AmerenUE; Notice of Application for Amendment of License and Soliciting Comments, Motions To Intervene, and Protests, 20474 [E9-10121]
Download as PDF
20474
Federal Register / Vol. 74, No. 84 / Monday, May 4, 2009 / Notices
Issued in Washington, DC on April 21,
2009.
Steven G. Chalk,
Principal Deputy Assistant Secretary, Energy
Efficiency and Renewable Energy.
[FR Doc. E9–10157 Filed 5–1–09; 8:45 am]
BILLING CODE 6450–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 459–265]
AmerenUE; Notice of Application for
Amendment of License and Soliciting
Comments, Motions To Intervene, and
Protests
tjames on PRODPC75 with NOTICES
April 27, 2009.
a. Type of Application: Non-project
use of project lands and waters.
b. Project Number: 459–265.
c. Date Filed: April 3, 2009.
d. Applicant: AmerenUE.
e. Name of Project: Osage
Hydroelectric Project.
f. Location: The proposed non-project
use is located at mile marker 7.5 of the
main channel of Lake of the Ozarks, in
Camden County, Missouri.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791a–825r.
h. Applicant Contact: Mr. Jeff Green,
Shoreline Supervisor, Ameren/UE, P.O.
Box 993, Lake Ozark, MO 65049, (573)
365–9214.
i. FERC Contact: Any questions on
this notice should be addressed to Jade
Alvey at (202) 502–6864.
j. Deadline for filing comments and or
motions: May 27, 2009.
All documents (original and eight
copies) should be filed with: Secretary,
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
The Commission’s Rules of Practice
and Procedure require all interveners
filing documents with the Commission
to serve a copy of that document on
each person whose name appears on the
official service list for the project.
Further, if an intervener files comments
or documents with the Commission
relating to the merits of an issue that
may affect the responsibilities of a
particular resource agency, they must
also serve a copy of the document on
that resource agency. A copy of any
motion to intervene must also be served
upon each representative of the
Applicant specified in the particular
application.
k. Description of Request: Union
Electric Company, dba AmerenUE, filed
an application seeking Commission
authorization to permit Glacier Park
VerDate Nov<24>2008
15:26 May 01, 2009
Jkt 217001
Investments, LLC to modify existing
docks and construct new docks near
mile marker 7.5 of the main channel of
Lake of the Ozarks in Camden County,
Missouri. The application is for
reconfiguration of 2 existing permitted
docks, replacement of 1 un-permitted
dock, and construction of 4 new docks
for a total of 83 boat slips. Existing land
use at the proposed activity site consists
of commercial development, including
Glacier Park Investments, LLC’s Shady
Gators restaurant and bar. No dredging
is proposed. This application was filed
after consultation with the appropriate
agencies.
l. Locations of the Application: A
copy of the application is available for
inspection and reproduction at the
Commission’s Public Reference Room,
located at 888 First Street, NE., Room
2A, Washington, DC 20426, or by calling
(202) 502–8371. This filing may also be
viewed on the Commission’s Web site at
https://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field (P–459) to
access the document. You may also
register online at https://www.ferc.gov/
docs-filing/esubscription.asp to be
notified via email of new filings and
issuances related to this or other
pending projects. For assistance, call
1–866–208–3372 or e-mail
FERCOnlineSupport@ferc.gov, for TTY,
call (202) 502–8659. A copy is also
available for inspection and
reproduction at the address in item (h)
above.
m. Individuals desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
n. Comments, Protests, or Motions To
Intervene: Anyone may submit
comments, a protest, or a motion to
intervene in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, .211, .214.
In determining the appropriate action to
take, the Commission will consider all
protests or other comments filed, but
only those who file a motion to
intervene in accordance with the
Commission’s Rules may become a
party to the proceeding. Any comments,
protests, or motions to intervene must
be received on or before the specified
comment date for the particular
application.
o. Any filings must bear in all capital
letters the title ‘‘COMMENTS’’,
‘‘PROTEST’’, or ‘‘MOTION TO
INTERVENE’’, as applicable, and the
Project Number of the particular
application to which the filing refers.
p. Agency Comments: Federal, State,
and local agencies are invited to file
PO 00000
Frm 00025
Fmt 4703
Sfmt 4703
comments on the described application.
A copy of the application may be
obtained by agencies directly from the
Applicant. If an agency does not file
comments within the time specified for
filing comments, it will be presumed to
have no comments. One copy of an
agency’s comments must also be sent to
the Applicant’s representatives.
q. Comments, protests and
interventions may be filed electronically
via the Internet in lieu of paper. See, 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site at https://www.ferc.gov under the
‘‘e-Filing’’ link.
Kimberly D. Bose,
Secretary.
[FR Doc. E9–10121 Filed 5–1–09; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 13373–000]
Hydrodynamics, Inc.; Notice of
Preliminary Permit Application
Accepted for Filing and Soliciting
Comments, Motions To Intervene, and
Competing Applications
April 23, 2009.
On February 12, 2009,
Hydrodynamics, Inc. filed an
application for a preliminary permit,
pursuant to section 4(f) of the Federal
Power Act, proposing to study the
feasibility of the Cooney Reservoir
Hydroelectric Project, which would be
located at the existing Cooney Reservoir
dam on Red Lodge Creek near the town
of Boyd in Carbon County, Montana.
