Notice of FERC Staff Attendance at Southwest Power Pool Board of Directors/Members Committee Meeting, Southwest Power Pool Regional State Committee Meeting and Cost Allocation Working Group Meeting, 18223-18224 [E9-9078]
Download as PDF
Federal Register / Vol. 74, No. 75 / Tuesday, April 21, 2009 / Notices
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 14 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
This filing is accessible online at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5 p.m. Eastern Time
on November 5, 2008.
Kimberly D. Bose,
Secretary.
[FR Doc. E9–9088 Filed 4–20–09; 8:45 am]
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 14 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
This filing is accessible online at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: May 14, 2009.
Kimberly D. Bose,
Secretary.
[FR Doc. E9–9086 Filed 4–20–09; 8:45 am]
BILLING CODE 6717–01–P
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. PR09–24–000]
Federal Energy Regulatory
Commission
Atmos Energy Corporation; Notice of
Informational Rate Filing
[Docket No. AC09–57–000]
Trans-Union Interstate Pipeline, L.P.;
Notice of Filing
mstockstill on PROD1PC66 with NOTICES
April 14, 2009.
Take notice that on April 3, 2009
Trans-Union Interstate Pipeline, L.P.
submitted a request for waiver of the
requirement to submit the 2008 FERC
Form No. 2–A under Section 260.2 of
the Commission regulations.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211, 385.214).
Protests will be considered by the
Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed on or before the
comment date. On or before the
comment date, it is not necessary to
serve motions to intervene or protests
on persons other than the Applicant.
The Commission encourages
electronic submission of protests and
VerDate Nov<24>2008
20:25 Apr 20, 2009
Jkt 217001
April 14, 2009.
Take notice that on April 9, 2009,
Atmos Energy Corporation (Atmos),
filed an informational rate filing in
Docket No. PR09–24–000. Atmos states
that the purpose of the filing is to
present information consistent with the
Commission’s authority under 15 U.S.C.
717i (a) in order to allow the
Commission to monitor Atmos’
jurisdictional rates under Section 5 of
the Natural Gas Act. Atmos further
states that it seeks no change in its
existing rates and charges or the
previously approved terms and
conditions upon which it provides
service.
Any person desiring to participate in
this rate proceeding must file a motion
to intervene or to protest this filing must
file in accordance with Rules 211 and
214 of the Commission’s Rules of
Practice and Procedure (18 CFR 385.211
and 385.214). Protests will be
considered by the Commission in
determining the appropriate action to be
taken, but will not serve to make
protestants parties to the proceeding.
Any person wishing to become a party
must file a notice of intervention or
PO 00000
Frm 00026
Fmt 4703
Sfmt 4703
18223
motion to intervene, as appropriate.
Such notices, motions, or protests must
be filed on or before the date as
indicated below. Anyone filing an
intervention or protest must serve a
copy of that document on the Applicant.
Anyone filing an intervention or protest
on or before the intervention or protest
date need not serve motions to intervene
or protests on persons other than the
Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 14 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
This filing is accessible online at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5 p.m. Eastern Time
on Friday, April 24, 2009.
Kimberly D. Bose,
Secretary.
[FR Doc. E9–9074 Filed 4–20–09; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Notice of FERC Staff Attendance at
Southwest Power Pool Board of
Directors/Members Committee
Meeting, Southwest Power Pool
Regional State Committee Meeting and
Cost Allocation Working Group
Meeting
April 14, 2009.
The Federal Energy Regulatory
Commission hereby gives notice that
members of its staff may attend the
meetings of the Southwest Power Pool
(SPP) Regional State Committee, SPP
Members Committee, SPP Board of
Directors and Cost Allocation Working
Group, as noted below. Their attendance
is part of the Commission’s ongoing
outreach efforts.
E:\FR\FM\21APN1.SGM
21APN1
18224
Federal Register / Vol. 74, No. 75 / Tuesday, April 21, 2009 / Notices
SPP Regional State Committee Meeting
April 27, 2009 (1 p.m.–5 p.m.), Skirvin
Hotel, One Park Avenue, Oklahoma
City, OK 73102, 405–272–3040.
SPP Board of Directors—Members
Committee Meeting
April 28, 2009 (8:30 a.m.–3 p.m.),
Skirvin Hotel, One Park Avenue,
Oklahoma City, OK 73102, 405–272–
3040.
These meetings are open to the
public.
For more information, contact Patrick
Clarey, Office of Energy Market
Regulation, Federal Energy Regulatory
Commission at (317) 249–5937 or
patrick.clarey@ferc.gov.
Kimberly D. Bose,
Secretary.
