Environmental Impacts Statements; Notice of Availability, 13431-13432 [E9-6888]
Download as PDF
Federal Register / Vol. 74, No. 58 / Friday, March 27, 2009 / Notices
Allottees must be able to obtain
delivery of their allocations. A letter of
commitment from each allottee’s serving
utility or transmission provider
confirming that the allottee will receive
the benefit of Western’s Proposed Power
Allocation must be received by May 11,
2009. If a copy of the letter is not
received by the date above, Western
may redistribute the allottee’s portion of
the resource pool to those allottees that
remain. Western may extend this
deadline for receiving a letter of
commitment if a written request to do
so is received by Western by the
deadline.
The proposed allocations shown in
the table above are based on the LAP
marketable resource currently available.
If the LAP marketable resource is
adjusted in the future, all allocations
may be adjusted accordingly.
III. Review Under the Paperwork
Reduction Act
In accordance with the Paperwork
Reduction Act of 1980, 44 U.S.C. 3501–
3520, Western received approval from
the Office of Management and Budget
(OMB) to collect the Applicant Profile
Data under control number 1910–5136,
which was used to develop this
Proposed Power Allocation.
IV. Review Under the National
Environmental Policy Act
Western completed an environmental
impact statement on the Program,
pursuant to the National Environmental
Policy Act of 1969 (NEPA). The Record
of Decision was published in the
Federal Register, 60 FR 53181, October
12, 1995. Western will comply with any
additional NEPA requirements for this
resource pool.
Dated: March 20, 2009.
Timothy J. Meeks,
Administrator.
[FR Doc. E9–6882 Filed 3–26–09; 8:45 am]
BILLING CODE 6450–01–P
ENVIRONMENTAL PROTECTION
AGENCY
[ER–FRL–8591–8]
mstockstill on PROD1PC66 with NOTICES
Environmental Impact Statements and
Regulations; Availability of EPA
Comments
Availability of EPA comments
prepared pursuant to the Environmental
Review Process (ERP), under section
309 of the Clean Air Act and Section
102(2)© of the National Environmental
Policy Act as amended. Requests for
copies of EPA comments can be directed
VerDate Nov<24>2008
17:13 Mar 26, 2009
Jkt 217001
to the Office of Federal Activities at
202–564–7167.
An explanation of the ratings assigned
to draft environmental impact
statements (EISs) was published in FR
dated April 6, 2008 (73 FR 19833).
Draft EISs
EIS No. 20080528, ERP No. D–USN–
L10006–00, Northwest Training Range
Complex (NWTRC), To Support and
Conduct Current, Emerging, and
Future Training and Research,
Development, Test and Evaluation
(RDT&E) Activities, WA, OR and CA.
Summary: EPA expressed
environmental concerns about impacts
to marine resources. Rating EC2.
EIS No. 20080533, ERP No. D–AFS–
K65351–CA, Plumas National Forest
Public Motorized Travel Management,
Implementation, Plumas National
Forest, Plumas County, CA.
Summary: EPA expressed
environmental concerns about the scope
of the travel management planning
process, and potential impacts from the
designation of the Sly Creek open area
and associated routes to soil and water
resources. The Final EIS should address
seasonal closures, monitoring, and
enforcement commitments. Rating EC2.
EIS No. 20090028, ERP No. D–NPS–
F65073–IN, Indiana Dunes National
Lakeshore, Draft White-Tailed Deer
Management Plan, Implementation,
Lake, Porter, LaPorte Counties, IN.
Summary: The preferred alternative
provides a balanced combination of
methods to manage deer and natural
resources. EPA does not object to this
project. Rating LO.
13431
EIS No. 20080509, ERP No. F–IBR–
J39037–ND, Northwest Area Water
Supply Project, To Construct a Biota
Water Treatment Plant, Lake
Sakakawea, Missouri River Basin to
Hudson Bay Basin, Divide, Williams,
Burke, Renville, Bottineau, Pierce,
McHenry, Ward, Mountrail and
McLean Counties, ND.
Summary: EPA noted that the
preferred alternative incorporates earlier
EPA recommendations regarding UV
treatment technology and the need for a
template for the adaptive management
plan. EPA made additional comments
regarding the water quality analysis.
EIS No. 20090036, ERP No. F–AFS–
F65069–MN, Glacier Project, To
Maintain and Promote Native
Vegetation, Communities that are
Diverse, Productive, Healthy,
Implementation, Superior National
Forest, Kawishiwi Ranger District, St.
Louis and Lake Counties, MN.
Summary: The Final EIS addressed
EPA’s earlier question regarding the
projected amount of suitable habitat for
the Northern goshawk; therefore, EPA
does not object to the proposed project.
Dated: March 24, 2009.
Ken Mittelholtz,
Environmental Protection Specialist, NEPA
Compliance Division, Office of Federal
Activities.
