Drawbridge Operation Regulations; Hackensack River, Jersey City, NJ, Maintenance, 19421 [E9-9717]
Download as PDF
Federal Register / Vol. 74, No. 81 / Wednesday, April 29, 2009 / Rules and Regulations
holding period through your
TreasuryDirect® account.
(2) Savings bond of any series
registered in the coowner form of
registration. The converting coowner
may redeem the converted savings bond
of any series registered in the coowner
form of registration at any time prior to
final maturity after the minimum
holding period through his or her
TreasuryDirect account. * * *
(b) Upon final maturity—(1) Savings
bond of any series registered in the
single owner, owner with beneficiary,
coowner, or entity forms of registration.
If you have not previously redeemed or
transferred your converted savings bond
of any series registered in the single
owner, owner with beneficiary,
coowner, or entity forms of registration,
it will be automatically redeemed for
you at final maturity.
*
*
*
*
*
29. Amend § 363.206 by revising
paragraph (c) to read as follows:
■
§ 363.206 How can I transfer my
marketable Treasury security into my
TreasuryDirect® account from another
book-entry system?
*
*
*
*
*
(c)(1) Individuals. When a security is
transferred into the TreasuryDirect
account of an individual, it will be
transferred in the name of the
individual account owner in the single
owner form of registration, regardless of
the form of registration prior to the
transfer. After the transfer is completed,
you can change the registration to any
form of registration permitted by these
regulations.
(2) Entities. When a security is
transferred into the TreasuryDirect
account of an entity, the security will be
transferred in the name of the entity,
regardless of the form of registration
prior to the transfer.
*
*
*
*
*
Dated: April 22, 2009.
Kenneth E. Carfine,
Fiscal Assistant Secretary.
[FR Doc. E9–9630 Filed 4–24–09; 11:15 am]
tjames on PRODPC75 with RULES
BILLING CODE 4810–39–P
VerDate Nov<24>2008
15:08 Apr 28, 2009
Jkt 217001
DEPARTMENT OF HOMELAND
SECURITY
Coast Guard
33 CFR Part 117
[USCG–2009–0210]
Drawbridge Operation Regulations;
Hackensack River, Jersey City, NJ,
Maintenance
Coast Guard, DHS.
Notice of temporary deviation
from regulations.
AGENCY:
ACTION:
SUMMARY: The Commander, First Coast
Guard District, has issued a temporary
deviation from the regulation governing
the operation of the Witt Penn Bridge
across the Hackensack River at mile 3.1,
and the Lower Hack Bridge at mile 3.4,
across the Hackensack River, at Jersey
City, New Jersey. Under this temporary
deviation the Lower Hack Bridge will be
allowed to provide a maximum opening
of only 110 feet at mean high water for
a period of 30-days and both bridges
will be allowed to remain in the closed
position for a period of 45-days to
facilitate major bridge maintenance.
Vessels that can pass under the draws
without a bridge opening may do so at
all times.
DATES: This deviation is effective from
May 9, 2009 through July 22, 2009.
ADDRESSES: Documents indicated in this
preamble as being available in the
docket are part of docket USCG–2009–
0210 and are available online at
www.regulations.gov, selecting the
Advanced Docket Search Option on the
right side of the screen, inserting USCG–
2009–0210 in the Docket ID box,
pressing Enter, and then clicking on the
item in the Docket ID column. This
material is also available for inspection
or copying at the Docket Management
Facility (M–30), U.S. Department of
Transportation, West Building Ground
Floor, Room W12–140, 1200 New Jersey
Avenue, SE., Washington, DC 20590,
between 9 a.m. and 5 p.m., Monday
through Friday, except Federal holidays.
FOR FURTHER INFORMATION CONTACT: If
you have questions on this rule, call
Zachary Strauss, Project Officer, First
Coast Guard District, telephone 212–
668–7165. If you have questions on
viewing the docket, call Renee V.
Wright, Program Manager, Docket
Operations, telephone 202–366–9826.
SUPPLEMENTARY INFORMATION: The Witt
Penn Bridge, across the Hackensack
River at mile 3.1 has a vertical clearance
in the closed position of 35 feet at mean
high water and 40 feet at mean low
water.
PO 00000
Frm 00049
Fmt 4700
Sfmt 4700
19421
The Lower Hack Bridge at mile 3.4
has a vertical clearance in the closed
position of 40 feet above mean high
water and 45 feet above low water. The
existing drawbridge operation
regulations are listed at 33 CFR 117.723.
The waterway has seasonal
recreational vessels, and commercial
vessels of various sizes.
The owner of the bridges, New Jersey
Department of Transportation, (Witt
Penn Bridge) and New Jersey Transit
(Lower Hack Bridge) requested a
temporary deviation to facilitate the
replacement of sheaves and wire ropes
at both the Witt Penn and Lower Hack
bridges and asbestos removal at the
Lower Hack Bridge only.
The asbestos removal at the Lower
Hack Bridge will prevent the bridge
from fully opening during the removal
process.
The asbestos removal is scheduled to
commence 30-days before the bridge
closures to replace the sheaves and wire
ropes at the bridges.
The Lower Hack Bridge will only be
able to open to 110 feet above mean
high water and 115 feet at mean low
water from May 9, 2009 through June 7,
2009, during the asbestos removal.
