Environmental Impact Statements; Notice of Availability, 11943-11944 [E9-6158]
Download as PDF
Federal Register / Vol. 74, No. 53 / Friday, March 20, 2009 / Notices
camping near streams, lakes and
wetlands. Rating EC2.
EIS No. 20090002, ERP No. D–USN–
D35063–VA, Norfolk Harbor Channel,
Proposed Dredging to Deepen Five
Miles of the Federal Navigation
Channel in the Elizabeth River from
Lamberts Bend to the Norfolk Naval
Shipyard (NNSY), Norfolk and
Portsmouth, VA.
Summary: EPA expressed
environmental concerns about impacts
to aquatic populations from the
dredging of contaminated sediment.
Rating EC1.
EIS No. 20090013, ERP No. D–CGD–
A11083–00, Programmatic—Future of
the U.S. Coast Guard Long Range Aids
to Navigation (LORAN–C) Program,
Implementation.
Summary: EPA does not object to the
proposed project. Rating LO.
EIS No. 20090024, ERP No. D–FHW–
H40397–MO, Interstate 70 Corridor
Improvements, Kansas City to St.
Louis, Updated Information,
Evaluates if a Truck-Only Lane
Strategy is Viable, Kansas City to St.
Louis, MO.
Summary: EPA does not object to the
proposed action. Rating LO.
Final EISs
EIS No. 20080470, ERP No. F–FHW–
B40098–VT, Middlebury Spur Project,
Improvements to the Freight
Transportation System in the Town of
Middlebury in Addison County to the
Town of Pittsford in Rutland County,
VT.
Summary: EPA has no objections to
the proposed project.
EIS No. 20090003, ERP No. F–FHW–
C40170–NY, Fort Drum Connector
Route Project, Proposed Link between
I–81 and U.S. Route 11 at the Fort
Drum North Gate, Town of Le Ray and
Pamelia, Jefferson County, NY.
Summary: EPA’s previous issues have
been resolved; therefore, EPA does not
object to the proposed action.
EIS No. 20090020, ERP No. F–AFS–
D65039–WV, Lower Williams Project
Area (LWPA), Alternative 6 is the
Preferred Alternative, Proposed to
Perform Vegetation Management and
Wildlife Habitat Improvements,
Implementation, Gauley Ranger
District, Monongahela National
Forest, Webster County, WV.
Summary: EPA does not object to the
proposed project.
EIS No. 20090027, ERP No. F–FHW–
G40192–TX, Grand Parkway/State
Highway 99 Improvement Project,
Segment G, from Interstate Highway
VerDate Nov<24>2008
17:07 Mar 19, 2009
Jkt 217001
(IH) 45 to US 59, Funding, Right-ofWay Grant, U.S. Army COE Section
404 Permit, Harris and Montgomery
Counties, TX.
Summary: EPA does not object to the
proposed action.
EIS No. 20090029, ERP No. F–NSA–
D11045–MD, Fort George G. Meade
Utilities Upgrade Project, Proposes to
Construct and Operate (1) North
Utility Plant (2) South Generator
Facility and (3) Central Boiler Plant,
Fort George M. Meade, MD.
Summary: EPA’s previous issues have
been resolved; therefore, EPA does not
object to the proposed action.
EIS No. 20090030, ERP No. F–COE–
J11025–CO, Fort Carson Grow the
Army Stationing Decision,
Constructing New Facilities to
Support Additional Soldiers and their
Families, Portions of El Paso, Pueblo
and Fremont Counties, CO.
Summary: No formal comment letter
was sent to the preparing agency.
EIS No. 20090033, ERP No. FS–COE–
G36072–AR, Fourche Bayou Basin
Project, 1,750 Acre Bottomland
Acquisition with Nature Appreciation
Facilities, Development, Funding,
City of Little Rock, Pulaski County,
AR.
Summary: EPA does not object to the
proposed action.
Dated: March 17, 2009.
Robert W. Hargrove,
Director, NEPA Compliance Division, Office
of Federal Activities.
