Federal Register / Vol. 74, No. 62 / Thursday, April 2, 2009 / Notices
with the Commission and is available
for public inspection.
a. Type of Application: New Major
License.
b. Project No.: 2677–019.
c. Date filed: August 29, 2007.
d. Applicant: City of Kaukauna,
Wisconsin.
e. Name of Project: Badger-Rapide
Croche Hydroelectric Project.
f. Location: On the Fox River in the
City of Kaukauna, in Outagamie County,
Wisconsin. The project does not affect
federal lands.
g. Filed Pursuant to: Federal Power
Act 16 U.S.C. 791 (a)—825(r).
h. Applicant Contact: Mike Pedersen,
Kaukauna Utilities, 777 Island Street,
P.O. Box 1777, Kaukauna, WI 54130–
7077, (920) 462–0220, or Arie DeWaal,
Mead & Hunt, Inc., 6501 Watts Road,
Madison, WI 53719, (608) 273–6380.
i. FERC Contact: John Smith (202)
502–8972 or john.smith@ferc.gov.
j. Deadline for filing comments,
recommendations, terms and
conditions, and prescriptions is 60 days
from the issuance date of this notice;
reply comments are due 105 days from
the issuance date of this notice.
All documents (original and eight
copies) should be filed with: Kimberly
D. Bose, Secretary, Federal Energy
Regulatory Commission, 888 First Street
NE., Washington, DC 20426.
The Commission’s Rules of Practice
require all intervenors filing documents
with the Commission to serve a copy of
that document on each person on the
official service list for the project.
Further, if an intervenor files comments
or documents with the Commission
relating to the merits of an issue that
may affect the responsibilities of a
particular resource agency, they must
also serve a copy of the document on
that resource agency.
Comments, recommendations, terms
and conditions, and prescriptions may
be filed electronically via the Internet in
lieu of paper. The Commission strongly
encourages electronic filings. See 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site (https://www.ferc.gov/docs-filing/
ferconline.asp) under the ‘‘e-filing’’ link.
For a simpler method of submitting text
only comments, click on ‘‘Quick
Comment.’’
k. This application has been accepted,
and is ready for environmental analysis
at this time.
l. The existing project consists of the
Badger and Rapide Croche
developments.
As licensed, the existing Badger
Development utilizes the head created
by the 22-foot-high Army Corps of
Engineers (Corps) Kaukauna dam and
VerDate Nov<24>2008
17:43 Apr 01, 2009
Jkt 217001
consists of: (1) A 2,100-foot-long, 100foot-wide power canal that bifurcates
into a 260-foot-long, 200-foot-wide canal
and a 250-foot-long, 80-foot-wide canal
leading to; (2) the Old Badger
powerhouse containing two 1,000kilowatt (kW) generating units for a total
installed capacity of 2,000 kW; and (3)
the New Badger powerhouse containing
two 1,800-kW generating units for a
total installed capacity of 3,600 kW; and
(4) appurtenant facilities.
As licensed, the existing Rapide
Croche Development utilizes the head
created by the 20-foot-high Corps
Rapide Croche dam, located
approximately 4.5 miles downstream
from the Badger Development and
consists of: (1) A powerhouse, located
on the south end of the dam, containing
four 600-kW generating units for a total
installed capacity of 2,400 kW; (2) the
5-mile-long, 12-kilovolt (kV)
transmission line (serving both
developments); and (3) appurtenant
facilities.
The license application also indicates
that flashboards are used at the
Kaukauna and Rapide Croche dams to
provide additional head for project
generation. The flashboards used at the
Kaukauna dam are 6 inches high. The
flashboards used at the Rapide Croche
dam are 30 inches high.
The proposed project would include
decommissioning the Old Badger and
New Badger developments and
constructing a new 7-megawatt (MW)
powerhouse about 150 feet upstream
from the existing New Badger plant site.
Proposed project works would consist
of: (1) A modified power canal leading
to; (2) a new powerhouse with integral
intake; and (3) two identical 3.5- to 3.6–
MW horizontal Kaplan ‘‘S’’ type
turbines. The Old Badger development
would be converted to an alternative
use. The New Badger development
would be decommissioned, demolished,
and removed. The existing service road
would be demolished and removed. The
tailrace area associated with the existing
Old Badger development would be
filled with soil. A new service road
would be constructed over the filled
area. No significant changes are
proposed for the Rapide Croche
development.
