Blue Heron Hydro, LLC; Notice of Preliminary Permit Applications Accepted for Filing and Soliciting Comment, Motions To Intervene, and Competing Applications, 17470 [E9-8560]
Download as PDF
17470
Federal Register / Vol. 74, No. 71 / Wednesday, April 15, 2009 / Notices
associated with the Commission’s
environmental review process.
Environmental commentors will not be
required to serve copies of filed
documents on all other parties.
However, the non-party commentors
will not receive copies of all documents
filed by other parties or issued by the
Commission (except for the mailing of
environmental documents issued by the
Commission) and will not have the right
to seek court review of the
Commission’s final order.
The Commission strongly encourages
electronic filings of comments, protests
and interventions in lieu of paper using
the ‘‘eFiling’’ link at https://
www.ferc.gov. Persons unable to file
electronically should submit an original
and 14 copies of the protest or
intervention to the Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: April 29, 2009.
Kimberly D. Bose,
Secretary.
[FR Doc. E9–8564 Filed 4–14–09; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 13368–000]
Blue Heron Hydro, LLC; Notice of
Preliminary Permit Applications
Accepted for Filing and Soliciting
Comment, Motions To Intervene, and
Competing Applications
rwilkins on PROD1PC63 with PROPOSALS
April 8, 2009.
On February 6, 2009, Blue Heron
Hydro, LLC, filed an application,
pursuant to section 4(f) of the Federal
Power Act, proposing to study the
feasibility of the Townsend Dam
Hydroelectric Project, to be located on
the West River, in Windham County,
Vermont.
The proposed Townsend Dam
Hydroelectric Project would be located
at: (1) The existing 1,700-foot-long U.S.
VerDate Nov<24>2008
16:44 Apr 14, 2009
Jkt 217001
Army Corps of Engineers Townsend
Dam; (2) an existing Corps intake tower
and control works, and (3) an existing
735-acre reservoir with 32,800 acre-feet
of storage.
The project would consist of: (1) Six
new turbine generating units connected
to the intake tower with a total installed
capacity of 0.96 megawatts; (2) a new 1mile-long, 45 kilovolt, 3 phase
transmission line and transformer
connected to an existing above ground
distribution system; and (3) appurtenant
facilities. The Townsend Dam Project
would have an estimated average annual
generation of 3,605 megawatt-hours,
which would be sold to local utilities.
Applicant Contact: Ms. Lori Barg,
Blue Heron Hydro, LLC, 113 Bartlett
Rd., Plainfield, VT 05667, phone (802)
454–1874.
FERC Contact: John Ramer, (202) 502–
8969.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Comments, motions to intervene,
notices of intent, and competing
applications may be filed electronically
via the Internet. See 18 CFR
385.2001(a)(1)(iii) and the instructions
on the Commission’s Web site under the
‘‘e-Filing’’ link. If unable to be filed
electronically, documents may be paperfiled. To paper-file, an original and eight
copies should be mailed to: Kimberly D.
Bose, Secretary, Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426. For
more information on how to submit
these types of filings please go to the
Commission’s Web site located at http:
//www.ferc.gov/filing-comments.asp.
More information about this project can
be viewed or printed on the ‘‘eLibrary’’
link of Commission’s Web site at http:
//www.ferc.gov/docs-filing/elibrary.asp.
Enter the docket number (P–13368) in
the docket number field to access the
document. For assistance, call toll-free
1–866–208–3372.
Kimberly D. Bose,
Secretary.
[FR Doc. E9–8560 Filed 4–14–09; 8:45 am]
BILLING CODE 6717–01–P
PO 00000
Frm 00024
Fmt 4703
Sfmt 4703
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 13367–000]
Community Hydro, LLC; Notice of
Preliminary Permit Applications
Accepted for Filing and Soliciting
Comment, Motions To Intervene, and
Competing Applications
April 8, 2009.
On February 6, 2009, Community
Hydro, LLC, filed an application,
pursuant to section 4(f) of the Federal
Power Act, proposing to study the
feasibility of the Littleville Dam
Hydroelectric Project, to be located on
the Middle Branch of the Westfield
River, in Hampshire and Hampden
Counties, Massachusetts.