[FR Doc. E9–6149 Filed 3–19–09; 8:45 am]
BILLING CODE 6560–50–P
ENVIRONMENTAL PROTECTION
AGENCY
[ER–FRL–8591–4]
Environmental Impact Statements;
Notice of Availability
Responsible Agency: Office of Federal
Activities, General Information (202)
564–1399 or https://www.epa.gov/
compliance/nepa/.
Weekly receipt of Environmental Impact
Statements Filed 03/09/2009 through
03/13/2009.
Pursuant to 40 CFR 1506.9.
EIS No. 20090066, Draft EIS, AFS, OR,
Tracy Placer Mining Project,
Proposing Mine Development on a
Portion of the Unpatented Cedar
Gulch Group Placer Claim, Plan-ofOperations, Wild Rivers Ranger
District, Rogue River-Siskiyou
National Forest, Josephine County,
OR, Comment Period Ends: 05/04/
PO 00000
Frm 00041
Fmt 4703
Sfmt 4703
11943
2009, Contact: John Wells, 541–951–
5932.
EIS No. 20090067, Draft Supplement,
FHW, TX, Trinity Parkway Project,
New and Additional Information,
Construction of a Six-Lane Controlled
Access Toll Facility from IH–35 E/
TX–183 to US–175/TX–310, U.S.
Army COE Section 10 and 404
Permits, Dallas County, TX, Comment
Period Ends: 05/04/2009, Contact:
Salvador Deocampo 512–536–5950.
EIS No. 20090068, Final EIS, AFS, AK,
Angoon Hydroelectric Project,
Construction and Operation, SpecialUse-Authorization, Thayer Creek,
Admiralty Island National Monument,
Tongass National Forest, AK, Wait
Period Ends: 04/20/2009, Contact:
Pete Griffin, 907–789–6244.
EIS No. 20090069, Draft EIS, AFS, 00,
Black Hills National Forest Travel
Management Plan, Proposes to
Designate Certain Roads and Trails
Open to Motorized Travel, Custer,
Fall River, Lawrence, Meade,
Pennington Counties, SD and Crook
and Weston Counties, WY, Comment
Period Ends: 05/04/2009, Contact: Ed
Fischer, 605–673–9207.
EIS No. 20090070, Draft Supplement,
AFS, CA, Pilgrim Vegetation
Management Project, Updated
Information to Address and Respond
to the Specific Issues Identified in the
Court Ruling. Implementation, ShastaTrinity National Forest, Siskiyou
County, CA, Comment Period Ends:
05/04/2009, Contact: Dennis
Poehlmann, 530–926–9656.
EIS No. 20090071, Draft EIS, FHW, OH,
Cleveland Innerbelt Project, Proposing
Major Rehabilitation and
Reconstruction between I–71 and I–
90, Cleveland Central Business
District, Funding, City of Cleveland,
Cuyahoga County, OH, Comment
Period Ends: 05/21/2009, Contact:
Craig K. Hebebrand, 216–584–2113.
EIS No. 20090072, Final EIS, USN, 00,
Jacksonville Range Complex Project,
To Support and Conduct Current and
Emerging Training and RDT&E
Operations, NC, SC, GA and FL, Wait
Period Ends: 04/20/2009, Contact:
Karen Foskey, 703–602–2859.
EIS No. 20090073, Final EIS, USN, 00,
Virginia Capes (VACAPES) Range
Complex, Proposed action is to
Support and Conduct Current and
Emerging Training and RDT & E
Operations, Chesapeake Bay, DE, MD,
VA and NC, Wait Period Ends: 04/20/
2009, Contact: Karen Foskey, 703–
602–2859.
EIS No. 20090074, Final EIS, FAA, OH,
Port Columbus International Airport/
E:\FR\FM\20MRN1.SGM
20MRN1
11944
Federal Register / Vol. 74, No. 53 / Friday, March 20, 2009 / Notices
(CMH) Project, Replacement of
Runway 10R/28L, Development of a
New Passenger Terminal and other
Associated Airport Projects, Funding,
City of Columbus, OH, Wait Period
Ends: 04/20/2009, Contact: Katherine
Delaney, 734–229–2958.
