California Independent System Operator Corporation; Notice Regarding Answer Period, 13429 [E9-6873]
Download as PDF
Federal Register / Vol. 74, No. 58 / Friday, March 27, 2009 / Notices
reasonableness of certain language in
section 2.2 of Southwest Power Pool,
Inc’s. existing Open Access
Transmission Tariff.
The refund effective date in Docket
No. EL09–40–000, established pursuant
to section 206(b) of the FPA, will be the
date of publication of this notice in the
Federal Register.
Kimberly D. Bose,
Secretary.
[FR Doc. E9–6870 Filed 3–26–09; 8:45 am]
BILLING CODE
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Notice of Ferc Staff Attendance at
Southwest Power Pool’s Synergistic
Planning Project Team and Cost
Allocation Working Group Meetings
mstockstill on PROD1PC66 with NOTICES
March 20, 2009.
The Federal Energy Regulatory
Commission hereby gives notice that
members of its staff may attend the
meetings of the Southwest Power Pool
(SPP) Synergistic Planning Project Team
and the SPP Cost Allocation Working
Group, as noted below. Their attendance
is part of the Commission’s ongoing
outreach efforts.
SPP Synergistic Planning Project
Team Meeting: March 31, 2009 (10
a.m.–3 p.m.), Embassy Suites Outdoor
World, 2401 Bass Pro Drive, Grapevine,
TX 76051, 972–724–2600.
SPP Cost Allocation Working Group
Meeting: April 1, 2009 (10 a.m.–4 p.m.),
Embassy Suites Outdoor World, 2401
Bass Pro Drive, Grapevine, TX 76051,
972–724–2600.
The discussions may address matters
at issue in the following proceedings:
Docket No. ER06–451, Southwest Power
Pool, Inc.,
Docket Nos. ER07–319 and EL07–73,
Southwest Power Pool, Inc.,
Docket No. ER07–371, Southwest Power
Pool, Inc.,
Docket No. ER07–1255, Southwest
Power Pool, Inc.,
Docket No. ER07–1206, Southwest
Power Pool, Inc.,
Docket No. ER08–923, Southwest Power
Pool, Inc.,
Docket No. ER08–1307, Southwest
Power Pool, Inc.,
Docket No. ER08–1308, Southwest
Power Pool, Inc.,
Docket No. ER08–1357, Southwest
Power Pool, Inc.,
Docket No. ER08–1358, Southwest
Power Pool, Inc.,
Docket No. ER08–1419, Southwest
Power Pool, Inc.,
VerDate Nov<24>2008
17:13 Mar 26, 2009
Jkt 217001
Docket No. ER08–1516, Southwest
Power Pool, Inc.,
Docket No. ER09–35, Tallgrass
Transmission LLC,
Docket No. ER09–36, Prairie Wind
Transmission LLC,
Docket No. ER09–262, Southwest Power
Pool, Inc.,
Docket No. ER09–342, Southwest Power
Pool, Inc.,
Docket No. ER09–548, ITC Great Plains
LLC,
Docket No. ER09–574, Southwest Power
Pool, Inc.,
Docket No. ER09–575, Southwest Power
Pool, Inc.,
Docket No. ER09–639, Southwest Power
Pool, Inc.,
Docket No. ER09–714, Southwest Power
Pool, Inc.,
Docket No. ER09–715, Southwest Power
Pool, Inc.,
Docket No. ER09–748, Southwest Power
Pool, Inc.,
Docket No. ER09–758, Southwest Power
Pool, Inc.,
Docket No. ER09–778, Southwest Power
Pool, Inc.,
Docket No. ER09–659, Southwest Power
Pool, Inc.,
Docket No. ER09–681, Green Power
Express LP,
Docket No. OA08–5, Southwest Power
Pool, Inc.,
Docket No. OA08–60, Southwest Power
Pool, Inc.,
Docket No. OA08–61, Southwest Power
Pool, Inc.,
Docket No. OA08–104, Southwest
Power Pool, Inc.
These meetings are open to the
public.
For more information, contact Patrick
Clarey, Office of Energy Market
Regulation, Federal Energy Regulatory
Commission at (317) 249–5937 or
patrick.clarey@ferc.gov.
Kimberly D. Bose,
Secretary.
[FR Doc. E9–6869 Filed 3–26–09; 8:45 am]
BILLING CODE
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket Nos. ER06–615–038; ER08–1113–
000]
California Independent System
Operator Corporation; Notice
Regarding Answer Period
March 23, 2009.
On March 18, 2009, Modesto
Irrigation District, Transmission Agency
of Northern California, City of Redding,
PO 00000
Frm 00035
Fmt 4703
Sfmt 4703
13429
California, Sacramento Municipal
Utility District, and the Turlock
Irrigation District (Affected IBAA
Entities) filed an Emergency Motion for
Clarification and Requested for
Shortened Response Time in the abovereferenced proceeding. In their filing,
the Affected IBAA Entities request a
shortening of the date for filing a
response to the motion, given the
urgency of the clarification request. By
this notice, the date for filing answers to
the Affected IBAA Entities’ motion for
clarification shall be March 24, 2009.
Kimberly D. Bose,
Secretary.
[FR Doc. E9–6873 Filed 3–26–09; 8:45 am]
BILLING CODE
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP03–302–005; Docket No.
CP04–345–003]
Cheyenne Plains Gas Pipeline
Company, LLC; Notice of Updated
Cost and Revenue Study
March 23, 2009.
Take notice that on March 9, 2009,
Cheyenne Plains Gas Pipeline Company,
LLC (Cheyenne Plains) filed an updated
cost and revenue study in response to
the Commission’s January 30, 2009 data
request.
Any person desiring to protest this
filing must file in accordance with Rule
211 of the Commission’s Rules of
Practice and Procedure (18 CFR
385.211). Protests to this filing will be
considered by the Commission in
determining the appropriate action to be
taken, but will not serve to make
protestants parties to the proceeding.
Such protests must be filed on or before
the date as indicated below. Anyone
filing a protest must serve a copy of that
document on all the parties to the
proceeding.
The Commission encourages
electronic submission of protests in lieu
of paper using the ‘‘eFiling’’ link at
https://www.ferc.gov. Persons unable to
file electronically should submit an
original and 14 copies of the protest to
the Federal Energy Regulatory
Commission, 888 First Street, NE.,
Washington, DC 20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
E:\FR\FM\27MRN1.SGM
27MRN1
Agencies
[Federal Register Volume 74, Number 58 (Friday, March 27, 2009)]
[Notices]
[Page 13429]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E9-6873]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket Nos. ER06-615-038; ER08-1113-000]
California Independent System Operator Corporation; Notice
Regarding Answer Period
March 23, 2009.
On March 18, 2009, Modesto Irrigation District, Transmission Agency
of Northern California, City of Redding, California, Sacramento
Municipal Utility District, and the Turlock Irrigation District
(Affected IBAA Entities) filed an Emergency Motion for Clarification
and Requested for Shortened Response Time in the above-referenced
proceeding. In their filing, the Affected IBAA Entities request a
shortening of the date for filing a response to the motion, given the
urgency of the clarification request. By this notice, the date for
filing answers to the Affected IBAA Entities' motion for clarification
shall be March 24, 2009.
Kimberly D. Bose,
Secretary.
[FR Doc. E9-6873 Filed 3-26-09; 8:45 am]
BILLING CODE