Square Butte Hydro, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comment, Motions To Intervene, and Competing Applications, 14794 [E9-7237]

Download as PDF 14794 Federal Register / Vol. 74, No. 61 / Wednesday, April 1, 2009 / Notices performance report, including financial information, as directed by the Secretary. If you receive a multi-year award, you must submit an annual performance report that provides the most current performance and financial expenditure information as directed by the Secretary under 34 CFR 75.118. The Secretary may also require more frequent performance reports under 34 CFR 75.720(c). For specific requirements on reporting, please go to https://www.ed.gov/fund/grant/apply/ appforms/appforms.html. 4. Performance Measures: The Secretary has established the following key performance measures for assessing the effectiveness of the MSEIP program: (1) The percentage change in the number of full-time, degree-seeking minority undergraduate students at grantee institutions enrolled in the fields of engineering or physical or biological sciences, compared to the average minority enrollment in the same fields in the three-year period immediately prior to the beginning of the current grant; (2) the percentage of full-time undergraduate minority students who were in their first year of postsecondary enrollment in the previous year and are enrolled in the current year at the same institution in the fields of engineering or physical or biological sciences; and (3)(a) in fouryear grantee institutions, the percentage of minority students who enrolled in the fields of engineering or physical or biological sciences who graduate within six years of enrollment; or (b) in twoyear grantee institutions, the percentage of minority students enrolled in the fields of engineering or physical or biological sciences who graduate within three years of enrollment. VII. Agency Contacts For Further Information Contact: Bernadette M. Hence, Yolande Badarou, or Matthew Willis, U.S. Department of Education, 1990 K Street, NW., Washington, DC 20006–8517. Telephone: (202) 502–7777 or by e-mail: bernadette.hence@ed.gov; yolande.badarou@ed.gov; or matthew.willis@ed.gov. If you use a TDD, call the FRS, toll free, at 1–800–877–8339. VIII. Other Information Accessible Format: Individuals with disabilities can obtain this document and a copy of the application package in an accessible format (e.g., braille, large print, audiotape, or computer diskette) on request to the program contact persons listed under FOR FURTHER INFORMATION CONTACT in section VII of this notice. VerDate Nov<24>2008 17:46 Mar 31, 2009 Jkt 217001 Electronic Access to This Document: You can view this document, as well as all other documents of this Department published in the Federal Register, in text or Adobe Portable Document Format (PDF) on the Internet at the following site: https://www.ed.gov/news/ fedregister. To use PDF, you must have Adobe Acrobat Reader, which is available free at this site. If you have questions about using PDF, call the U.S. Government Printing Office (GPO), toll free, at 1– 888–293–6498; or in the Washington, DC, area at (202) 512–1530. Note: The official version of this document is the document published in the Federal Register. Free Internet access to the official edition of the Federal Register and the Code of Federal Regulations is available on GPO Access at: https://www.gpoaccess.gov/nara/ index.html. Delegation of Authority: The Secretary of Education has delegated authority to Daniel T. Madzelan, Director, Forecasting and Policy Analysis for the Office of Postsecondary Education, to perform the functions of the Assistant Secretary for Postsecondary Education. Dated: March 27, 2009. Daniel T. Madzelan, Director, Forecasting and Policy Analysis. [FR Doc. E9–7306 Filed 3–31–09; 8:45 am] BILLING CODE 4000–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13349–000] Square Butte Hydro, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comment, Motions To Intervene, and Competing Applications March 25, 2009. On December 23, 2008, Square Butte Hydro, LLC (Butte Hydro), filed an application for a preliminary permit, pursuant to section 4(f) of the Federal Power Act, proposing to study the feasibility of the Square Butte Pumped Storage Project (project). The proposed project would be located near Great Falls, Cascade County, Montana. The sole purpose of the preliminary permit, if issued, is to grant the permit holder priority to file a license application during the permit term. A preliminary permit does not authorize the permit holder to perform any land-disturbing activities or otherwise enter upon lands or waters owned by others without the owners’ expressed permission. PO 00000 Frm 00028 Fmt 4703 Sfmt 4703 The proposed project would consist of: (1) A proposed upper earthen dam 7,870-foot-long, 110-foot-high with approximately 9,540-acre-foot storage reservoir, having a surface area of approximately 152 acres with a normal maximum surface elevation of 4,760 feet mean sea level; (2) a proposed lower earthen dam 7,940-foot-long, 130-foothigh with approximately 10,550-acrefoot storage reservoir, having a surface area of approximately 151 acres with a normal maximum surface elevation of 3,740 feet mean sea level; (3) a proposed 4,650-foot-long, 31-foot-diameter steel penstock; (4) a proposed 500-foot-long, 120-foot-wide, 80-foot-high powerhouse containing 10–103-megawatt generating units; (5) a proposed 20.4-mile-long, 500-kV transmission line, and (6) appurtenant facilities. The project would have an average annual generation of approximately 2,150,000 megawatt-hours. Applicant Contact: Square Butte Hydro, LLC, 975 South State Highway, Logan, Utah 84321, phone (435) 752– 2580, Agent: Mr. Brent L. Smith, COO, Symbiotics, LLC, P.O. Box 535, Rigby, Idaho 83442, (208) 745–0834. FERC Contact: Gaylord Hoisington, (202) 502–6032. Deadline for filing comments, motions to intervene, competing applications (without notices of intent), or notices of intent to file competing applications: 60 days from the issuance of this notice. Comments, motions to intervene, notices of intent, and competing applications may be filed electronically via the Internet. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site under the ‘‘e-Filing’’ link. If unable to be filed electronically, documents may be paperfiled. To paper-file, an original and eight copies should be mailed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. For more information on how to submit these types of filings please go to the Commission’s Web site located at https:// www.ferc.gov/filing-comments.asp. More information about this project can be viewed or printed on the ‘‘eLibrary’’ link of Commission’s Web site at https:// www.ferc.gov/docs-filing/elibrary.asp. Enter the docket number (P–13349) in the docket number field to access the document. For assistance, call toll-free 1–866–208–3372. Kimberly D. Bose, Secretary. [FR Doc. E9–7237 Filed 3–31–09; 8:45 am] BILLING CODE E:\FR\FM\01APN1.SGM 01APN1

