Southern Natural Gas Company; Notice of Technical Conference, 17192 [E9-8453]
Download as PDF
17192
Federal Register / Vol. 74, No. 70 / Tuesday, April 14, 2009 / Notices
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5 p.m. Eastern Time,
April 30, 2009.
Kimberly D. Bose,
Secretary.
[FR Doc. E9–8460 Filed 4–13–09; 8:45 am]
FERC conferences are accessible
under section 508 of the Rehabilitation
Act of 1973. For accessibility
accommodations please send an e-mail
to accessibility@ferc.gov or call toll free
(866) 208–3372 (voice) or (202) 502–
8659 (TTY), or send a fax to (202) 208–
2106 with the required
accommodations.
All interested persons are permitted
to attend. For further information please
contact Jacob Silverman at (202) 502–
8445 or e-mail Jacob
Silverman@ferc.gov.
Kimberly D. Bose,
Secretary.
[FR Doc. E9–8459 Filed 4–13–09; 8:45 am]
BILLING CODE 6717–01–P
Act of 1973. For accessibility
accommodations, please send an e-mail
to accessibility@ferc.gov or call toll free
(866) 208–3372 (voice) or (202) 502–
8659 (TTY), or send a fax to (202) 208–
2106 with the required
accommodations.
All interested persons are permitted
to attend. For further information please
contact Robert McLean at (202) 502–
8156 or e-mail Robert_McLean@ferc.gov.
Kimberly D. Bose,
Secretary.
[FR Doc. E9–8453 Filed 4–13–09; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. RP09–318–000]
Northern Natural Gas Company; Notice
of Technical Conference
April 7, 2009.
Take notice that the Commission Staff
will convene a technical conference in
the above-referenced proceeding on
Tuesday, April 21, 2009, at 10 a.m.
(EST), in a room to be designated at the
offices of the Federal Energy Regulatory
Commission, 888 First Street, NE.,
Washington, DC 20426.
The technical conference will afford
the Commission staff and the parties to
the proceeding an opportunity to
discuss all of the issues raised by
Northern Natural Gas Company’s
(Northern) filing, including but not
limited to the proposed increase in the
Market Area 2009 summer season fuel
percentage. At the technical conference,
Northern should be prepared to fully
explain its methodology for determining
the periodic adjustments for fuel and
provide a clear explanation as to the
basis of the increase in the Market Area
2009 summer season fuel percentage.
Any party proposing alternatives to
Northern’s proposed reimbursement
adjustment and its methodology should
be prepared to similarly support its
position.
Federal Energy Regulatory
Commission
Sunshine Act Meeting Notice
[Docket No. RP09–427–000]
The following notice of meeting is
published pursuant to section 3(a) of the
government in the Sunshine Act (Pub.
L. 94–409), 5 U.S.C. 552b:
AGENCY HOLDING MEETING: Federal
Energy Regulatory Commission.
DATE AND TIME: April 16, 2009, 10 a.m.
PLACE: Room 2C, 888 First Street, NE.,
Washington, DC 20426.
STATUS: Open.
MATTERS TO BE CONSIDERED: Agenda.
Note—Items listed on the agenda may
be deleted without further notice.
CONTACT PERSON FOR MORE INFORMATION:
Kimberly D. Bose, Secretary, Telephone
(202) 502–8400.
For a recorded message listing items
struck from or added to the meeting, call
(202) 502–8627.
This is a list of matters to be
considered by the Commission. It does
not include a listing of all documents
relevant to the items on the agenda. All
public documents, however, may be
viewed on line at the Commission’s
Web site at https://www.ferc.gov using
the eLibrary link, or may be examined
in the Commission’s Public Reference
Room.
April 9, 2009.
Southern Natural Gas Company;
Notice of Technical Conference
April 7, 2009.
Take notice that the Commission Staff
will convene a technical conference in
the above-referenced proceeding on
Thursday, April 30, 2009, at 9 a.m.
(EST), in a room to be designated at the
offices of the Federal Energy Regulatory
Commission, 888 First Street, NE.,
Washington, DC 20426.
The issues to be addressed at the
technical conference include those
Southern identified as changes to its
terms and conditions of service. These
include Southern’s proposal to: (1)
Modify its general requirements
applicable to the installation or
modification of interconnection
facilities; (2) require a shipper that has
not used its point to move its primary
receipt point; (3) modify its open season
requirements; (4) allow a shipper and
Southern to agree to a prepayment for
services; and (5) modify its ROFR time
frames.
FERC conferences are accessible
under section 508 of the Rehabilitation
947TH—MEETING, REGULAR MEETING, APRIL 16, 2009, 10 A.M.
Item No.
Docket No.
Company
ADMINISTRATIVE
A–1 ........
A–2 ........
A–3 ........
AD02–1–000 ............................................................................
AD02–7–000 ............................................................................
AD06–3–000 ............................................................................
Agency Administrative Matters.
Customer Matters, Reliability, Security and Market Operations.
Energy Market Update.
ELECTRIC
E–1 ........
EL09–20–000 ..........................................................................
VerDate Nov<24>2008
16:39 Apr 13, 2009
Jkt 217001
PO 00000
Frm 00050
Fmt 4703
Northeast Utilities Service Company and NSTAR Electric Company.
Sfmt 4703
E:\FR\FM\14APN1.SGM
14APN1
Agencies
[Federal Register Volume 74, Number 70 (Tuesday, April 14, 2009)]
[Notices]
[Page 17192]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E9-8453]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. RP09-427-000]
Southern Natural Gas Company; Notice of Technical Conference
April 7, 2009.
Take notice that the Commission Staff will convene a technical
conference in the above-referenced proceeding on Thursday, April 30,
2009, at 9 a.m. (EST), in a room to be designated at the offices of the
Federal Energy Regulatory Commission, 888 First Street, NE.,
Washington, DC 20426.
The issues to be addressed at the technical conference include
those Southern identified as changes to its terms and conditions of
service. These include Southern's proposal to: (1) Modify its general
requirements applicable to the installation or modification of
interconnection facilities; (2) require a shipper that has not used its
point to move its primary receipt point; (3) modify its open season
requirements; (4) allow a shipper and Southern to agree to a prepayment
for services; and (5) modify its ROFR time frames.
FERC conferences are accessible under section 508 of the
Rehabilitation Act of 1973. For accessibility accommodations, please
send an e-mail to accessibility@ferc.gov or call toll free (866) 208-
3372 (voice) or (202) 502-8659 (TTY), or send a fax to (202) 208-2106
with the required accommodations.
All interested persons are permitted to attend. For further
information please contact Robert McLean at (202) 502-8156 or e-mail
Robert_McLean@ferc.gov.
Kimberly D. Bose,
Secretary.
[FR Doc. E9-8453 Filed 4-13-09; 8:45 am]
BILLING CODE 6717-01-P