. With respect to copyrighted
works, except for limited excerpts that
serve the purpose of the adjudicatory
filings and would constitute a Fair Use
application, participants are requested
not to include copyrighted materials in
their submissions.
The Commission will issue a notice or
order granting or denying a hearing
request or intervention petition,
designating the issues for any hearing
that will be held and designating the
PO 00000
Frm 00116
Fmt 4703
Sfmt 4703
Presiding Officer. A notice granting a
hearing will be published in the Federal
Register and served on the parties to the
hearing.
Within 30 days from the date of
publication of this notice, persons may
submit written comments regarding the
license transfer application, as provided
for in 10 CFR 2.1305. The Commission
will consider and, if appropriate,
respond to these comments, but such
comments will not otherwise constitute
part of the decisional record. Comments
are not subject to the E-filing rule and
should be submitted to the Secretary,
U.S. Nuclear Regulatory Commission,
Washington, DC 20555–0001, Attention:
Rulemakings and Adjudications Staff,
and should cite the publication date and
page number of this Federal Register
notice. Comments may also be sent by
e-mail to
HEARINGDOCKET@NRC.GOV.
For further details with respect to this
indirect license transfer application, see
the application dated January 22, 2009,
available for public inspection at the
Commission’s Public Document Room
(PDR), located at One White Flint North,
Public File Area O1 F21, 11555
Rockville Pike (first floor), Rockville,
Maryland. Publicly available records
will be accessible electronically from
the Agency wide Documents Access and
Management System’s (ADAMS) Public
Electronic Reading Room on the Internet
at the NRC Web site, https://
www.nrc.gov/reading-rm/adams.html.
Persons who do not have access to
ADAMS or who encounter problems in
accessing the documents located in
ADAMS should contact the NRC PDR
Reference staff by telephone at 1–800–
397–4209, or 301–415–4737 or by e-mail
to pdr.resource@nrc.gov.
Attorneys for applicants: Daniel F.
Stenger, Hogan & Hartson LLP, 555
Thirteenth Street, NW., Washington, DC
20004, tel: 202.637.5691, e-mail:
DFStenger@hhlaw.com (counsel for
CENG); and John E. Matthews, Morgan,
Lewis, & Bockius, 1111 Pennsylvania
Ave., NW., Washington, DC 20004, tel.
202.739.5524, e-mail:
jmatthews@morganlewis.com (counsel
for EDF Development).
Dated at Rockville, Maryland this 28th day
of April 2009.
For the Nuclear Regulatory Commission.
Douglas V. Pickett,
Senior Project Manager, Plant Licensing
Branch I–1, Division of Operating Reactor
Licensing, Office of Nuclear Reactor
Regulation.
[FR Doc. E9–10456 Filed 5–5–09; 8:45 am]
BILLING CODE 7590–01–P
E:\FR\FM\06MYN1.SGM
06MYN1
Agencies
[Federal Register Volume 74, Number 86 (Wednesday, May 6, 2009)]
[Notices]
[Pages 21013-21014]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E9-10456]
=======================================================================
-----------------------------------------------------------------------
NUCLEAR REGULATORY COMMISSION
[Docket No. 50-244; NRC-2009-0192]
R.E. Ginna Nuclear Power Plant, LLC; R.E. Ginna Nuclear Power
Plant Notice of Consideration of Approval of Application Regarding
Proposed Corporate Restructuring and of Indirect Transfer of Licenses
Pursuant to 10 CFR 50.80 and Opportunity for a Hearing
The U.S. Nuclear Regulatory Commission (NRC, the Commission) is
considering the issuance of an Order under 10 CFR 50.80 approving the
indirect transfer of Renewed Facility Operating License, No. DPR-18,
for the R.E. Ginna Nuclear Power Plant, currently held by R.E. Ginna
Nuclear Power Plant, LLC, as owner and licensed operator. R.E. Ginna
Nuclear Power Plant, LLC, is owned by Constellation Nuclear Power
Plants, Inc., which is owned by Constellation Energy Nuclear Group, LLC
(CENG). CENG is a wholly-owned subsidiary of Constellation Energy
Group, Inc. (CEG).
According to an application dated January 22, 2009, filed by CENG,
on behalf of R.E. Ginna Nuclear Power Plant, LLC, and EDF Development,
Inc. (EDF Development), as supplemented by letters dated February 26
and April 8, 2009, the applicants seek approval pursuant to 10 CFR
50.80 of the indirect transfer of control of the subject license held
by R.E. Ginna Nuclear Power Plant, LLC, to the extent such would result
from certain proposed corporate restructuring actions in connection
with a planned investment by EDF Development whereby it would acquire a
49.99% ownership interest in CENG. EDF Development is a U.S.
corporation organized under the laws of the State of Delaware and a
wholly-owned subsidiary of E.D.F. International S.A., a public limited
company organized under the laws of France, which is in turn a wholly-
owned subsidiary of [Eacute]lectricit[eacute] de France S.A., a French
limited company.
