Download as PDF Federal Register / Vol. 74, No. 84 / Monday, May 4, 2009 / Notices powerhouse; (6) a new powerhouse containing two generating units with a combined installed capacity of 0.8 megawatts; (7) a new tailrace discharging flows into Red Lodge Creek at the base of the dam; (8) a new substation; (9) a proposed 15-kilovolt, 8mile-long transmission line; and (10) appurtenant facilities. The proposed project would have an average annual generation of 4.2 gigawatt-hours. Applicant Contact: Ben Singer, Project Manager, Hydrodynamics, Inc., P.O. Box 1136, Bozeman, MT 59771; phone: (406) 587–5086. FERC Contact: Dianne Rodman, (202) 502–6077. Deadline for filing comments, motions to intervene, competing applications (without notices of intent), or notices of intent to file competing applications: 60 days from the issuance of this notice. Comments, motions to intervene, notices of intent, and competing applications may be filed electronically via the Internet. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site under the ‘‘e-Filing’’ link. If unable to be filed electronically, documents may be paperfiled. To paper-file, an original and eight copies should be mailed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. For more information on how to submit these types of filings please go to the Commission’s Web site located at https:// www.ferc.gov/filing-comments.asp. More information about this project, including a copy of the application, can be viewed or printed on the ‘‘eLibrary’’ link of Commission’s Web site at https:// www.ferc.gov/docs-filing/elibrary.asp. Enter the docket number (P–13373) in the docket number field to access the document. For assistance, call toll-free 1–866–208–3372. Kimberly D. Bose, Secretary. [FR Doc. E9–10100 Filed 5–1–09; 8:45 am] tjames on PRODPC75 with NOTICES BILLING CODE 6717–01–P VerDate Nov<24>2008 15:26 May 01, 2009 Jkt 217001 DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13372–000] Hydrodynamics, Inc.; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications April 23, 2009. On February 11, 2009, Hydrodynamics, Inc. filed an application for a preliminary permit, pursuant to section 4(f) of the Federal Power Act, proposing to study the feasibility of the Tongue River Reservoir Hydroelectric Project, which would be located at the existing Tongue River Reservoir dam on the Tongue River near the town of Decker in Bighorn County, Montana. The sole purpose of a preliminary permit, if issued, is to grant the permit holder priority to file a license application during the permit term. A preliminary permit does not authorize the permit holder to perform any land disturbing activities or otherwise enter upon lands or waters owned by others without the owners’ express permission. The proposed project would consist of the following: (1) An existing 1,824-foot-long, 91foot-high earthen dam; (2) an existing reservoir with a surface area of 3,700 acres and a storage capacity of 79,071 acre-feet at the normal water surface elevation of 3,138 feet mean sea level; (3) an existing concrete outlet works tunnel, which would be lined with steel; (4) a new 84-inch, 520-foot-long steel penstock in the tunnel; (5) a new 40-foot-long penstock extending from the tunnel to the powerhouse; (6) a new powerhouse containing two generating units with a combined installed capacity of 2.0 megawatts; (7) a new tailrace discharging flows into the Tongue River at the base of the dam; (8) a new substation; (9) a new 125-kilovolt, 8.5-mile-long transmission line; and (10) appurtenant facilities. The proposed project would have an average annual generation of 11.0 gigawatt-hours. Applicant Contact: Ben Singer, Project Manager, Hydrodynamics, Inc., P.O. Box 1136, Bozeman, MT 59771; phone: (406) 587–5086. FERC Contact: Dianne Rodman, (202) 502–6077. Deadline for filing comments, motions to intervene, competing applications (without notices of intent), or notices of intent to file competing applications: 60 days from the issuance of this notice. Comments, motions to intervene, PO 00000 Frm 00026 Fmt 4703 Sfmt 4703 20475 notices of intent, and competing applications may be filed electronically via the Internet. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site under the ‘‘e-Filing’’ link. If unable to be filed electronically, documents may be paperfiled. To paper-file, an original and eight copies should be mailed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. For more information on how to submit these types of filings please go to the Commission’s Web site located at https:// www.ferc.gov/filing-comments.asp. More information about this project, including a copy of the application, can be viewed or printed on the ‘‘eLibrary’’ link of Commission’s Web site at https:// www.ferc.gov/docs-filing/elibrary.asp. Enter the docket number (P–13373) in the docket number field to access the document. For assistance, call toll-free 1–866–208–3372. Kimberly D. Bose, Secretary. [FR Doc. E9–10101 Filed 5–1–09; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. ER09–1020–000] Panoche Energy Center, LLC; Supplemental Notice That Initial Market-Based Rate Filing Includes Request for Blanket Section 204 Authorization April 24, 2009. This is a supplemental notice in the above-referenced proceeding of Panoche Energy Center, LLC’s application for market-based rate authority, with an accompanying rate tariff, noting that such application includes a request for blanket authorization, under 18 CFR part 34, of future issuances of securities and assumptions of liability. Any person desiring to intervene or to protest should file with the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC, 20426, in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Anyone filing a motion to intervene or protest must serve a copy of that document on the Applicant. Notice is hereby given that the deadline for filing protests with regard to the applicant’s request for blanket authorization, under 18 CFR part 34, of future issuances of securities and E:\FR\FM\04MYN1.SGM 04MYN1

