Environmental Impact Statements and Regulations; Availability of EPA Comments, 15263-15264 [E9-7515]
Download as PDF
Federal Register / Vol. 74, No. 63 / Friday, April 3, 2009 / Notices
If you use a TDD, call the FRS, toll
free, at 1–800–877–8339.
statements (EISs) was published in FR
dated April 6, 2008 (73 FR 19833).
VIII. Other Information
Draft EISs
Accessible Format: Individuals with
disabilities can obtain this document
and a copy of the application package in
an accessible format (e.g., braille, large
print, audiotape, or computer diskette)
on request to the program contact
person listed in Section VII of this
notice.
Electronic Access to This Document:
You can view this document, as well as
all other documents of this Department
published in the Federal Register, in
text or Adobe Portable Document
Format (PDF), on the Internet at the
following site: https://www.ed.gov/news/
fedregister.
To use PDF, you must have Adobe
Acrobat Reader, which is available free
at this site. If you have questions about
using PDF, call the U.S. Government
Printing Office (GPO), toll free, at 1–
888–293–6498; or in the Washington,
DC, area at (202) 512–1530.
EIS No. 20080242, ERP No. D–BLM–
D65040–WV, East Lynn Lake Coal
Lease Project, Proposal to Lease
Federal Coal that lies Under Nine
Tracts of Land for Mining, Wayne
County, WV.
Summary: EPA expressed
environmental objections to adverse
impacts to water quality and aquatic
life. EPA recommends consideration of
an alternative that includes a more
protective buffer between proposed
mining operations and the existing
earthen dam including East Lynn Lake.
Additionally, the final EIS should
include information on degradation
from past mining activities, clarify the
hydrologic connection between surface
and ground water, and geological
conditions in the project area. Rating
EO2.
EIS No. 20080279, ERP No. D–FRC–
D05125–PA, Holtwood Hydroelectric
Project (Docket No. P–1881–050)
Application for an Amendment
License to Increase the Installed
Capacity, Susquehanna River,
Lancaster and York Counties, PA.
Summary: Although EPA
acknowledged the efforts to address fish
passage, we expressed environmental
concerns about potential impacts to
other resources, including wetlands and
water quality, and requested that
information, regarding wetland
delineation, plans for excavation of
sediment and bedrock, sediment
sampling protocols, and a comparison of
impacts of the excavation and blasting
plans be included in the FEIS. Rating
EC2.
EIS No. 20080393, ERP No. D–NRC–
D06006–PA, Generic—License
Renewal of Nuclear Plants,
Supplement 36 to NUREG–1437,
Regarding Beaver Valley Power
Station, Units 1 and 2, Plant Specific,
Issuing Nuclear Power Plant
Operating License for an Additional
20-Year Period, PA.
Summary: EPA does not object to
proposed project. Rating LO.
EIS No. 20080404, ERP No. D–BLM–
J65526–00, Grand Staircase—
Escalante National Monument
(GSENM), Draft Monument
Management Plan Amendment &
Draft Rangeland Health,
Implementation, Portions of Kane and
Garfield, Utah and Coconino County,
AZ.
Summary: EPA expressed
environmental concerns about the use of
Note: The official version of this document
is the document published in the Federal
Register. Free Internet access to the official
edition of the Federal Register and the Code
of Federal Regulations is available on GPO
Access at: https://www.gpoaccess.gov/nara/
index.html.
Delegation of Authority: The Secretary
of Education has delegated authority to
Daniel T. Madzelan, Director,
Forecasting and Policy Analysis for the
Office of Postsecondary Education, to
perform the functions of the Assistant
Secretary for Postsecondary Education.
Dated: March 31, 2009.
Daniel T. Madzelan,
Director, Forecasting and Policy Analysis.
[FR Doc. E9–7532 Filed 4–2–09; 8:45 am]
BILLING CODE 4000–01–P
ENVIRONMENTAL PROTECTION
AGENCY
[ER–FRL–8592–1]
sroberts on PROD1PC70 with NOTICES
Environmental Impact Statements and
Regulations; Availability of EPA
Comments
Availability of EPA comments
prepared pursuant to the Environmental
Review Process (ERP), under section
309 of the Clean Air Act and Section
102(2)(c) of the National Environmental
Policy Act as amended. Requests for
copies of EPA comments can be directed
to the Office of Federal Activities at
202–564–7146.
An explanation of the ratings assigned
to draft environmental impact
VerDate Nov<24>2008
16:07 Apr 02, 2009
Jkt 217001
PO 00000
Frm 00024
Fmt 4703
Sfmt 4703
15263
accurate criteria to measure stream
riparian health and trends in the grazing
allotments, and the need to mitigate
impacts to the impaired reaches of the
Paria River and the Escalante River.
