Blue Heron Hydro, LLC; Notice of Preliminary Permit Applications Accepted for Filing and Soliciting Comment, Motions To Intervene, and Competing Applications, 17470 [E9-8560]

Download as PDF 17470 Federal Register / Vol. 74, No. 71 / Wednesday, April 15, 2009 / Notices associated with the Commission’s environmental review process. Environmental commentors will not be required to serve copies of filed documents on all other parties. However, the non-party commentors will not receive copies of all documents filed by other parties or issued by the Commission (except for the mailing of environmental documents issued by the Commission) and will not have the right to seek court review of the Commission’s final order. The Commission strongly encourages electronic filings of comments, protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https:// www.ferc.gov. Persons unable to file electronically should submit an original and 14 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Comment Date: April 29, 2009. Kimberly D. Bose, Secretary. [FR Doc. E9–8564 Filed 4–14–09; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13368–000] Blue Heron Hydro, LLC; Notice of Preliminary Permit Applications Accepted for Filing and Soliciting Comment, Motions To Intervene, and Competing Applications rwilkins on PROD1PC63 with PROPOSALS April 8, 2009. On February 6, 2009, Blue Heron Hydro, LLC, filed an application, pursuant to section 4(f) of the Federal Power Act, proposing to study the feasibility of the Townsend Dam Hydroelectric Project, to be located on the West River, in Windham County, Vermont. The proposed Townsend Dam Hydroelectric Project would be located at: (1) The existing 1,700-foot-long U.S. VerDate Nov<24>2008 16:44 Apr 14, 2009 Jkt 217001 Army Corps of Engineers Townsend Dam; (2) an existing Corps intake tower and control works, and (3) an existing 735-acre reservoir with 32,800 acre-feet of storage. The project would consist of: (1) Six new turbine generating units connected to the intake tower with a total installed capacity of 0.96 megawatts; (2) a new 1mile-long, 45 kilovolt, 3 phase transmission line and transformer connected to an existing above ground distribution system; and (3) appurtenant facilities. The Townsend Dam Project would have an estimated average annual generation of 3,605 megawatt-hours, which would be sold to local utilities. Applicant Contact: Ms. Lori Barg, Blue Heron Hydro, LLC, 113 Bartlett Rd., Plainfield, VT 05667, phone (802) 454–1874. FERC Contact: John Ramer, (202) 502– 8969. Deadline for filing comments, motions to intervene, competing applications (without notices of intent), or notices of intent to file competing applications: 60 days from the issuance of this notice. Comments, motions to intervene, notices of intent, and competing applications may be filed electronically via the Internet. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site under the ‘‘e-Filing’’ link. If unable to be filed electronically, documents may be paperfiled. To paper-file, an original and eight copies should be mailed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. For more information on how to submit these types of filings please go to the Commission’s Web site located at http: //www.ferc.gov/filing-comments.asp. More information about this project can be viewed or printed on the ‘‘eLibrary’’ link of Commission’s Web site at http: //www.ferc.gov/docs-filing/elibrary.asp. Enter the docket number (P–13368) in the docket number field to access the document. For assistance, call toll-free 1–866–208–3372. Kimberly D. Bose, Secretary. [FR Doc. E9–8560 Filed 4–14–09; 8:45 am] BILLING CODE 6717–01–P PO 00000 Frm 00024 Fmt 4703 Sfmt 4703 DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13367–000] Community Hydro, LLC; Notice of Preliminary Permit Applications Accepted for Filing and Soliciting Comment, Motions To Intervene, and Competing Applications April 8, 2009. On February 6, 2009, Community Hydro, LLC, filed an application, pursuant to section 4(f) of the Federal Power Act, proposing to study the feasibility of the Littleville Dam Hydroelectric Project, to be located on the Middle Branch of the Westfield River, in Hampshire and Hampden Counties, Massachusetts. The proposed Littleville Dam Hydroelectric Project would be located at: (1) The existing 1,360-foot-long U.S. Army Corps of Engineers Littleville Dam; (2) an existing Corps intake tower and control works; and (3) an existing 584-acre reservoir with 31,200 acre-feet of storage. The proposed project would consist of: (1) Six new turbine generating units attached to the intake tower with a total installed capacity of 0.85 megawatts; (2) a new 3-phase transmission line and transformer connected to an existing above ground distribution system; and (3) appurtenant facilities. The Littleville Dam Project would have an estimated average annual generation of 3,000 megawatt-hours, which would be sold to local utilities. Applicant Contact: Ms. Lori Barg, Community Hydro, LLC, 113 Bartlett Rd., Plainfield, VT 05667, phone (802) 454–1874. FERC Contact: John Ramer, (202) 502– 8969. Deadline for filing comments, motions to intervene, competing applications (without notices of intent), or notices of intent to file competing applications: 60 days from the issuance of this notice. Comments, motions to intervene, notices of intent, and competing applications may be filed electronically via the Internet. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site under the ‘‘e-Filing’’ link. If unable to be filed electronically, documents may be paperfiled. To paper-file, an original and eight copies should be mailed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. For more information on how to submit these types of filings please go to the Commission’s Web site located at E:\FR\FM\15APN1.SGM 15APN1