[FR Doc. E9–9078 Filed 4–20–09; 8:45 am]
BILLING CODE 6717–01–P
mstockstill on PROD1PC66 with NOTICES
SPP Cost Allocation Working Group
Meeting
April 29, 2009 (8 a.m.–12 p.m.), Skirvin
Hotel, One Park Avenue, Oklahoma
City, OK 73102, 405–272–3040.
The discussions may address matters
at issue in the following proceedings:
Docket No. ER06–451, Southwest Power
Pool, Inc.
Docket Nos. ER07–319 and EL07–73,
Southwest Power Pool, Inc.
Docket No. ER07–371, Southwest Power
Pool, Inc.
Docket No. ER07–1255, Southwest
Power Pool, Inc.
Docket No. ER08–923, Southwest Power
Pool, Inc.
Docket No. ER08–1307, Southwest
Power Pool, Inc.
Docket No. ER08–1308, Southwest
Power Pool, Inc.
Docket No. ER08–1357, Southwest
Power Pool, Inc.
Docket No. ER08–1358, Southwest
Power Pool, Inc.
Docket No. ER08–1419, Southwest
Power Pool, Inc.
Docket No. ER08–1516, Southwest
Power Pool, Inc.
Docket No. EL08–80–, Oklahoma
Corporation Commission
Docket No. ER09–35, Tallgrass
Transmission LLC
Docket No. ER09–36, Prairie Wind
Transmission LLC
Docket No. ER09–149, Southwest Power
Pool, Inc.
Docket No. ER09–262, Southwest Power
Pool, Inc.
Docket No. ER09–336, Southwest Power
Pool, Inc.
Docket No. ER09–342, Southwest Power
Pool, Inc.
Docket No. ER09–443, Southwest Power
Pool, Inc.
Docket No. ER09–659, Southwest Power
Pool, Inc.
Docket No. ER09–748, Southwest Power
Pool, Inc.
Docket No. OA08–5 and EL09–40,
Southwest Power Pool, Inc.
Docket No. OA08–60, Southwest Power
Pool, Inc.
Docket No. OA08–61, Southwest Power
Pool, Inc.
Docket No. OA08–104, Southwest Power
Pool, Inc.
VerDate Nov<24>2008
20:25 Apr 20, 2009
Jkt 217001
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2210–169]
Appalachian Power Company, Virginia;
Notice of Public Meeting for the Smith
Mountain Pumped Storage Project
Draft Environmental Impact Statement
April 14, 2009.
In accordance with the National
Environmental Policy Act of 1969 and
the Federal Energy Regulatory
Commission’s (Commission)
regulations, 18 CFR Part 380 (Order No.
486, 52 FR 47897), the Office of Energy
Projects has reviewed the application
for license for the Smith Mountain
Pumped Storage Project (FERC No.
2210), located on the headwaters of the
Roanoke River in Bedford, Campbell,
Franklin, and Pittsylvania counties in
the Commonwealth of Virginia.
Commission staff have prepared a draft
Environmental Impact Statement (EIS)
for the project, which was issued on
March 27, 2009.
In addition to, or in lieu of, sending
written comments, all interested
individuals, organizations, and agencies
are invited to attend a public meeting.
The time and location of the meeting is
as follows:
Date: Thursday, April 30, 2009.
Time: 7 p.m.–10 p.m.
Place: Franklin County High School
(Auditorium).
Address: 700 Tanyard Road, Rocky
Mount, VA 24151, (540) 483–0221; Attn:
Mr. William Adkins.
Individuals, organizations, and
agencies with environmental expertise
and concerns are encouraged to attend
the meeting and to discuss their
comments on staff’s recommendations
included in the draft EIS. At this
meeting, resource agency personnel and
other interested persons will have the
opportunity to provide oral and written
comments and recommendations
regarding the draft EIS. The meeting
will be recorded by a court reporter, and
all statements (verbal and written) will
PO 00000
Frm 00027
Fmt 4703
Sfmt 4703
become part of the Commission’s public
record for the project. This meeting is
posted on the Commission’s calendar
located at https://www.ferc.gov/
EventCalendar/EventsList.aspx along
with other related information.
Written comments should be filed
with: Kimberly D. Bose, Secretary,
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC,
20426. All comments must be filed by
May 11, 2009, and should reference
Project No. 2210–169. Comments may
be filed electronically via the Internet in
lieu of paper. The Commission strongly
encourages electronic filings. See 18
CFR 385.2001(a)(1)(iii) and instructions
on the Commission’s Web site at
https://www.ferc.gov under the eLibrary
link.
