Federal Register / Vol. 74, No. 81 / Wednesday, April 29, 2009 / Notices
The Power Generation Station consists
of three internal combustion engine/
generators, each rated at 2.15 MW
capacity for total capacity of 6.45 MW.
The dual fuel engines operate primarily
on biogas (from anaerobic digestion),
however a small amount (<1% total
fuel) is used for pre-combustion
ignition. This location of the facility is
located at 2020 Wake Avenue, Oakland,
California.
Pacific Gas & Electric (PG&E) is the
electric utility to which the facility
interconnects. Generation is used
primarily to meet on-site demand for
wastewater treatment (distribution
generation), however, any surplus is
sold to PG&E. The Western Area Power
Administration provides supplemental
power to the wastewater plant, wheeled
via the PG&E distribution system.
A notice of self-certification does not
institute a proceeding regarding
qualifying facility status; a notice of selfcertification provides notice that the
entity making the filing has determined
the Facility meets the applicable criteria
to be a qualifying facility. Any person
seeking to challenge such qualifying
facility status may do so by filing a
motion pursuant to 18 CFR
292.207(d)(iii).
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Kimberly D. Bose,
Secretary.
[FR Doc. E9–9707 Filed 4–28–09; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. ER09–993–000]
pwalker on PROD1PC71 with NOTICES
Lake Cogen, Ltd.; Supplemental Notice
That Initial Market-Based Rate Filing
Includes Request for Blanket Section
204 Authorization
April 22, 2009.
This is a supplemental notice in the
above-referenced proceeding of Lake
Cogen, Ltd.’s application for marketbased rate authority, with an
VerDate Nov<24>2008
17:48 Apr 28, 2009
Jkt 217001
accompanying rate tariff, noting that
such application includes a request for
blanket authorization, under 18 CFR
part 34, of future issuances of securities
and assumptions of liability.
Any person desiring to intervene or to
protest should file with the Federal
Energy Regulatory Commission, 888
First Street, NE., Washington, DC 20426,
in accordance with Rules 211 and 214
of the Commission’s Rules of Practice
and Procedure (18 CFR 385.211 and
385.214). Anyone filing a motion to
intervene or protest must serve a copy
of that document on the Applicant.
Notice is hereby given that the
deadline for filing protests with regard
to the applicant’s request for blanket
authorization, under 18 CFR part 34, of
future issuances of securities and
assumptions of liability, is May 12,
2009.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with Internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
should submit an original and 14 copies
of the intervention or protest to the
Federal Energy Regulatory Commission,
888 First St., NE., Washington, DC
20426.
The filings in the above-referenced
proceeding are accessible in the
Commission’s eLibrary system by
clicking on the appropriate link in the
above list. They are also available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an eSubscription link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
dockets(s). For assistance with any
FERC Online service, please e-mail
FERCOnlineSupport@ferc.gov. or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Kimberly D. Bose,
Secretary.
[FR Doc. E9–9708 Filed 4–28–09; 8:45 am]
BILLING CODE 6717–01–P
PO 00000
Frm 00072
Fmt 4703
Sfmt 4703
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP09–150–000]
CenterPoint Energy Gas Transmission
Company; Notice of Request Under
Blanket Authorization
April 22, 2009.
Take notice that on April 14, 2009,
CenterPoint Energy Gas Transmission
Company (CEGT), 1111 Louisiana Street
Houston, TX 77002, filed a prior notice
request pursuant to Part 157.205 of the
Commission’s regulations under the
Natural Gas Act (NGA) for authorization
to abandon by sale CEGT’s Line HM–36
located in Ouachita Parish, Louisiana,
all as more fully set forth in the
application, which is on file with the
Commission and open to public
inspection. The filing may also be
viewed on the web at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
assistance, contact FERC at
FERCOnlineSupport@ferc.gov or call
toll-free, (866) 208–3676 or TTY, (202)
502–8659.
Specifically, CEGT requests
authorization to abandon by sale and
transfer to CenterPoint Energy Louisiana
Gas (Louisiana Gas), Line HM–36 in its
entirety. Line HM–36 is composed of
approximately 262 feet of 2-inch
diameter steel pipe and is currently
operated at 375 psig to deliver gas to a
Louisiana Gas distribution system rural
extension.
Any questions regarding the
application should be directed to
Lawrence O. Thomas, Director, Rate &
Regulatory, CenterPoint Energy Gas
Transmission Company, PO Box 21734
Shreveport, LA 71151, phone: (318)
429–2804, fax: (318) 429–3133, e-mail:
larry.thomas@centerpointenergy.com.
Any person may, within 60 days after
the issuance of the instant notice by the
Commission, file pursuant to Rule 214
of the Commission’s Procedural Rules
(18 CFR 385.214) a motion to intervene
or notice of intervention. Any person
filing to intervene or the Commission’s
staff may, pursuant to section 157.205 of
the Commission’s Regulations under the
Natural Gas Act (NGA) (18 CFR 157.205)
file a protest to the request. If no protest
is filed within the time allowed
therefore, the proposed activity shall be
deemed to be authorized effective the
day after the time allowed for protest. If
a protest is filed and not withdrawn
within 30 days after the time allowed
for filing a protest, the instant request
E:\FR\FM\29APN1.SGM
29APN1
Agencies
[Federal Register Volume 74, Number 81 (Wednesday, April 29, 2009)]
[Notices]
[Page 19556]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E9-9708]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. ER09-993-000]
Lake Cogen, Ltd.; Supplemental Notice That Initial Market-Based
Rate Filing Includes Request for Blanket Section 204 Authorization
April 22, 2009.
This is a supplemental notice in the above-referenced proceeding of
Lake Cogen, Ltd.'s application for market-based rate authority, with an
accompanying rate tariff, noting that such application includes a
request for blanket authorization, under 18 CFR part 34, of future
issuances of securities and assumptions of liability.
Any person desiring to intervene or to protest should file with the
Federal Energy Regulatory Commission, 888 First Street, NE.,
Washington, DC 20426, in accordance with Rules 211 and 214 of the
Commission's Rules of Practice and Procedure (18 CFR 385.211 and
385.214). Anyone filing a motion to intervene or protest must serve a
copy of that document on the Applicant.
Notice is hereby given that the deadline for filing protests with
regard to the applicant's request for blanket authorization, under 18
CFR part 34, of future issuances of securities and assumptions of
liability, is May 12, 2009.
The Commission encourages electronic submission of protests and
interventions in lieu of paper, using the FERC Online links at https://www.ferc.gov. To facilitate electronic service, persons with Internet
access who will eFile a document and/or be listed as a contact for an
intervenor must create and validate an eRegistration account using the
eRegistration link. Select the eFiling link to log on and submit the
intervention or protests.
Persons unable to file electronically should submit an original and
14 copies of the intervention or protest to the Federal Energy
Regulatory Commission, 888 First St., NE., Washington, DC 20426.
The filings in the above-referenced proceeding are accessible in
the Commission's eLibrary system by clicking on the appropriate link in
the above list. They are also available for review in the Commission's
Public Reference Room in Washington, DC. There is an eSubscription link
on the Web site that enables subscribers to receive e-mail notification
when a document is added to a subscribed dockets(s). For assistance
with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov.
or call (866) 208-3676 (toll free). For TTY, call (202) 502-8659.
Kimberly D. Bose,