The existing Badger and Rapide
Croche developments currently operate
in a run-of-river mode. As proposed, the
new project would continue to operate
in a run-of-river mode.
m. A copy of the application is
available for review at the Commission
in the Public Reference Room or may be
viewed on the Commission’s Web site at
https://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
PO 00000
Frm 00026
Fmt 4703
Sfmt 4703
14977
number excluding the last three digits in
the docket number field to access the
document. For assistance, contact FERC
Online Support at
FERCOnlineSupport@ferc.gov or tollfree at 1–866–208–3676, or for TTY,
(202) 502–8659. A copy is also available
for inspection and reproduction at the
address in item h above.
All filings must (1) Bear in all capital
letters the title ‘‘COMMENTS,’’ ‘‘REPLY
COMMENTS,’’
‘‘RECOMMENDATIONS,’’ ‘‘TERMS
AND CONDITIONS,’’ or
‘‘PRESCRIPTIONS;’’ (2) set forth in the
heading the name of the applicant and
the project number of the application to
which the filing responds; (3) furnish
the name, address, and telephone
number of the person submitting the
filing; and (4) otherwise comply with
the requirements of 18 CFR 385.2001
through 385.2005. All comments,
recommendations, terms and conditions
or prescriptions must set forth their
evidentiary basis and otherwise comply
with the requirements of 18 CFR 4.34(b).
Agencies may obtain copies of the
application directly from the applicant.
Each filing must be accompanied by
proof of service on all persons listed on
the service list prepared by the
Commission in this proceeding, in
accordance with 18 CFR 4.34(b), and
385.2010.
You may also register online at
https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
n. A license applicant must file no
later than 60 days following the date of
issuance of this notice: (1) A copy of the
water quality certification; (2) a copy of
the request for certification, including
proof of the date on which the certifying
agency received the request; or (3)
evidence of waiver of water quality
certification.
Kimberly D. Bose,
Secretary.
[FR Doc. E9–7347 Filed 4–1–09; 8:45 am]
BILLING CODE
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
March 26, 2009.
Take notice that the Commission
received the following electric rate
filings:
E:\FR\FM\02APN1.SGM
02APN1
mstockstill on PROD1PC66 with NOTICES
14978
Federal Register / Vol. 74, No. 62 / Thursday, April 2, 2009 / Notices
Docket Numbers: ER08–1178–003;
EL08–88–004.
Applicants: California Independent
System Operator Corporation.
Description: California Independent
System Operator Corporation submits
Attachment A- Exceptional Dispatch
Amendment Compliance Filing.
Filed Date: 03/23/2009.
Accession Number: 20090324–0295.
Comment Date: 5 p.m. Eastern Time
on Monday, April 13, 2009.
Docket Numbers: ER09–380–001.
Applicants: PacifiCorp
Description: PacifiCorp submits its
Transmission Interconnection
Agreement.
Filed Date: 03/05/2009.
Accession Number: 20090305–0175.
Comment Date: 5 p.m. Eastern Time
on Monday, April 06, 2009.
Docket Numbers: ER09–583–001.
Applicants: ITC Midwest LLC.
Description: ITC Midwest LLC
submits the cover sheet to the
Agreement redesignated as required
under the Midwest ISO’s Fourth
Revised Volume.
Filed Date: 03/25/2009.
Accession Number: 20090326–0027.
Comment Date: 5 p.m. Eastern Time
on Wednesday, April 15, 2009.
Docket Numbers: ER09–850–000.
Applicants: Public Service Company
of Colorado.
Description: Public Service Company
of Colorado submits Amended and
Restated Power Supply Agreement with
Holy Cross Electric Association, Inc
dated 2/18/09.
Filed Date: 03/16/2009.
Accession Number 20090317–0259.
Comment Date: 5 p.m. Eastern Time
on Monday, April 06, 2009.
Docket Numbers: ER09–851–000.
Applicants: PJM Interconnection
L.L.C.
Description: PJM Interconnection,
LLC submits a notice of cancellation of
a wholesale market participation
agreement with Granger Energy of
Honeybrook, LLC.
Filed Date: 03/16/2009.
Accession Number: 20090317–0260.
Comment Date: 5 p.m. Eastern Time
on Monday, April 06, 2009.
Docket Numbers: ER09–852–000.
Applicants: PJM Interconnection
L.L.C.
Description: PJM Interconnection,
LLC submits notice of cancellation of an
interim interconnection service
agreement with Connectiv Bethlehem,
LLC, etc.
Filed Date: 03/16/2009.
Accession Number: 20090317–0261.