Rating EC2.
EIS No. 20080484, ERP No. D–NOA–
L91033–AK, Bering Sea Chinook
Salmon Bycatch Management,
Establish New Measures to Minimize
Chinook Salmon Bycatch, to Amend
the Fishery Management Plan,
Implementation, Bering Sea Pollock
Fishery, AK.
Summary: EPA expressed
environmental concerns about
monitoring and enforcement of the
Bering Sea Chinook Salmon Bycatch
program, and requested a discussion of
how climate change may impact the
proposed action. Rating EC2.
EIS No. 20080503, ERP No. D–NRC–
D06007–PA, Generic—License
Renewal of Nuclear Plants,
Supplement 37 to NUREG–1437,
Regarding Three Mile Island Nuclear
Station, Unit 1, in Londonterry
Township in Dauphin County, PA.
Summary: EPA expressed
environmental concerns about air
quality impacts associated with the
steam generator transport process.
Rating EC2.
EIS No. 20080513, ERP No. D–AFS–
L65562–AK, Central Kupreanof
Timber Harvest Project, Proposes to
Harvest up to 70.2 Million Board Feet
of Timber, Kupreanof Island,
Petersburg Ranger District, Tongass
National Forest, AK.
Summary: EPA expressed
environmental concerns about potential
adverse impacts to essential fish habitat
and water quality from increased
harvest activities. Rating EC2.
EIS No. 20080521, ERP No. D–NPS–
J65528–ND, Theodore Roosevelt
National Park, Elk Management Plan,
Implementation, Billing and
McKenzie Counties, ND.
Summary: EPA does not object to the
proposed project. Rating LO.
EIS No. 20080535, ERP No. D–BLM–
J65529–MT, Indian Creek Mine
Expansion, Proposed Mine Expansion
would include Quarry Areas, Mine
Facilities, Ore Storage Sites, Soil
Salvage Stockpiles, Haul Roads, and
Overburden Disposal Areas, Issuing
Operating Permit #00105 and Plan of
Operation #MTM78300, Broadwater
County, MT.
Summary: EPA expressed
environmental concerns about potential
impacts to air quality and nitrate
contamination of groundwater from
blasting residue. The final EIS should
E:\FR\FM\03APN1.SGM
03APN1
15264
Federal Register / Vol. 74, No. 63 / Friday, April 3, 2009 / Notices
include monitoring and mitigation
measures to avoid water quality impacts
and an air quality analysis including
values for NAAQS and PSD. Rating EC2.
EIS No. 20080543, ERP No. D–NRC–
C03017–NY, Generic—License
Renewal of Nuclear Plants,
Supplement 38 to NUREG–1437,
Regarding Indian Point Nuclear
Generating Unit Nos. 2 and 3,
Westchester County, NY.
Summary: EPA expressed
environmental concerns about the
proposed project’s impacts to aquatic
resources and storage of low level waste.
We recommended that the final SEIS
include new geologic and seismic data
concerning recent seismic activity in the
area. Rating EC2.
EIS No. 20090004, ERP No. D–NPS–
H65028–MO, Jefferson National
Expansion Memorial, General
Management Plan, Implementation,
St. Louis, MO.
Summary: EPA expressed
environmental concerns that the
competition for the design of the
preferred alternative had not begun, and
that the implemented design could
cause ‘‘moderate to major long term to
beneficial impacts on transportation’’.
EPA recommended working with
metropolitan and State transportation
planners to include design
specifications to reduce potential
adverse effects. Rating EC2.
sroberts on PROD1PC70 with NOTICES
Final EISs
EIS No. 20080472, ERP No. F–FRC–
D05125–PA, Holtwood Hydroelectric
Project (Docket No. P–1881–050)
Application for an Amendment
License to Increase the Installed
Capacity, Susquehanna River,
Lancaster and York Counties, PA.
Summary: EPA expressed
environmental concerns because the
impacts associated with sediment and
bedrock excavation activities, and
requested additional information,
including excavation plans, a
comparison of alternatives, and
sediment sampling plans.
EIS No. 20080526, ERP No. F–IBR–
J39038–CO, Southern Delivery System
Project, Water Supply Development,
Execution of up to 40-year Contracts
for Use of Fryingpan-Arkansas Project
Facilities, Special Use Permit, El Paso
County, CO.