The sole purpose of a preliminary
permit, if issued, is to grant the permit
holder priority to file a license
application during the permit term. A
preliminary permit does not authorize
the permit holder to perform any land
disturbing activities or otherwise enter
upon lands or waters owned by others
without the owners’ express permission.
The proposed project would consist of
the following:
(1) An existing 2,369-foot-long, 103foot-high earthen dam; (2) an existing
reservoir with a surface area of 1,078
acres and a storage capacity of 28,230
acre-feet at the normal water surface
elevation of 4,173 feet mean sea level;
(3) an existing 430-foot-long concrete
dam outlet works tunnel, which would
be lined with steel; (4) a new 54-inchdiameter, 430-foot-long penstock in the
tunnel; (5) a new 20-foot-long penstock
extending from the tunnel to the
E:\FR\FM\04MYN1.SGM
04MYN1
Agencies
[Federal Register Volume 74, Number 84 (Monday, May 4, 2009)]
[Notices]
[Page 20474]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E9-10121]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 459-265]
AmerenUE; Notice of Application for Amendment of License and
Soliciting Comments, Motions To Intervene, and Protests
April 27, 2009.
a. Type of Application: Non-project use of project lands and
waters.
b. Project Number: 459-265.
c. Date Filed: April 3, 2009.
d. Applicant: AmerenUE.
e. Name of Project: Osage Hydroelectric Project.
f. Location: The proposed non-project use is located at mile marker
7.5 of the main channel of Lake of the Ozarks, in Camden County,
Missouri.
g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791a-825r.
h. Applicant Contact: Mr. Jeff Green, Shoreline Supervisor, Ameren/
UE, P.O. Box 993, Lake Ozark, MO 65049, (573) 365-9214.
i. FERC Contact: Any questions on this notice should be addressed
to Jade Alvey at (202) 502-6864.
j. Deadline for filing comments and or motions: May 27, 2009.
All documents (original and eight copies) should be filed with:
Secretary, Federal Energy Regulatory Commission, 888 First Street, NE.,
Washington, DC 20426.
The Commission's Rules of Practice and Procedure require all
interveners filing documents with the Commission to serve a copy of
that document on each person whose name appears on the official service
list for the project. Further, if an intervener files comments or
documents with the Commission relating to the merits of an issue that
may affect the responsibilities of a particular resource agency, they
must also serve a copy of the document on that resource agency. A copy
of any motion to intervene must also be served upon each representative
of the Applicant specified in the particular application.
k. Description of Request: Union Electric Company, dba AmerenUE,
filed an application seeking Commission authorization to permit Glacier
Park Investments, LLC to modify existing docks and construct new docks
near mile marker 7.5 of the main channel of Lake of the Ozarks in
Camden County, Missouri. The application is for reconfiguration of 2
existing permitted docks, replacement of 1 un-permitted dock, and
construction of 4 new docks for a total of 83 boat slips. Existing land
use at the proposed activity site consists of commercial development,
including Glacier Park Investments, LLC's Shady Gators restaurant and
bar. No dredging is proposed. This application was filed after
consultation with the appropriate agencies.
l. Locations of the Application: A copy of the application is
available for inspection and reproduction at the Commission's Public
Reference Room, located at 888 First Street, NE., Room 2A, Washington,
DC 20426, or by calling (202) 502-8371. This filing may also be viewed
on the Commission's Web site at https://www.ferc.gov using the
``eLibrary'' link. Enter the docket number excluding the last three
digits in the docket number field (P-459) to access the document. You
may also register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances
related to this or other pending projects. For assistance, call 1-866-
208-3372 or e-mail FERCOnlineSupport@ferc.gov, for TTY, call (202) 502-
8659. A copy is also available for inspection and reproduction at the
address in item (h) above.
m. Individuals desiring to be included on the Commission's mailing
list should so indicate by writing to the Secretary of the Commission.
n. Comments, Protests, or Motions To Intervene: Anyone may submit
comments, a protest, or a motion to intervene in accordance with the
requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211,
.214. In determining the appropriate action to take, the Commission
will consider all protests or other comments filed, but only those who
file a motion to intervene in accordance with the Commission's Rules
may become a party to the proceeding. Any comments, protests, or
motions to intervene must be received on or before the specified
comment date for the particular application.
o. Any filings must bear in all capital letters the title
``COMMENTS'', ``PROTEST'', or ``MOTION TO INTERVENE'', as applicable,
and the Project Number of the particular application to which the
filing refers.
p. Agency Comments: Federal, State, and local agencies are invited
to file comments on the described application. A copy of the
application may be obtained by agencies directly from the Applicant. If
an agency does not file comments within the time specified for filing
comments, it will be presumed to have no comments. One copy of an
agency's comments must also be sent to the Applicant's representatives.
q. Comments, protests and interventions may be filed electronically
via the Internet in lieu of paper. See, 18 CFR 385.2001(a)(1)(iii) and
the instructions on the Commission's Web site at https://www.ferc.gov
under the ``e-Filing'' link.
Kimberly D. Bose,
Secretary.
[FR Doc. E9-10121 Filed 5-1-09; 8:45 am]