[FR Doc. E9–6886 Filed 3–26–09; 8:45 am]
BILLING CODE 6560–50–P
ENVIRONMENTAL PROTECTION
AGENCY
[ER–FRL–8591–7]
Final EISs
Environmental Impacts Statements;
Notice of Availability
EIS No. 20080347, ERP No. F–COE–
D30005–MD, Atlantic Coast of
Maryland Shoreline Protection
Project, Proposed Dredging of Several
New Offshore Shoals to Provide Sand
for Borrow Sources from 2010 to
2044, Ocean City, Worcester County,
MD.
Summary: EPA does not object to the
proposed action.
EIS No. 20080378, ERP No. F–COE–
D39028–00, Mid-Chesapeake Bay
Island Ecosystem Restoration
Integrated Feasibility Study, Using
Uncontaminated Dredged Material
from the Upper Chesapeake Bay
Approach Channels to the Port of
Baltimore to Restore and Protect
Island Habitat in the Middle Portion
of Chesapeake Bay, Dorchester
County, MD.
Summary: EPA does not object to the
proposed project.
Responsible Agency: Office of Federal
Activities, General Information (202)
564–1399 or https://www.epa.gov/
compliance/nepa/. Weekly receipt of
Environmental Impact Statements filed
03/16/2009 through 03/20/2009
pursuant to 40 CFR 1506.9.
EIS No. 20090079, Revised Draft EIS,
AFS, MT, Cabin Gulch Vegetation
Treatment Project, Restore FireAdapted Ecosystems, Existing and
Desired Conditions, Townsend Ranger
District, Helena National Forest,
Broadwater County, MT, Comment
Period Ends: 05/11/2009, Contact:
David Carroll 406–495–3716.
EIS No. 20090080, Final EIS, AFS, CO,
Long Draw Reservoir Project, Re-Issue
a Special-Use-Authorization to Water
Supply and Storage to Allow the
Continued Use of Long Draw
Reservoir and Dam, Arapaho and
Roosevelt National Forests and
PO 00000
Frm 00037
Fmt 4703
Sfmt 4703
E:\FR\FM\27MRN1.SGM
27MRN1
mstockstill on PROD1PC66 with NOTICES
13432
Federal Register / Vol. 74, No. 58 / Friday, March 27, 2009 / Notices
Pawnee National Grassland, Grand
and Larimer Counties, CO, Wait
Period Ends: 04/27/2009, Contact:
Kris Sexton, 970–295–6623.
EIS No. 20090081, Final EIS, AFS, OR,
BLT Project, Proposed Vegetation
Management Activities, Crescent
Ranger District, Deschutes National
Forest, Deschutes County, OR, Wait
Period Ends: 04/27/2009, Contact:
Chris Mickle, 541–433–3200.
EIS No. 20090082, Draft EIS, AFS, CA,
Salt Timber Harvest and Fuel Hazard
Reduction Project, Proposing
Vegetation Management in the Salt
Creek Watershed, South Fork
Management Unit, Hayfork Ranger
District, Shasta-Trinity National
Forest, Trinity County, CA, Comment
Period Ends: 05/11/2009, Contact:
Sandy Mack, 406–375–2638.
EIS No. 20090083, Draft EIS, AFS, 00,
Rogue River-Siskiyou National forest,
Motorized Vehicle Use, To Enact the
Travel Management Rule,
Implementation, Douglas, Klamath,
Jackson, Curry, Coos and Josephine
Counties, OR and Del Norte and
Siskiyou Counties, CA, Comment
Period Ends: 05/11/2009, Contact:
Steven R. Johnson, 541–552–2900.
EIS No. 20090084, Second Final
Supplement, BLM, NV, Betze Pit
Expansion Project, Development of
New Facilities and Expansion of
Existing Open-Pit Gold Mining,
Eureka and Elko Counties, NV, Wait
Period Ends: 04/27/2009, Contact:
Kirk Laird, 775–753–0272.
EIS No. 20090085, Revised Draft EIS,
FHW, CA, Partially Revised Tier 1—
Placer Parkway Corridor Preservation
Project, Select and Preserve a Corridor
for the Future Construction from CA–
70/99 to CA 65, Placer and Sutter
Counties, CA, Comment Period Ends:
05/11/2009, Contact: Gary Sweeten,
916–498–5128.
EIS No. 20090086, Second Draft
Supplement, GSA, MD, U.S. Food and
Drug Administration (FDA)
Headquarters Consolidation, Master
Plan Update, Federal Research Center
at White Oak, Silver Spring,
Montgomery County, MD, Comment
Period Ends: 05/11/2009, Contact:
Suzanne Hill, 202–205–5821.
