Olsen Electric Development Co., Inc.; Notice of Preliminary Permit Applications Accepted for Filing and Soliciting Comment, Motions To Intervene, and Competing Applications, 17845 [E9-8806]
Download as PDF
mstockstill on PROD1PC66 with NOTICES
Federal Register / Vol. 74, No. 73 / Friday, April 17, 2009 / Notices
EA in the Commission’s public record
for this proceeding or the issuance of a
Notice of Schedule for Environmental
Review will serve to notify Federal and
State agencies of the timing for the
completion of all necessary reviews, and
the subsequent need to complete all
Federal authorizations within 90 days of
the date of issuance of the Commission
staff’s FEIS or EA.
There are two ways to become
involved in the Commission’s review of
this project. First, any person wishing to
obtain legal status by becoming a party
to the proceedings for this project
should, on or before the comment date
stated below, file with the Federal
Energy Regulatory Commission, 888
First Street, NE., Washington, DC 20426,
a motion to intervene in accordance
with the requirements of the
Commission’s Rules of Practice and
Procedure (18 CFR 385.214 or 385.211)
and the Regulations under the NGA (18
CFR 157.10). A person obtaining party
status will be placed on the service list
maintained by the Secretary of the
Commission and will receive copies of
all documents filed by the applicant and
by all other parties. A party must submit
14 copies of filings made with the
Commission and must mail a copy to
the applicant and to every other party in
the proceeding. Only parties to the
proceeding can ask for court review of
Commission orders in the proceeding.
However, a person does not have to
intervene in order to have comments
considered. The second way to
participate is by filing with the
Secretary of the Commission, as soon as
possible, an original and two copies of
comments in support of or in opposition
to this project. The Commission will
consider these comments in
determining the appropriate action to be
taken, but the filing of a comment alone
will not serve to make the filer a party
to the proceeding. The Commission’s
rules require that persons filing
comments in opposition to the project
provide copies of their protests only to
the party or parties directly involved in
the protest.
Persons who wish to comment only
on the environmental review of this
project should submit an original and
two copies of their comments to the
Secretary of the Commission.
Environmental commenters will be
placed on the Commission’s
environmental mailing list, will receive
copies of the environmental documents,
and will be notified of meetings
associated with the Commission’s
environmental review process.
Environmental commenters will not be
required to serve copies of filed
documents on all other parties.
VerDate Nov<24>2008
16:13 Apr 16, 2009
Jkt 217001
However, the non-party commenters
will not receive copies of all documents
filed by other parties or issued by the
Commission (except for the mailing of
environmental documents issued by the
Commission) and will not have the right
to seek court review of the
Commission’s final order.
Motions to intervene, protests and
comments may be filed electronically
via the Internet in lieu of paper; see, 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site under the ‘‘e-Filing’’ link. The
Commission strongly encourages
electronic filings.
Comment Date: April 30, 2009.
Kimberly D. Bose,
Secretary.
[FR Doc. E9–8807 Filed 4–16–09; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 13352–000]
Olsen Electric Development Co., Inc.;
Notice of Preliminary Permit
Applications Accepted for Filing and
Soliciting Comment, Motions To
Intervene, and Competing Applications
On January 20, 2009, Olsen Electric
Development Co., Inc. filed an
application, pursuant to section 4(f) of
the Federal Power Act, proposing to
study the feasibility of the Malden Mills
Hydroelectric Project, to be located on
the Spicket River, in Essex County,
Massachusetts.
The proposed Malden Mills
Hydroelectric Project consists of: (1) An
existing 85-foot-long, 12-foot-high
Malden Mills Dam, with new foot-high
wooden flashboards; (2) an existing 10acre head pond having a maximum
storage capacity of about 36 acre-feet; (3)
a refurbished gatehouse containing two
turbine generating units with a total
installed capacity of 0.2 megawatts; (4)
a direct connection to an existing
substation; and (5) appurtenant
facilities. The Malden Mills Project
would have an average annual
generation of 850 megawatt-hours,
which would be sold to Polartec, LLC.
Applicant Contact: Mr. Jerome A.
Olson, Olsen Electric Development Co.,
Inc., 30r Hampshire Street, Methuen,
MA 01844, phone (978) 975–0400.
FERC Contact: John Ramer, (202) 502–
8969.
Deadline for filing comments, motions
to intervene, competing applications
Frm 00032
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Comments, motions to intervene,
notices of intent, and competing
applications may be filed electronically
via the Internet. See 18 CFR
385.2001(a)(1)(iii) and the instructions
on the Commission’s Web site under the
‘‘e-Filing’’ link. If unable to be filed
electronically, documents may be paperfiled. To paper-file, an original and eight
copies should be mailed to: Kimberly D.