Agencies

[Federal Register Volume 74, Number 84 (Monday, May 4, 2009)]
[Notices]
[Page 20475]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E9-10101]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 13372-000]


Hydrodynamics, Inc.; Notice of Preliminary Permit Application 
Accepted for Filing and Soliciting Comments, Motions To Intervene, and 
Competing Applications

April 23, 2009.
    On February 11, 2009, Hydrodynamics, Inc. filed an application for 
a preliminary permit, pursuant to section 4(f) of the Federal Power 
Act, proposing to study the feasibility of the Tongue River Reservoir 
Hydroelectric Project, which would be located at the existing Tongue 
River Reservoir dam on the Tongue River near the town of Decker in 
Bighorn County, Montana. The sole purpose of a preliminary permit, if 
issued, is to grant the permit holder priority to file a license 
application during the permit term. A preliminary permit does not 
authorize the permit holder to perform any land disturbing activities 
or otherwise enter upon lands or waters owned by others without the 
owners' express permission.
    The proposed project would consist of the following:
    (1) An existing 1,824-foot-long, 91-foot-high earthen dam; (2) an 
existing reservoir with a surface area of 3,700 acres and a storage 
capacity of 79,071 acre-feet at the normal water surface elevation of 
3,138 feet mean sea level; (3) an existing concrete outlet works 
tunnel, which would be lined with steel; (4) a new 84-inch, 520-foot-
long steel penstock in the tunnel; (5) a new 40-foot-long penstock 
extending from the tunnel to the powerhouse; (6) a new powerhouse 
containing two generating units with a combined installed capacity of 
2.0 megawatts; (7) a new tailrace discharging flows into the Tongue 
River at the base of the dam; (8) a new substation; (9) a new 125-
kilovolt, 8.5-mile-long transmission line; and (10) appurtenant 
facilities. The proposed project would have an average annual 
generation of 11.0 gigawatt-hours.
    Applicant Contact: Ben Singer, Project Manager, Hydrodynamics, 
Inc., P.O. Box 1136, Bozeman, MT 59771; phone: (406) 587-5086.
    FERC Contact: Dianne Rodman, (202) 502-6077.
    Deadline for filing comments, motions to intervene, competing 
applications (without notices of intent), or notices of intent to file 
competing applications: 60 days from the issuance of this notice. 
Comments, motions to intervene, notices of intent, and competing 
applications may be filed electronically via the Internet. See 18 CFR 
385.2001(a)(1)(iii) and the instructions on the Commission's Web site 
under the ``e-Filing'' link. If unable to be filed electronically, 
documents may be paper-filed. To paper-file, an original and eight 
copies should be mailed to: Kimberly D. Bose, Secretary, Federal Energy 
Regulatory Commission, 888 First Street, NE., Washington, DC 20426. For 
more information on how to submit these types of filings please go to 
the Commission's Web site located at https://www.ferc.gov/filing-comments.asp. More information about this project, including a copy of 
the application, can be viewed or printed on the ``eLibrary'' link of 
Commission's Web site at https://www.ferc.gov/docs-filing/elibrary.asp. 
Enter the docket number (P-13373) in the docket number field to access 
the document. For assistance, call toll-free 1-866-208-3372.

Kimberly D. Bose,
Secretary.