EIS No. 20090087, Draft EIS, FRA, 00,
DesertXpress High-Speed Passenger
Train Project, Proposes to Construct
and Operate High-Speed Passenger
Train between Victorville, California
and Las Vegas, Nevada, Comment
Period Ends: 05/22/2009, Contact:
Wendy Messenger, 202–493–6396.
Amended Notices
EIS No. 20090017, Draft EIS, USN, GU,
Mariana Islands Range Complex
VerDate Nov<24>2008
17:13 Mar 26, 2009
Jkt 217001
(MIRC), To Address Ongoing and
Proposed Military Training Activities,
Mariana Islands, GU, Comment Period
Ends: 03/31/2009, Contact: Nora
Macariola-See 808–472–1402.
Revision to FR Notice Published 01/
30/2009: Extending Comment Period
from 03/16/2009 to 03/31/2009.
Dated: March 24, 2009.
Ken Mittelholtz,
Environmental Protection Specialist, NEPA
Compliance Division, Office of Federal
Activities.
[FR Doc. E9–6888 Filed 3–26–09; 8:45 am]
BILLING CODE
ENVIRONMENTAL PROTECTION
AGENCY
[ER–FRL–8591–6]
Absaloka Coal Mine Expansion, Notice
of Availability of the Record of
Decision (ROD), National Pollutant
Discharge Elimination System
(NPDES) permit
AGENCY: U.S. Environmental Protection
Agency (EPA).
ACTION: Notice of Availability of the
Record of Decision to issue an NPDES
permit for the South Extension of the
Absaloka Coal Mine.
SUMMARY: The Absaloka surface coal
mine is located in southeastern
Montana, and will be expanding onto
the Crow Indian Reservation. The
NPDES permit will be for surface water
discharges associated with the operation
of the South Extension of the Absaloka
Coal Mine. To support its NPDES
decision, EPA has adopted the
Environmental Impact Statement No.
20080406, BIA, MT, ‘‘Absaloka Mine
Crow Reservation South Extension Coal
Lease Approval, Proposed Mine
Development Plan, and Related Federal
and State Permitting Actions, Crow
Indian Reservation.’’ The ROD and
adopted FEIS are available for review at
https://www.epa.gov/region8/water/
npdes. The appeal period for the NPDES
permit decision ends April 27, 2009.
FOR FURTHER INFORMATION CONTACT: Mr.
Greg Davis; davis.gregory@epa.gov; U.S.
Environmental Protection Agency,
Region 8, (8P–W–WW); 1595 Wynkoop
St.; Denver, Colorado, 80202–1129; or
303–312–6314.
Dated: March 24, 2009.
Susan E. Bromm,
Director, Office of Federal Activities.
[FR Doc. E9–6889 Filed 3–26–09; 8:45 am]
BILLING CODE
PO 00000
Frm 00038
Fmt 4703
Sfmt 4703
ENVIRONMENTAL PROTECTION
AGENCY
[FRL–8787–1]
Notice of Proposed Administrative
Settlement Pursuant to the
Comprehensive Environmental
Response, Compensation, and Liability
Act
AGENCY: Environmental Protection
Agency.
ACTION: Notice; request for public
comment.
SUMMARY: In accordance with Section
122 (h) of the Comprehensive
Environmental Response,
Compensation, and Liability Act, as
amended (CERCLA), 42 U.S.C. 9622(i),
notice is hereby given of a proposed
administrative settlement concerning
the Great Lakes Chemical Corporation
Emergency Response Superfund Site, El
Dorado, Arkansas.
The settlement requires the one (1)
settling party to pay a total of
$45,000.00 as payment of response costs
to the Hazardous Substances Superfund.
The total response costs incurred by
EPA, as of January 31, 2008, were
$63,870.49. The settlement includes a
covenant not to sue pursuant to Section
107 of CERCLA, 42, U.S.C. 9607.
For thirty (30) days following the date
of publication of this notice, the Agency
will receive written comments relating
to this notice and will receive written
comments relating to the settlement.
The Agency will consider all comments
received and may modify or withdraw
its consent to the settlement if
comments received disclose facts or
considerations which indicate that the
settlement is inappropriate, improper,
or inadequate. The Agency’s response to
any comments received will be available
for public inspection at 1445 Ross
Avenue, Dallas, Texas 75202–2733.
DATES: Comments must be submitted on
or before April 27, 2009.
ADDRESSES: The proposed settlement
and additional background information
relating to the settlement are available
for public inspection at 1445 Ross
Avenue, Dallas, Texas 75202–2733. A
copy of the proposed settlement may be
obtained from Courtney Kudla, 1445
Ross Avenue, Ste. 1200 (SF–TE), Dallas,
Texas 75202–2733 or by calling (214)
665–8008. Comments should reference
the Great Lakes Chemical Corporation
Emergency Response Superfund Site, El
Dorado, Arkansas, and EPA Docket
Number 06–02–09, and should be
addressed to Courtney Kudla at the
address listed above.
