Massachusetts Water Resources Authority; Notice of Conduit Exemption Application Accepted for Filing and Soliciting Comment, Motions To Intervene, and Competing Applications, 18221-18222 [E9-9080]

Download as PDF mstockstill on PROD1PC66 with NOTICES Federal Register / Vol. 74, No. 75 / Tuesday, April 21, 2009 / Notices Comment Date: 5 p.m. Eastern Time on Thursday, April 30, 2009. Docket Numbers: ER09–980–000. Applicants: WSPP Inc. Description: WSPP Inc submits Second Revised Sheet 90A et al. to its FERC Rate Schedule 6. Filed Date: 04/10/2009. Accession Number: 20090413–0146. Comment Date: 5 p.m. Eastern Time on Friday, May 01, 2009. Docket Numbers: ER09–981–000. Applicants: New York Independent System Operator, Inc. Description: New York Independent System Operator, Inc submits for acceptance Seventh Revised Sheet 3 et al. to FERC Electric Tariff, Original Volume 2. Filed Date: 04/10/2009. Accession Number: 20090413–0145. Comment Date: 5 p.m. Eastern Time on Friday, May 01, 2009. Docket Numbers: ER09–982–000. Applicants: Black Hills Power, Inc. Description: Black Hills Power, Inc submits for acceptance Original Volume 1 to FERC Electric Rate Schedule 37 etc. re Transmission Interconnection Agreement with Basin Electric Power Cooperative et al. Filed Date: 04/10/2009. Accession Number: 20090413–0144. Comment Date: 5 p.m. Eastern Time on Friday, May 01, 2009. Docket Numbers: ER09–983–000. Applicants: Black Hills Power, Inc. Description: Black Hills Power, Inc submits for acceptance Original Volume 1 to FERC Electric Rate Schedule 37 etc. re Transmission Interconnection Agreement with Basin Electric Power Cooperative et al. Filed Date: 04/10/2009. Accession Number: 20090413–0144. Comment Date: 5 p.m. Eastern Time on Friday, May 01, 2009. Docket Numbers: ER09–984–000. Applicants: New York Independent System Operator, Inc. Description: New York Independent System Operator, Inc submits for acceptance Second Revised Sheet 12 et al to FERC Electric Tariff, Original Volume 1. Filed Date: 04/10/2009. Accession Number: 20090413–0143. Comment Date: 5 p.m. Eastern Time on Friday, May 01, 2009. Take notice that the Commission received the following electric securities filings: Docket Numbers: ES09–26–000. Applicants: California Independent System Operator Corporation. Description: Application of California Independent System Operator Corporation under Section 204 of the VerDate Nov<24>2008 20:25 Apr 20, 2009 Jkt 217001 Federal Power Act for an Order Authorizing the Issuance of Securities. Filed Date: 04/10/2009. Accession Number: 20090410–5113. Comment Date: 5 p.m. Eastern Time on Friday, May 01, 2009. Any person desiring to intervene or to protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214) on or before 5 p.m. Eastern time on the specified comment date. It is not necessary to separately intervene again in a subdocket related to a compliance filing if you have previously intervened in the same docket. Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Anyone filing a motion to intervene or protest must serve a copy of that document on the Applicant. In reference to filings initiating a new proceeding, interventions or protests submitted on or before the comment deadline need not be served on persons other than the Applicant. The Commission encourages electronic submission of protests and interventions in lieu of paper, using the FERC Online links at https:// www.ferc.gov. To facilitate electronic service, persons with Internet access who will eFile a document and/or be listed as a contact for an intervenor must create and validate an eRegistration account using the eRegistration link. Select the eFiling link to log on and submit the intervention or protests. Persons unable to file electronically should submit an original and 14 copies of the intervention or protest to the Federal Energy Regulatory Commission, 888 First St. NE., Washington, DC 20426. The filings in the above proceedings are accessible in the Commission’s eLibrary system by clicking on the appropriate link in the above list. They are also available for review in the Commission’s Public Reference Room in Washington, DC. There is an eSubscription link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed dockets(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov. or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. E9–9113 Filed 4–20–09; 8:45 am] BILLING CODE 6717–01–P PO 00000 Frm 00024 Fmt 4703 Sfmt 4703 18221 DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13400–000] Massachusetts Water Resources Authority; Notice of Conduit Exemption Application Accepted for Filing and Soliciting Comment, Motions To Intervene, and Competing Applications April 14, 2009. On March 17, 2009, Massachusetts Water Resources Authority, filed an application pursuant to 16 U.S.C. 791a– 825r of the Federal Power Act, for conduit exemption of the Loring Road Hydroelectric Project, to be located in Valve Chamber One at Massachusetts Water Resources Authority’s Loring Road facility in Middlesex County, Massachusetts. The proposed Loring Road Hydroelectric Project consists of: (1) A proposed powerhouse containing one generating unit having an installed capacity of 200 kilowatts, and (2) appurtenant facilities. The Massachusetts Water Resources Authority estimates the project would have an average annual generation of 1,207 megawatt-hours that would be used on-site with any excess being sold to a local utility. Applicant Contact: Ms. Pamela A. Heidell, Policy and Planning Manager, Massachusetts Water Resources Authority, Charlestown Navy Yard, Building 39, 100 First Avenue, Boston, MA 85326, (617) 788–1102. Pamela.Heidell@mwra.state.ma.us. FERC Contact: Jeremy Jessup, (202) 502–6779. Jeremy.Jessup@ferc.gov. Deadline for filing comments, motions to intervene, protests, recommendations, terms and conditions, prescriptions, competing applications (without notices of intent), or notices of intent to file competing applications: 60 days from the issuance of this notice. All filings may be filed electronically via the Internet. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site under the ‘‘e-Filing’’ link. If unable to be filed electronically, documents may be paper-filed. To paper-file, an original and eight copies should be mailed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. For more information on how to submit these types of filings please go to the Commission’s Web site located at https://www.ferc.gov/filingcomments.asp. More information about this project can be viewed or printed on E:\FR\FM\21APN1.SGM 21APN1 18222 Federal Register / Vol. 74, No. 75 / Tuesday, April 21, 2009 / Notices the ‘‘eLibrary’’ link of Commission’s Web site at https://www.ferc.gov/docsfiling/elibrary.asp. Enter the docket number (P–13400) in the docket number field to access the document. For assistance, call toll-free 1–866–208– 3372. Kimberly D. Bose, Secretary. [FR Doc. E9–9080 Filed 4–20–09; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. DI09–6–000] Townsend Historical Society; Notice of Declaration of Intention and Soliciting Comments, Protests, and/or Motions To Intervene mstockstill on PROD1PC66 with NOTICES April 14, 2009. Take notice that the following application has been filed with the Commission and is available for public inspection: a. Application Type: Declaration of Intention. b. Docket No.: DI09–6–000. c. Date Filed: April 2, 2009. d. Applicant: Townsend Historical Society. e. Name of Project: Spaulding Grist Mill Hydroelectric Project. f. Location: The Spaulding Grist Mill Hydroelectric Project will be located on the Squannacook River, in Townsend, Middlesex County, Massachusetts. g. Filed Pursuant to: Section 23(b)(1) of the Federal Power Act, 16 U.S.C. 817(b). h. Applicant Contact: Jock Snaith, 264 South Row, Townsend, MA 01469; Telephone: (978) 597–2275; e-mail: https://www.jocksnaith@yahoo.com. i. FERC Contact: Any questions on this notice should be addressed to Henry Ecton, (202) 502–8768, or E-mail address: henry.ecton@ferc.gov. j. Deadline for filing comments, protests, and/or motions: May 15, 2009. All documents (original and eight copies) should be filed with: Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. Comments, protests, and/or interventions may be filed electronically via the Internet in lieu of paper. Any questions, please contact the Secretary’s Office. See, 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site at https:// www.ferc.gov under the ‘‘e-Filing’’ link. Please include the docket number (DI09–6–000) on any comments, protests, and/or motions filed. VerDate Nov<24>2008 20:25 Apr 20, 2009 Jkt 217001 k. Description of Project: The proposed Spaulding Grist Mill Hydroelectric Project includes: (1) A 55acre-foot reservoir; (2) a 10-foot-high, approximately 20-foot-long, cut stone block dam; (3) a 375-foot-long, 20-footwide dry-laid masonry-lined canal; (4) one 25-kW S. Morgan Smith turbine/ generator, located in the basement of the Spaulding Grist Mill; and (5) appurtenant facilities. The proposed project has not operated since 1929. It will not occupy any Tribal or Federal lands. When a Declaration of Intention is filed with the Federal Energy Regulatory Commission, the Federal Power Act requires the Commission to investigate and determine if the interests of interstate or foreign commerce would be affected by the project. The Commission also determines whether or not the project: (1) Would be located on a navigable waterway; (2) would occupy or affect public lands or reservations of the United States; (3) would utilize surplus water or water power from a government dam; or (4) if applicable, has involved or would involve any construction subsequent to 1935 that may have increased or would increase the project’s head or generating capacity, or have otherwise significantly modified the project’s pre-1935 design or operation. l. Locations of the Application: Copies of this filing are on file with the Commission and are available for public inspection. This filing may be viewed on the Web at https://www.ferc.gov using the ‘‘eLibrary’’ link, select ‘‘Docket#’’ and follow the instructions. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov or tollfree at (866) 208–3372, or TTY, contact (202) 502–8659. m. Individuals desiring to be included on the Commission’s mailing list should so indicate by writing to the Secretary of the Commission. n. Comments, Protests, or Motions to Intervene—Anyone may submit comments, a protest, or a motion to intervene in accordance with the requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, .214. In determining the appropriate action to take, the Commission will consider all protests or other comments filed, but only those who file a motion to intervene in accordance with the Commission’s Rules may become a party to the proceeding. Any comments, protests, or motions to intervene must be received on or before the specified comment date for the particular application. PO 00000 Frm 00025 Fmt 4703 Sfmt 4703 o. Filing and Service of Responsive Documents—Any filings must bear in all capital letters the title ‘‘COMMENTS’’, ‘‘PROTESTS’’, and/or ‘‘MOTIONS TO INTERVENE’’, as applicable, and the Docket Number of the particular application to which the filing refers. A copy of any motion to intervene must also be served upon each representative of the Applicant specified in the particular application. p. Agency Comments—Federal, State, and local agencies are invited to file comments on the described application. A copy of the application may be obtained by agencies directly from the Applicant. If an agency does not file comments within the time specified for filing comments, it will be presumed to have no comments. One copy of an agency’s comments must also be sent to the Applicant’s representatives. Kimberly D. Bose, Secretary. [FR Doc. E9–9076 Filed 4–20–09; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. RC08–5–001] North American Electric Reliability Corporation; Notice of Filing October 7, 2008. Take notice that on October 6, 2008, the North American Electric Reliability Corporation (NERC) submitted for filing in compliance with Commission Order issued July 21, 2008, the NERC Board of Trustees Compliance Committee’s decision on remand affirming Reliability First Corporation’s decision to retain the United States Department of Energy, Portsmouth/Paducah Project Office’s registration as a Load-Serving Entity on the NERC Compliance Registry. Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211, 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed on or before the comment date. Anyone filing a motion to intervene or protest must serve a copy of that document on the Applicant and all the parties in this proceeding. E:\FR\FM\21APN1.SGM 21APN1