Bose, Secretary, Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426. For
more information on how to submit
these types of filings please go to the
Commission’s Web site located at https://
www.ferc.gov/filing-comments.asp.
More information about this project can
be viewed or printed on the ‘‘eLibrary’’
link of Commission’s Web site at https://
www.ferc.gov/docs-filing/elibrary.asp.
Enter the docket number (P–13352) in
the docket number field to access the
document. For assistance, call toll-free
1–866–208–3372.
Kimberly D. Bose,
Secretary.
[FR Doc. E9–8806 Filed 4–16–09; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
April 9, 2009.
PO 00000
17845
Fmt 4703
Sfmt 4703
Federal Energy Regulatory
Commission
[Project No. 13343–000]
Hydro Energy Technologies, LLC;
Notice of Preliminary Permit
Applications Accepted for Filing and
Soliciting Comment, Motions To
Intervene, and Competing Applications
April 9, 2009.
On December 9, 2008, Hydro Energy
Technologies, LLC filed an application,
pursuant to section 4(f) of the Federal
Power Act, proposing to study the
feasibility of the Mosquito Creek
Hydroelectric Project, to be located on
Mosquito Creek, in Trumbull County,
Ohio.
The proposed Mosquito Creek
Hydroelectric Project would be located
at: (1) the existing U.S. Army Corps of
Engineers 5,650-foot-long, 47-foot-high
Mosquito Creek Dam; and (2) an existing
8,900-acre reservoir with water surface
elevation of 904 feet mean sea level.
The proposed project would consist
of: (1) A new powerhouse containing
one or more turbine/generators with a
total installed capacity of 0.5 megawatts;
(2) a new 50-foot-long, 60-inch-diameter
penstock; (3) a new 400-foot-long
E:\FR\FM\17APN1.SGM
17APN1
Agencies
[Federal Register Volume 74, Number 73 (Friday, April 17, 2009)]
[Notices]
[Page 17845]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E9-8806]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 13352-000]
Olsen Electric Development Co., Inc.; Notice of Preliminary
Permit Applications Accepted for Filing and Soliciting Comment, Motions
To Intervene, and Competing Applications
April 9, 2009.
On January 20, 2009, Olsen Electric Development Co., Inc. filed an
application, pursuant to section 4(f) of the Federal Power Act,
proposing to study the feasibility of the Malden Mills Hydroelectric
Project, to be located on the Spicket River, in Essex County,
Massachusetts.
The proposed Malden Mills Hydroelectric Project consists of: (1) An
existing 85-foot-long, 12-foot-high Malden Mills Dam, with new foot-
high wooden flashboards; (2) an existing 10-acre head pond having a
maximum storage capacity of about 36 acre-feet; (3) a refurbished
gatehouse containing two turbine generating units with a total
installed capacity of 0.2 megawatts; (4) a direct connection to an
existing substation; and (5) appurtenant facilities. The Malden Mills
Project would have an average annual generation of 850 megawatt-hours,
which would be sold to Polartec, LLC.
Applicant Contact: Mr. Jerome A. Olson, Olsen Electric Development
Co., Inc., 30r Hampshire Street, Methuen, MA 01844, phone (978) 975-
0400.
FERC Contact: John Ramer, (202) 502-8969.
Deadline for filing comments, motions to intervene, competing
applications (without notices of intent), or notices of intent to file
competing applications: 60 days from the issuance of this notice.
Comments, motions to intervene, notices of intent, and competing
applications may be filed electronically via the Internet. See 18 CFR
385.2001(a)(1)(iii) and the instructions on the Commission's Web site
under the ``e-Filing'' link. If unable to be filed electronically,
documents may be paper-filed. To paper-file, an original and eight
copies should be mailed to: Kimberly D. Bose, Secretary, Federal Energy
Regulatory Commission, 888 First Street, NE., Washington, DC 20426. For
more information on how to submit these types of filings please go to
the Commission's Web site located at https://www.ferc.gov/filing-comments.asp. More information about this project can be viewed or
printed on the ``eLibrary'' link of Commission's Web site at https://www.ferc.gov/docs-filing/elibrary.asp. Enter the docket number (P-
13352) in the docket number field to access the document. For
assistance, call toll-free 1-866-208-3372.
Kimberly D. Bose,
Secretary.
[FR Doc. E9-8806 Filed 4-16-09; 8:45 am]