Copies of the draft EIS were
distributed to the parties on the
Commission’s mailing list. Copies of the
draft EIS will be available at the
meeting. The draft EIS contains staff’s
evaluation of the applicant’s proposal
and the alternatives for relicensing the
Smith Mountain Project. A copy of the
draft EIS is also available for review in
the Commission’s Public Reference
Branch, Room 2A, located at 888 First
Street, NE., Washington, DC 20426. The
draft EIS also may be viewed on the
Commission’s Web site at https://
www.ferc.gov, using the eLibrary link.
Enter the docket number, excluding the
last three digits in the docket number
field, to access the document. For
assistance, contact FERC Online
Support at
FERCOnlineSupport@ferc.gov or tollfree at 1–866–208–3676, or for TTY,
(202) 502–8659.
You may also register online at
https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
For further information, contact Allan
Creamer at (202) 502–8365, or by e-mail
at allan.creamer@ferc.gov.
Kimberly D. Bose,
Secretary.
[FR Doc. E9–9082 Filed 4–20–09; 8:45 am]
BILLING CODE 6717–01–P
E:\FR\FM\21APN1.SGM
21APN1
Agencies
[Federal Register Volume 74, Number 75 (Tuesday, April 21, 2009)]
[Notices]
[Pages 18223-18224]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E9-9078]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Notice of FERC Staff Attendance at Southwest Power Pool Board of
Directors/Members Committee Meeting, Southwest Power Pool Regional
State Committee Meeting and Cost Allocation Working Group Meeting
April 14, 2009.
The Federal Energy Regulatory Commission hereby gives notice that
members of its staff may attend the meetings of the Southwest Power
Pool (SPP) Regional State Committee, SPP Members Committee, SPP Board
of Directors and Cost Allocation Working Group, as noted below. Their
attendance is part of the Commission's ongoing outreach efforts.
[[Page 18224]]
SPP Regional State Committee Meeting
April 27, 2009 (1 p.m.-5 p.m.), Skirvin Hotel, One Park Avenue,
Oklahoma City, OK 73102, 405-272-3040.
SPP Board of Directors--Members Committee Meeting
April 28, 2009 (8:30 a.m.-3 p.m.), Skirvin Hotel, One Park Avenue,
Oklahoma City, OK 73102, 405-272-3040.
SPP Cost Allocation Working Group Meeting
April 29, 2009 (8 a.m.-12 p.m.), Skirvin Hotel, One Park Avenue,
Oklahoma City, OK 73102, 405-272-3040.
The discussions may address matters at issue in the following
proceedings:
Docket No. ER06-451, Southwest Power Pool, Inc.
Docket Nos. ER07-319 and EL07-73, Southwest Power Pool, Inc.
Docket No. ER07-371, Southwest Power Pool, Inc.
Docket No. ER07-1255, Southwest Power Pool, Inc.
Docket No. ER08-923, Southwest Power Pool, Inc.
Docket No. ER08-1307, Southwest Power Pool, Inc.
Docket No. ER08-1308, Southwest Power Pool, Inc.
Docket No. ER08-1357, Southwest Power Pool, Inc.
Docket No. ER08-1358, Southwest Power Pool, Inc.
Docket No. ER08-1419, Southwest Power Pool, Inc.
Docket No. ER08-1516, Southwest Power Pool, Inc.
Docket No. EL08-80-, Oklahoma Corporation Commission
Docket No. ER09-35, Tallgrass Transmission LLC
Docket No. ER09-36, Prairie Wind Transmission LLC
Docket No. ER09-149, Southwest Power Pool, Inc.
Docket No. ER09-262, Southwest Power Pool, Inc.
Docket No. ER09-336, Southwest Power Pool, Inc.
Docket No. ER09-342, Southwest Power Pool, Inc.
Docket No. ER09-443, Southwest Power Pool, Inc.
Docket No. ER09-659, Southwest Power Pool, Inc.
Docket No. ER09-748, Southwest Power Pool, Inc.
Docket No. OA08-5 and EL09-40, Southwest Power Pool, Inc.
Docket No. OA08-60, Southwest Power Pool, Inc.
Docket No. OA08-61, Southwest Power Pool, Inc.
Docket No. OA08-104, Southwest Power Pool, Inc.
These meetings are open to the public.
For more information, contact Patrick Clarey, Office of Energy
Market Regulation, Federal Energy Regulatory Commission at (317) 249-
5937 or patrick.clarey@ferc.gov.
Kimberly D. Bose,
Secretary.
[FR Doc. E9-9078 Filed 4-20-09; 8:45 am]
BILLING CODE 6717-01-P