EIS No. 20090075, Final EIS, NPS, CA,
Golden Gate National Recreation
Area, Proposed Marin Headlands and
Fort Baker Transportation
Infrastructure and Management Plan,
Implementation, Marin County, CA,
Wait Period Ends: 04/20/2009,
Contact: Steve Ortega, 415–561–4841.
EIS No. 20090076, Draft EIS, SFW, CA,
Paiute Cutthroat Trout Restoration
Project, Eradication of Non-Native
Trout Species from 11 Stream Miles of
Silver King Creek, Alpine County, CA,
Comment Period Ends: 05/04/2009,
Contact: Chad Mellison, 775–861–
6300.
EIS No. 20090077, Final EIS, FRC, CA,
Big Creek Hydro Project (FERC Nos.
67, 120, 2085, and 2175) Proposes to
Relicenses, Big Creek Nos.2A,8 and
Eastwood—FERC No. 67; Big Creek
Nos. 1 and 2—FERC No. 2175;
Mammoth Pool—FERC No. 2085 and
Big Creek No. 3 FERC No. 120, Fresno
and Madera Counties, CA, Wait
Period Ends: 04/20/2009, Contact:
Patricia Schaub, 1–866–208–3372.
EIS No. 20090078, Final EIS, NIH, MT,
Rocky Mountain Laboratories (RML)
Master Plan, Implementation,
Hamilton, Ravalli County, MT, Wait
Period Ends: 04/20/2009, Contact:
Mark Radtke, 301–451–6467.
Amended Notices
EIS No. 20080406, Final EIS, BIA, MT,
Absaloka Mine Crow Reservation
South Extension Coal Lease Approval,
Proposed Mine Development Plan,
and Related Federal and State
Permitting Actions, Crow Indian
Reservation, Crow Tribe, Bighorn
County, MT.
The U.S. Environmental Protection
Agency’s (EPA) has ADOPTED the U.S.
Department of Interior’s, Bureau of
Indian Affairs (DOI/BIA) FEIS
#20080406 filed 10/02/2008. EPA was a
Cooperating Agency for the above
project. Recirculation of the FEIS is not
necessary under 40CFR 1506.3(c). If you
have any questions, please contact Greg
Davis at davis.gregory@epa.gov or 303–
312–6314.
EIS No. 20080528, Draft EIS, USN, 00,
Northwest Training Range Complex
(NWTRC), To Support and Conduct
Current, Emerging, and Future
Training and Research, Development,
Test and Evaluation (RDT&E)
Activities, WA, OR and CA, Comment
VerDate Nov<24>2008
17:07 Mar 19, 2009
Jkt 217001
Period Ends: 04/13/2009, Contact:
Kimberly Kler, 360–396–0927.
Revision to FR Notice Published 12/
29/2008: Extending the Comment Period
from 03/11/2009 to 04/13/2009.
EIS No. 20080530, Draft EIS, MMS, AK,
Beaufort Sea and Chukchi Sea
Planning Areas, Proposals for Oil and
Gas Lease Sales 209, 212, 217, and
221, Offshore Marine Environment,
Beaufort Sea Outer Continental Shelf,
and North Slope Borough of Alaska,
Comment Period Ends: 03/30/2009,
Contact: Keith Gordon 907–334–5265.
Revision of the FR Published 12/29/
2008: Extending Comment Period from
03/16/2009 to 03/30/2009.
EIS No. 20080540, Draft EIS, AFS, ID,
Nez Perce National Forest (NPNF),
Proposed Designated Routes and
Areas for Motor Vehicle Use
(DRMVU), Implementation, Idaho
County, ID, Comment Period Ends:
04/20/2009, Contact: Alexandra
Botello, 208–983–1950.
Revision to FR Notice Published 01/
02/2009: Extending Comment Period
from 02/25/2009 to 04/20/2009.