Comment Date: 5 p.m. Eastern Time
on Monday, April 06, 2009.
VerDate Nov<24>2008
17:43 Apr 01, 2009
Jkt 217001
Docket Numbers: ER09–884–000.
Applicants: TransAlta Energy
Marketing Corporation.
Description: Petition of Transalta
Energy Marketing Corporation for
authority to sell energy, capacity, and
ancillary services at market-based rates,
acceptance of initial rate schedule,
waivers, and blanket authority.
Filed Date: 03/25/2009.
Accession Number: 20090326–0076.
Comment Date: 5 p.m. Eastern Time
on Wednesday, April 15, 2009.
Take notice that the Commission
received the following open access
transmission tariff filings:
Docket Numbers: OA09–23–000.
Applicants: Southwest Power Pool,
Inc.
Description: Request for Waiver of
Southwest Power Pool, Inc.
Filed Date: 03/26/2009.
Accession Number: 20090326–5041.
Comment Date: 5 p.m. Eastern Time
on Thursday, April 16, 2009.
Any person desiring to intervene or to
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s Rules of
Practice and Procedure (18 CFR 385.211
and 385.214) on or before 5 p.m. Eastern
time on the specified comment date. It
is not necessary to separately intervene
again in a subdocket related to a
compliance filing if you have previously
intervened in the same docket. Protests
will be considered by the Commission
in determining the appropriate action to
be taken, but will not serve to make
protestants parties to the proceeding.
Anyone filing a motion to intervene or
protest must serve a copy of that
document on the Applicant. In reference
to filings initiating a new proceeding,
interventions or protests submitted on
or before the comment deadline need
not be served on persons other than the
Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with Internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
should submit an original and 14 copies
of the intervention or protest to the
Federal Energy Regulatory Commission,
888 First St. NE., Washington, DC
20426.
The filings in the above proceedings
are accessible in the Commission’s
PO 00000
Frm 00027
Fmt 4703
Sfmt 4703
eLibrary system by clicking on the
appropriate link in the above list. They
are also available for review in the
Commission’s Public Reference Room in
Washington, DC. There is an
eSubscription link on the Web site that
enables subscribers to receive e-mail
notification when a document is added
to a subscribed dockets(s). For
assistance with any FERC Online
service, please e-mail
FERCOnlineSupport@ferc.gov. or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Kimberly D. Bose,
Secretary.
[FR Doc. E9–7348 Filed 4–1–09; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2210–169]
Appalachian Power Company, Virginia;
Notice of Availability of the Draft
Environmental Impact Statement for
the Smith Mountain Pumped Storage
Project and Announcing Intention To
Hold Public Meeting
March 27, 2009.
In accordance with the National
Environmental Policy Act of 1969 and
the Federal Energy Regulatory
Commission’s (Commission)
regulations, 18 CFR part 380 (Order No.
486, 52 FR 47897), the Office of Energy
Projects has reviewed the application
for license for the Smith Mountain
Pumped Storage Project (FERC No.
2210), located on the headwaters of the
Roanoke River in Bedford, Campbell,
Franklin, and Pittsylvania counties in
the Commonwealth of Virginia.
Commission staff has prepared a draft
Environmental Impact Statement (EIS)
for the project.
The draft EIS contains staff’s
evaluation of the applicant’s proposal
and the alternatives for relicensing the
Smith Mountain Project. The draft EIS
documents the views of governmental
agencies, non-governmental
organizations, affected Indian tribes, the
public, the license applicant, and
Commission staff.
A copy of the draft EIS is available for
review in the Commission’s Public
Reference Branch, Room 2A, located at
888 First Street, NE., Washington, DC
20426. The draft EIS also may be viewed
on the Commission’s web site at
https://www.ferc.gov, under the eLibrary
link. Enter the docket number excluding
the last three digits in the docket
E:\FR\FM\02APN1.SGM
02APN1
Agencies
[Federal Register Volume 74, Number 62 (Thursday, April 2, 2009)]
[Notices]
[Pages 14977-14978]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E9-7348]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Combined Notice of Filings 1
March 26, 2009.
Take notice that the Commission received the following electric
rate filings:
[[Page 14978]]
Docket Numbers: ER08-1178-003; EL08-88-004.
Applicants: California Independent System Operator Corporation.
Description: California Independent System Operator Corporation
submits Attachment A- Exceptional Dispatch Amendment Compliance Filing.
Filed Date: 03/23/2009.
Accession Number: 20090324-0295.
Comment Date: 5 p.m. Eastern Time on Monday, April 13, 2009.
