Blue Heron Hydro, LLC; Notice of Preliminary Permit Applications Accepted for Filing and Soliciting Comment, Motions To Intervene, and Competing Applications, 17186-17187 [E9-8457]
Download as PDF
17186
Federal Register / Vol. 74, No. 70 / Tuesday, April 14, 2009 / Notices
with the Commission at the following
address: Kimberly D. Bose, Secretary,
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426. All filings with the Commission
must include on the first page, the
project name (Cook Inlet Tidal Energy
Pilot Project) and number (P–12679–
002), and bear the heading ‘‘Comments
on the proposed Cook Inlet Tidal Energy
Pilot Project.’’ Any individual or entity
interested in submitting comments on
the pre-filing materials must do so by
April 30, 2009.
Comments may be filed electronically
via the Internet in lieu of paper. The
Commission strongly encourages
electronic filings. See 18 CFR
385.2001(a)(1)(iii) and the instructions
on the Commission’s Web site (https://
www.ferc.gov) under the ‘‘e-filing’’ link.
l. With this notice, we are approving
ORPC Alaska’s request to be designated
as the non-federal representative for
section 7 of the Endangered Species Act
(ESA) and its request to initiate
consultation under section 106 of the
National Historic Preservation Act; and
recommending that it begin informal
consultation with: (a) the U.S. Fish and
Wildlife Service and the National
Marine Fisheries Service as required by
section 7 of ESA; and (b) the Alaska
State Historic Preservation Officer, as
required by section 106, National
Historical Preservation Act, and the
implementing regulations of the
Advisory Council on Historic
Preservation at 36 CFR 800.2.
m. This notice does not constitute the
Commission’s approval of ORPC
Alaska’s request to use the Pilot Project
Licensing Procedures. Upon its review
of the project’s overall characteristics
relative to the pilot project criteria, the
draft license application contents, and
any comments filed, the Commission
will determine whether there is
adequate information to conclude the
pre-filing process.
n. The proposed Cook Inlet Tidal
Energy Pilot Project would be
implemented in two phases. Phase 1
would occur in year 1 of the pilot
project license and would consist of
deployment of one OCGen module
(module), containing 4 turbine-generator
units with a combined capacity of 1
megawatt. Phase 2 would occur in year
2 of the license and would consist of
deployment of four additional modules
each with a capacity of 1 megawatt, for
a total capacity of 5 megawatts. The
project would also consist of: (1)
Underwater transmission cables from
the modules to a shore station on Fire
Island; (2) a transmission line
connecting the shore station to an
interconnection point on Fire Island;
and (3) appurtenant facilities for
operation and maintenance. The
estimated annual generation of phase 1
would be 2,700 megawatt-hours. The
estimated annual generation of phase 2
would be 15,000 megawatt-hours.
o. A copy of the draft license
application and all pre-filing materials
are available for review at the
Commission in the Public Reference
Room or may be viewed on the
Commission’s Web site (https://
www.ferc.gov), using the ‘‘eLibrary’’
link. Enter the docket number,
excluding the last three digits in the
docket number field to access the
document. For assistance, contact FERC
Online Support at
FERCONlineSupport@ferc.gov or toll
free at 1–866–208–3676, or for TTY,
(202) 502–8659.
p. Pre-filing process schedule. The
pre-filing process will be conducted
pursuant to the following tentative
schedule. ORPC plans to complete
studies in 2009 to provide further
support for the environmental analysis.
Revisions to the schedule below may be
made based on staff’s review of the draft
application and any comments received.
Milestone
Date
Comments on pre-filing materials due .........................................................................................
Issuance of meeting notice (if needed) .........................................................................................
Public meeting/technical conference (if needed) .........................................................................
Issuance of notice concluding pre-filing process and ILP waiver request determination ........
April 30, 2009.
May 15, 2009.
June 14, 2009.
