Kinder Morgan Interstate Gas Transmission LLC; Notice of Intent To Prepare an Environmental Assessment for the Proposed Kinder Morgan Huntsman Storage Expansion Project and Request for Comments on Environmental Issues, 19077-19078 [E9-9543]

Download as PDF Federal Register / Vol. 74, No. 79 / Monday, April 27, 2009 / Notices The filings in the above proceedings are accessible in the Commission’s eLibrary system by clicking on the appropriate link in the above list. They are also available for review in the Commission’s Public Reference Room in Washington, DC. There is an eSubscription link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please email FERCOnlineSupport@ferc.gov or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. E9–9502 Filed 4–24–09; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP09–109–000] Kinder Morgan Interstate Gas Transmission LLC; Notice of Intent To Prepare an Environmental Assessment for the Proposed Kinder Morgan Huntsman Storage Expansion Project and Request for Comments on Environmental Issues pwalker on PROD1PC71 with NOTICES April 20, 2009. The staff of the Federal Energy Regulatory Commission (FERC or Commission) will prepare an environmental assessment (EA) that will discuss the environmental impacts of the Huntsman Storage Expansion Project involving construction and operation of facilities by Kinder Morgan Interstate Gas Transmission LLC (Kinder Morgan) in Cheyenne County, Nebraska. This EA will be used by the Commission in its decision-making process to determine whether the project is in the public convenience and necessity. This notice announces the opening of the scoping process we will use to gather input from the public and interested agencies on the project. Your input will help the Commission staff determine which issues need to be evaluated in the EA. Please note that the scoping period will close on May 20, 2009. This notice is being sent to affected landowners; Federal, State, and local government representatives and agencies; elected officials; environmental and public interest groups; Native American Tribes; other interested parties; and local libraries and newspapers. State and local VerDate Nov<24>2008 15:55 Apr 24, 2009 Jkt 217001 government representatives are asked to notify their constituents of this planned project and encourage them to comment on their areas of concern. If you are a landowner receiving this notice, you may be contacted by a Kinder Morgan representative about survey permission and/or the acquisition of an easement to construct, operate, and maintain the proposed facilities. The company would seek to negotiate a mutually acceptable agreement. However, if the project is approved by the Commission, that approval conveys with it the right of eminent domain. Therefore, if easement negotiations fail to produce an agreement, the natural gas company could initiate condemnation proceedings in accordance with State law. A fact sheet prepared by the FERC entitled ‘‘An Interstate Natural Gas Facility On My Land? What Do I Need To Know?’’ is available for viewing on the FERC Web site (https:// www.ferc.gov). This fact sheet addresses a number of typically asked questions, including the use of eminent domain and how to participate in the Commission’s proceedings. It is available for viewing on the FERC Internet Web site (https://www.ferc.gov). Summary of the Proposed Project Kinder Morgan proposes to construct and modify its existing Huntsman Storage Facility. Kinder Morgan says that the completion of the Huntsman Ridge Expansion Project would benefit the Rocky Mountain region by meeting the immediate and long-term needs of the region as well as providing flexibility in managing and storing gas supplies. Kinder Morgan is proposing to: • Abandon in place two 1,200 foot sections of 8-inch diameter pipeline; • Install two injection/withdrawal wells; • Rework two existing injection/ withdrawal wells; • Install various ancillary facilities including a 400 bbl tank, pig receivers, a slug catcher, and a gas cooler; and • Install 2,000 feet of 12-inch diameter pipeline. The general location of the project facilities is shown in Appendix 1.1 1 The appendices referenced in this notice are not being printed in the Federal Register. Copies of all appendices are available on the Commission’s Web site at the ‘‘eLibrary’’ link or from the Commission’s Public Reference Room, 888 First Street, NE., Washington, DC 20426, or call (202) 502–8371. For instructions on connecting to eLibrary, refer to the last page of this notice. Copies of the appendices were sent to all those receiving this notice in the mail. PO 00000 Frm 00040 Fmt 4703 Sfmt 4703 19077 If approved, Kinder Morgan proposes to commence construction of the proposed facilities in October 2009, with an in-service date of mid-year 2010. Land Requirements for Construction Construction and renovation of the Huntsman Storage Facility would impact about 15.6 temporary acres where 0.8 acres would be permanently impacted. All land disturbances would occur entirely on private lands. Kinder Morgan is proposing to utilize existing access roads for the proposed project. No land disturbance would be required for additional access roads. The EA Process The National Environmental Policy Act (NEPA) requires the Commission to take into account the environmental impacts that could result from an action whenever it considers the issuance of a Certificate of Public Convenience and Necessity. NEPA also requires us to discover and address concerns the public may have about proposals. This process is referred to as ‘‘scoping.’’ The main goal of the scoping process is to focus the analysis in the EA on the important environmental issues. By this Notice of Intent, the Commission staff requests public comments on the scope of the issues to address in the EA. All comments received are considered during the preparation of the EA. State and local government representatives are encouraged to notify their constituents of this proposed action and encourage them to comment on their areas of concern. In the EA we 2 will discuss impacts that could occur as a result of the construction and operation of the proposed project under these general headings: • Geology and soils, • Land use, • Water resources, fisheries, and wetlands, • Cultural resources, • Vegetation and wildlife, • Air quality and noise, • Endangered and threatened species, • Public safety. We will also evaluate possible alternatives to the proposed project or portions of the project, and make recommendations on how to lessen or avoid impacts on the various resource areas. Our independent analysis of the issues will be in the EA. Depending on the comments received during the 2 ‘‘We’’, ‘‘us’’, and ‘‘our’’ refer to the environmental staff of the Office of Energy Projects (OEP). E:\FR\FM\27APN1.SGM 27APN1 19078 Federal Register / Vol. 74, No. 79 / Monday, April 27, 2009 / Notices scoping process, the EA may be published and mailed to Federal, State, and local agencies, public interest groups, interested individuals, affected landowners, newspapers, libraries, and the Commission’s official service list for this proceeding. A comment period will be allotted for review if the EA is published. We will consider all comments on the EA before we make our recommendations to the Commission. To ensure your comments are considered, please carefully follow the instructions in the public participation section below. With this NOI, we are asking Federal, State, and local agencies with jurisdiction and/or special expertise with respect to environmental issues to formally cooperate with us in the preparation of the EA. These agencies may choose to participate once they have evaluated the proposal relative to their responsibilities. Additional agencies that would like to request cooperating agency status should follow the instructions for filing comments provided under the Public Participation section of this NOI. pwalker on PROD1PC71 with NOTICES Currently Identified Environmental Issues We have already identified an issue that we think deserves attention based on a preliminary review of the proposed facilities and the environmental information provided by Kinder Morgan. This preliminary list of issues may be changed based on your comments and our analysis. • Potential impacts may occur to the whooping crane, black-footed ferret, spectaclecase, burrowing owl, swift fox, and mountain plover. Public Participation You can make a difference by providing us with your specific comments or concerns about the Huntsman Ridge Expansion Project. Your comments should focus on the potential environmental effects, reasonable alternatives, and measures to avoid or lessen environmental impacts. The more specific your comments, the more useful they will be. To ensure that your comments are timely and properly recorded, please send in your comments so that they will be received in Washington, DC on or before May 20, 2009. For your convenience, there are three methods which you can use to submit your comments to the Commission. In all instances please reference the project docket number CP09–109–000 with your submission. The docket number can be found on the front of this notice. The Commission encourages electronic VerDate Nov<24>2008 17:28 Apr 24, 2009 Jkt 217001 filing of comments and has dedicated eFiling expert staff available to assist you at 202–502–8258 or efiling@ferc.gov. (1) You may file your comments electronically by using the Quick Comment feature, which is located on the Commission’s Internet Web site at https://www.ferc.gov under the link to Documents and Filings. A Quick Comment is an easy method for interested persons to submit text-only comments on a project; (2) You may file your comments electronically by using the eFiling feature, which is located on the Commission’s Internet Web site at https://www.ferc.gov under the link to Documents and Filings. eFiling involves preparing your submission in the same manner as you would if filing on paper, and then saving the file on your computer’s hard drive. You will attach that file as your submission. New eFiling users must first create an account by clicking on ‘‘Sign up’’ or ‘‘eRegister.’’ You will be asked to select the type of filing you are making. A comment on a particular project is considered a ‘‘Comment on a Filing;’’ or (3) You may file your comments via mail to the Commission by sending an original and two copies of your letter to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First St., NE., Room 1A, Washington, DC 20426; Label one copy of the comments for the attention of Gas Branch 2, PJ11.2. Environmental Mailing List An effort is being made to send this notice to all individuals, organizations, and government entities interested in and/or potentially affected by the proposed project. This includes all landowners who are potential right-ofway grantors, whose property may be used temporarily for project purposes, or who own homes within distances defined in the Commission’s regulations of certain aboveground facilities. If you do not want to send comments at this time but still want to remain on our mailing list, please return the Information Request (Appendix 2). If you do not return the Information Request, you will be taken off the mailing list. Becoming an Intervenor In addition to involvement in the EA scoping process, you may want to become an ‘‘intervenor,’’ which is an official party to the proceeding. Intervenors play a more formal role in the process and are able to file briefs, appear at hearings, and be heard by the courts if they choose to appeal the PO 00000 Frm 00041 Fmt 4703 Sfmt 4703 Commission’s final ruling. An intervenor formally participates in a Commission proceeding by filing a request to intervene. Instructions for becoming an intervenor are included in the User’s Guide under the ‘‘e-filing’’ link on the Commission’s Web site. Additional Information Additional information about the project is available from the Commission’s Office of External Affairs, at 1–866–208–FERC or on the FERC Internet Web site (https://www.ferc.gov) using the eLibrary link. Click on the eLibrary link, click on ‘‘General Search’’ and enter the docket number excluding the last three digits in the Docket Number field. Be sure you have selected an appropriate date range. For assistance, please contact FERC Online Support at FercOnlineSupport@ferc.gov or toll free at 1–866–208–3676, or for TTY, contact (202) 502–8659. The eLibrary link also provides access to the texts of formal documents issued by the Commission, such as orders, notices, and rulemakings. In addition, the Commission now offers a free service called eSubscription which allows you to keep track of all formal issuances and submittals in specific dockets. This can reduce the amount of time you spend researching proceedings by automatically providing you with notification of these filings, document summaries and direct links to the documents. Go to https:// www.ferc.gov/esubscribenow.htm. Finally, public meetings or site visits will be posted on the Commission’s calendar located at https://www.ferc.gov/ EventCalendar/EventsList.aspx along with other related information. Kimberly D. Bose, Secretary. [FR Doc. E9–9543 Filed 4–24–09; 8:45 am] BILLING CODE P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket Nos. ER06–615–000, ER07–1257– 000, ER08–1113–000, ER08–1178–000, ER09–241–000] California Independent System Operator Corporation; Notice of FERC Staff Attendance April 20, 2009. The Federal Energy Regulatory Commission (Commission) hereby gives notice that on the following dates members of its staff will participate in teleconferences and meetings to be E:\FR\FM\27APN1.SGM 27APN1