The proposed Littleville Dam
Hydroelectric Project would be located
at: (1) The existing 1,360-foot-long U.S.
Army Corps of Engineers Littleville
Dam; (2) an existing Corps intake tower
and control works; and (3) an existing
584-acre reservoir with 31,200 acre-feet
of storage.
The proposed project would consist
of: (1) Six new turbine generating units
attached to the intake tower with a total
installed capacity of 0.85 megawatts; (2)
a new 3-phase transmission line and
transformer connected to an existing
above ground distribution system; and
(3) appurtenant facilities. The Littleville
Dam Project would have an estimated
average annual generation of 3,000
megawatt-hours, which would be sold
to local utilities.
Applicant Contact: Ms. Lori Barg,
Community Hydro, LLC, 113 Bartlett
Rd., Plainfield, VT 05667, phone (802)
454–1874.
FERC Contact: John Ramer, (202) 502–
8969.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Comments, motions to intervene,
notices of intent, and competing
applications may be filed electronically
via the Internet. See 18 CFR
385.2001(a)(1)(iii) and the instructions
on the Commission’s Web site under the
‘‘e-Filing’’ link. If unable to be filed
electronically, documents may be paperfiled. To paper-file, an original and eight
copies should be mailed to: Kimberly D.
Bose, Secretary, Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426. For
more information on how to submit
these types of filings please go to the
Commission’s Web site located at
E:\FR\FM\15APN1.SGM
15APN1
Agencies
[Federal Register Volume 74, Number 71 (Wednesday, April 15, 2009)]
[Notices]
[Page 17470]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E9-8560]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 13368-000]
Blue Heron Hydro, LLC; Notice of Preliminary Permit Applications
Accepted for Filing and Soliciting Comment, Motions To Intervene, and
Competing Applications
April 8, 2009.
On February 6, 2009, Blue Heron Hydro, LLC, filed an application,
pursuant to section 4(f) of the Federal Power Act, proposing to study
the feasibility of the Townsend Dam Hydroelectric Project, to be
located on the West River, in Windham County, Vermont.
The proposed Townsend Dam Hydroelectric Project would be located
at: (1) The existing 1,700-foot-long U.S. Army Corps of Engineers
Townsend Dam; (2) an existing Corps intake tower and control works, and
(3) an existing 735-acre reservoir with 32,800 acre-feet of storage.
The project would consist of: (1) Six new turbine generating units
connected to the intake tower with a total installed capacity of 0.96
megawatts; (2) a new 1-mile-long, 45 kilovolt, 3 phase transmission
line and transformer connected to an existing above ground distribution
system; and (3) appurtenant facilities. The Townsend Dam Project would
have an estimated average annual generation of 3,605 megawatt-hours,
which would be sold to local utilities.
Applicant Contact: Ms. Lori Barg, Blue Heron Hydro, LLC, 113
Bartlett Rd., Plainfield, VT 05667, phone (802) 454-1874.
FERC Contact: John Ramer, (202) 502-8969.
Deadline for filing comments, motions to intervene, competing
applications (without notices of intent), or notices of intent to file
competing applications: 60 days from the issuance of this notice.
Comments, motions to intervene, notices of intent, and competing
applications may be filed electronically via the Internet. See 18 CFR
385.2001(a)(1)(iii) and the instructions on the Commission's Web site
under the ``e-Filing'' link. If unable to be filed electronically,
documents may be paper-filed. To paper-file, an original and eight
copies should be mailed to: Kimberly D. Bose, Secretary, Federal Energy
Regulatory Commission, 888 First Street, NE., Washington, DC 20426. For
more information on how to submit these types of filings please go to
the Commission's Web site located at https://www.ferc.gov/filing-comments.asp. More information about this project can be viewed or
printed on the ``eLibrary'' link of Commission's Web site at https://www.ferc.gov/docs-filing/elibrary.asp. Enter the docket number (P-
13368) in the docket number field to access the document. For
assistance, call toll-free 1-866-208-3372.
Kimberly D. Bose,
Secretary.
[FR Doc. E9-8560 Filed 4-14-09; 8:45 am]