EIS No. 20090062, Draft EIS, FRC, 00,
Catawba-Wateree Hydroelectric
Project (FERC No. 2232), Application
for Hydroelectric License, Catawba
and Wateree Rivers in Burke,
McDowell, Caldwell, Catawba,
Alexander, Iredell, Mecklenburg,
Lincoln and Gaston Counties, NC and
York, Lancaster, Chester, Fairfield and
Kershaw Counties, SC, Comment
Period Ends: 05/08/2009, Contact:
Patricia Schaub, 1–866–208–3372.
Revision to FR Notice Published 03/
13/2009: Correction to Comment Period
from 04/27/09 to 05/08/09.
Dated: March 17, 2009.
Robert W. Hargrove,
Director, NEPA Compliance Division, Office
of Federal Activities.
[FR Doc. E9–6158 Filed 3–19–09; 8:45 am]
BILLING CODE 6560–50–P
ENVIRONMENTAL PROTECTION
AGENCY
[EPA–HQ–OPP–2008–0416; FRL–8383–5]
Diiodomethyl p-tolyl sulfone (Amical
48), Busan 77, Organic Esters of
Phosphoric Acid Reregistration
Eligibility Decisions; Notice of
Availability
AGENCY: Environmental Protection
Agency (EPA).
ACTION: Notice.
SUMMARY: This notice announces the
availability of EPA’s Reregistration
PO 00000
Frm 00042
Fmt 4703
Sfmt 4703
Eligibility Decision (RED) for the
pesticides Diiodomethyl p-tolyl sulfone
(Amical 48), Busan 77, and Organic
Esters of Phosphoric Acid, and opens a
public comment period on these
documents. The Agency’s risk
assessments and other related
documents also are available in the
Diiodomethyl p-tolyl sulfone (Amical
48), Busan 77, and Organic Esters of
Phosphoric Acid Dockets. Diiodomethyl
p-tolyl sulfone is used as an algaecide,
bactericide, and fungicide for materials
and wood preservation. Busan 77 is
used to control of algae in swimming
pools, hot tubs, whirlpools and
fountains without fish. It is also
registered to control growth of algae,
bacteria, and fungi in recirculating
cooling towers, industrial air washing
systems, and as a materials preservative
in metal cutting fluids. Organic Esters of
Phosphoric Acid is used primarily as a
fungicide and bacteriostat, with the
main use site being a material
preservative for carpet backings. Some
other use sites include paint, textiles,
vinyl products, polymeric laminates,
and epoxy flooring and tile. EPA has
reviewed Diiodomethyl p-tolyl sulfone
(Amical 48), Busan 77, and Organic
Esters of Phosphoric Acid through the
public participation process that the
Agency uses to involve the public in
developing pesticide reregistration and
tolerance reassessment decisions.
Through these programs, EPA is
ensuring that all pesticides meet current
health and safety standards.
DATES: Comments must be received on
or before May 19, 2009.
ADDRESSES: Submit your comments,
identified by docket identification (ID)
number for Diiodomethyl p-tolyl
sulfone, EPA–HQ–OPP–2007–1151; for
Busan 77, EPA–HQ–OPP–2007–0834;
and for Organic Esters of Phosphoric
Acid, EPA–HQ–OPP–2007–1166 by one
of the following methods:
• Federal eRulemaking Portal: https://
www.regulations.gov. Follow the on-line
instructions for submitting comments.
• Mail: Office of Pesticide Programs
(OPP) Regulatory Public Docket (7502P),
Environmental Protection Agency, 1200
Pennsylvania Ave., NW., Washington,
DC 20460–0001.
• Delivery: OPP Regulatory Public
Docket (7502P), Environmental
Protection Agency, Rm. S–4400, One
Potomac Yard (South Bldg.), 2777 S.
Crystal Dr., Arlington, VA. Deliveries
are only accepted during the Docket’s
normal hours of operation (8:30 a.m. to
4 p.m., Monday through Friday,
excluding legal holidays). Special
arrangements should be made for
deliveries of boxed information. The
E:\FR\FM\20MRN1.SGM
20MRN1
Agencies
[Federal Register Volume 74, Number 53 (Friday, March 20, 2009)]
[Notices]
[Pages 11943-11944]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E9-6158]
-----------------------------------------------------------------------
ENVIRONMENTAL PROTECTION AGENCY
[ER-FRL-8591-4]
Environmental Impact Statements; Notice of Availability
Responsible Agency: Office of Federal Activities, General
Information (202) 564-1399 or https://www.epa.gov/compliance/nepa/.
