Salvatore and Michelle Shifrin; Notice of Availability of Environmental Assessment, 11934 [E9-6070]

Download as PDF 11934 Federal Register / Vol. 74, No. 53 / Friday, March 20, 2009 / Notices Documents and Filings. A Quick Comment is an easy method for interested persons to submit text-only comments on a project; (2) You may file your comments electronically by using the eFiling feature, which is located on the Commission’s Internet Web site at https://www.ferc.gov under the link to Documents and Filings. eFiling involves preparing your submission in the same manner as you would if filing on paper, and then saving the file on your computer’s hard drive. You will attach that file as your submission. New eFiling users must first create an account by clicking on ‘‘Sign up’’ or ‘‘eRegister.’’ You will be asked to select the type of filing you are making. A comment on a particular project is considered a ‘‘Comment on a Filing;’’ or (3) You may file your comments via mail to the Commission by sending an original and two copies of your letter to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First St., NE., Room 1A, Washington, DC 20426. Label one copy of the comments for the attention of Gas Branch 3, PJ11.3. Environmental Mailing List An effort is being made to send this notice to all individuals, organizations, and government entities interested in and/or potentially affected by the proposed project. This includes all landowners who are potential right-ofway grantors, whose property may be used temporarily for project purposes, or who own homes within distances defined in the Commission’s regulations of certain aboveground facilities. If you do not want to send comments at this time but still want to remain on our mailing list, please return the Information Request (Appendix 2). If you do not return the Information Request, you will be taken off the mailing list. Becoming an Intervenor In addition to involvement in the EA scoping process, you may want to become an ‘‘intervenor,’’ which is an official party to the proceeding. Intervenors play a more formal role in the process and are able to file briefs, appear at hearings, and be heard by the courts if they choose to appeal the Commission’s final ruling. An intervenor formally participates in a Commission proceeding by filing a request to intervene. Instructions for becoming an intervenor are included in the User’s Guide under the ‘‘e-filing’’ link on the Commission’s Web site. VerDate Nov<24>2008 17:07 Mar 19, 2009 Jkt 217001 Additional Information Additional information about the project is available from the Commission’s Office of External Affairs, at 1–866–208–FERC or on the FERC Internet Web site (https://www.ferc.gov) using the eLibrary link. Click on the eLibrary link, click on ‘‘General Search’’ and enter the docket number excluding the last three digits in the Docket Number field and enter ‘‘002’’ in the Sub-Docket field. Be sure you have selected an appropriate date range. For assistance, please contact FERC Online Support toll free at 1–866–208–3676, for TTY contact 1–202–502–8659 or e-mail at FercOnlineSupport@ferc.gov. The eLibrary link also provides access to the texts of formal documents issued by the Commission, such as orders, notices, and rulemakings. In addition, the Commission now offers a free service called eSubscription which allows you to keep track of all formal issuances and submittals in specific dockets. This can reduce the amount of time you spend researching proceedings by automatically providing you with notification of these filings, document summaries and direct links to the documents. Go to www.ferc.gov/ esubscribenow.htm. Finally, public meetings or site visits will be posted on the Commission’s calendar located at https://www.ferc.gov/ EventCalendar/EventsList.aspx along with other related information. Kimberly D. Bose, Secretary. [FR Doc. E9–6076 Filed 3–19–09; 8:45 am] potential environmental effects of the project and conclude that issuing an exemption for the project, with appropriate environmental measures, would not constitute a major Federal action significantly affecting the quality of the human environment. A copy of the EA is on file with the Commission and is available for public inspection. The EA may also be viewed on the Commission’s Web site at https:// www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, contact FERC Online Support at FERCOnlineSupport@ferc.gov or tollfree at 1–866–208–3676, or for TTY, (202) 502–8659. Any comments should be filed within 30 days from the issuance date of this notice, and should be addressed to the Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Room 1–A, Washington, DC 20426. Please affix ‘‘Mansfield Hollow Hydro Project No. 12551’’ to all comments. Comments may be filed electronically via Internet in lieu of paper. The Commission strongly encourages electronic filings. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site under the ‘‘eFiling’’ link. For further information, contact Tom Dean at (202) 502–6041. Kimberly D. Bose, Secretary. [FR Doc. E9–6070 Filed 3–19–09; 8:45 am] BILLING CODE BILLING CODE DEPARTMENT OF ENERGY DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Federal Energy Regulatory Commission [Project Nos. 2085–014—California; 67–113; 120–020] [Project No. 12551–001–CT] Salvatore and Michelle Shifrin; Notice of Availability of Environmental Assessment March 12, 2009. In accordance with the National Environmental Policy Act of 1969 and the Federal Energy Regulatory Commission’s regulations, 18 CFR part 380 (Order No. 486, 52 FR 47879), the Office of Energy Projects has reviewed the application for a small hydro (less than 5 megawatt) exemption from licensing for the Mansfield Hollow Hydro Power Project, to be located on the Natchaug River, in Tolland County, Connecticut, and has prepared an Environmental Assessment (EA). In the EA, Commission staff analyze the PO 00000 Frm 00032 Fmt 4703 Sfmt 4703 Southern California Edison; Notice of Availability of the Final Environmental Impact Statement for the Big Creek Projects March 13, 2009. In accordance with the National Environmental Policy Act of 1969 and the Federal Energy Regulatory Commission’s (Commission) regulations, 18 CFR part 380 (Order No. 486, 52 FR 47897), the Office of Energy Projects has reviewed the applications for relicensing four Southern California Edison (SCE) projects, which are part of the Big Creek System: Mammoth Pool Project (FERC No. 2085); Big Creek Nos. 2A, 8 and Eastwood (FERC No. 67); Big Creek Nos. 1 and 2 (FERC No. 2175); E:\FR\FM\20MRN1.SGM 20MRN1

