Environmental Impacts Statements; Notice of Availability, 15264-15265 [E9-7516]

Download as PDF 15264 Federal Register / Vol. 74, No. 63 / Friday, April 3, 2009 / Notices include monitoring and mitigation measures to avoid water quality impacts and an air quality analysis including values for NAAQS and PSD. Rating EC2. EIS No. 20080543, ERP No. D–NRC– C03017–NY, Generic—License Renewal of Nuclear Plants, Supplement 38 to NUREG–1437, Regarding Indian Point Nuclear Generating Unit Nos. 2 and 3, Westchester County, NY. Summary: EPA expressed environmental concerns about the proposed project’s impacts to aquatic resources and storage of low level waste. We recommended that the final SEIS include new geologic and seismic data concerning recent seismic activity in the area. Rating EC2. EIS No. 20090004, ERP No. D–NPS– H65028–MO, Jefferson National Expansion Memorial, General Management Plan, Implementation, St. Louis, MO. Summary: EPA expressed environmental concerns that the competition for the design of the preferred alternative had not begun, and that the implemented design could cause ‘‘moderate to major long term to beneficial impacts on transportation’’. EPA recommended working with metropolitan and State transportation planners to include design specifications to reduce potential adverse effects. Rating EC2. sroberts on PROD1PC70 with NOTICES Final EISs EIS No. 20080472, ERP No. F–FRC– D05125–PA, Holtwood Hydroelectric Project (Docket No. P–1881–050) Application for an Amendment License to Increase the Installed Capacity, Susquehanna River, Lancaster and York Counties, PA. Summary: EPA expressed environmental concerns because the impacts associated with sediment and bedrock excavation activities, and requested additional information, including excavation plans, a comparison of alternatives, and sediment sampling plans. EIS No. 20080526, ERP No. F–IBR– J39038–CO, Southern Delivery System Project, Water Supply Development, Execution of up to 40-year Contracts for Use of Fryingpan-Arkansas Project Facilities, Special Use Permit, El Paso County, CO. Summary: EPA found the Final EIS to be largely responsive to EPA’s comments on the Draft EIS and Supplemental Information Report, and believes the project is much improved and will result in fewer environmental impacts than what was originally VerDate Nov<24>2008 16:07 Apr 02, 2009 Jkt 217001 proposed. EPA does not object to the proposed project. EIS No. 20090012, ERP No. F–NOA– L91032–00, Proposed Acceptable Biological Catch (ABC) and Optimum Yield (OY) Specifications and Management Measures for the 2009– 2010 Pacific Coast Groundfish Fishery Management Plan, Implementation, WA, OR and CA. Summary: While EPA had no objections to the proposed action, EPA did request clarification on monitoring and catch limits. EIS No. 20090042, ERP No. FR–AFS– J65446–MT, Beaverhead-Deerlodge National Forest Land and Resource Management Plan, Implementation, Beaverhead, Butte-Silver Bow, Deerlodge, Granite, Jefferson, and Madison Counties, MT. Summary: The preferred alternative addresses EPA concerns and we support the development of a consistent and integrated aquatic strategy to provide for protection for riparian areas, aquatic species, and good water quality. EIS No. 20090037, ERP No. FS–AFS– F65062–MN, Echo Trail Area Forest Management Project, Updated Information