Weekly receipt of Environmental Impact Statements Filed 03/09/2009
through 03/13/2009.
Pursuant to 40 CFR 1506.9.
EIS No. 20090066, Draft EIS, AFS, OR, Tracy Placer Mining Project,
Proposing Mine Development on a Portion of the Unpatented Cedar Gulch
Group Placer Claim, Plan-of-Operations, Wild Rivers Ranger District,
Rogue River-Siskiyou National Forest, Josephine County, OR, Comment
Period Ends: 05/04/2009, Contact: John Wells, 541-951-5932.
EIS No. 20090067, Draft Supplement, FHW, TX, Trinity Parkway Project,
New and Additional Information, Construction of a Six-Lane Controlled
Access Toll Facility from IH-35 E/TX-183 to US-175/TX-310, U.S. Army
COE Section 10 and 404 Permits, Dallas County, TX, Comment Period Ends:
05/04/2009, Contact: Salvador Deocampo 512-536-5950.
EIS No. 20090068, Final EIS, AFS, AK, Angoon Hydroelectric Project,
Construction and Operation, Special-Use-Authorization, Thayer Creek,
Admiralty Island National Monument, Tongass National Forest, AK, Wait
Period Ends: 04/20/2009, Contact: Pete Griffin, 907-789-6244.
EIS No. 20090069, Draft EIS, AFS, 00, Black Hills National Forest
Travel Management Plan, Proposes to Designate Certain Roads and Trails
Open to Motorized Travel, Custer, Fall River, Lawrence, Meade,
Pennington Counties, SD and Crook and Weston Counties, WY, Comment
Period Ends: 05/04/2009, Contact: Ed Fischer, 605-673-9207.
EIS No. 20090070, Draft Supplement, AFS, CA, Pilgrim Vegetation
Management Project, Updated Information to Address and Respond to the
Specific Issues Identified in the Court Ruling. Implementation, Shasta-
Trinity National Forest, Siskiyou County, CA, Comment Period Ends: 05/
04/2009, Contact: Dennis Poehlmann, 530-926-9656.
EIS No. 20090071, Draft EIS, FHW, OH, Cleveland Innerbelt Project,
Proposing Major Rehabilitation and Reconstruction between I-71 and I-
90, Cleveland Central Business District, Funding, City of Cleveland,
Cuyahoga County, OH, Comment Period Ends: 05/21/2009, Contact: Craig K.
Hebebrand, 216-584-2113.
EIS No. 20090072, Final EIS, USN, 00, Jacksonville Range Complex
Project, To Support and Conduct Current and Emerging Training and RDT&E
Operations, NC, SC, GA and FL, Wait Period Ends: 04/20/2009, Contact:
Karen Foskey, 703-602-2859.
EIS No. 20090073, Final EIS, USN, 00, Virginia Capes (VACAPES) Range
Complex, Proposed action is to Support and Conduct Current and Emerging
Training and RDT & E Operations, Chesapeake Bay, DE, MD, VA and NC,
Wait Period Ends: 04/20/2009, Contact: Karen Foskey, 703-602-2859.
EIS No. 20090074, Final EIS, FAA, OH, Port Columbus International
Airport/
[[Page 11944]]
(CMH) Project, Replacement of Runway 10R/28L, Development of a New
Passenger Terminal and other Associated Airport Projects, Funding, City
of Columbus, OH, Wait Period Ends: 04/20/2009, Contact: Katherine
Delaney, 734-229-2958.
EIS No. 20090075, Final EIS, NPS, CA, Golden Gate National Recreation
Area, Proposed Marin Headlands and Fort Baker Transportation
Infrastructure and Management Plan, Implementation, Marin County, CA,
Wait Period Ends: 04/20/2009, Contact: Steve Ortega, 415-561-4841.
