Advisory Committee on Reactor Safeguards (ACRS) Meeting of the Subcommittee on Plant License Renewal; Notice of Meeting, 11138 [E9-5600]
Download as PDF
11138
Federal Register / Vol. 74, No. 49 / Monday, March 16, 2009 / Notices
Accession No. ML090510728). The
purpose of this ISG is to modify and
provide additional clarity in the
guidance for the review of analyses of
adverse flow effects in equipment other
than reactor internals performed by
Combined License (COL) and Design
Certification (DC) applicants. This ISG
would revise the staff guidance
previously issued in March 2007 in the
Standard Review Plan (SRP) NUREG–
0080, ‘‘Standard Review Plan for the
Review of Safety Analysis Reports for
Nuclear Power Plants,’’ Section 3.9.2,
‘‘Dynamic Testing and Analysis of
Systems, Structures, and Components,’’
Section 3.9.5, ‘‘Reactor Pressure Vessel
Internals,’’ and Regulatory Guide 1.20,
‘‘Comprehensive Vibration Assessment
Program for Reactor Internals During
Pre-operational and Initial Startup
Testing.’’ The NRC staff issues DC/COL–
ISGs to facilitate timely implementation
of current staff guidance and to facilitate
activities associated with review of
applications for DCs and COLs by the
Office of New Reactors. The NRC staff
will also incorporate the approved DC/
COL–ISG–010 into the next revision of
the SRP and related guidance
documents.
0001; telephone 301–415–2967 or e-mail
at jennifer.dixon-herrity@nrc.gov.
SUPPLEMENTARY INFORMATION: The
agency posts its issued staff guidance in
the agency external Web page (https://
www.nrc.gov/reading-rm/doccollections/isg/). The NRC staff is
issuing this notice to solicit public
comments on proposed DC/COL–ISG–
010. After the NRC staff considers any
public comments, it will make a
determination regarding proposed DC/
COL–ISG–010.
DATES: Comments must be filed no later
than 30 days from the date of
publication of this notice in the Federal
Register. Comments received after this
date will be considered, if it is practical
to do so, but the Commission is able to
ensure consideration only for comments
received on or before this date.
ADDRESSES: Comments may be
submitted to: Chief, Rulemaking,
Directives, and Editing Branch, Office of
Administration, Mail Stop TWB–05–
B01M, U.S. Nuclear Regulatory
Commission, Washington, DC, 20555–
0001, and should cite the publication
date and page number of the Federal
Register notice.
The NRC ADAMS provides text and
image files of NRC’s public documents.
These documents may be accessed
through the NRC’s Public Electronic
Reading Room on the Internet at https://
www.nrc.gov/reading-rm/adams.html.
Persons who do not have access to
ADAMS or who encounter problems in
accessing the documents located in
ADAMS should contact the NRC Public
Document Room reference staff at 1–
800–397–4209, 301–415–4737, or by email at PDR.Resource@nrc.gov.
FOR FURTHER INFORMATION CONTACT: Ms.
Jennifer L. Dixon-Herrity, Chief,
Engineering Mechanics Branch 2,
Division of Engineering, Office of the
New Reactors, U.S. Nuclear Regulatory
Commission, Washington, DC 20555–
The ACRS Subcommittee on Plant
License Renewal will hold a meeting on
April 1, 2009, Room T–2B3, 11545
Rockville Pike, Rockville, Maryland.
The entire meeting will be open to
public attendance.
The agenda for the subject meeting
shall be as follows:
Wednesday, April 1, 2009–8:30 a.m.–
12:30 p.m.
The Subcommittee will discuss the
license renewal application for the
Susquehanna Steam Electric Station,
Units 1 and 2 and the associated Safety
Evaluation Report (SER) with Open
Items prepared by the staff. The
Subcommittee will hear presentations
by and hold discussions with
representatives of the NRC staff, PPL
Susquehanna, and other interested
persons regarding this matter. The
Subcommittee will gather information,
analyze relevant issues and facts, and
formulate proposed positions and
actions, as appropriate, for deliberation
by the full Committee.
Members of the public desiring to
provide oral statements and/or written
comments should notify the Designated
Federal Official, Mr. Peter Wen
(telephone (301) 415–2832 five days
prior to the meeting, if possible, so that
appropriate arrangements can be made.
Electronic recordings will be permitted.
Detailed procedures for the conduct of
and participation in ACRS meetings
were published in the Federal Register
VerDate Nov<24>2008
15:38 Mar 13, 2009
Jkt 217001
Dated at Rockville, Maryland, this 9th day
of March 2009.
For the Nuclear Regulatory Commission.
William F. Burton,
Branch Chief, Rulemaking and Guidance
Development Branch, Division of New Reactor
Licensing, Office of New Reactors.