E:\FR\FM\27MRN1.SGM
27MRN1
Agencies
[Federal Register Volume 74, Number 58 (Friday, March 27, 2009)]
[Notices]
[Pages 13431-13432]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E9-6888]
-----------------------------------------------------------------------
ENVIRONMENTAL PROTECTION AGENCY
[ER-FRL-8591-7]
Environmental Impacts Statements; Notice of Availability
Responsible Agency: Office of Federal Activities, General
Information (202) 564-1399 or https://www.epa.gov/compliance/nepa/.
Weekly receipt of Environmental Impact Statements filed 03/16/2009
through 03/20/2009 pursuant to 40 CFR 1506.9.
EIS No. 20090079, Revised Draft EIS, AFS, MT, Cabin Gulch Vegetation
Treatment Project, Restore Fire-Adapted Ecosystems, Existing and
Desired Conditions, Townsend Ranger District, Helena National Forest,
Broadwater County, MT, Comment Period Ends: 05/11/2009, Contact: David
Carroll 406-495-3716.
EIS No. 20090080, Final EIS, AFS, CO, Long Draw Reservoir Project, Re-
Issue a Special-Use-Authorization to Water Supply and Storage to Allow
the Continued Use of Long Draw Reservoir and Dam, Arapaho and Roosevelt
National Forests and
[[Page 13432]]
Pawnee National Grassland, Grand and Larimer Counties, CO, Wait Period
Ends: 04/27/2009, Contact: Kris Sexton, 970-295-6623.
EIS No. 20090081, Final EIS, AFS, OR, BLT Project, Proposed Vegetation
Management Activities, Crescent Ranger District, Deschutes National
Forest, Deschutes County, OR, Wait Period Ends: 04/27/2009, Contact:
Chris Mickle, 541-433-3200.
EIS No. 20090082, Draft EIS, AFS, CA, Salt Timber Harvest and Fuel
Hazard Reduction Project, Proposing Vegetation Management in the Salt
Creek Watershed, South Fork Management Unit, Hayfork Ranger District,
Shasta-Trinity National Forest, Trinity County, CA, Comment Period
Ends: 05/11/2009, Contact: Sandy Mack, 406-375-2638.
EIS No. 20090083, Draft EIS, AFS, 00, Rogue River-Siskiyou National
forest, Motorized Vehicle Use, To Enact the Travel Management Rule,
Implementation, Douglas, Klamath, Jackson, Curry, Coos and Josephine
Counties, OR and Del Norte and Siskiyou Counties, CA, Comment Period
Ends: 05/11/2009, Contact: Steven R. Johnson, 541-552-2900.
EIS No. 20090084, Second Final Supplement, BLM, NV, Betze Pit Expansion
Project, Development of New Facilities and Expansion of Existing Open-
Pit Gold Mining, Eureka and Elko Counties, NV, Wait Period Ends: 04/27/
2009, Contact: Kirk Laird, 775-753-0272.
EIS No. 20090085, Revised Draft EIS, FHW, CA, Partially Revised Tier
1--Placer Parkway Corridor Preservation Project, Select and Preserve a
Corridor for the Future Construction from CA-70/99 to CA 65, Placer and
Sutter Counties, CA, Comment Period Ends: 05/11/2009, Contact: Gary
Sweeten, 916-498-5128.
EIS No. 20090086, Second Draft Supplement, GSA, MD, U.S. Food and Drug
Administration (FDA) Headquarters Consolidation, Master Plan Update,
Federal Research Center at White Oak, Silver Spring, Montgomery County,
MD, Comment Period Ends: 05/11/2009, Contact: Suzanne Hill, 202-205-
5821.
EIS No. 20090087, Draft EIS, FRA, 00, DesertXpress High-Speed Passenger
Train Project, Proposes to Construct and Operate High-Speed Passenger
Train between Victorville, California and Las Vegas, Nevada, Comment
Period Ends: 05/22/2009, Contact: Wendy Messenger, 202-493-6396.
Amended Notices
EIS No. 20090017, Draft EIS, USN, GU, Mariana Islands Range Complex
(MIRC), To Address Ongoing and Proposed Military Training Activities,
Mariana Islands, GU, Comment Period Ends: 03/31/2009, Contact: Nora
Macariola-See 808-472-1402. Revision to FR Notice Published 01/30/2009:
Extending Comment Period from 03/16/2009 to 03/31/2009.
Dated: March 24, 2009.
Ken Mittelholtz,
Environmental Protection Specialist, NEPA Compliance Division, Office
of Federal Activities.
[FR Doc. E9-6888 Filed 3-26-09; 8:45 am]
BILLING CODE