Agencies

[Federal Register Volume 74, Number 75 (Tuesday, April 21, 2009)]
[Notices]
[Pages 18221-18222]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E9-9080]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 13400-000]


Massachusetts Water Resources Authority; Notice of Conduit 
Exemption Application Accepted for Filing and Soliciting Comment, 
Motions To Intervene, and Competing Applications

April 14, 2009.
    On March 17, 2009, Massachusetts Water Resources Authority, filed 
an application pursuant to 16 U.S.C. 791a-825r of the Federal Power 
Act, for conduit exemption of the Loring Road Hydroelectric Project, to 
be located in Valve Chamber One at Massachusetts Water Resources 
Authority's Loring Road facility in Middlesex County, Massachusetts.
    The proposed Loring Road Hydroelectric Project consists of: (1) A 
proposed powerhouse containing one generating unit having an installed 
capacity of 200 kilowatts, and (2) appurtenant facilities. The 
Massachusetts Water Resources Authority estimates the project would 
have an average annual generation of 1,207 megawatt-hours that would be 
used on-site with any excess being sold to a local utility.
    Applicant Contact: Ms. Pamela A. Heidell, Policy and Planning 
Manager, Massachusetts Water Resources Authority, Charlestown Navy 
Yard, Building 39, 100 First Avenue, Boston, MA 85326, (617) 788-1102. 
Pamela.Heidell@mwra.state.ma.us.
    FERC Contact: Jeremy Jessup, (202) 502-6779. 
Jeremy.Jessup@ferc.gov.
    Deadline for filing comments, motions to intervene, protests, 
recommendations, terms and conditions, prescriptions, competing 
applications (without notices of intent), or notices of intent to file 
competing applications: 60 days from the issuance of this notice. All 
filings may be filed electronically via the Internet. See 18 CFR 
385.2001(a)(1)(iii) and the instructions on the Commission's Web site 
under the ``e-Filing'' link. If unable to be filed electronically, 
documents may be paper-filed. To paper-file, an original and eight 
copies should be mailed to: Kimberly D. Bose, Secretary, Federal Energy 
Regulatory Commission, 888 First Street, NE., Washington, DC 20426. For 
more information on how to submit these types of filings please go to 
the Commission's Web site located at https://www.ferc.gov/filing-comments.asp. More information about this project can be viewed or 
printed on

[[Page 18222]]

the ``eLibrary'' link of Commission's Web site at https://www.ferc.gov/docs-filing/elibrary.asp. Enter the docket number (P-13400) in the 
docket number field to access the document. For assistance, call toll-
free 1-866-208-3372.

Kimberly D. Bose,
Secretary.
[FR Doc. E9-9080 Filed 4-20-09; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.