Federal Register / Vol. 74, No. 50 / Tuesday, March 17, 2009 / Notices
Long-Term Stewardship EIS
Comments.’’
Issued in Washington, DC on March 11,
2009.
Michael C. Moore,
Acting Director, Office of Small Sites Projects.
[FR Doc. E9–5701 Filed 3–16–09; 8:45 am]
BILLING CODE 6450–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP04–48–002]
Chandeleur Pipe Line Company;
Notice of Application for Amendment
dwashington3 on PROD1PC60 with NOTICES
March 10, 2009.
Take notice that on March 3, 2009,
Chandeleur Pipe Line Company
(Chandeleur) filed with the Commission
an application pursuant to section 7(c)
of the Natural Gas Act (NGA), as
amended, and part 157 of the
Commission’s regulations seeking an
amendment of the existing authorization
issued to Chandeleur on May 11, 2004 1
in Docket No CP04–48–000 (May 11
Order) for the acquisition from Chevron
Natural Gas Pipe Line LLC (Chevron) of
Chevron’s interest in the Mobile Area
Gathering System (MAGS), an offshore
gathering pipeline.
Specifically, by the application,
Chandeleur requests that the
Commission amend the Certificate of
Public Convenience and Necessity
issued in the May 11 Order to authorize
Chandeleur to acquire the interest of
Murphy Exploration & Production
Company (Murphy) in the MO 908
Segment of the MAGS System. The
acquisition by Chandeleur of this
remaining interest will complete
Chandeleur’s ownership of the MAGS
System.
Copies of this filing are available for
review at the Commission’s
Washington, DC offices, or may be
viewed on the Web at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
assistance, contact FERC at
FERCOnlineSupport@ferc.gov or call
toll-free, (801) 584–6851.
Any questions regarding this
application should be directed to Jeffrey
L. Kirk, at 4800 Fournace Place,
Bellaire, Texas 77401, or by telephone at
(713) 432–6753, or via e-mail at
jkgv@chevron.com.
There are two ways to become
involved in the Commission’s review of
1 107
FERC ¶ 61,162 (2004).
VerDate Nov<24>2008
13:44 Mar 16, 2009
Jkt 217001
this application. First, any person
wishing to obtain legal status by
becoming a party to this proceeding
should file with the Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426, a
motion to intervene in accordance with
the requirements of the Commission’s
Rules of Practice and Procedure (18 CFR
385.214 or 385.211) and the Regulations
under the NGA (18 CFR 157.10) by the
comment date, below. A person
obtaining party status will be placed on
the service list maintained by the
Secretary of the Commission and will
receive copies of all documents filed by
the applicant and by all other parties. A
party must submit 14 copies of filings
made with the Commission and must
mail a copy to the applicant and to
every other party in the proceeding.
Only parties to the proceeding can ask
for court review of Commission orders
in the proceeding.
However, a person does not have to
intervene in order to have comments
considered. The second way to
participate is by filing with the
Secretary of the Commission, as soon as
possible, an original and two copies of
comments in support of or in opposition
to the project. The Commission will
consider these comments in
determining the appropriate action to be
taken, but the filing of a comment alone
will not serve to make the filer a party
to the proceeding. The Commission’s
rules require that persons filing
comments in opposition to the project
provide copies of their protests only to
the party or parties directly involved in
the protest.
Persons who wish to comment only
on the environmental review of this
project should submit an original and
two copies of their comments to the
Secretary of the Commission.
Environmental commenters will be
placed on the Commission’s
environmental mailing list, will receive
copies of the environmental documents,
and will be notified of meetings
associated with the Commission’s
environmental review process.
Environmental commenters will not be
required to serve copies of filed
documents on all other parties.
However, the non-party commenters
will not receive copies of all documents
filed by other parties or issued by the
Commission (except for the mailing of
environmental documents issued by the
Commission) and will not have the right
to seek court review of the
Commission’s final order.
The Commission strongly encourages
electronic filings of comments, protests,
and interventions via the Internet in lieu
of paper. See 18 CFR 385.2001(a) (1) (iii)
PO 00000
Frm 00021
Fmt 4703
Sfmt 4703
11365
and the instructions on the
Commission’s Web site (https://
www.ferc.gov) under the ‘‘e-Filing’’ link.