Therefore, under this temporary
deviation the Lower Hack Bridge may
open to only 110 feet above mean high
water instead of the normal 135 feet
above mean high water from May 9,
2009 through June 7, 2009. From June
8, 2009 through July 22, 2009, the Witt
Penn Bridge, mile 3.1, and the Lower
Hack Bridge, mile 3.4, across the
Hackensack River may remain in the
closed position for bridge maintenance.
Vessels that can pass under the bridge
without a bridge opening may do so at
all times.
In accordance with 33 CFR 117.35(e),
the bridge must return to its regular
operating schedule immediately at the
end of the designated time period. This
deviation from the operating regulations
is authorized under 33 CFR 117.35.
Dated: April 13, 2009.
Gary Kassof,
Bridge Program Manager, First Coast Guard
District.
[FR Doc. E9–9717 Filed 4–28–09; 8:45 am]
BILLING CODE 4910–15–P
E:\FR\FM\29APR1.SGM
29APR1
Agencies
[Federal Register Volume 74, Number 81 (Wednesday, April 29, 2009)]
[Rules and Regulations]
[Page 19421]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E9-9717]
=======================================================================
-----------------------------------------------------------------------
DEPARTMENT OF HOMELAND SECURITY
Coast Guard
33 CFR Part 117
[USCG-2009-0210]
Drawbridge Operation Regulations; Hackensack River, Jersey City,
NJ, Maintenance
AGENCY: Coast Guard, DHS.
ACTION: Notice of temporary deviation from regulations.
-----------------------------------------------------------------------
SUMMARY: The Commander, First Coast Guard District, has issued a
temporary deviation from the regulation governing the operation of the
Witt Penn Bridge across the Hackensack River at mile 3.1, and the Lower
Hack Bridge at mile 3.4, across the Hackensack River, at Jersey City,
New Jersey. Under this temporary deviation the Lower Hack Bridge will
be allowed to provide a maximum opening of only 110 feet at mean high
water for a period of 30-days and both bridges will be allowed to
remain in the closed position for a period of 45-days to facilitate
major bridge maintenance. Vessels that can pass under the draws without
a bridge opening may do so at all times.
DATES: This deviation is effective from May 9, 2009 through July 22,
2009.
ADDRESSES: Documents indicated in this preamble as being available in
the docket are part of docket USCG-2009-0210 and are available online
at www.regulations.gov, selecting the Advanced Docket Search Option on
the right side of the screen, inserting USCG-2009-0210 in the Docket ID
box, pressing Enter, and then clicking on the item in the Docket ID
column. This material is also available for inspection or copying at
the Docket Management Facility (M-30), U.S. Department of
Transportation, West Building Ground Floor, Room W12-140, 1200 New
Jersey Avenue, SE., Washington, DC 20590, between 9 a.m. and 5 p.m.,
Monday through Friday, except Federal holidays.
FOR FURTHER INFORMATION CONTACT: If you have questions on this rule,
call Zachary Strauss, Project Officer, First Coast Guard District,
telephone 212-668-7165. If you have questions on viewing the docket,
call Renee V. Wright, Program Manager, Docket Operations, telephone
202-366-9826.
SUPPLEMENTARY INFORMATION: The Witt Penn Bridge, across the Hackensack
River at mile 3.1 has a vertical clearance in the closed position of 35
feet at mean high water and 40 feet at mean low water.
The Lower Hack Bridge at mile 3.4 has a vertical clearance in the
closed position of 40 feet above mean high water and 45 feet above low
water. The existing drawbridge operation regulations are listed at 33
CFR 117.723.
The waterway has seasonal recreational vessels, and commercial
vessels of various sizes.
The owner of the bridges, New Jersey Department of Transportation,
(Witt Penn Bridge) and New Jersey Transit (Lower Hack Bridge) requested
a temporary deviation to facilitate the replacement of sheaves and wire
ropes at both the Witt Penn and Lower Hack bridges and asbestos removal
at the Lower Hack Bridge only.
The asbestos removal at the Lower Hack Bridge will prevent the
bridge from fully opening during the removal process.
The asbestos removal is scheduled to commence 30-days before the
bridge closures to replace the sheaves and wire ropes at the bridges.
The Lower Hack Bridge will only be able to open to 110 feet above
mean high water and 115 feet at mean low water from May 9, 2009 through
June 7, 2009, during the asbestos removal.
Therefore, under this temporary deviation the Lower Hack Bridge may
open to only 110 feet above mean high water instead of the normal 135
feet above mean high water from May 9, 2009 through June 7, 2009. From
June 8, 2009 through July 22, 2009, the Witt Penn Bridge, mile 3.1, and
the Lower Hack Bridge, mile 3.4, across the Hackensack River may remain
in the closed position for bridge maintenance. Vessels that can pass
under the bridge without a bridge opening may do so at all times.
In accordance with 33 CFR 117.35(e), the bridge must return to its
regular operating schedule immediately at the end of the designated
time period. This deviation from the operating regulations is
authorized under 33 CFR 117.35.
Dated: April 13, 2009.
Gary Kassof,
Bridge Program Manager, First Coast Guard District.