Town of West Stockbridge; Notice of Preliminary Permit Applications Accepted for Filing and Soliciting Comment, Motions To Intervene, and Competing Applications, 17185 [E9-8458]
Download as PDF
Federal Register / Vol. 74, No. 70 / Tuesday, April 14, 2009 / Notices
Rd., Plainfield, VT 05667, phone (802)
454–1874.
FERC Contact: John Ramer, (202) 502–
8969.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Comments, motions to intervene,
notices of intent, and competing
applications may be filed electronically
via the Internet. See 18 CFR
385.2001(a)(1)(iii) and the instructions
on the Commission’s Web site under the
‘‘e-Filing’’ link. If unable to be filed
electronically, documents may be paperfiled. To paper-file, an original and eight
copies should be mailed to: Kimberly D.
Bose, Secretary, Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426. For
more information on how to submit
these types of filings please go to the
Commission’s Web site located at
https://www.ferc.gov/filingcomments.asp. More information about
this project can be viewed or printed on
the ‘‘eLibrary’’ link of the Commission’s
Web site at
https://www.ferc.gov/docs-filing/
elibrary.asp. Enter the docket number
(P–13369) in the docket number field to
access the document. For assistance,
call toll-free 1–866–208–3372.
Kimberly D. Bose,
Secretary.
[FR Doc. E9–8456 Filed 4–13–09; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 13371–000]
Town of West Stockbridge; Notice of
Preliminary Permit Applications
Accepted for Filing and Soliciting
Comment, Motions To Intervene, and
Competing Applications
April 7, 2009.
On February 9, 2009, Town of West
Stockbridge filed an application,
pursuant to section 4(f) of the Federal
Power Act, proposing to study the
feasibility of the Shaker Mill Dam
Hydroelectric Project, to be located on
the Williams River, in Berkshire County,
Massachusetts.
The proposed Shaker Mill Dam
Hydroelectric Project would be located
at: (1) The existing 33-foot-long, 18.3foot-high Shaker Mill Dam; (2) existing
control works and discharge pipes; and
VerDate Nov<24>2008
16:39 Apr 13, 2009
Jkt 217001
(3) an existing 31.88-acre head pond
with 198 acre-feet of storage.
The project would consist of: (1) A
new powerhouse enclosing two new
turbine generating units with a total
installed capacity of 9.0 kilowatts; (2) a
new 600 volt, transmission line connect
to an existing above ground transformer
and distribution system; and (3)
appurtenant facilities. The Blue Heron
Hydro LLC project would have an
estimated average annual generation of
6.7 megawatt-hours, which would be
sold to power marketers, local industrial
users, or used by the applicant to offset
current utility costs.
Applicant Contact: Town of West
Stockbridge, c/o Curt G. Wilton,
Chairman, Board of Selectman, 21State
Line Rd., P.O. Box 525, West
Stockbridge, MA 01266, phone (413)
232–0300 ext. 319.
FERC Contact: John Ramer, (202) 502–
8969.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Comments, motions to intervene,
notices of intent, and competing
applications may be filed electronically
via the Internet. See 18 CFR
385.2001(a)(1)(iii) and the instructions
on the Commission’s Web site under the
‘‘e-Filing’’ link. If unable to be filed
electronically, documents may be paperfiled. To paper-file, an original and eight
copies should be mailed to: Kimberly D.
Bose, Secretary, Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426. For
more information on how to submit
these types of filings please go to the
Commission’s Web site located at
https://www.ferc.gov/filingcomments.asp. More information about
this project can be viewed or printed on
the ‘‘eLibrary’’ link of the Commission’s
Web site at https://www.ferc.gov/docsfiling/elibrary.asp. Enter the docket
number (P–13371) in the docket number
field to access the document. For
assistance, call toll-free 1–866–208–
3372.
Kimberly D. Bose,
Secretary.