Agencies

[Federal Register Volume 74, Number 79 (Monday, April 27, 2009)]
[Notices]
[Pages 19077-19078]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E9-9543]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. CP09-109-000]


Kinder Morgan Interstate Gas Transmission LLC; Notice of Intent 
To Prepare an Environmental Assessment for the Proposed Kinder Morgan 
Huntsman Storage Expansion Project and Request for Comments on 
Environmental Issues

April 20, 2009.
    The staff of the Federal Energy Regulatory Commission (FERC or 
Commission) will prepare an environmental assessment (EA) that will 
discuss the environmental impacts of the Huntsman Storage Expansion 
Project involving construction and operation of facilities by Kinder 
Morgan Interstate Gas Transmission LLC (Kinder Morgan) in Cheyenne 
County, Nebraska. This EA will be used by the Commission in its 
decision-making process to determine whether the project is in the 
public convenience and necessity.
    This notice announces the opening of the scoping process we will 
use to gather input from the public and interested agencies on the 
project. Your input will help the Commission staff determine which 
issues need to be evaluated in the EA. Please note that the scoping 
period will close on May 20, 2009.
    This notice is being sent to affected landowners; Federal, State, 
and local government representatives and agencies; elected officials; 
environmental and public interest groups; Native American Tribes; other 
interested parties; and local libraries and newspapers. State and local 
government representatives are asked to notify their constituents of 
this planned project and encourage them to comment on their areas of 
concern.
    If you are a landowner receiving this notice, you may be contacted 
by a Kinder Morgan representative about survey permission and/or the 
acquisition of an easement to construct, operate, and maintain the 
proposed facilities. The company would seek to negotiate a mutually 
acceptable agreement. However, if the project is approved by the 
Commission, that approval conveys with it the right of eminent domain. 
Therefore, if easement negotiations fail to produce an agreement, the 
natural gas company could initiate condemnation proceedings in 
accordance with State law.
    A fact sheet prepared by the FERC entitled ``An Interstate Natural 
Gas Facility On My Land? What Do I Need To Know?'' is available for 
viewing on the FERC Web site (https://www.ferc.gov). This fact sheet 
addresses a number of typically asked questions, including the use of 
eminent domain and how to participate in the Commission's proceedings. 
It is available for viewing on the FERC Internet Web site (https://www.ferc.gov).