May 30, 2009 (if no meeting is needed); June
29, 2009 (if meeting is needed).
q. Register online at https://ferc.gov/
esubscribenow.htm to be notified via email of new filing and issuances related
to this or other pending projects. For
assistance, contact FERC Online
Support.
DEPARTMENT OF ENERGY
Kimberly D. Bose,
Secretary.
[FR Doc. E9–8454 Filed 4–13–09; 8:45 am]
Blue Heron Hydro, LLC; Notice of
Preliminary Permit Applications
Accepted for Filing and Soliciting
Comment, Motions To Intervene, and
Competing Applications
intake tower and control works; and (3)
an existing 1,200-acre reservoir with
50,000 acre-feet of storage.
The project would consist of: (1)
Three new turbine generating units
connected the intake tower with a total
installed capacity of 0.65 megawatts; (2)
a new 12.47-kilovolt transmission line
and transformer connected to an
existing above ground distribution
system; and (3) appurtenant facilities.
The North Springfield Dam Project
would have an estimated average annual
generation of 2,200 megawatt-hours,
which would be sold to local utilities.
Applicant Contact: Ms. Lori Barg,
Blue Heron Hydro, LLC, 113 Bartlett
Rd., Plainfield, VT 05667, phone (802)
454–1874.
FERC Contact: John Ramer, (202) 502–
8969.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
BILLING CODE 6717–01–P
Federal Energy Regulatory
Commission
[Project No. 13370–000]
April 7, 2009.
On February 6, 2009, Blue Heron
Hydro, LLC, filed an application,
pursuant to section 4(f) of the Federal
Power Act, proposing to study the
feasibility of the North Springfield Dam
Hydroelectric Project, to be located on
the Black River, in Windsor County,
Vermont.
The proposed North Springfield Dam
Hydroelectric Project would be located
at: (1) The existing 2,940-foot-long U.S.
Army Corps of Engineers North
Springfield Dam; (2) an existing Corps
VerDate Nov<24>2008
16:39 Apr 13, 2009
Jkt 217001
PO 00000
Frm 00044
Fmt 4703
Sfmt 4703
E:\FR\FM\14APN1.SGM
14APN1
Federal Register / Vol. 74, No. 70 / Tuesday, April 14, 2009 / Notices
Description: PacifiCorp submits
Second Amended and Restated
Transmission Service and Operating
Agreement between PacifiCorp and
Utah Municipal Power Agency.
Filed Date: 03/30/2009.
Accession Number: 20090403–0137.
Comment Date: 5 p.m. Eastern Time
on Monday, April 20, 2009.
Docket Numbers: ER09–88–002.
Applicants: Southern Company
Services, Inc.
Description: Southern Companies
submits the attached two tariffs sheets
to Southern Companies Market-Based
Rate Tariff.
Filed Date: 04/03/2009.
Accession Number: 20090407–0543.
Comment Date: 5 p.m. Eastern Time
on Friday, April 24, 2009.
Docket Numbers: ER09–404–002.
Applicants: Langdon Wind, LLC.
Description: Refund Report of
Langdon Wind, LLC.
Filed Date: 04/06/2009.
Accession Number: 20090406–5114.
Comment Date: 5 p.m. Eastern Time
Kimberly D. Bose,
on Monday, April 27, 2009.
Secretary.
Docket Numbers: ER09–556–001;
[FR Doc. E9–8457 Filed 4–13–09; 8:45 am]
ER08–367–004; ER06–615–044.
BILLING CODE 6717–01–P
Applicants: California Independent
System Operator Corporation
Description: California Independent
DEPARTMENT OF ENERGY
System Operator Corp submits a
Federal Energy Regulatory
compliance filing.
Commission
Filed Date: 03/30/2009.
Accession Number: 20090403–0141.
Combined Notice of Filings #1
Comment Date: 5 p.m. Eastern Time
on Monday, April 20, 2009.
April 07, 2009.
Docket Numbers: ER09–642–001.