Summary: EPA found the Final EIS to
be largely responsive to EPA’s
comments on the Draft EIS and
Supplemental Information Report, and
believes the project is much improved
and will result in fewer environmental
impacts than what was originally
VerDate Nov<24>2008
16:07 Apr 02, 2009
Jkt 217001
proposed. EPA does not object to the
proposed project.
EIS No. 20090012, ERP No. F–NOA–
L91032–00, Proposed Acceptable
Biological Catch (ABC) and Optimum
Yield (OY) Specifications and
Management Measures for the 2009–
2010 Pacific Coast Groundfish Fishery
Management Plan, Implementation,
WA, OR and CA.
Summary: While EPA had no
objections to the proposed action, EPA
did request clarification on monitoring
and catch limits.
EIS No. 20090042, ERP No. FR–AFS–
J65446–MT, Beaverhead-Deerlodge
National Forest Land and Resource
Management Plan, Implementation,
Beaverhead, Butte-Silver Bow,
Deerlodge, Granite, Jefferson, and
Madison Counties, MT.
Summary: The preferred alternative
addresses EPA concerns and we support
the development of a consistent and
integrated aquatic strategy to provide for
protection for riparian areas, aquatic
species, and good water quality.
EIS No. 20090037, ERP No. FS–AFS–
F65062–MN, Echo Trail Area Forest
Management Project, Updated
Information to Amended to Further
Address Water Quality and Watershed
Health, Superior National Forest,
Lacroix Ranger District and
Kawishiwi Ranger District, St. Louis
and Lake Counties, MN.
Summary: No formal comments were
sent to the preparing agency.
Dated: March 31, 2009.
Dawn Roberts,
Management Analyst, Office of Federal
Activities.
[FR Doc. E9–7515 Filed 4–2–09; 8:45 am]
BILLING CODE 6560–50–P
ENVIRONMENTAL PROTECTION
AGENCY
[ER–FRL–8591–9]
Environmental Impacts Statements;
Notice of Availability
Responsible Agency: Office of Federal
Activities, General Information, (202)
564–1399 or https://www.epa.gov/
compliance/nepa/
Weekly receipt of Environmental Impact
Statements
Filed 03/23/2009 through 03/27/2009
Pursuant to 40 CFR 1506.9.
EIS No. 20090088, Draft EIS, BLM, UT,
Greens Hollow Coal Lease Tract
Project, Proposed Federal Coal
Leasing and Subsequent Underground
Coal Mining, Funding and Lease
PO 00000
Frm 00025
Fmt 4703
Sfmt 4703
Application, Fishlake and Manti-La
Sal National Forest, Sanpete and
Sevier Counties, UT, Comment Period
Ends: 05/18/2009, Contact: Steve
Rigby, 435–636–3604.
EIS No. 20090089, Final EIS, AFS, AZ,
Warm Fire Recovery Project, Removal
of Fire-Killed Trees Reforestation,
Fuel Reduction and Road
Reconstruction of Wildland Fire Burn
Portion, Coconino County, AZ, Wait
Period Ends: 05/04/2009, Contact:
Lois Pfeffer, 559–359–7023.
EIS No. 20090090, Final EIS, FHW, MI,
Blue Water Bridge Plaza Study and
Improvements to the I–94/1–69
Corridor, To Provide Safe, Efficient
and Secure Movement of People and
Goods across the Canadian-U.S.
Border, Port Huron Area, St. Clair
County, MI, Wait Period Ends: 05/04/
2009, Contact: Ryan Rizzo, 517–702–
1833.
EIS No. 20090091, Draft EIS, FRC, VA,
Smith Mountain Pumped Storage
Project (FERC No. 2210–169).
Application for Hydropower License
To Continue Operating the 636megawatt Pumped Storage Project,
Roanoke River, Bedford, Campbell,
Franklin and Pittsylvania Counties,
VA, Comment Period Ends: 05/18/
2009, Contact: Patricia Schaub,
1–866–208–3372.
EIS No. 20090092, Draft EIS, FHW, MO,
East Columbia Transportation Project,
To Improvements the Transportation
Network in Eastern Columbia/Bounty
County by: (1) Extending Route 740
from its Terminus at US–63, along a
new Alignment, to I–70 at the existing
St. Charles road interchange, (2)
Improving existing Broadway (Route
WW) to Oliver Road and (3)
Extending Ballenger Lane, from Route
740 to Clark Lane, City of Columbia,
Bounty County, MO, Comment Period
Ends: 05/18/2009, Contact: Peggy
Casey, 573–636–7104.