Docket Numbers: ER09-380-001.
Applicants: PacifiCorp
Description: PacifiCorp submits its Transmission Interconnection
Agreement.
Filed Date: 03/05/2009.
Accession Number: 20090305-0175.
Comment Date: 5 p.m. Eastern Time on Monday, April 06, 2009.
Docket Numbers: ER09-583-001.
Applicants: ITC Midwest LLC.
Description: ITC Midwest LLC submits the cover sheet to the
Agreement redesignated as required under the Midwest ISO's Fourth
Revised Volume.
Filed Date: 03/25/2009.
Accession Number: 20090326-0027.
Comment Date: 5 p.m. Eastern Time on Wednesday, April 15, 2009.
Docket Numbers: ER09-850-000.
Applicants: Public Service Company of Colorado.
Description: Public Service Company of Colorado submits Amended and
Restated Power Supply Agreement with Holy Cross Electric Association,
Inc dated 2/18/09.
Filed Date: 03/16/2009.
Accession Number 20090317-0259.
Comment Date: 5 p.m. Eastern Time on Monday, April 06, 2009.
Docket Numbers: ER09-851-000.
Applicants: PJM Interconnection L.L.C.
Description: PJM Interconnection, LLC submits a notice of
cancellation of a wholesale market participation agreement with Granger
Energy of Honeybrook, LLC.
Filed Date: 03/16/2009.
Accession Number: 20090317-0260.
Comment Date: 5 p.m. Eastern Time on Monday, April 06, 2009.
Docket Numbers: ER09-852-000.
Applicants: PJM Interconnection L.L.C.
Description: PJM Interconnection, LLC submits notice of
cancellation of an interim interconnection service agreement with
Connectiv Bethlehem, LLC, etc.
Filed Date: 03/16/2009.
Accession Number: 20090317-0261.
Comment Date: 5 p.m. Eastern Time on Monday, April 06, 2009.
Docket Numbers: ER09-884-000.
Applicants: TransAlta Energy Marketing Corporation.
Description: Petition of Transalta Energy Marketing Corporation for
authority to sell energy, capacity, and ancillary services at market-
based rates, acceptance of initial rate schedule, waivers, and blanket
authority.
Filed Date: 03/25/2009.
Accession Number: 20090326-0076.
Comment Date: 5 p.m. Eastern Time on Wednesday, April 15, 2009.
Take notice that the Commission received the following open access
transmission tariff filings:
Docket Numbers: OA09-23-000.
Applicants: Southwest Power Pool, Inc.
Description: Request for Waiver of Southwest Power Pool, Inc.
Filed Date: 03/26/2009.
Accession Number: 20090326-5041.
Comment Date: 5 p.m. Eastern Time on Thursday, April 16, 2009.
Any person desiring to intervene or to protest in any of the above
proceedings must file in accordance with Rules 211 and 214 of the
Commission's Rules of Practice and Procedure (18 CFR 385.211 and
385.214) on or before 5 p.m. Eastern time on the specified comment
date. It is not necessary to separately intervene again in a subdocket
related to a compliance filing if you have previously intervened in the
same docket. Protests will be considered by the Commission in
determining the appropriate action to be taken, but will not serve to
make protestants parties to the proceeding. Anyone filing a motion to
intervene or protest must serve a copy of that document on the
Applicant. In reference to filings initiating a new proceeding,
interventions or protests submitted on or before the comment deadline
need not be served on persons other than the Applicant.
The Commission encourages electronic submission of protests and
interventions in lieu of paper, using the FERC Online links at https://www.ferc.gov. To facilitate electronic service, persons with Internet
access who will eFile a document and/or be listed as a contact for an
intervenor must create and validate an eRegistration account using the
eRegistration link. Select the eFiling link to log on and submit the
intervention or protests.
Persons unable to file electronically should submit an original and
14 copies of the intervention or protest to the Federal Energy
Regulatory Commission, 888 First St. NE., Washington, DC 20426.
The filings in the above proceedings are accessible in the
Commission's eLibrary system by clicking on the appropriate link in the
above list. They are also available for review in the Commission's
Public Reference Room in Washington, DC. There is an eSubscription link
on the Web site that enables subscribers to receive e-mail notification
when a document is added to a subscribed dockets(s). For assistance
with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov.
or call (866) 208-3676 (toll free). For TTY, call (202) 502-8659.
Kimberly D. Bose,
Secretary.
[FR Doc. E9-7348 Filed 4-1-09; 8:45 am]