Agencies

[Federal Register Volume 74, Number 71 (Wednesday, April 15, 2009)]
[Notices]
[Page 17470]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E9-8560]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 13368-000]


Blue Heron Hydro, LLC; Notice of Preliminary Permit Applications 
Accepted for Filing and Soliciting Comment, Motions To Intervene, and 
Competing Applications

April 8, 2009.
    On February 6, 2009, Blue Heron Hydro, LLC, filed an application, 
pursuant to section 4(f) of the Federal Power Act, proposing to study 
the feasibility of the Townsend Dam Hydroelectric Project, to be 
located on the West River, in Windham County, Vermont.
    The proposed Townsend Dam Hydroelectric Project would be located 
at: (1) The existing 1,700-foot-long U.S. Army Corps of Engineers 
Townsend Dam; (2) an existing Corps intake tower and control works, and 
(3) an existing 735-acre reservoir with 32,800 acre-feet of storage.
    The project would consist of: (1) Six new turbine generating units 
connected to the intake tower with a total installed capacity of 0.96 
megawatts; (2) a new 1-mile-long, 45 kilovolt, 3 phase transmission 
line and transformer connected to an existing above ground distribution 
system; and (3) appurtenant facilities. The Townsend Dam Project would 
have an estimated average annual generation of 3,605 megawatt-hours, 
which would be sold to local utilities.
    Applicant Contact: Ms. Lori Barg, Blue Heron Hydro, LLC, 113 
Bartlett Rd., Plainfield, VT 05667, phone (802) 454-1874.
    FERC Contact: John Ramer, (202) 502-8969.
    Deadline for filing comments, motions to intervene, competing 
applications (without notices of intent), or notices of intent to file 
competing applications: 60 days from the issuance of this notice. 
Comments, motions to intervene, notices of intent, and competing 
applications may be filed electronically via the Internet. See 18 CFR 
385.2001(a)(1)(iii) and the instructions on the Commission's Web site 
under the ``e-Filing'' link. If unable to be filed electronically, 
documents may be paper-filed. To paper-file, an original and eight 
copies should be mailed to: Kimberly D. Bose, Secretary, Federal Energy 
Regulatory Commission, 888 First Street, NE., Washington, DC 20426. For 
more information on how to submit these types of filings please go to 
the Commission's Web site located at https://www.ferc.gov/filing-comments.asp. More information about this project can be viewed or 
printed on the ``eLibrary'' link of Commission's Web site at https://www.ferc.gov/docs-filing/elibrary.asp. Enter the docket number (P-
13368) in the docket number field to access the document. For 
assistance, call toll-free 1-866-208-3372.

Kimberly D. Bose,
Secretary.
 [FR Doc. E9-8560 Filed 4-14-09; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.