Take notice that the Commission
Applicants: Niagara Mohawk Power
received the following electric rate
Corporation.
filings:
Description: Niagara Mohawk Power
Docket Numbers: ER01–1418–010;
Corporation et al. submits amended
ER02–1238–010; ER03–28–004; ER03–
Huntley IA in an Order 614- compliant
398–011.
Applicants: Effingham County Power, format as Attachment A to the instant
filing.
LLC; MPC Generating, LLC; Walton
Filed Date: 04/03/2009.
County Power, LLC; Washington County
Accession Number: 20090407–0539.
Power, LLC.
Comment Date: 5 p.m. Eastern Time
Description: Effingham County Power,
LLC et al. submits substitute tariff sheets on Friday, April 24, 2009.
to the 12/31/08 filing of updated market
Docket Numbers: ER09–729–001.
power analysis.
Applicants: Avista Corporation.
Filed Date: 04/06/2009.
Description: Avista Corporation
Accession Number: 20090407–0354.
submits FERC Revised Sheet 1 et al. to
Comment Date: 5 p.m. Eastern Time
FERC Electric Tariff Revised Volume 11
on Thursday, April 16, 2009.
for approval.
Filed Date: 04/03/2009.
Docket Numbers: ER08–682–002.
Accession Number: 20090407–0541.
Applicants: Idaho Power Company.
Comment Date: 5 p.m. Eastern Time
Description: Compliance Filing of
on Tuesday, April 14, 2009.
Idaho Power Company.
Filed Date: 04/06/2009.
Docket Numbers: ER09–730–001.
Accession Number: 20090406–5122.
Applicants: PJM Interconnection LLC.
Comment Date: 5 p.m. Eastern Time
Description: PJM Interconnection,
on Monday, April 27, 2009.
LLC submits revised PJM Open Access
Transmission Tariff sheets.
Docket Numbers: ER08–1360–001.
Filed Date: 03/30/2009.
Applicants: PacifiCorp.
Comments, motions to intervene,
notices of intent, and competing
applications may be filed electronically
via the Internet. See 18 CFR
385.2001(a)(1)(iii) and the instructions
on the Commission’s Web site under the
‘‘e-Filing’’ link. If unable to be filed
electronically, documents may be paperfiled. To paper-file, an original and eight
copies should be mailed to: Kimberly D.
Bose, Secretary, Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426. For
more information on how to submit
these types of filings, please go to the
Commission’s Web site located at
https://www.ferc.gov/filingcomments.asp. More information about
this project can be viewed or printed on
the ‘‘eLibrary’’ link of the Commission’s
Web site at https://www.ferc.gov/docsfiling/elibrary.asp. Enter the docket
number (P–13370) in the docket number
field to access the document. For
assistance, call toll-free 1–866–208–
3372.
VerDate Nov<24>2008
16:39 Apr 13, 2009
Jkt 217001
PO 00000
Frm 00045
Fmt 4703
Sfmt 4703
17187
Accession Number: 20090403–0140.
Comment Date: 5 p.m. Eastern Time
on Monday, April 20, 2009.
Docket Numbers: ER09–952–000.
Applicants: Dayton Power and Light
Company, Duke Energy Business
Services, LLC.
Description: Duke Energy Ohio, Inc
submits Interconnection Agreement
between The Dayton Power and Light
Company and Duke Energy Business,
LLC.
Filed Date: 04/03/2009.
Accession Number: 20090406–0097.
Comment Date: 5 p.m. Eastern Time
on Friday, April 24, 2009.
Docket Numbers: ER09–953–000.
Applicants: PJM Interconnection LLC.
Description: PJM Interconnection,
LLC submits executed interconnection
service agreement entered into among
PJM, Virginia Electric and Power
Company.
Filed Date: 04/03/2009.
Accession Number: 20090406–0099.
Comment Date: 5 p.m. Eastern Time
on Friday, April 24, 2009.
Docket Numbers: ER09–955–000.
Applicants: Southwestern Electric
Power Company.
