Version Two Facilities Design, Connections and Maintenance Reliability Standards, 18290 [E9-9169]
Download as PDF
18290
Federal Register / Vol. 74, No. 76 / Wednesday, April 22, 2009 / Rules and Regulations
southeast via a straight line to intersect a 100mile radius of the Fernando Luis Ribas
Dominicci Airport at lat. 19°47′28″ N., long.
67°09′37″ W., thence clockwise via a 100mile radius of the Fernando Luis Ribas
Dominicci Airport to lat. 18°53′05″ N., long.
67°47′43″ W., thence from that point
northwest via a straight line to intersect the
point where the Santo Domingo FIR turns
northwest at lat. 19°39′00″ N., long. 69°09′00″
W., thence from that point northeast along
the San Juan CTA/FIR and Miami CTA/FIR
boundary to the point of beginning.
[Docket No. RM08–11–000]
days from the effective date of this final
rule, as discussed above and as
indicated in Attachment A.’’
2. On page 14016, column 1, the last
sentence of paragraph 65 is corrected to
read: ‘‘The ERO shall submit its
revisions to sub-requirements R4.1
through R4.3 to the Commission within
30 days of the effective date of this final
rule, as discussed above and as
indicated in Attachment A.’’
3. On page 14016, column 2, the last
sentence of paragraph 71 is corrected to
read: ‘‘The Commission therefore adopts
the NOPR proposal agreed to by NERC
and directs the ERO to file revised
violation severity levels for FAC–011–2,
Requirements R3 within 30 days of the
effective date of this final rule, as
discussed above and as indicated in
Attachment A.
4. On page 14017, column 1, the last
sentence of paragraph 75 is corrected to
read: ‘‘The ERO shall submit its
revisions to sub-requirements R4.1
through R4.3 to the Commission with 30
days of the effective date of this final
rule, as discussed above and as
indicated in Attachment A.’’
Version Two Facilities Design,
Connections and Maintenance
Reliability Standards
Kimberly D. Bose,
Secretary.
[FR Doc. E9–9169 Filed 4–21–09; 8:45 am]
*
*
*
*
*
Issued in Washington, DC, on April 15,
2009.
Edith V. Parish,
Manager, Airspace and Rules Group.
[FR Doc. E9–9137 Filed 4–21–09; 8:45 am]
BILLING CODE 4910–13–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
18 CFR Part 40
BILLING CODE P
Federal Energy Regulatory
Commission.
ACTION: Final rule: correction.
AGENCY:
This document corrects
compliance filing deadline errors in a
Final Rule that the Federal Energy
Regulatory Commission published in
the Federal Register on March 30, 2009.
That action approved three revised
Reliability Standards developed by the
North American Electric Reliability
Corporation (NERC), designated by
NERC as FAC–010–2, FAC–011–2 and
FAC–014–2, which set requirements for
the development and communication of
system operating limits of the BulkPower system for use in planning and
operation horizons.
DATES: Effective Date: April 29, 2009.
FOR FURTHER INFORMATION CONTACT: Cory
Lankford (Legal Information), Office of
the General Counsel, Federal Energy
Regulatory Commission, at (202) 502–
6711.
In FR
Document E–9–6823, published March
30, 2009 (74 FR 14008), make the
following corrections to compliance
filing dates:
1. On page 14014, column 2, the last
sentence of paragraph 50 is corrected to
read: ‘‘The ERO shall submit its
revisions to the Commission within 30
dwashington3 on PROD1PC60 with RULES
VerDate Nov<24>2008
13:14 Apr 21, 2009
Jkt 217001
Appendix B to Part 4022—[Corrected]
1. On page 17396, in the table for
Appendix B to Part 4022, under
‘‘Immediate annuity rate (percent)’’,
remove the figure ‘‘3.25’’, and add, in its
place, ‘‘3.50’’.
■
Appendix C to Part 4022—[Corrected]
2. On page 17396, in the table for
Appendix C to Part 4022, under
‘‘Immediate annuity rate (percent)’’,
remove the figure ‘‘3.25’’, and add, in its
place, ‘‘3.50’’.
■
Issued in Washington, DC, on this 16th day
of April 2009.
Vincent K. Snowbarger,
Acting Director, Pension Benefit Guaranty
Corporation.
[FR Doc. E9–9212 Filed 4–21–09; 8:45 am]
BILLING CODE 7709–01–P
SUMMARY:
SUPPLEMENTARY INFORMATION:
The
Pension Benefit Guaranty Corporation
published a document in the April 15,
2009, Federal Register (74 FR 17395),
informing the public of the interest rates
and assumptions to be used under
certain Pension Benefit Guaranty
Corporation regulations. This document
corrects an inadvertent error in that
final rule.
