BJ Energy LLC, Franklin Power LLC, GLE Trading LLC, Ocean Power LLC, Pillar Fund LLC v. PJM Interconnection, LLC; Notice Requiring Protective Order, 20479-20480 [E9-10108]
Download as PDF
tjames on PRODPC75 with NOTICES
Federal Register / Vol. 74, No. 84 / Monday, May 4, 2009 / Notices
free at 1–866–208–3676, of for TTY,
(202) 502–8659. A copy is also available
for inspection and reproduction at the
address in paragraph h.
Register online at https://ferc.gov/
esubscribenow.htm to be notified via email of new filing and issuances related
to this or other pending projects. For
assistance, contact FERC Online
Support.
o. With this notice, we are soliciting
comments on the PAD and Scoping
Document 1 (SD1), as well as study
requests. All comments on the PAD and
SD1, and study requests should be sent
to the address above in paragraph (h). In
addition, all comments on the PAD and
SD1, study requests, requests for
cooperating agency status, and all
communications to and from
Commission staff related to the merits of
the potential application (original and
eight copies) must be filed with the
Commission at the following address:
Kimberly D. Bose, Secretary, Federal
Energy Regulatory Commission, 888
First Street, NE., Washington, DC 20426.
All filings with the Commission must
include on the first page, the project
name (Merced Falls Hydroelectric
Project) and number (P–2467–019), and
bear the heading ‘‘Comments on PreApplication Document,’’ ‘‘Study
Requests,’’ ‘‘Comments on Scoping
Document 1,’’ ‘‘Request for Cooperating
Agency Status,’’ or ‘‘Communications to
and from Commission Staff.’’ Any
individual or entity interested in
submitting study requests, commenting
on the PAD or SD1, and any agency
requesting cooperating status must do so
by June 23, 2009.
Comments on the PAD and SD1,
study requests, requests for cooperating
agency status, and other permissible
forms of communications with the
Commission may be filed electronically
via the Internet in lieu of paper. The
Commission strongly encourages
electronic filings. See 18 CFR
385.2001(a)(1)(iii) and the instructions
on the Commission’s Web site (https://
www.ferc.gov/docs-filing/ferconline.asp)
under the ‘‘e-filing’’ link. For a simpler
method of submitting text only
comments, click on ‘‘Quick Comment.’’
p. Although our current intent is to
prepare an environmental assessment
(EA), there is the possibility that an
Environmental Impact Statement (EIS)
will be required. Nevertheless, this
meeting will satisfy the NEPA scoping
requirements, irrespective of whether an
EA or EIS is issued by the Commission.
Kimberly D. Bose,
Secretary.
[FR Doc. E9–10107 Filed 5–1–09; 8:45 am]
BILLING CODE 6717–01–P
VerDate Nov<24>2008
15:26 May 01, 2009
Jkt 217001
Comment Date: 5 p.m. Eastern Time
on May 22, 2009.
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Kimberly D. Bose,
Secretary.
[FR Doc. E9–10122 Filed 5–1–09; 8:45 am]
[Docket No. NJ09–3–000]
BILLING CODE 6717–01–P
Big Rivers Electric Corporation; Notice
of Filing
April 27, 2009.
Take notice that on April 22, 2009,
Big Rivers Electric Corporation filed a
Petition for Declaratory Order revising
its ‘‘safe harbor’’ Open Access
Transmission Tariff in compliance with
the Commission’s Order Nos. 890–A,
890–B and 890–C, pursuant to section
35.28(e) of the Federal Energy
Commission’s regulations, 18 CFR
35.8(e) (2208), and Rule 207 of the
Commission’s Rules of Practice and
Procedure, 18 CFR 385.207(a)(2) (2008).
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211, 385.214).
Protests will be considered by the
Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed on or before the
comment date. On or before the
comment date, it is not necessary to
serve motions to intervene or protests
on persons other than the Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 14 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
PO 00000
Frm 00030
Fmt 4703
Sfmt 4703
20479
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. EL08–49–001]
BJ Energy LLC, Franklin Power LLC,
GLE Trading LLC, Ocean Power LLC,
Pillar Fund LLC v. PJM
Interconnection, LLC; Notice Requiring
Protective Order
April 24, 2009.
Take notice on April 15, 2009, PJM
Interconnection, LLC (PJM) filed a
motion requesting the Commission
authorize the public release of currently
non-public documents of BJ Energy, et
al. that PJM filed as part of an answer
and request for rehearing in this
docket.1 PJM represented that these
documents are covered by a protective
order issued by the United States
District Court for the Eastern District of
Pennsylvania.2 PJM attached a copy of
the District Court’s March 26, 2009
order which provided that ‘‘[t]he court’s
Protective Order does not prohibit FERC
from issuing an order declassifying
documents submitted to this court
under seal.’’ 3 On April 23, 2009, the BJ
Energy, et al. filed an answer, requesting
that the Commission deny PJM’s motion
and maintain the confidentiality of this
information.