EIS No. 20090093, Final EIS, FHW, IA,
I–29 Improvements in Sioux City,
Construction from Burlington
Northern Santa Fe Rail Road (BNSF)
Bridge over the Missouri River to
Existing Hamilton Boulevard
Interchange, Woodbury County, IA,
Wait Period Ends: 05/04/2009,
Contact: Lubin Quinones, 515–233–
7300.
EIS No. 20090094, Draft EIS, UAF, HI,
Fort Kamehameha Historic District
Buildings and Structures Proposes to
Dispose of their Obligation of
Continuing Management and
Maintenance, Hickham Air Force Base
(AFB), HI, Comment Period Ends:
05/18/2009, Contact: Tiffany Patrick,
808–449–3197.
E:\FR\FM\03APN1.SGM
03APN1
Agencies
[Federal Register Volume 74, Number 63 (Friday, April 3, 2009)]
[Notices]
[Pages 15263-15264]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E9-7515]
=======================================================================
-----------------------------------------------------------------------
ENVIRONMENTAL PROTECTION AGENCY
[ER-FRL-8592-1]
Environmental Impact Statements and Regulations; Availability of
EPA Comments
Availability of EPA comments prepared pursuant to the Environmental
Review Process (ERP), under section 309 of the Clean Air Act and
Section 102(2)(c) of the National Environmental Policy Act as amended.
Requests for copies of EPA comments can be directed to the Office of
Federal Activities at 202-564-7146.
An explanation of the ratings assigned to draft environmental
impact statements (EISs) was published in FR dated April 6, 2008 (73 FR
19833).
Draft EISs
EIS No. 20080242, ERP No. D-BLM-D65040-WV, East Lynn Lake Coal Lease
Project, Proposal to Lease Federal Coal that lies Under Nine Tracts of
Land for Mining, Wayne County, WV.
Summary: EPA expressed environmental objections to adverse impacts
to water quality and aquatic life. EPA recommends consideration of an
alternative that includes a more protective buffer between proposed
mining operations and the existing earthen dam including East Lynn
Lake. Additionally, the final EIS should include information on
degradation from past mining activities, clarify the hydrologic
connection between surface and ground water, and geological conditions
in the project area. Rating EO2.
EIS No. 20080279, ERP No. D-FRC-D05125-PA, Holtwood Hydroelectric
Project (Docket No. P-1881-050) Application for an Amendment License to
Increase the Installed Capacity, Susquehanna River, Lancaster and York
Counties, PA.
Summary: Although EPA acknowledged the efforts to address fish
passage, we expressed environmental concerns about potential impacts to
other resources, including wetlands and water quality, and requested
that information, regarding wetland delineation, plans for excavation
of sediment and bedrock, sediment sampling protocols, and a comparison
of impacts of the excavation and blasting plans be included in the
FEIS. Rating EC2.
EIS No. 20080393, ERP No. D-NRC-D06006-PA, Generic--License Renewal of
Nuclear Plants, Supplement 36 to NUREG-1437, Regarding Beaver Valley
Power Station, Units 1 and 2, Plant Specific, Issuing Nuclear Power
Plant Operating License for an Additional 20-Year Period, PA.
Summary: EPA does not object to proposed project. Rating LO.
EIS No. 20080404, ERP No. D-BLM-J65526-00, Grand Staircase--Escalante
National Monument (GSENM), Draft Monument Management Plan Amendment &
Draft Rangeland Health, Implementation, Portions of Kane and Garfield,
Utah and Coconino County, AZ.
Summary: EPA expressed environmental concerns about the use of
accurate criteria to measure stream riparian health and trends in the
grazing allotments, and the need to mitigate impacts to the impaired
reaches of the Paria River and the Escalante River. Rating EC2.
EIS No. 20080484, ERP No. D-NOA-L91033-AK, Bering Sea Chinook Salmon
Bycatch Management, Establish New Measures to Minimize Chinook Salmon
Bycatch, to Amend the Fishery Management Plan, Implementation, Bering
Sea Pollock Fishery, AK.
Summary: EPA expressed environmental concerns about monitoring and
enforcement of the Bering Sea Chinook Salmon Bycatch program, and
requested a discussion of how climate change may impact the proposed
action. Rating EC2.
EIS No. 20080503, ERP No. D-NRC-D06007-PA, Generic--License Renewal of
Nuclear Plants, Supplement 37 to NUREG-1437, Regarding Three Mile
Island Nuclear Station, Unit 1, in Londonterry Township in Dauphin
County, PA.
Summary: EPA expressed environmental concerns about air quality
impacts associated with the steam generator transport process. Rating
EC2.
EIS No. 20080513, ERP No. D-AFS-L65562-AK, Central Kupreanof Timber
Harvest Project, Proposes to Harvest up to 70.2 Million Board Feet of
Timber, Kupreanof Island, Petersburg Ranger District, Tongass National
Forest, AK.