Following the proposed transaction, CEG will hold a 50.01%
ownership interest in CENG through two new intermediate parent
companies which will be formed for non-operational purposes. In
addition, the intermediate holding company, Constellation Nuclear Power
Plants, Inc., which exists between CENG and R.E. Ginna Nuclear Power
Plant, LLC, will be converted from a corporation to a limited liability
company. No physical changes to the facilities or operational changes
are being proposed in the application.
Pursuant to 10 CFR 50.80, no license, or any right thereunder,
shall be transferred, directly or indirectly, through transfer of
control of the license, unless the Commission shall give its consent in
writing. The Commission will approve an application for the indirect
transfer of a license, if the Commission determines that the proposed
underlying transaction, i.e., the proposed corporate restructuring,
will not affect the qualifications of the licensee to hold the license,
and that the transfer is otherwise consistent with applicable
provisions of law, regulations, and Orders issued by the Commission
pursuant thereto.
The filing of requests for hearing and petitions for leave to
intervene, and written comments with regard to the license transfer
application, are discussed below.
Within 20 days from the date of publication of this notice, any
person(s) whose interest may be affected by the Commission's action on
the application may request a hearing and intervention through the NRC
E-filing system. Requests for a hearing and petitions for leave to
intervene should be filed in accordance with the Commission's rules of
practice set forth in Subpart C ``Rules of General Applicability:
Hearing Requests, Petitions to Intervene, Availability of Documents,
Selection of Specific Hearing Procedures, Presiding Officer Powers, and
General Hearing Management for NRC Adjudicatory Hearings,'' of 10 CFR
Part 2. In particular, such requests and petitions must comply with the
requirements set forth in 10 CFR 2.309. Untimely requests and petitions
may be denied, as provided in 10 CFR 2.309(c)(1), unless good cause for
failure to file on time is established. In addition, an untimely
request or petition should address the factors that the Commission will
also consider, in reviewing untimely requests or petitions, set forth
in 10 CFR 2.309(c)(1)(i)-(viii).
All documents filed in NRC adjudicatory proceedings, including a
request for hearing, a petition for leave to intervene, any motion or
other document filed in the proceeding prior to the submission of a
request for hearing or petition to intervene, and documents filed by
interested governmental entities participating under 10 CFR 2.315(c),
must be filed in accordance with the NRC E-Filing rule, which the NRC
promulgated in August 2007 (72 FR 49139). The E-Filing process requires
participants to submit and serve documents over the Internet, or in
some cases to mail copies on electronic storage media. Participants
[[Page 21014]]
may not submit paper copies of their filings unless they seek an
exemption in accordance with the procedures described below.
To comply with the procedural requirements of E-Filing, at least
ten (10) days prior to the filing deadline, the petitioner/requestor
should contact the Office of the Secretary by e-mail at
HEARING.DOCKET@NRC.GOV, or by calling (301) 415-1677, to request (1) a
digital ID certificate, which allows the participant (or its counsel or
representative) to digitally sign documents and access the E-Submittal
server for any proceeding in which it is participating; and/or (2)
creation of an electronic docket for the proceeding (even in instances
in which the petitioner/requestor (or its counsel or representative)
already holds an NRC-issued digital ID certificate). Each petitioner/
requestor will need to download the Workplace Forms ViewerTM
to access the Electronic Information Exchange (EIE), a component of the
E-Filing system. The Workplace Forms ViewerTM is free and is
available at https://www.nrc.gov/site-help/e-submittals/install-viewer.html. Information about applying for a digital ID certificate is
available on NRC's public Web site at https://www.nrc.gov/site-help/e-submittals/apply-certificates.html.
Once a petitioner/requestor has obtained a digital ID certificate,
had a docket created, and downloaded the EIE viewer, it can then submit
a request for hearing or petition for leave to intervene. Submissions
should be in Portable Document Format (PDF) in accordance with NRC
guidance available on the NRC public Web site at https://www.nrc.gov/site-help/e-submittals.html. A filing is considered complete at the
time the filer submits its documents through EIE. To be timely, an
electronic filing must be submitted to the EIE system no later than
11:59 p.m. Eastern Time on the due date. Upon receipt of a
transmission, the E-Filing system time-stamps the document and sends
the submitter an e-mail notice confirming receipt of the document. The
EIE system also distributes an e-mail notice that provides access to
the document to the NRC Office of the General Counsel and any others
who have advised the Office of the Secretary that they wish to
participate in the proceeding, so that the filer need not serve the
documents on those participants separately. Therefore, applicants and
other participants (or their counsel or representative) must apply for
and receive a digital ID certificate before a hearing request/petition
to intervene is filed so that they can obtain access to the document
via the E-Filing system.