Pursuant to Rule 213(c)(5) of the
Commission’s regulations, 18 CFR
385.213 (c)(5), PJM is required to
provide such documents to those parties
whose interventions were accepted in
the April 2, 2009 order4 that request the
documents and sign a protective order
no less stringent than the one already
approved by the District Court.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
1 The request related to: (1) PJM’s answer to
Tower Companies supplemental answer and
amendment of PJM’s answer to the complaint filed
in this proceeding on March 4, 2009; and (2) PJM’s
April 15, 2009 filing for clarification and rehearing
in this proceeding.
2 BJ Energy LLC, et al. v. PJM Interconnection, LLC
Protective Order, C.A. No. 08–cv–03649–NS (Jan. 7,
2009).
3 BJ Energy LLC, et al. v. PJM Interconnection, LLC
Protective Order, C.A. No. 2:08–cv–03649–NS
(March 26, 2009).
4 BJ Energy LLC v. PJM Interconnection, LLC, 127
FERC ¶ 61,006 (2009).
E:\FR\FM\04MYN1.SGM
04MYN1
20480
Federal Register / Vol. 74, No. 84 / Monday, May 4, 2009 / Notices
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Kimberly D. Bose,
Secretary.
[FR Doc. E9–10108 Filed 5–1–09; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project Nos. 460–033; 460–040]
City of Tacoma, WA; Notice of
Technical Conference, Public Meeting,
and Site Visit for the Cushman
Hydroelectric Project Settlement
Agreement and Amendment of License
To Construct Third Powerhouse
April 24, 2009.
On January 21, 2009, the City of
Tacoma, Washington (Tacoma Power),
on behalf of itself, the Skokomish Indian
Tribe, and six state and federal agencies,
filed a comprehensive settlement
agreement (Settlement) and Joint
Explanatory Statement for the Cushman
Project. On January 26, 2009, Tacoma
Power filed an Application for
Amendment of License to construct a
third powerhouse at the base of
Cushman Dam No. 2.
tjames on PRODPC75 with NOTICES
Technical Conference and Public
Meeting
Commission staff will hold a
technical conference to discuss the
proposed license articles submitted by
Tacoma Power as part of its Settlement.
Commission staff will also hold a public
meeting to solicit comments on the
Settlement and License Amendment.
The technical conference will be held
on Thursday, May 21, 2009, beginning
at 8:30 a.m. (PST). Participation at the
technical conference will be limited to
Commission staff and the Settlement
Parties, though the public is free to
attend. The public meeting will begin at
4 p.m. (PST). Both the technical
conference and public meeting will be
held at the Tacoma Public Utilities
building, located at 3628 S. 35th Street,
Tacoma, WA 98409–3192. The technical
conference and meeting will be
recorded by a court reporter, and all
statements (verbal and written) will
become part of the Commission’s public
VerDate Nov<24>2008
15:26 May 01, 2009
Jkt 217001
record for the project. The conference,
meeting, and site visit described below
are posted on the Commission’s
calendar located at https://www.ferc.gov/
EventCalendar/EventsList.aspx along
with other related information.
Site Visit
Kimberly D. Bose,
Secretary.
[FR Doc. E9–10103 Filed 5–1–09; 8:45 am]
BILLING CODE 6717–01–P
FEDERAL ELECTION COMMISSION
Sunshine Act Notices
Federal Election Commission.
Executive Session
Scheduled for Tuesday, April 28, 2009.
Executive Session Scheduled for
Wednesday, April 29, 2009.
Open Meeting Scheduled for
Thursday, April 30, 2009.
DATE AND TIME: Thursday, April 30,
2009, at 10 a.m.
Tuesday, May 5, 2009, at 10 a.m.
Wednesday, May 6, at 10 a.m.
PLACE: 999 E Street, NW., Washington,
DC.
STATUS: These meetings will be closed
to the public.
ITEMS TO BE DISCUSSED: Compliance
matters pursuant to 2 U.S.C. 437g.
Audits conducted pursuant to 2
U.S.C. 437g, 438(b), and Title 26, U.S.C.
Matters concerning participation in
civil actions or proceedings or
arbitration.
Internal personnel rules and
procedures or matters affecting a
particular employee.
*
*
*
*
*
AGENCY:
CANCELLATIONS:
Frm 00031
Mary W. Dove,
Secretary of the Commission.
[FR Doc. E9–10092 Filed 5–1–09; 8:45 am]
BILLING CODE 6715–01–M
On Wednesday, May 20, 2009,
Commission staff, along with
representatives of Tacoma Power, will
conduct a site visit of the Cushman
Project. The site visit will begin at 8:30
a.m. (PST). All interested individuals,
organizations, and agencies are invited
to attend. All participants should meet
at Cushman Powerhouse No. 2, located
on Hwy 101, 2.4 miles south of
Hoodsport, WA. In addition, all
participants are responsible for their
own transportation to the site and
throughout the day. Anyone planning to
attend, or otherwise with questions
about, the site visit should contact Mr.