Summary: EPA expressed environmental concerns about potential
adverse impacts to essential fish habitat and water quality from
increased harvest activities. Rating EC2.
EIS No. 20080521, ERP No. D-NPS-J65528-ND, Theodore Roosevelt National
Park, Elk Management Plan, Implementation, Billing and McKenzie
Counties, ND.
Summary: EPA does not object to the proposed project. Rating LO.
EIS No. 20080535, ERP No. D-BLM-J65529-MT, Indian Creek Mine Expansion,
Proposed Mine Expansion would include Quarry Areas, Mine Facilities,
Ore Storage Sites, Soil Salvage Stockpiles, Haul Roads, and Overburden
Disposal Areas, Issuing Operating Permit 00105 and Plan of
Operation MTM78300, Broadwater County, MT.
Summary: EPA expressed environmental concerns about potential
impacts to air quality and nitrate contamination of groundwater from
blasting residue. The final EIS should
[[Page 15264]]
include monitoring and mitigation measures to avoid water quality
impacts and an air quality analysis including values for NAAQS and PSD.
Rating EC2.
EIS No. 20080543, ERP No. D-NRC-C03017-NY, Generic--License Renewal of
Nuclear Plants, Supplement 38 to NUREG-1437, Regarding Indian Point
Nuclear Generating Unit Nos. 2 and 3, Westchester County, NY.
Summary: EPA expressed environmental concerns about the proposed
project's impacts to aquatic resources and storage of low level waste.
We recommended that the final SEIS include new geologic and seismic
data concerning recent seismic activity in the area. Rating EC2.
EIS No. 20090004, ERP No. D-NPS-H65028-MO, Jefferson National Expansion
Memorial, General Management Plan, Implementation, St. Louis, MO.
Summary: EPA expressed environmental concerns that the competition
for the design of the preferred alternative had not begun, and that the
implemented design could cause ``moderate to major long term to
beneficial impacts on transportation''. EPA recommended working with
metropolitan and State transportation planners to include design
specifications to reduce potential adverse effects. Rating EC2.
Final EISs
EIS No. 20080472, ERP No. F-FRC-D05125-PA, Holtwood Hydroelectric
Project (Docket No. P-1881-050) Application for an Amendment License to
Increase the Installed Capacity, Susquehanna River, Lancaster and York
Counties, PA.
Summary: EPA expressed environmental concerns because the impacts
associated with sediment and bedrock excavation activities, and
requested additional information, including excavation plans, a
comparison of alternatives, and sediment sampling plans.
EIS No. 20080526, ERP No. F-IBR-J39038-CO, Southern Delivery System
Project, Water Supply Development, Execution of up to 40-year Contracts
for Use of Fryingpan-Arkansas Project Facilities, Special Use Permit,
El Paso County, CO.
Summary: EPA found the Final EIS to be largely responsive to EPA's
comments on the Draft EIS and Supplemental Information Report, and
believes the project is much improved and will result in fewer
environmental impacts than what was originally proposed. EPA does not
object to the proposed project.
EIS No. 20090012, ERP No. F-NOA-L91032-00, Proposed Acceptable
Biological Catch (ABC) and Optimum Yield (OY) Specifications and
Management Measures for the 2009-2010 Pacific Coast Groundfish Fishery
Management Plan, Implementation, WA, OR and CA.
Summary: While EPA had no objections to the proposed action, EPA
did request clarification on monitoring and catch limits.
EIS No. 20090042, ERP No. FR-AFS-J65446-MT, Beaverhead-Deerlodge
National Forest Land and Resource Management Plan, Implementation,
Beaverhead, Butte-Silver Bow, Deerlodge, Granite, Jefferson, and
Madison Counties, MT.
Summary: The preferred alternative addresses EPA concerns and we
support the development of a consistent and integrated aquatic strategy
to provide for protection for riparian areas, aquatic species, and good
water quality.
EIS No. 20090037, ERP No. FS-AFS-F65062-MN, Echo Trail Area Forest
Management Project, Updated Information to Amended to Further Address
Water Quality and Watershed Health, Superior National Forest, Lacroix
Ranger District and Kawishiwi Ranger District, St. Louis and Lake
Counties, MN.
Summary: No formal comments were sent to the preparing agency.
Dated: March 31, 2009.
Dawn Roberts,
Management Analyst, Office of Federal Activities.
[FR Doc. E9-7515 Filed 4-2-09; 8:45 am]
BILLING CODE 6560-50-P