Appalachian Power Company, Virginia; Notice of Public Meeting for the Smith Mountain Pumped Storage Project Draft Environmental Impact Statement, 18224 [E9-9082]
Download as PDF
18224
Federal Register / Vol. 74, No. 75 / Tuesday, April 21, 2009 / Notices
SPP Regional State Committee Meeting
April 27, 2009 (1 p.m.–5 p.m.), Skirvin
Hotel, One Park Avenue, Oklahoma
City, OK 73102, 405–272–3040.
SPP Board of Directors—Members
Committee Meeting
April 28, 2009 (8:30 a.m.–3 p.m.),
Skirvin Hotel, One Park Avenue,
Oklahoma City, OK 73102, 405–272–
3040.
These meetings are open to the
public.
For more information, contact Patrick
Clarey, Office of Energy Market
Regulation, Federal Energy Regulatory
Commission at (317) 249–5937 or
patrick.clarey@ferc.gov.
Kimberly D. Bose,
Secretary.
[FR Doc. E9–9078 Filed 4–20–09; 8:45 am]
BILLING CODE 6717–01–P
mstockstill on PROD1PC66 with NOTICES
SPP Cost Allocation Working Group
Meeting
April 29, 2009 (8 a.m.–12 p.m.), Skirvin
Hotel, One Park Avenue, Oklahoma
City, OK 73102, 405–272–3040.
The discussions may address matters
at issue in the following proceedings:
Docket No. ER06–451, Southwest Power
Pool, Inc.
Docket Nos. ER07–319 and EL07–73,
Southwest Power Pool, Inc.
Docket No. ER07–371, Southwest Power
Pool, Inc.
Docket No. ER07–1255, Southwest
Power Pool, Inc.
Docket No. ER08–923, Southwest Power
Pool, Inc.
Docket No. ER08–1307, Southwest
Power Pool, Inc.
Docket No. ER08–1308, Southwest
Power Pool, Inc.
Docket No. ER08–1357, Southwest
Power Pool, Inc.
Docket No. ER08–1358, Southwest
Power Pool, Inc.
Docket No. ER08–1419, Southwest
Power Pool, Inc.
Docket No. ER08–1516, Southwest
Power Pool, Inc.
Docket No. EL08–80–, Oklahoma
Corporation Commission
Docket No. ER09–35, Tallgrass
Transmission LLC
Docket No. ER09–36, Prairie Wind
Transmission LLC
Docket No. ER09–149, Southwest Power
Pool, Inc.
Docket No. ER09–262, Southwest Power
Pool, Inc.
Docket No. ER09–336, Southwest Power
Pool, Inc.
Docket No. ER09–342, Southwest Power
Pool, Inc.
Docket No. ER09–443, Southwest Power
Pool, Inc.
Docket No. ER09–659, Southwest Power
Pool, Inc.
Docket No. ER09–748, Southwest Power
Pool, Inc.
Docket No. OA08–5 and EL09–40,
Southwest Power Pool, Inc.
Docket No. OA08–60, Southwest Power
Pool, Inc.
Docket No. OA08–61, Southwest Power
Pool, Inc.
Docket No. OA08–104, Southwest Power
Pool, Inc.
VerDate Nov<24>2008
20:25 Apr 20, 2009
Jkt 217001
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2210–169]
Appalachian Power Company, Virginia;
Notice of Public Meeting for the Smith
Mountain Pumped Storage Project
Draft Environmental Impact Statement
April 14, 2009.
In accordance with the National
Environmental Policy Act of 1969 and
the Federal Energy Regulatory
Commission’s (Commission)
regulations, 18 CFR Part 380 (Order No.
486, 52 FR 47897), the Office of Energy
Projects has reviewed the application
for license for the Smith Mountain
Pumped Storage Project (FERC No.
2210), located on the headwaters of the
Roanoke River in Bedford, Campbell,
Franklin, and Pittsylvania counties in
the Commonwealth of Virginia.
Commission staff have prepared a draft
Environmental Impact Statement (EIS)
for the project, which was issued on
March 27, 2009.
In addition to, or in lieu of, sending
written comments, all interested
individuals, organizations, and agencies
are invited to attend a public meeting.
The time and location of the meeting is
as follows:
Date: Thursday, April 30, 2009.
Time: 7 p.m.–10 p.m.
Place: Franklin County High School
(Auditorium).
Address: 700 Tanyard Road, Rocky
Mount, VA 24151, (540) 483–0221; Attn:
Mr. William Adkins.
Individuals, organizations, and
agencies with environmental expertise
and concerns are encouraged to attend
the meeting and to discuss their
comments on staff’s recommendations
included in the draft EIS. At this
meeting, resource agency personnel and
other interested persons will have the
opportunity to provide oral and written
comments and recommendations
regarding the draft EIS. The meeting
will be recorded by a court reporter, and
all statements (verbal and written) will
PO 00000
Frm 00027
Fmt 4703
Sfmt 4703
become part of the Commission’s public
record for the project. This meeting is
posted on the Commission’s calendar
located at https://www.ferc.gov/
EventCalendar/EventsList.aspx along
with other related information.