Paul Hickey of Tacoma Power at (253)
502–8692.
For further information, contact Allan
Creamer at (202) 502–8365, or by e-mail
at allan.creamer@ferc.gov.
PO 00000
PERSON TO CONTACT FOR INFORMATION:
Judith Ingram, Press Officer, Telephone:
(202) 694–1220.
Fmt 4703
Sfmt 4703
GENERAL SERVICES
ADMINISTRATION
[OMB Control No. 3090–0248]
General Services Administration
Acquisition Regulation; Submission
for OMB Review; Solicitation
Provisions and Contract Clauses,
Placement of Orders Clause, and
Ordering Information Clause
AGENCY: Office of the Chief Acquisition
Officer, GSA.
ACTION: Notice of request for public
comments regarding an extension to an
existing OMB clearance.
SUMMARY: Under the provisions of the
Paperwork Reduction Act of 1995 (44
U.S.C. Chapter 35), the Federal
Acquisition Regulation (FAR), the
Regulatory Secretariat will be
submitting to the Office of Management
and Budget (OMB) a request to review
and approve an extension of a currently
approved information collection
requirement concerning Solicitation
provisions and contract clauses,
placement of orders clauses, and
ordering information clause. A request
for public comments was published in
the Federal Register at 74 FR 8258,
February 24, 2009. No comments were
received.
Public comments are particularly
invited on: Whether this collection of
information is necessary; whether it will
have practical utility; whether our
estimate of the public burden of this
collection of information is accurate and
based on valid assumptions and
methodology; ways to enhance the
quality, utility, and clarity of the
information to be collected; and ways in
which we can minimize the burden of
collection of information on those who
are to respond, through the use of
appropriate technological collection
techniques or other forms of information
technology.
DATES: Submit comments on or before:
June 3, 2009.
ADDRESSES: Submit comments regarding
this burden estimate or any other aspect
of this collection of information,
including suggestions for reducing this
burden to: General Services
Administration (GSA) Desk Officer,
E:\FR\FM\04MYN1.SGM
04MYN1
Agencies
[Federal Register Volume 74, Number 84 (Monday, May 4, 2009)]
[Notices]
[Pages 20479-20480]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E9-10108]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. EL08-49-001]
BJ Energy LLC, Franklin Power LLC, GLE Trading LLC, Ocean Power
LLC, Pillar Fund LLC v. PJM Interconnection, LLC; Notice Requiring
Protective Order
April 24, 2009.
Take notice on April 15, 2009, PJM Interconnection, LLC (PJM) filed
a motion requesting the Commission authorize the public release of
currently non-public documents of BJ Energy, et al. that PJM filed as
part of an answer and request for rehearing in this docket.\1\ PJM
represented that these documents are covered by a protective order
issued by the United States District Court for the Eastern District of
Pennsylvania.\2\ PJM attached a copy of the District Court's March 26,
2009 order which provided that ``[t]he court's Protective Order does
not prohibit FERC from issuing an order declassifying documents
submitted to this court under seal.'' \3\ On April 23, 2009, the BJ
Energy, et al. filed an answer, requesting that the Commission deny
PJM's motion and maintain the confidentiality of this information.
---------------------------------------------------------------------------
\1\ The request related to: (1) PJM's answer to Tower Companies
supplemental answer and amendment of PJM's answer to the complaint
filed in this proceeding on March 4, 2009; and (2) PJM's April 15,
2009 filing for clarification and rehearing in this proceeding.
\2\ BJ Energy LLC, et al. v. PJM Interconnection, LLC Protective
Order, C.A. No. 08-cv-03649-NS (Jan. 7, 2009).
\3\ BJ Energy LLC, et al. v. PJM Interconnection, LLC Protective
Order, C.A. No. 2:08-cv-03649-NS (March 26, 2009).
---------------------------------------------------------------------------
Pursuant to Rule 213(c)(5) of the Commission's regulations, 18 CFR
385.213 (c)(5), PJM is required to provide such documents to those
parties whose interventions were accepted in the April 2, 2009 order\4\
that request the documents and sign a protective order no less
stringent than the one already approved by the District Court.
---------------------------------------------------------------------------
\4\ BJ Energy LLC v. PJM Interconnection, LLC, 127 FERC ] 61,006
(2009).
---------------------------------------------------------------------------
This filing is accessible on-line at https://www.ferc.gov, using the
``eLibrary'' link and is available for review in the Commission's
Public
[[Page 20480]]
Reference Room in Washington, DC. There is an ``eSubscription'' link on
the Web site that enables subscribers to receive e-mail notification
when a document is added to a subscribed docket(s). For assistance with
any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or
---------------------------------------------------------------------------
call (866) 208-3676 (toll free). For TTY, call (202) 502-8659.
Kimberly D. Bose,
Secretary.
[FR Doc. E9-10108 Filed 5-1-09; 8:45 am]
BILLING CODE 6717-01-P