[FR Doc. E9–5604 Filed 3–13–09; 8:45 am]
BILLING CODE 7590–01–P
Advisory Committee on Reactor
Safeguards (ACRS) Meeting of the
Subcommittee on Plant License
Renewal; Notice of Meeting
Frm 00061
Fmt 4703
Sfmt 4703
Dated: March 10, 2009.
Cayetano Santos,
Chief, Reactor Safety Branch A, Advisory
Committee on Reactor Safeguards.
[FR Doc. E9–5600 Filed 3–13–09; 8:45 am]
BILLING CODE 7590–01–P
NUCLEAR REGULATORY
COMMISSION
Advisory Committee on Reactor
Safeguards (ACRS); Subcommittee
Meeting on Planning and Procedures
NUCLEAR REGULATORY
COMMISSION
PO 00000
on October 6, 2008 (73 FR 58268–
58269).
Further information regarding this
meeting can be obtained by contacting
the Designated Federal Official between
6:45 a.m. and 3:30 p.m. (ET). Persons
planning to attend this meeting are
urged to contact the above named
individual at least two working days
prior to the meeting to be advised of any
potential changes to the agenda.
Notice of Meeting
The ACRS Subcommittee on Planning
and Procedures will hold a meeting on
April 1, 2009, Room T2–B1, 11545
Rockville Pike, Rockville, Maryland.
The entire meeting will be open to
public attendance, with the exception of
a portion that may be closed pursuant
to 5 U.S.C. 552b(c)(2) and (6) to discuss
organizational and personnel matters
that relate solely to the internal
personnel rules and practices of the
ACRS, and information the release of
which would constitute a clearly
unwarranted invasion of personal
privacy.
The agenda for the subject meeting
shall be as follows:
Wednesday, April 1, 2009, 12 p.m.–1
p.m.
The Subcommittee will discuss
proposed ACRS activities and related
matters. The Subcommittee will gather
information, analyze relevant issues and
facts, and formulate proposed positions
and actions, as appropriate, for
deliberation by the full Committee.
Members of the public desiring to
provide oral statements and/or written
comments should notify the Designated
Federal Officer, Mr. Sam Duraiswamy
(Telephone: 301–415–7364) between
7:30 a.m. and 4 p.m. (ET) five days prior
to the meeting, if possible, so that
appropriate arrangements can be made.
Electronic recordings will be permitted
only during those portions of the
meeting that are open to the public.
Detailed procedures for the conduct of
and participation in ACRS meetings
were published in the Federal Register
on October 6, 2008 (73 FR 58268–
58269).
E:\FR\FM\16MRN1.SGM
16MRN1
Agencies
[Federal Register Volume 74, Number 49 (Monday, March 16, 2009)]
[Notices]
[Page 11138]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E9-5600]
-----------------------------------------------------------------------
NUCLEAR REGULATORY COMMISSION
Advisory Committee on Reactor Safeguards (ACRS) Meeting of the
Subcommittee on Plant License Renewal; Notice of Meeting
The ACRS Subcommittee on Plant License Renewal will hold a meeting
on April 1, 2009, Room T-2B3, 11545 Rockville Pike, Rockville,
Maryland.
The entire meeting will be open to public attendance.
The agenda for the subject meeting shall be as follows:
Wednesday, April 1, 2009-8:30 a.m.-12:30 p.m.
The Subcommittee will discuss the license renewal application for
the Susquehanna Steam Electric Station, Units 1 and 2 and the
associated Safety Evaluation Report (SER) with Open Items prepared by
the staff. The Subcommittee will hear presentations by and hold
discussions with representatives of the NRC staff, PPL Susquehanna, and
other interested persons regarding this matter. The Subcommittee will
gather information, analyze relevant issues and facts, and formulate
proposed positions and actions, as appropriate, for deliberation by the
full Committee.
Members of the public desiring to provide oral statements and/or
written comments should notify the Designated Federal Official, Mr.
Peter Wen (telephone (301) 415-2832 five days prior to the meeting, if
possible, so that appropriate arrangements can be made. Electronic
recordings will be permitted. Detailed procedures for the conduct of
and participation in ACRS meetings were published in the Federal
Register on October 6, 2008 (73 FR 58268-58269).
Further information regarding this meeting can be obtained by
contacting the Designated Federal Official between 6:45 a.m. and 3:30
p.m. (ET). Persons planning to attend this meeting are urged to contact
the above named individual at least two working days prior to the
meeting to be advised of any potential changes to the agenda.
Dated: March 10, 2009.
Cayetano Santos,
Chief, Reactor Safety Branch A, Advisory Committee on Reactor
Safeguards.
[FR Doc. E9-5600 Filed 3-13-09; 8:45 am]
BILLING CODE 7590-01-P