Agencies

[Federal Register Volume 74, Number 61 (Wednesday, April 1, 2009)]
[Notices]
[Page 14794]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E9-7237]


=======================================================================
-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 13349-000]


Square Butte Hydro, LLC; Notice of Preliminary Permit Application 
Accepted for Filing and Soliciting Comment, Motions To Intervene, and 
Competing Applications

March 25, 2009.
    On December 23, 2008, Square Butte Hydro, LLC (Butte Hydro), filed 
an application for a preliminary permit, pursuant to section 4(f) of 
the Federal Power Act, proposing to study the feasibility of the Square 
Butte Pumped Storage Project (project). The proposed project would be 
located near Great Falls, Cascade County, Montana. The sole purpose of 
the preliminary permit, if issued, is to grant the permit holder 
priority to file a license application during the permit term. A 
preliminary permit does not authorize the permit holder to perform any 
land-disturbing activities or otherwise enter upon lands or waters 
owned by others without the owners' expressed permission.
    The proposed project would consist of: (1) A proposed upper earthen 
dam 7,870-foot-long, 110-foot-high with approximately 9,540-acre-foot 
storage reservoir, having a surface area of approximately 152 acres 
with a normal maximum surface elevation of 4,760 feet mean sea level; 
(2) a proposed lower earthen dam 7,940-foot-long, 130-foot-high with 
approximately 10,550-acre-foot storage reservoir, having a surface area 
of approximately 151 acres with a normal maximum surface elevation of 
3,740 feet mean sea level; (3) a proposed 4,650-foot-long, 31-foot-
diameter steel penstock; (4) a proposed 500-foot-long, 120-foot-wide, 
80-foot-high powerhouse containing 10-103-megawatt generating units; 
(5) a proposed 20.4-mile-long, 500-kV transmission line, and (6) 
appurtenant facilities. The project would have an average annual 
generation of approximately 2,150,000 megawatt-hours.
    Applicant Contact: Square Butte Hydro, LLC, 975 South State 
Highway, Logan, Utah 84321, phone (435) 752-2580, Agent: Mr. Brent L. 
Smith, COO, Symbiotics, LLC, P.O. Box 535, Rigby, Idaho 83442, (208) 
745-0834.
    FERC Contact: Gaylord Hoisington, (202) 502-6032.
    Deadline for filing comments, motions to intervene, competing 
applications (without notices of intent), or notices of intent to file 
competing applications: 60 days from the issuance of this notice. 
Comments, motions to intervene, notices of intent, and competing 
applications may be filed electronically via the Internet. See 18 CFR 
385.2001(a)(1)(iii) and the instructions on the Commission's Web site 
under the ``e-Filing'' link. If unable to be filed electronically, 
documents may be paper-filed. To paper-file, an original and eight 
copies should be mailed to: Kimberly D. Bose, Secretary, Federal Energy 
Regulatory Commission, 888 First Street, NE., Washington, DC 20426. For 
more information on how to submit these types of filings please go to 
the Commission's Web site located at https://www.ferc.gov/filing-comments.asp. More information about this project can be viewed or 
printed on the ``eLibrary'' link of Commission's Web site at https://www.ferc.gov/docs-filing/elibrary.asp. Enter the docket number (P-
13349) in the docket number field to access the document. For 
assistance, call toll-free 1-866-208-3372.

Kimberly D. Bose,
Secretary.
 [FR Doc. E9-7237 Filed 3-31-09; 8:45 am]
BILLING CODE
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.