■ In FR Doc. E9–8674, published on
April 15, 2009 (74 FR 17395), make the
following corrections.
SUPPLEMENTARY INFORMATION:
PENSION BENEFIT GUARANTY
CORPORATION
DEPARTMENT OF HOMELAND
SECURITY
29 CFR Part 4022
Coast Guard
Benefits Payable in Terminated SingleEmployer Plans; Interest Assumptions
for Valuing and Paying Benefits
33 CFR Part 100
Pension Benefit Guaranty
Corporation.
ACTION: Final rule; correction.
RIN 1625–AA08
SUMMARY: The Pension Benefit Guaranty
Corporation published in the Federal
Register of April 15, 2009, a final rule
informing the public of the interest rates
and assumptions to be used under
certain Pension Benefit Guaranty
Corporation regulations. This document
corrects an inadvertent error in that
final rule.
DATES: Effective May 1, 2009.
FOR FURTHER INFORMATION CONTACT:
Catherine B. Klion, Attorney, Legislative
and Regulatory Department, Pension
Benefit Guaranty Corporation, 1200 K
Street, NW., Washington, DC 20005,
202–326–4024. (TTY/TDD users may
call the Federal relay service toll-free at
1–800–877–8339 and ask to be
connected to 202–326–4024.)
AGENCY:
AGENCY:
PO 00000
Frm 00006
Fmt 4700
Sfmt 4700
[Docket No. USCG–2008–1268]
Special Local Regulation; Volvo Ocean
Race 2009, Nahant, Boston Harbor, MA
ACTION:
Coast Guard, DHS.
Temporary final rule.
SUMMARY: The Coast Guard is
establishing a special local regulation
during the Volvo Ocean Race 2009 InPort Race to be held on Broad Sound,
off Nahant, Massachusetts, on May 9,
2009. This special local regulation is
necessary to provide for the safety of life
on navigable waters during the event.
This proposed action is intended to
restrict vessel traffic before, during and
after the race.
DATES: This rule is effective from 10:30
a.m. through 4 p.m. on May 09, 2009.
ADDRESSES: Documents indicated in this
preamble as being available in the
docket are part of docket USCG–2008–
E:\FR\FM\22APR1.SGM
22APR1
Agencies
[Federal Register Volume 74, Number 76 (Wednesday, April 22, 2009)]
[Rules and Regulations]
[Page 18290]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E9-9169]
=======================================================================
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
18 CFR Part 40
[Docket No. RM08-11-000]
Version Two Facilities Design, Connections and Maintenance
Reliability Standards
AGENCY: Federal Energy Regulatory Commission.
ACTION: Final rule: correction.
-----------------------------------------------------------------------
SUMMARY: This document corrects compliance filing deadline errors in a
Final Rule that the Federal Energy Regulatory Commission published in
the Federal Register on March 30, 2009. That action approved three
revised Reliability Standards developed by the North American Electric
Reliability Corporation (NERC), designated by NERC as FAC-010-2, FAC-
011-2 and FAC-014-2, which set requirements for the development and
communication of system operating limits of the Bulk-Power system for
use in planning and operation horizons.
DATES: Effective Date: April 29, 2009.
FOR FURTHER INFORMATION CONTACT: Cory Lankford (Legal Information),
Office of the General Counsel, Federal Energy Regulatory Commission, at
(202) 502-6711.
SUPPLEMENTARY INFORMATION: In FR Document E-9-6823, published March 30,
2009 (74 FR 14008), make the following corrections to compliance filing
dates:
1. On page 14014, column 2, the last sentence of paragraph 50 is
corrected to read: ``The ERO shall submit its revisions to the
Commission within 30 days from the effective date of this final rule,
as discussed above and as indicated in Attachment A.''
2. On page 14016, column 1, the last sentence of paragraph 65 is
corrected to read: ``The ERO shall submit its revisions to sub-
requirements R4.1 through R4.3 to the Commission within 30 days of the
effective date of this final rule, as discussed above and as indicated
in Attachment A.''
3. On page 14016, column 2, the last sentence of paragraph 71 is
corrected to read: ``The Commission therefore adopts the NOPR proposal
agreed to by NERC and directs the ERO to file revised violation
severity levels for FAC-011-2, Requirements R3 within 30 days of the
effective date of this final rule, as discussed above and as indicated
in Attachment A.
4. On page 14017, column 1, the last sentence of paragraph 75 is
corrected to read: ``The ERO shall submit its revisions to sub-
requirements R4.1 through R4.3 to the Commission with 30 days of the
effective date of this final rule, as discussed above and as indicated
in Attachment A.''
Kimberly D. Bose,
Secretary.
[FR Doc. E9-9169 Filed 4-21-09; 8:45 am]
BILLING CODE P