A person filing electronically may seek assistance through the
``Contact Us'' link located on the NRC Web site at https://www.nrc.gov/site-help/e-submittals.html or by calling the NRC technical help line,
which is available between 8:30 a.m. and 8 p.m., Eastern Time, Monday
through Friday, excluding government holidays. The electronic filing
Help Desk can be contacted by telephone at 1-866-672-7640 or by e-mail
at MHSD.Resource@nrc.gov.
Participants who believe that they have a good cause for not
submitting documents electronically must file an exemption request, in
accordance with 10 CFR 2.302(g), with their initial paper filing
requesting authorization to continue to submit documents in paper
format. Such filings must be submitted by: (1) First class mail
addressed to the Office of the Secretary of the Commission, U.S.
Nuclear Regulatory Commission, Washington, DC 20555-0001, Attention:
Rulemaking and Adjudications Staff; or (2) courier, express mail, or
expedited delivery service to the Office of the Secretary, Sixteenth
Floor, One White Flint North, 11555 Rockville Pike, Rockville, Maryland
20852, Attention: Rulemaking and Adjudications Staff. Participants
filing a document in this manner are responsible for serving the
document on all other participants. Filing is considered complete by
first-class mail as of the time of deposit in the mail, or by courier,
express mail, or expedited delivery service upon depositing the
document with the provider of the service.
Documents submitted in adjudicatory proceedings will appear in
NRC's electronic hearing docket which is available to the public at
https://ehd.nrc.gov/EHD_Proceeding/home.asp, unless excluded pursuant
to an order of the Commission, an Atomic Safety and Licensing Board, or
a Presiding Officer. Participants are requested not to include personal
privacy information, such as social security numbers, home addresses,
or home phone numbers in their filings. With respect to copyrighted
works, except for limited excerpts that serve the purpose of the
adjudicatory filings and would constitute a Fair Use application,
participants are requested not to include copyrighted materials in
their submissions.
The Commission will issue a notice or order granting or denying a
hearing request or intervention petition, designating the issues for
any hearing that will be held and designating the Presiding Officer. A
notice granting a hearing will be published in the Federal Register and
served on the parties to the hearing.
Within 30 days from the date of publication of this notice, persons
may submit written comments regarding the license transfer application,
as provided for in 10 CFR 2.1305. The Commission will consider and, if
appropriate, respond to these comments, but such comments will not
otherwise constitute part of the decisional record. Comments are not
subject to the E-filing rule and should be submitted to the Secretary,
U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001,
Attention: Rulemakings and Adjudications Staff, and should cite the
publication date and page number of this Federal Register notice.
Comments may also be sent by e-mail to HEARINGDOCKET@NRC.GOV.
For further details with respect to this indirect license transfer
application, see the application dated January 22, 2009, available for
public inspection at the Commission's Public Document Room (PDR),
located at One White Flint North, Public File Area O1 F21, 11555
Rockville Pike (first floor), Rockville, Maryland. Publicly available
records will be accessible electronically from the Agency wide
Documents Access and Management System's (ADAMS) Public Electronic
Reading Room on the Internet at the NRC Web site, https://www.nrc.gov/reading-rm/adams.html. Persons who do not have access to ADAMS or who
encounter problems in accessing the documents located in ADAMS should
contact the NRC PDR Reference staff by telephone at 1-800-397-4209, or
301-415-4737 or by e-mail to pdr.resource@nrc.gov.
Attorneys for applicants: Daniel F. Stenger, Hogan & Hartson LLP,
555 Thirteenth Street, NW., Washington, DC 20004, tel: 202.637.5691, e-
mail: DFStenger@hhlaw.com (counsel for CENG); and John E. Matthews,
Morgan, Lewis, & Bockius, 1111 Pennsylvania Ave., NW., Washington, DC
20004, tel. 202.739.5524, e-mail: jmatthews@morganlewis.com (counsel
for EDF Development).
Dated at Rockville, Maryland this 28th day of April 2009.
For the Nuclear Regulatory Commission.
Douglas V. Pickett,
Senior Project Manager, Plant Licensing Branch I-1, Division of
Operating Reactor Licensing, Office of Nuclear Reactor Regulation.
[FR Doc. E9-10456 Filed 5-5-09; 8:45 am]