EIS No. 20090076, Draft EIS, SFW, CA, Paiute Cutthroat Trout
Restoration Project, Eradication of Non-Native Trout Species from 11
Stream Miles of Silver King Creek, Alpine County, CA, Comment Period
Ends: 05/04/2009, Contact: Chad Mellison, 775-861-6300.
EIS No. 20090077, Final EIS, FRC, CA, Big Creek Hydro Project (FERC
Nos. 67, 120, 2085, and 2175) Proposes to Relicenses, Big Creek
Nos.2A,8 and Eastwood--FERC No. 67; Big Creek Nos. 1 and 2--FERC No.
2175; Mammoth Pool--FERC No. 2085 and Big Creek No. 3 FERC No. 120,
Fresno and Madera Counties, CA, Wait Period Ends: 04/20/2009, Contact:
Patricia Schaub, 1-866-208-3372.
EIS No. 20090078, Final EIS, NIH, MT, Rocky Mountain Laboratories (RML)
Master Plan, Implementation, Hamilton, Ravalli County, MT, Wait Period
Ends: 04/20/2009, Contact: Mark Radtke, 301-451-6467.
Amended Notices
EIS No. 20080406, Final EIS, BIA, MT, Absaloka Mine Crow Reservation
South Extension Coal Lease Approval, Proposed Mine Development Plan,
and Related Federal and State Permitting Actions, Crow Indian
Reservation, Crow Tribe, Bighorn County, MT.
The U.S. Environmental Protection Agency's (EPA) has ADOPTED the
U.S. Department of Interior's, Bureau of Indian Affairs (DOI/BIA) FEIS
20080406 filed 10/02/2008. EPA was a Cooperating Agency for
the above project. Recirculation of the FEIS is not necessary under
40CFR 1506.3(c). If you have any questions, please contact Greg Davis
at davis.gregory@epa.gov or 303-312-6314.
EIS No. 20080528, Draft EIS, USN, 00, Northwest Training Range Complex
(NWTRC), To Support and Conduct Current, Emerging, and Future Training
and Research, Development, Test and Evaluation (RDT&E) Activities, WA,
OR and CA, Comment Period Ends: 04/13/2009, Contact: Kimberly Kler,
360-396-0927.
Revision to FR Notice Published 12/29/2008: Extending the Comment
Period from 03/11/2009 to 04/13/2009.
EIS No. 20080530, Draft EIS, MMS, AK, Beaufort Sea and Chukchi Sea
Planning Areas, Proposals for Oil and Gas Lease Sales 209, 212, 217,
and 221, Offshore Marine Environment, Beaufort Sea Outer Continental
Shelf, and North Slope Borough of Alaska, Comment Period Ends: 03/30/
2009, Contact: Keith Gordon 907-334-5265.
Revision of the FR Published 12/29/2008: Extending Comment Period
from 03/16/2009 to 03/30/2009.
EIS No. 20080540, Draft EIS, AFS, ID, Nez Perce National Forest (NPNF),
Proposed Designated Routes and Areas for Motor Vehicle Use (DRMVU),
Implementation, Idaho County, ID, Comment Period Ends: 04/20/2009,
Contact: Alexandra Botello, 208-983-1950.
Revision to FR Notice Published 01/02/2009: Extending Comment
Period from 02/25/2009 to 04/20/2009.
EIS No. 20090062, Draft EIS, FRC, 00, Catawba-Wateree Hydroelectric
Project (FERC No. 2232), Application for Hydroelectric License, Catawba
and Wateree Rivers in Burke, McDowell, Caldwell, Catawba, Alexander,
Iredell, Mecklenburg, Lincoln and Gaston Counties, NC and York,
Lancaster, Chester, Fairfield and Kershaw Counties, SC, Comment Period
Ends: 05/08/2009, Contact: Patricia Schaub, 1-866-208-3372.
Revision to FR Notice Published 03/13/2009: Correction to Comment
Period from 04/27/09 to 05/08/09.
Dated: March 17, 2009.
Robert W. Hargrove,
Director, NEPA Compliance Division, Office of Federal Activities.
[FR Doc. E9-6158 Filed 3-19-09; 8:45 am]