to Amended to Further Address Water Quality and Watershed Health, Superior National Forest, Lacroix Ranger District and Kawishiwi Ranger District, St. Louis and Lake Counties, MN. Summary: No formal comments were sent to the preparing agency. Dated: March 31, 2009. Dawn Roberts, Management Analyst, Office of Federal Activities. [FR Doc. E9–7515 Filed 4–2–09; 8:45 am] BILLING CODE 6560–50–P ENVIRONMENTAL PROTECTION AGENCY [ER–FRL–8591–9] Environmental Impacts Statements; Notice of Availability Responsible Agency: Office of Federal Activities, General Information, (202) 564–1399 or https://www.epa.gov/ compliance/nepa/ Weekly receipt of Environmental Impact Statements Filed 03/23/2009 through 03/27/2009 Pursuant to 40 CFR 1506.9. EIS No. 20090088, Draft EIS, BLM, UT, Greens Hollow Coal Lease Tract Project, Proposed Federal Coal Leasing and Subsequent Underground Coal Mining, Funding and Lease PO 00000 Frm 00025 Fmt 4703 Sfmt 4703 Application, Fishlake and Manti-La Sal National Forest, Sanpete and Sevier Counties, UT, Comment Period Ends: 05/18/2009, Contact: Steve Rigby, 435–636–3604. EIS No. 20090089, Final EIS, AFS, AZ, Warm Fire Recovery Project, Removal of Fire-Killed Trees Reforestation, Fuel Reduction and Road Reconstruction of Wildland Fire Burn Portion, Coconino County, AZ, Wait Period Ends: 05/04/2009, Contact: Lois Pfeffer, 559–359–7023. EIS No. 20090090, Final EIS, FHW, MI, Blue Water Bridge Plaza Study and Improvements to the I–94/1–69 Corridor, To Provide Safe, Efficient and Secure Movement of People and Goods across the Canadian-U.S. Border, Port Huron Area, St. Clair County, MI, Wait Period Ends: 05/04/ 2009, Contact: Ryan Rizzo, 517–702– 1833. EIS No. 20090091, Draft EIS, FRC, VA, Smith Mountain Pumped Storage Project (FERC No. 2210–169). Application for Hydropower License To Continue Operating the 636megawatt Pumped Storage Project, Roanoke River, Bedford, Campbell, Franklin and Pittsylvania Counties, VA, Comment Period Ends: 05/18/ 2009, Contact: Patricia Schaub, 1–866–208–3372. EIS No. 20090092, Draft EIS, FHW, MO, East Columbia Transportation Project, To Improvements the Transportation Network in Eastern Columbia/Bounty County by: (1) Extending Route 740 from its Terminus at US–63, along a new Alignment, to I–70 at the existing St. Charles road interchange, (2) Improving existing Broadway (Route WW) to Oliver Road and (3) Extending Ballenger Lane, from Route 740 to Clark Lane, City of Columbia, Bounty County, MO, Comment Period Ends: 05/18/2009, Contact: Peggy Casey, 573–636–7104. EIS No. 20090093, Final EIS, FHW, IA, I–29 Improvements in Sioux City, Construction from Burlington Northern Santa Fe Rail Road (BNSF) Bridge over the Missouri River to Existing Hamilton Boulevard Interchange, Woodbury County, IA, Wait Period Ends: 05/04/2009, Contact: Lubin Quinones, 515–233– 7300. EIS No. 20090094, Draft EIS, UAF, HI, Fort Kamehameha Historic District Buildings and Structures Proposes to Dispose of their Obligation of Continuing Management and Maintenance, Hickham Air Force Base (AFB), HI, Comment Period Ends: 05/18/2009, Contact: Tiffany Patrick, 808–449–3197. E:\FR\FM\03APN1.SGM 03APN1 Federal Register / Vol. 74, No. 63 / Friday, April 3, 2009 / Notices EIS No. 20090095, Final EIS, NRC, PA, Generic—License Renewal of Nuclear Plants, Supplement 35 to NUREG– 1437, Regarding