[FR Doc. E9–8458 Filed 4–13–09; 8:45 am]
BILLING CODE 6717–01–P
PO 00000
Frm 00043
Fmt 4703
Sfmt 4703
17185
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 12679–002]
ORPC Alaska, LLC; Notice of Intent To
File License Application, Filing of Draft
Application, Request for Waivers of
Integrated Licensing Process
Regulations Necessary for Expedited
Processing of a Hydrokinetic Pilot
Project License Application, and
Soliciting Comments
April 7, 2009.
a. Type of Filing: Notice of Intent to
File a License Application for an
Original License for a Hydrokinetic Pilot
Project.
b. Project No.: 12679–002.
c. Date Filed: March 31, 2009.
d. Submitted By: ORPC Alaska, LLC.
e. Name of Project: Cook Inlet Tidal
Energy Pilot Project.
f. Location: In upper Cook Inlet off the
north shore of Fire Island in the
boroughs of Anchorage and MatanuskaSusitna, Alaska. Three proposed
alternatives for transmission line
alignment would occupy varying
amounts of federal lands on Fire Island
administered by the U.S. Coast Guard
and Federal Aviation Administration.
g. Filed Pursuant to: 18 CFR 5.3 of the
Commission’s regulations.
h. Applicant Contact: ORPC Alaska,
LLC, 151 Martine Street, Suite 102–5C,
Fall River, MA 02723; (813) 417–6660.
i. FERC Contact: Matt Cutlip (503)
552–2762.
j. ORPC Alaska, LLC (ORPC Alaska)
has filed with the Commission: (1) A
notice of intent (NOI) to file an
application for an original license for a
hydrokinetic pilot project and a draft
license application with monitoring
plans; (2) a request for waivers of the
integrated licensing process regulations
necessary for expedited processing of a
hydrokinetic pilot project license
application; (3) a proposed process plan
and schedule; (4) a request to be
designated as the non-federal
representative for section 7 of the
Endangered Species Act consultation;
and (5) a request to be designated as the
non-federal representative for section
106 consultation under the National
Historic Preservation Act (collectively
the pre-filing materials).
k. With this notice, we are soliciting
comments on the pre-filing materials
listed in paragraph j above, including
the draft license application and
monitoring plans. All comments should
be sent to the address above in
paragraph h. In addition, all comments
(original and eight copies) must be filed
E:\FR\FM\14APN1.SGM
14APN1
Agencies
[Federal Register Volume 74, Number 70 (Tuesday, April 14, 2009)]
[Notices]
[Page 17185]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E9-8458]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 13371-000]
Town of West Stockbridge; Notice of Preliminary Permit
Applications Accepted for Filing and Soliciting Comment, Motions To
Intervene, and Competing Applications
April 7, 2009.
On February 9, 2009, Town of West Stockbridge filed an application,
pursuant to section 4(f) of the Federal Power Act, proposing to study
the feasibility of the Shaker Mill Dam Hydroelectric Project, to be
located on the Williams River, in Berkshire County, Massachusetts.
The proposed Shaker Mill Dam Hydroelectric Project would be located
at: (1) The existing 33-foot-long, 18.3-foot-high Shaker Mill Dam; (2)
existing control works and discharge pipes; and (3) an existing 31.88-
acre head pond with 198 acre-feet of storage.
The project would consist of: (1) A new powerhouse enclosing two
new turbine generating units with a total installed capacity of 9.0
kilowatts; (2) a new 600 volt, transmission line connect to an existing
above ground transformer and distribution system; and (3) appurtenant
facilities. The Blue Heron Hydro LLC project would have an estimated
average annual generation of 6.7 megawatt-hours, which would be sold to
power marketers, local industrial users, or used by the applicant to
offset current utility costs.
Applicant Contact: Town of West Stockbridge, c/o Curt G. Wilton,
Chairman, Board of Selectman, 21State Line Rd., P.O. Box 525, West
Stockbridge, MA 01266, phone (413) 232-0300 ext. 319.
FERC Contact: John Ramer, (202) 502-8969.
Deadline for filing comments, motions to intervene, competing
applications (without notices of intent), or notices of intent to file
competing applications: 60 days from the issuance of this notice.
Comments, motions to intervene, notices of intent, and competing
applications may be filed electronically via the Internet. See 18 CFR
385.2001(a)(1)(iii) and the instructions on the Commission's Web site
under the ``e-Filing'' link. If unable to be filed electronically,
documents may be paper-filed. To paper-file, an original and eight
copies should be mailed to: Kimberly D. Bose, Secretary, Federal Energy
Regulatory Commission, 888 First Street, NE., Washington, DC 20426. For
more information on how to submit these types of filings please go to
the Commission's Web site located at https://www.ferc.gov/filing-comments.asp. More information about this project can be viewed or
printed on the ``eLibrary'' link of the Commission's Web site at https://www.ferc.gov/docs-filing/elibrary.asp. Enter the docket number (P-
13371) in the docket number field to access the document. For
assistance, call toll-free 1-866-208-3372.
Kimberly D. Bose,
Secretary.
[FR Doc. E9-8458 Filed 4-13-09; 8:45 am]