Summary of the Proposed Project

    Kinder Morgan proposes to construct and modify its existing 
Huntsman Storage Facility. Kinder Morgan says that the completion of 
the Huntsman Ridge Expansion Project would benefit the Rocky Mountain 
region by meeting the immediate and long-term needs of the region as 
well as providing flexibility in managing and storing gas supplies.
    Kinder Morgan is proposing to:
     Abandon in place two 1,200 foot sections of 8-inch 
diameter pipeline;
     Install two injection/withdrawal wells;
     Rework two existing injection/withdrawal wells;
     Install various ancillary facilities including a 400 bbl 
tank, pig receivers, a slug catcher, and a gas cooler; and
     Install 2,000 feet of 12-inch diameter pipeline.
    The general location of the project facilities is shown in Appendix 
1.\1\
---------------------------------------------------------------------------

    \1\ The appendices referenced in this notice are not being 
printed in the Federal Register. Copies of all appendices are 
available on the Commission's Web site at the ``eLibrary'' link or 
from the Commission's Public Reference Room, 888 First Street, NE., 
Washington, DC 20426, or call (202) 502-8371. For instructions on 
connecting to eLibrary, refer to the last page of this notice. 
Copies of the appendices were sent to all those receiving this 
notice in the mail.
---------------------------------------------------------------------------

    If approved, Kinder Morgan proposes to commence construction of the 
proposed facilities in October 2009, with an in-service date of mid-
year 2010.

Land Requirements for Construction

    Construction and renovation of the Huntsman Storage Facility would 
impact about 15.6 temporary acres where 0.8 acres would be permanently 
impacted. All land disturbances would occur entirely on private lands.
    Kinder Morgan is proposing to utilize existing access roads for the 
proposed project. No land disturbance would be required for additional 
access roads.

The EA Process

    The National Environmental Policy Act (NEPA) requires the 
Commission to take into account the environmental impacts that could 
result from an action whenever it considers the issuance of a 
Certificate of Public Convenience and Necessity. NEPA also requires us 
to discover and address concerns the public may have about proposals. 
This process is referred to as ``scoping.'' The main goal of the 
scoping process is to focus the analysis in the EA on the important 
environmental issues. By this Notice of Intent, the Commission staff 
requests public comments on the scope of the issues to address in the 
EA. All comments received are considered during the preparation of the 
EA. State and local government representatives are encouraged to notify 
their constituents of this proposed action and encourage them to 
comment on their areas of concern.
    In the EA we \2\ will discuss impacts that could occur as a result 
of the construction and operation of the proposed project under these 
general headings:
---------------------------------------------------------------------------

    \2\ ``We'', ``us'', and ``our'' refer to the environmental staff 
of the Office of Energy Projects (OEP).
---------------------------------------------------------------------------

     Geology and soils,
     Land use,
     Water resources, fisheries, and wetlands,
     Cultural resources,
     Vegetation and wildlife,
     Air quality and noise,
     Endangered and threatened species,
     Public safety.
    We will also evaluate possible alternatives to the proposed project 
or portions of the project, and make recommendations on how to lessen 
or avoid impacts on the various resource areas.
    Our independent analysis of the issues will be in the EA. Depending 
on the comments received during the

[[Page 19078]]

scoping process, the EA may be published and mailed to Federal, State, 
and local agencies, public interest groups, interested individuals, 
affected landowners, newspapers, libraries, and the Commission's 
official service list for this proceeding. A comment period will be 
allotted for review if the EA is published. We will consider all 
comments on the EA before we make our recommendations to the 
Commission. To ensure your comments are considered, please carefully 
follow the instructions in the public participation section below.
    With this NOI, we are asking Federal, State, and local agencies 
with jurisdiction and/or special expertise with respect to 
environmental issues to formally cooperate with us in the preparation 
of the EA. These agencies may choose to participate once they have 
evaluated the proposal relative to their responsibilities. Additional 
agencies that would like to request cooperating agency status should 
follow the instructions for filing comments provided under the Public 
Participation section of this NOI.