Susquehanna Steam Electric Station, Units 1 and 2, Issuing Nuclear Power Plant Operating Licenses for a 20-Year Period, PA, Wait Period Ends: 05/04/2009, Contact: Andrew Stuyvenberg, 301– 415–4006. EIS No. 20090096, Final Supplement, COE, LA, Inner Harbor Navigation Canal (IHNC) Lock Replacement Project, Proposal for Relieving Navigation Traffic Congestion Associated with IHNC Lock, Located between the St. Claude Avenue and North Claibone Avenue Bridge, Orleans, LA, Wait Period Ends: 05/04/ 2009, Contact: Richard Boe, 504–862– 1505. Amended Notices sroberts on PROD1PC70 with NOTICES EIS No. 20090056, Third Draft Supplement, TPT, CA, Presidio Trust Management Plan (PTMP), Updated Information on the Preferred Alternative for the Main Post District of the Presidio of San Francisco, Implementation, City and County of San Francisco, CA, Comment Period Ends: 04/27/2009, Contact: John Pelka, 415–561–4183. Revision to FR Notice Published 03/06/2009: Extending Comment Period from 04/20/2009 to 04/27/2009. EIS No. 20090067, Draft Supplement, FHW, TX, Trinity Parkway Project, New and Additional Information, Construction of a Six-Lane Controlled Access Toll Facility from IH–35 E/ TX–183 to US–175/TX–310, U.S. Army COE Section 10 and 404 Permits, Dallas County, TX, Comment Period Ends: 05/15/2009, Contact: Salvador Deocampo, 512–536–5950. Revision to FR Notice Published 03/ 20/2009: Extending Comment Period from 05/04/2009 to 05/15/2009. EIS No. 20090053, Final Supplement, COE, MS, Gulfport Harbor Navigation Channel Project, To Evaluate Proposed Construction of Authorized Improvements to the Gulfport Harbor, Harrison County, MS, Wait Period Ends: 05/04/2009. Contract: Jennifer Jacobson, 251–690–2724. Revision to FR Notice Published 03/06/2009: Extending Wait Period from 04/06/ 2009 to 05/04/2009, Due to an Omission in Appendix D. Dated: March 31, 2009. Robert W. Hargrove, Director, NEPA Compliance Division, Office of Federal Activities. [FR Doc. E9–7516 Filed 4–2–09; 8:45 am] BILLING CODE 6560–50–P VerDate Nov<24>2008 16:07 Apr 02, 2009 Jkt 217001 ENVIRONMENTAL PROTECTION AGENCY [FRL–8789–3] Science Advisory Board Staff Office; Notification of a Public Meeting of the Clean Air Scientific Advisory Committee (CASAC) Carbon Monoxide Review Panel AGENCY: Environmental Protection Agency (EPA). ACTION: Notice. SUMMARY: The Environmental Protection Agency (EPA) Science Advisory Board (SAB) Staff Office announces a public meeting of the Clean Air Scientific Advisory Committee Carbon Monoxide Review Panel to peer review EPA’s Integrated Science Assessment for Carbon Monoxide: First External Review Draft and conduct a consultation on EPA’s planning document entitled Carbon Monoxide National Ambient Air Quality Standards: Scope and Methods Plan for Risk and Exposure Assessment. DATES: The public meeting will be held on Tuesday, May 12, 2009 from 9 a.m. to 5 p.m. (Eastern Time) and Wednesday, May 13, 2009 from 8 a.m. to 2 p.m. (Eastern Time). ADDRESSES: The meeting will be held at the Carolina Inn, 211 Pittsboro Street, Chapel Hill, North Carolina 27516. FOR FURTHER INFORMATION CONTACT: Any member of the public who wants further information concerning the CASAC public meeting may contact Dr. Ellen Rubin, Designated Federal Officer (DFO), EPA Science Advisory Board (1400F), U.S. Environmental Protection Agency, 1200 