Persons unable to file electronically
should submit an original and 14 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
Comment Date: March 31, 2009.
Kimberly D. Bose,
Secretary.
[FR Doc. E9–5684 Filed 3–16–09; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project Nos. 2175–000,120–000, 67–000]
Southern California Edison Company;
Notice of Authorization for Continued
Project Operation
March 10, 2009.
On February 23, 2007, the Southern
California Edison Company, licensee for
the Big Creek Nos.1, 2, (FERC No. 2175),
3 (FERC No.120), and 2A, 8, and
Eastwood Project (FERC No. 67), filed
Applications for New license(s)
pursuant to the Federal Power Act
(FPA) and the Commission’s regulations
thereunder. The Big Creek Nos. 1 and 2
are situated along Big Creek, No. 3 is
situated on the San Joaquin River, and
the Nos. 2A, 8, and Eastwood Project is
situated on the South Fork San Joaquin
River. The nearest communities are Big
Creek, Shaver Lake, North Fork, City of
Fresno, and Auberry.
The licenses for Project Nos. 2175,
120, and 67 were issued for a period
ending February, 28, 2009. Section
15(a)(1) of the FPA, 16 U.S.C. 808(a)(1),
requires the Commission, at the
expiration of a license term, to issue
from year-to-year an annual license to
the then licensee under the terms and
conditions of the prior license until a
new license is issued, or the project is
otherwise disposed of as provided in
section 15 or any other applicable
section of the FPA. If the project’s prior
license waived the applicability of
section 15 of the FPA, then, based on
section 9(b) of the Administrative
Procedure Act, 5 U.S.C. 558(c), and as
set forth at 18 CFR 16.21(a), if the
licensee of such project has filed an
application for a subsequent license, the
licensee may continue to operate the
project in accordance with the terms
and conditions of the license after the
minor or minor part license expires,
until the Commission acts on its
E:\FR\FM\17MRN1.SGM
17MRN1
11366
Federal Register / Vol. 74, No. 50 / Tuesday, March 17, 2009 / Notices
application. If the licensee of such a
project has not filed an application for
a subsequent license, then it may be
required, pursuant to 18 CFR 16.21(b),
to continue project operations until the
Commission issues someone else a
license for the project or otherwise
orders disposition of the project.
If the project is subject to section 15
of the FPA, notice is hereby given that
an annual license for Project Nos. 2175,
120, and 67 is issued to the Southern
California Edison Company for a period
effective March 1, 2009 through
February 28, 2010, or until the issuance
of a new license for the project or other
disposition under the FPA, whichever
comes first. If issuance of a new license
(or other disposition) does not take
place on or before February 28, 2010,
notice is hereby given that, pursuant to
18 CFR 16.18(c), an annual license
under section 15(a)(1) of the FPA is
renewed automatically without further
order or notice by the Commission,
unless the Commission orders
otherwise. If the project is not subject to
section 15 of the FPA, notice is hereby
given that the Southern California
Edison Company is authorized to
continue operation of the Big Creek Nos.
1 and 2, 3, and 2A, 8, and Eastwood
Projects, until such time as the
Commission acts on its application for
a subsequent license.
Kimberly D. Bose,
Secretary.
[FR Doc. E9–5681 Filed 3–16–09; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings
dwashington3 on PROD1PC60 with NOTICES
March 10, 2009.
Take notice that the Commission has
received the following Natural Gas
Pipeline Rate and Refund Report filings:
Docket Numbers: RP96–312–188.
Applicants: Tennessee Gas Pipeline
Company.
Description: Tennessee Gas Pipeline
Company submits notice of the
termination of a Negotiated Rate
Arrangement.
Filed Date: 03/02/2009.
Accession Number: 20090309–0168.
Comment Date: 5 p.m. Eastern Time
on Monday, March 16, 2009.
Docket Numbers: RP99–176–185.
Applicants: Natural Gas Pipeline
Company of America.