Description: Southwestern Electric
Power Company submits 2009 Formula
Rates: Post Employment Benefits Other
Than Pensions and Post Employment
Benefits.
Filed Date: 04/03/2009.
Accession Number: 20090406–0100.
Comment Date: 5 p.m. Eastern Time
on Friday, April 24, 2009.
Docket Numbers: ER09–956–000.
Applicants: Ameren Services
Company.
Description: Union Electric Company
submits Original Service Agreement
2037 to FERC Electric Tariff, Third
Revised Volume 1.
Filed Date: 04/03/2009.
Accession Number: 20090406–0098.
Comment Date: 5 p.m. Eastern Time
on Friday, April 24, 2009.
Docket Numbers: ER09–957–000.
Applicants: Southern California
Edison Company.
Description: Southern California
Edison Company submits letter
agreement between SCE and First Solar
Electric, LLC.
Filed Date: 04/06/2009.
Accession Number: 20090407–0545.
Comment Date: 5 p.m. Eastern Time
on Monday, April 27, 2009.
Docket Numbers: ER09–958–000.
Applicants: Central Vermont Public
Service Corp.
Description: Central Vermont Public
Service Corporation revisions to
Schedule 2—CV of the ISO New
E:\FR\FM\14APN1.SGM
14APN1
Agencies
[Federal Register Volume 74, Number 70 (Tuesday, April 14, 2009)]
[Notices]
[Pages 17186-17187]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E9-8457]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 13370-000]
Blue Heron Hydro, LLC; Notice of Preliminary Permit Applications
Accepted for Filing and Soliciting Comment, Motions To Intervene, and
Competing Applications
April 7, 2009.
On February 6, 2009, Blue Heron Hydro, LLC, filed an application,
pursuant to section 4(f) of the Federal Power Act, proposing to study
the feasibility of the North Springfield Dam Hydroelectric Project, to
be located on the Black River, in Windsor County, Vermont.
The proposed North Springfield Dam Hydroelectric Project would be
located at: (1) The existing 2,940-foot-long U.S. Army Corps of
Engineers North Springfield Dam; (2) an existing Corps intake tower and
control works; and (3) an existing 1,200-acre reservoir with 50,000
acre-feet of storage.
The project would consist of: (1) Three new turbine generating
units connected the intake tower with a total installed capacity of
0.65 megawatts; (2) a new 12.47-kilovolt transmission line and
transformer connected to an existing above ground distribution system;
and (3) appurtenant facilities. The North Springfield Dam Project would
have an estimated average annual generation of 2,200 megawatt-hours,
which would be sold to local utilities.
Applicant Contact: Ms. Lori Barg, Blue Heron Hydro, LLC, 113
Bartlett Rd., Plainfield, VT 05667, phone (802) 454-1874.
FERC Contact: John Ramer, (202) 502-8969.
Deadline for filing comments, motions to intervene, competing
applications (without notices of intent), or notices of intent to file
competing applications: 60 days from the issuance of this notice.
[[Page 17187]]
Comments, motions to intervene, notices of intent, and competing
applications may be filed electronically via the Internet. See 18 CFR
385.2001(a)(1)(iii) and the instructions on the Commission's Web site
under the ``e-Filing'' link. If unable to be filed electronically,
documents may be paper-filed. To paper-file, an original and eight
copies should be mailed to: Kimberly D. Bose, Secretary, Federal Energy
Regulatory Commission, 888 First Street, NE., Washington, DC 20426. For
more information on how to submit these types of filings, please go to
the Commission's Web site located at https://www.ferc.gov/filing-comments.asp. More information about this project can be viewed or
printed on the ``eLibrary'' link of the Commission's Web site at https://www.ferc.gov/docs-filing/elibrary.asp. Enter the docket number (P-
13370) in the docket number field to access the document. For
assistance, call toll-free 1-866-208-3372.
Kimberly D. Bose,
Secretary.
[FR Doc. E9-8457 Filed 4-13-09; 8:45 am]