Pennsylvania Avenue, NW., Washington, DC 20460; via telephone/voice mail (202) 343–9975; fax (202) 233–0643; or e-mail at rubin.ellen@epa.gov. General information concerning the CASAC can be found on the EPA Web site at https://www.epa.gov/casac. SUPPLEMENTARY INFORMATION: Background: The Clean Air Scientific Advisory Committee (CASAC) was established under section 109(d)(2) of the Clean Air Act (CAA or Act) (42 U.S.C. 7409) as an independent scientific advisory committee. CASAC provides advice, information and recommendations on the scientific and technical aspects of air quality criteria and National Ambient Air Quality Standards (NAAQS) under sections 108 and 109 of the Act. The CASAC is a Federal advisory committee chartered under the Federal Advisory Committee Act (FACA), as amended, 5 U.S.C., App. The Panel will comply with the PO 00000 Frm 00026 Fmt 4703 Sfmt 4703 15265 provisions of FACA and all appropriate SAB Staff Office procedural policies. Section 109(d)(1) of the CAA requires that the Agency periodically review and revise, as appropriate, the air quality criteria and the National Ambient Air Quality Standards (NAAQS) for the six ‘‘criteria’’ air pollutants, including carbon monoxide (CO). EPA is conducting scientific assessments to review the primary (health-based) NAAQS of CO. As part of this review, EPA’s Office of Research and Development (ORD) has completed a draft document, Integrated Science Assessment for Carbon Monoxide (First External Review Draft, March 2009) and requested that CASAC peer review the document. EPA’s Office of Air and Radiation (OAR) will also release a planning document entitled Carbon Monoxide National Ambient Air Quality Standards: Scope and Methods Plan for Risk and Exposure Assessment (April 2009). OAR has requested that the CASAC provide consultative advice on this plan. The purpose of the May 12–13, 2009 meeting is to review these two documents. Background information about the formation of the CASAC Carbon Monoxide Review Panel was published in the Federal Register on October 12, 2007 (72 FR 58078–58080). The CASAC Panel previously held a public teleconference on April 8, 2008 (announced in 73 FR 12998) to provide consultative advice on EPA’s Plan for Review of the National Ambient Air Quality Standards for Carbon Monoxide, the first document in this review of the CO NAAQS. The CASAC panel report was made available at https://yosemite.epa.gov/sab/ sabproduct.nsf/AB0ED61CDF9F3 7DF8525746A005C12EC/$File/EPACASAC-08-013-unsigned.pdf. Technical Contacts: Any questions concerning EPA’s Integrated Science Assessment for Carbon Monoxide should be directed to Dr. Tom Long at long.tom@epa.gov at (919) 541–1880. Any questions concerning EPA’s Carbon Monoxide National Ambient Air Quality Standard: Scope and Methods Plan for Risk and Exposure Assessment should be directed to Dr. Dave McKee at mckee.dave@epa.gov at (919) 541–5288. Availability of Meeting Materials: A meeting agenda, charge questions and other materials for the meeting will be placed on the CASAC Web site at https://www.epa.gov/casac. Select the calendar link on the left and click on May 12–13. The Integrated Science Assessment for Carbon Monoxide: First External Review Draft (March 2009) is available at https://cfpub.epa.gov/ncea/ cfm/recordisplay.cfm?deid=203935. The E:\FR\FM\03APN1.SGM 03APN1