Description: Natural Gas Pipeline
Company of America, LLC submits an
VerDate Nov<24>2008
13:44 Mar 16, 2009
Jkt 217001
amendment with a negotiated rate
exhibit to an existing recourse rate
Storage Rate Schedule NSS Agreement
with JP Morgan Ventures Energy Corp
etc.
Filed Date: 03/05/2009.
Accession Number: 20090306–0038.
Comment Date: 5 p.m. Eastern Time
on Tuesday, March 17, 2009.
Docket Numbers: RP99–176–186.
Applicants: Natural Gas Pipeline
Company of America.
Description: Natural Gas Pipeline
Company of America, LLC submits an
amendment with negotiated rate exhibit
to an existing negotiated Storage Rate
Schedule NSS Agreement etc with
Oneok Energy Services Company, LP.
Filed Date: 03/05/2009.
Accession Number: 20090306–0039.
Comment Date: 5 p.m. Eastern Time
on Tuesday, March 17, 2009.
Docket Numbers: RP99–176–187
Applicants: Natural Gas Pipeline
Company of America.
Description: Natural Gas Pipeline
Company of America, LLC submits an
amendment with negotiated rate exhibit
to an existing discount Transportation
Rate Schedule FTS Agreement.
Filed Date: 03/05/2009.
Accession Number: 20090306–0040.
Comment Date: 5 p.m. Eastern Time
on Tuesday, March 17, 2009.
Docket Numbers: RP99–176–188.
Applicants: Natural Gas Pipeline
Company of America.
Description: Natural Gas Pipeline
Company of America, LLC submits an
amendment with negotiated rate exhibit
to an existing discounted Storage Rate
Schedule NSS Agreement.
Filed Date: 03/05/2009.
Accession Number: 20090306–0041.
Comment Date: 5 p.m. Eastern Time
on Tuesday, March 17, 2009.
Docket Numbers: RP99–176–189.
Applicants: Natural Gas Pipeline
Company of America.
Description: Natural Gas Pipeline
Company of America, LLC submits a
new Transportation Rate Schedule FTS
Agreement et al. Filed Date: 03/05/2009.
Accession Number: 20090306–0042.
Comment Date: 5 p.m. Eastern Time
on Tuesday, March 17, 2009.
Docket Numbers: RP99–176–190.
Applicants: Natural Gas Pipeline
Company of America.
Description: Natural Gas Pipeline
Company of America, LLC submits an
amendment with negotiated rate exhibit
to an existing recourse rate Storage Rate
Schedule NSS Agreement.
Filed Date: 03/05/2009.
Accession Number: 20090306–0043.
Comment Date: 5 p.m. Eastern Time
on Tuesday, March 17, 2009.
PO 00000
Frm 00022
Fmt 4703
Sfmt 4703
Docket Numbers: RP99–176–191.
Applicants: Natural Gas Pipeline
Company of America.
Description: Natural Gas Pipeline
Company of America, LLC submits an
amendment with a negotiated rate
exhibit to an existing recourse rate
Transportation Rate Schedule FTS
Agreement with Black Hills Utility
Holdings, Inc etc.
Filed Date: 03/05/2009.
Accession Number: 20090306–0036.
Comment Date: 5 p.m. Eastern Time
on Tuesday, March 17, 2009.
Docket Numbers: RP04–274–017.
Applicants: Kern River Gas
Transmission Company.
Description: Kern River Gas
Transmission Company submits its
FERC Gas Tariff, Second Revised
Volume 1 the tariff sheets, the tariff
sheets listed on Appendix A effective
dates indicated.
Filed Date: 03/02/2009.
Accession Number: 20090306–0107.
Comment Date: 5 p.m. Eastern Time
on Monday, March 16, 2009.
Docket Numbers: RP08–257–004.
Applicants: Saltville Gas Storage
Company L.L.C.
Description: Saltville Gas Storage
Company LLC submits their refund
report pursuant to Sections 154.501 and
154.502 of the Commission’s
regulations.
Filed Date: 03/06/2009.
Accession Number: 20090309–0140.
Comment Date: 5 p.m. Eastern Time
on Wednesday, March 18, 2009.
Docket Numbers: RP08–484–002.