Currently Identified Environmental Issues

    We have already identified an issue that we think deserves 
attention based on a preliminary review of the proposed facilities and 
the environmental information provided by Kinder Morgan. This 
preliminary list of issues may be changed based on your comments and 
our analysis.
     Potential impacts may occur to the whooping crane, black-
footed ferret, spectaclecase, burrowing owl, swift fox, and mountain 
plover.

Public Participation

    You can make a difference by providing us with your specific 
comments or concerns about the Huntsman Ridge Expansion Project. Your 
comments should focus on the potential environmental effects, 
reasonable alternatives, and measures to avoid or lessen environmental 
impacts. The more specific your comments, the more useful they will be. 
To ensure that your comments are timely and properly recorded, please 
send in your comments so that they will be received in Washington, DC 
on or before May 20, 2009.
    For your convenience, there are three methods which you can use to 
submit your comments to the Commission. In all instances please 
reference the project docket number CP09-109-000 with your submission. 
The docket number can be found on the front of this notice. The 
Commission encourages electronic filing of comments and has dedicated 
eFiling expert staff available to assist you at 202-502-8258 or 
efiling@ferc.gov.
    (1) You may file your comments electronically by using the Quick 
Comment feature, which is located on the Commission's Internet Web site 
at https://www.ferc.gov under the link to Documents and Filings. A Quick 
Comment is an easy method for interested persons to submit text-only 
comments on a project;
    (2) You may file your comments electronically by using the eFiling 
feature, which is located on the Commission's Internet Web site at  
https://www.ferc.gov under the link to Documents and Filings. eFiling 
involves preparing your submission in the same manner as you would if 
filing on paper, and then saving the file on your computer's hard 
drive. You will attach that file as your submission. New eFiling users 
must first create an account by clicking on ``Sign up'' or 
``eRegister.'' You will be asked to select the type of filing you are 
making. A comment on a particular project is considered a ``Comment on 
a Filing;'' or
    (3) You may file your comments via mail to the Commission by 
sending an original and two copies of your letter to: Kimberly D. Bose, 
Secretary, Federal Energy Regulatory Commission, 888 First St., NE., 
Room 1A, Washington, DC 20426;
    Label one copy of the comments for the attention of Gas Branch 2, 
PJ11.2.

Environmental Mailing List

    An effort is being made to send this notice to all individuals, 
organizations, and government entities interested in and/or potentially 
affected by the proposed project. This includes all landowners who are 
potential right-of-way grantors, whose property may be used temporarily 
for project purposes, or who own homes within distances defined in the 
Commission's regulations of certain aboveground facilities.
    If you do not want to send comments at this time but still want to 
remain on our mailing list, please return the Information Request 
(Appendix 2). If you do not return the Information Request, you will be 
taken off the mailing list.

Becoming an Intervenor

    In addition to involvement in the EA scoping process, you may want 
to become an ``intervenor,'' which is an official party to the 
proceeding. Intervenors play a more formal role in the process and are 
able to file briefs, appear at hearings, and be heard by the courts if 
they choose to appeal the Commission's final ruling. An intervenor 
formally participates in a Commission proceeding by filing a request to 
intervene. Instructions for becoming an intervenor are included in the 
User's Guide under the ``e-filing'' link on the Commission's Web site.

Additional Information

    Additional information about the project is available from the 
Commission's Office of External Affairs, at 1-866-208-FERC or on the 
FERC Internet Web site (https://www.ferc.gov) using the eLibrary link. 
Click on the eLibrary link, click on ``General Search'' and enter the 
docket number excluding the last three digits in the Docket Number 
field. Be sure you have selected an appropriate date range. For 
assistance, please contact FERC Online Support at 
FercOnlineSupport@ferc.gov or toll free at 1-866-208-3676, or for TTY, 
contact (202) 502-8659. The eLibrary link also provides access to the 
texts of formal documents issued by the Commission, such as orders, 
notices, and rulemakings.
    In addition, the Commission now offers a free service called 
eSubscription which allows you to keep track of all formal issuances 
and submittals in specific dockets. This can reduce the amount of time 
you spend researching proceedings by automatically providing you with 
notification of these filings, document summaries and direct links to 
the documents. Go to https://www.ferc.gov/esubscribenow.htm.
    Finally, public meetings or site visits will be posted on the 
Commission's calendar located at https://www.ferc.gov/EventCalendar/EventsList.aspx along with other related information.

Kimberly D. Bose,
Secretary.
[FR Doc. E9-9543 Filed 4-24-09; 8:45 am]
BILLING CODE P