Written comments should be filed
with: Kimberly D. Bose, Secretary,
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC,
20426. All comments must be filed by
May 11, 2009, and should reference
Project No. 2210–169. Comments may
be filed electronically via the Internet in
lieu of paper. The Commission strongly
encourages electronic filings. See 18
CFR 385.2001(a)(1)(iii) and instructions
on the Commission’s Web site at
https://www.ferc.gov under the eLibrary
link.
Copies of the draft EIS were
distributed to the parties on the
Commission’s mailing list. Copies of the
draft EIS will be available at the
meeting. The draft EIS contains staff’s
evaluation of the applicant’s proposal
and the alternatives for relicensing the
Smith Mountain Project. A copy of the
draft EIS is also available for review in
the Commission’s Public Reference
Branch, Room 2A, located at 888 First
Street, NE., Washington, DC 20426. The
draft EIS also may be viewed on the
Commission’s Web site at https://
www.ferc.gov, using the eLibrary link.
Enter the docket number, excluding the
last three digits in the docket number
field, to access the document. For
assistance, contact FERC Online
Support at
FERCOnlineSupport@ferc.gov or tollfree at 1–866–208–3676, or for TTY,
(202) 502–8659.
You may also register online at
https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
For further information, contact Allan
Creamer at (202) 502–8365, or by e-mail
at allan.creamer@ferc.gov.
Kimberly D. Bose,
Secretary.
[FR Doc. E9–9082 Filed 4–20–09; 8:45 am]
BILLING CODE 6717–01–P
E:\FR\FM\21APN1.SGM
21APN1
Agencies
[Federal Register Volume 74, Number 75 (Tuesday, April 21, 2009)]
[Notices]
[Page 18224]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E9-9082]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 2210-169]
Appalachian Power Company, Virginia; Notice of Public Meeting for
the Smith Mountain Pumped Storage Project Draft Environmental Impact
Statement
April 14, 2009.
In accordance with the National Environmental Policy Act of 1969
and the Federal Energy Regulatory Commission's (Commission)
regulations, 18 CFR Part 380 (Order No. 486, 52 FR 47897), the Office
of Energy Projects has reviewed the application for license for the
Smith Mountain Pumped Storage Project (FERC No. 2210), located on the
headwaters of the Roanoke River in Bedford, Campbell, Franklin, and
Pittsylvania counties in the Commonwealth of Virginia. Commission staff
have prepared a draft Environmental Impact Statement (EIS) for the
project, which was issued on March 27, 2009.
In addition to, or in lieu of, sending written comments, all
interested individuals, organizations, and agencies are invited to
attend a public meeting. The time and location of the meeting is as
follows:
Date: Thursday, April 30, 2009.
Time: 7 p.m.-10 p.m.
Place: Franklin County High School (Auditorium).
Address: 700 Tanyard Road, Rocky Mount, VA 24151, (540) 483-0221;
Attn: Mr. William Adkins.
Individuals, organizations, and agencies with environmental
expertise and concerns are encouraged to attend the meeting and to
discuss their comments on staff's recommendations included in the draft
EIS. At this meeting, resource agency personnel and other interested
persons will have the opportunity to provide oral and written comments
and recommendations regarding the draft EIS. The meeting will be
recorded by a court reporter, and all statements (verbal and written)
will become part of the Commission's public record for the project.
This meeting is posted on the Commission's calendar located at https://www.ferc.gov/EventCalendar/EventsList.aspx along with other related
information.
Written comments should be filed with: Kimberly D. Bose, Secretary,
Federal Energy Regulatory Commission, 888 First Street, NE.,
Washington, DC, 20426. All comments must be filed by May 11, 2009, and
should reference Project No. 2210-169. Comments may be filed
electronically via the Internet in lieu of paper. The Commission
strongly encourages electronic filings. See 18 CFR 385.2001(a)(1)(iii)
and instructions on the Commission's Web site at https://www.ferc.gov
under the eLibrary link.
Copies of the draft EIS were distributed to the parties on the
Commission's mailing list. Copies of the draft EIS will be available at
the meeting. The draft EIS contains staff's evaluation of the
applicant's proposal and the alternatives for relicensing the Smith
Mountain Project. A copy of the draft EIS is also available for review
in the Commission's Public Reference Branch, Room 2A, located at 888
First Street, NE., Washington, DC 20426. The draft EIS also may be
viewed on the Commission's Web site at https://www.ferc.gov, using the
eLibrary link. Enter the docket number, excluding the last three digits
in the docket number field, to access the document. For assistance,
contact FERC Online Support at FERCOnlineSupport@ferc.gov or toll-free
at 1-866-208-3676, or for TTY, (202) 502-8659.
You may also register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via e-mail of new filings and
issuances related to this or other pending projects. For assistance,
contact FERC Online Support.
For further information, contact Allan Creamer at (202) 502-8365,
or by e-mail at allan.creamer@ferc.gov.
Kimberly D. Bose,
Secretary.
[FR Doc. E9-9082 Filed 4-20-09; 8:45 am]
BILLING CODE 6717-01-P