Agencies

[Federal Register Volume 74, Number 63 (Friday, April 3, 2009)]
[Notices]
[Pages 15264-15265]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E9-7516]


-----------------------------------------------------------------------

ENVIRONMENTAL PROTECTION AGENCY

[ER-FRL-8591-9]


Environmental Impacts Statements; Notice of Availability

    Responsible Agency: Office of Federal Activities, General 
Information, (202) 564-1399 or https://www.epa.gov/compliance/nepa/

Weekly receipt of Environmental Impact Statements
Filed 03/23/2009 through 03/27/2009
Pursuant to 40 CFR 1506.9.

EIS No. 20090088, Draft EIS, BLM, UT, Greens Hollow Coal Lease Tract 
Project, Proposed Federal Coal Leasing and Subsequent Underground Coal 
Mining, Funding and Lease Application, Fishlake and Manti-La Sal 
National Forest, Sanpete and Sevier Counties, UT, Comment Period Ends: 
05/18/2009, Contact: Steve Rigby, 435-636-3604.
EIS No. 20090089, Final EIS, AFS, AZ, Warm Fire Recovery Project, 
Removal of Fire-Killed Trees Reforestation, Fuel Reduction and Road 
Reconstruction of Wildland Fire Burn Portion, Coconino County, AZ, Wait 
Period Ends: 05/04/2009, Contact: Lois Pfeffer, 559-359-7023.
EIS No. 20090090, Final EIS, FHW, MI, Blue Water Bridge Plaza Study and 
Improvements to the I-94/1-69 Corridor, To Provide Safe, Efficient and 
Secure Movement of People and Goods across the Canadian-U.S. Border, 
Port Huron Area, St. Clair County, MI, Wait Period Ends: 05/04/2009, 
Contact: Ryan Rizzo, 517-702-1833.
EIS No. 20090091, Draft EIS, FRC, VA, Smith Mountain Pumped Storage 
Project (FERC No. 2210-169). Application for Hydropower License To 
Continue Operating the 636-megawatt Pumped Storage Project, Roanoke 
River, Bedford, Campbell, Franklin and Pittsylvania Counties, VA, 
Comment Period Ends: 05/18/2009, Contact: Patricia Schaub, 1-866-208-
3372.
EIS No. 20090092, Draft EIS, FHW, MO, East Columbia Transportation 
Project, To Improvements the Transportation Network in Eastern 
Columbia/Bounty County by: (1) Extending Route 740 from its Terminus at 
US-63, along a new Alignment, to I-70 at the existing St. Charles road 
interchange, (2) Improving existing Broadway (Route WW) to Oliver Road 
and (3) Extending Ballenger Lane, from Route 740 to Clark Lane, City of 
Columbia, Bounty County, MO, Comment Period Ends: 05/18/2009, Contact: 
Peggy Casey, 573-636-7104.
EIS No. 20090093, Final EIS, FHW, IA, I-29 Improvements in Sioux City, 
Construction from Burlington Northern Santa Fe Rail Road (BNSF) Bridge 
over the Missouri River to Existing Hamilton Boulevard Interchange, 
Woodbury County, IA, Wait Period Ends: 05/04/2009, Contact: Lubin 
Quinones, 515-233-7300.
EIS No. 20090094, Draft EIS, UAF, HI, Fort Kamehameha Historic District 
Buildings and Structures Proposes to Dispose of their Obligation of 
Continuing Management and Maintenance, Hickham Air Force Base (AFB), 
HI, Comment Period Ends: 05/18/2009, Contact: Tiffany Patrick, 808-449-
3197.

[[Page 15265]]

EIS No. 20090095, Final EIS, NRC, PA, Generic--License Renewal of 
Nuclear Plants, Supplement 35 to NUREG-1437, Regarding Susquehanna 
Steam Electric Station, Units 1 and 2, Issuing Nuclear Power Plant 
Operating Licenses for a 20-Year Period, PA, Wait Period Ends: 05/04/
2009, Contact: Andrew Stuyvenberg, 301-415-4006.
EIS No. 20090096, Final Supplement, COE, LA, Inner Harbor Navigation 
Canal (IHNC) Lock Replacement Project, Proposal for Relieving 
Navigation Traffic Congestion Associated with IHNC Lock, Located 
between the St. Claude Avenue and North Claibone Avenue Bridge, 
Orleans, LA, Wait Period Ends: 05/04/2009, Contact: Richard Boe, 504-
862-1505.

Amended Notices

EIS No. 20090056, Third Draft Supplement, TPT, CA, Presidio Trust 
Management Plan (PTMP), Updated Information on the Preferred 
Alternative for the Main Post District of the Presidio of San 
Francisco, Implementation, City and County of San Francisco, CA, 
Comment Period Ends: 04/27/2009, Contact: John Pelka, 415-561-4183. 
Revision to FR Notice Published 03/06/2009: Extending Comment Period 
from 04/20/2009 to 04/27/2009.
EIS No. 20090067, Draft Supplement, FHW, TX, Trinity Parkway Project, 
New and Additional Information, Construction of a Six-Lane Controlled 
Access Toll Facility from IH-35 E/TX-183 to US-175/TX-310, U.S. Army 
COE Section 10 and 404 Permits, Dallas County, TX, Comment Period Ends: 
05/15/2009, Contact: Salvador Deocampo, 512-536-5950. Revision to FR 
Notice Published 03/20/2009: Extending Comment Period from 05/04/2009 
to 05/15/2009.
EIS No. 20090053, Final Supplement, COE, MS, Gulfport Harbor Navigation 
Channel Project, To Evaluate Proposed Construction of Authorized 
Improvements to the Gulfport Harbor, Harrison County, MS, Wait Period 
Ends: 05/04/2009. Contract: Jennifer Jacobson, 251-690-2724. Revision 
to FR Notice Published 03/06/2009: Extending Wait Period from 04/06/
2009 to 05/04/2009, Due to an Omission in Appendix D.

    Dated: March 31, 2009.
Robert W. Hargrove,
Director, NEPA Compliance Division, Office of Federal Activities.
 [FR Doc. E9-7516 Filed 4-2-09; 8:45 am]
BILLING CODE 6560-50-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.