Agencies

[Federal Register Volume 74, Number 53 (Friday, March 20, 2009)]
[Notices]
[Page 11934]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E9-6070]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 12551-001-CT]


Salvatore and Michelle Shifrin; Notice of Availability of 
Environmental Assessment

March 12, 2009.
    In accordance with the National Environmental Policy Act of 1969 
and the Federal Energy Regulatory Commission's regulations, 18 CFR part 
380 (Order No. 486, 52 FR 47879), the Office of Energy Projects has 
reviewed the application for a small hydro (less than 5 megawatt) 
exemption from licensing for the Mansfield Hollow Hydro Power Project, 
to be located on the Natchaug River, in Tolland County, Connecticut, 
and has prepared an Environmental Assessment (EA). In the EA, 
Commission staff analyze the potential environmental effects of the 
project and conclude that issuing an exemption for the project, with 
appropriate environmental measures, would not constitute a major 
Federal action significantly affecting the quality of the human 
environment.
    A copy of the EA is on file with the Commission and is available 
for public inspection. The EA may also be viewed on the Commission's 
Web site at https://www.ferc.gov using the ``eLibrary'' link. Enter the 
docket number excluding the last three digits in the docket number 
field to access the document. For assistance, contact FERC Online 
Support at FERCOnlineSupport@ferc.gov or toll-free at 1-866-208-3676, 
or for TTY, (202) 502-8659.
    Any comments should be filed within 30 days from the issuance date 
of this notice, and should be addressed to the Secretary, Federal 
Energy Regulatory Commission, 888 First Street, NE., Room 1-A, 
Washington, DC 20426. Please affix ``Mansfield Hollow Hydro Project No. 
12551'' to all comments. Comments may be filed electronically via 
Internet in lieu of paper. The Commission strongly encourages 
electronic filings. See 18 CFR 385.2001(a)(1)(iii) and the instructions 
on the Commission's Web site under the ``eFiling'' link. For further 
information, contact Tom Dean at (202) 502-6041.

Kimberly D. Bose,
Secretary.
 [FR Doc. E9-6070 Filed 3-19-09; 8:45 am]
BILLING CODE
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.