Applicants: Colorado Interstate Gas
Company.
Description: Colorado Interstate Gas
Co submits Sixth Revised Sheet 318 et
al to FERC Gas Tariff, First Revised
Volume 1, to be effective 2/1/09.
Filed Date: 02/27/2009.
Accession Number: 20090304–0153.
Comment Date: 5 p.m. Eastern Time
on Friday, March 13, 2009.
Docket Numbers: RP06–540–007.
Applicants: High Island Offshore
System, L.L.C.
Description: Second annual report of
non-routine expenditures pursuant to its
O&M Agreement for calendar year 2008
of High Island Offshore System, L.L.C..
Filed Date: 03/02/2009.
Accession Number: 20090302–5186.
Comment Date: 5 p.m. Eastern Time
on Monday, March 16, 2009.
Docket Numbers: RP09–435–000.
Applicants: Chandeleur Pipe Line
Company.
Description: Chandeleur Pipe Line
Company submits Petition For Approval
of Settlement requesting Commission
approval of an Offer of Settlement and
Stipulation and Agreement etc.
E:\FR\FM\17MRN1.SGM
17MRN1
Agencies
[Federal Register Volume 74, Number 50 (Tuesday, March 17, 2009)]
[Notices]
[Pages 11365-11366]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E9-5681]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project Nos. 2175-000,120-000, 67-000]
Southern California Edison Company; Notice of Authorization for
Continued Project Operation
March 10, 2009.
On February 23, 2007, the Southern California Edison Company,
licensee for the Big Creek Nos.1, 2, (FERC No. 2175), 3 (FERC No.120),
and 2A, 8, and Eastwood Project (FERC No. 67), filed Applications for
New license(s) pursuant to the Federal Power Act (FPA) and the
Commission's regulations thereunder. The Big Creek Nos. 1 and 2 are
situated along Big Creek, No. 3 is situated on the San Joaquin River,
and the Nos. 2A, 8, and Eastwood Project is situated on the South Fork
San Joaquin River. The nearest communities are Big Creek, Shaver Lake,
North Fork, City of Fresno, and Auberry.
The licenses for Project Nos. 2175, 120, and 67 were issued for a
period ending February, 28, 2009. Section 15(a)(1) of the FPA, 16
U.S.C. 808(a)(1), requires the Commission, at the expiration of a
license term, to issue from year-to-year an annual license to the then
licensee under the terms and conditions of the prior license until a
new license is issued, or the project is otherwise disposed of as
provided in section 15 or any other applicable section of the FPA. If
the project's prior license waived the applicability of section 15 of
the FPA, then, based on section 9(b) of the Administrative Procedure
Act, 5 U.S.C. 558(c), and as set forth at 18 CFR 16.21(a), if the
licensee of such project has filed an application for a subsequent
license, the licensee may continue to operate the project in accordance
with the terms and conditions of the license after the minor or minor
part license expires, until the Commission acts on its
[[Page 11366]]
application. If the licensee of such a project has not filed an
application for a subsequent license, then it may be required, pursuant
to 18 CFR 16.21(b), to continue project operations until the Commission
issues someone else a license for the project or otherwise orders
disposition of the project.
If the project is subject to section 15 of the FPA, notice is
hereby given that an annual license for Project Nos. 2175, 120, and 67
is issued to the Southern California Edison Company for a period
effective March 1, 2009 through February 28, 2010, or until the
issuance of a new license for the project or other disposition under
the FPA, whichever comes first. If issuance of a new license (or other
disposition) does not take place on or before February 28, 2010, notice
is hereby given that, pursuant to 18 CFR 16.18(c), an annual license
under section 15(a)(1) of the FPA is renewed automatically without
further order or notice by the Commission, unless the Commission orders
otherwise. If the project is not subject to section 15 of the FPA,
notice is hereby given that the Southern California Edison Company is
authorized to continue operation of the Big Creek Nos. 1 and 2, 3, and
2A, 8, and Eastwood Projects, until such time as the Commission acts on
its application for a subsequent license.
Kimberly D. Bose,
Secretary.
[FR Doc. E9-5681 Filed 3-16-09; 8:45 am]