San Diego Gas & Electric Company v. Sellers of Energy and Ancillary Services; Notice of Filing, 10731-10732 [E9-5258]

Download as PDF 10731 Federal Register / Vol. 74, No. 47 / Thursday, March 12, 2009 / Notices the requirements of the Commission’s Rules of Practice and Procedure (18 CFR 385.214 or 385.211) and the Regulations under the NGA (18 CFR 157.10). A person obtaining party status will be placed on the service list maintained by the Secretary of the Commission and will receive copies of all documents filed by the applicant and by all other parties. A party must submit 14 copies of filings made with the Commission and must mail a copy to the applicant and to every other party in the proceeding. Only parties to the proceeding can ask for court review of Commission orders in the proceeding. Motions to intervene, protests and comments may be filed electronically via the Internet in lieu of paper, see, 18 CFR 385.2001 (a)(1)(iii) and the instructions on the Commission’s web site under the ‘‘e-Filing’’ link. The Commission strongly encourages electronic filings. Comment Date: March 16, 2009. Kimberly D. Bose, Secretary. [FR Doc. E9–5255 Filed 3–11–09; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Notice of Filing March 5, 2009. San Diego Gas & Electric Company v. Sellers of Energy and Ancillary Services ............................................ Investigation of Practices of the California Independent System Operator and the California Power Exchange. Puget Sound Energy, Inc v. Sellers of Energy and/or Capacity ......................................................................... Investigation of Anomalous Bidding Behavior and Practices in Western Markets .......................................... Fact-finding Investigation Into Possible Manipulation of Electric and Natural Gas Prices ............................ City of Riverside, California ................................................................................................................................. Take notice that on July 1, 2008, the City of Azusa, California and the California Parties submit their Joint Compliance Filing in response to the Commission’s June 4, 2008 Order, San Diego Gas & Elec. Co., Order Approving Settlement Subject to Condition, 123 FERC ¶ 61,244 (2008) (June 4 Order). Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211, 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed on or before the comment date. Anyone filing a motion to intervene or protest must serve a copy of that document on the Applicant and all the parties in this proceeding. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 14 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC cprice-sewell on PRODPC61 with NOTICES VerDate Nov<24>2008 14:56 Mar 11, 2009 Jkt 217001 Procedure (18 CFR 385.211, 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed on or before the comment date. Anyone filing a motion to intervene or protest must serve a copy PO 00000 Frm 00028 Fmt 4703 Sfmt 4703 Docket Docket Docket Docket No. No. No. No. EL01–10–038 IN03–10–040 PA02–2–055 EL03–146–005 Online service, please e-mail FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Comment Date: 5 p.m. Eastern Time on March 26, 2009. Kimberly D. Bose, Secretary. [FR Doc. E9–5257 Filed 3–11–09; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. EL00–95–215] San Diego Gas & Electric Company v. Sellers of Energy and Ancillary Services; Notice of Filing March 5, 2009. Investigation of Practices of the California Independent System Operator and the California Power Exchange. Puget Sound Energy, Inc. v. Sellers of Energy and/or Capacity ........................................................................ Investigation of Anomalous Bidding Behavior and Practices in Western Markets .......................................... Fact-finding Investigation Into Possible Manipulation of Electric and Natural Gas Prices ............................ City of Riverside, California ................................................................................................................................. Take notice that on July 1, 2008, the City of Riverside, California and the California Parties submit their Joint Compliance Filing in response to the Commission’s June 4, 2008 Order, San Diego Gas & Elec. Co., Order Approving Settlement Subject to Condition, 123 FERC ¶ 61,242 (2008) (June 4 Order). Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Docket No. EL00–95–214 Docket No. EL00–98–199 Docket No. EL00–98–200 Docket Docket Docket Docket No. No. No. No. EL01–10–039 IN03–10–035 PA02–2–056 EL03–150–005 of that document on the Applicant and all the parties in this proceeding. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 14 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. E:\FR\FM\12MRN1.SGM 12MRN1 10732 Federal Register / Vol. 74, No. 47 / Thursday, March 12, 2009 / Notices This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Comment Date: 5 p.m. Eastern Time on March 26, 2009. Kimberly D. Bose, Secretary. [FR Doc. E9–5258 Filed 3–11–09; 8:45 am] review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Comment Date: 5 p.m. Eastern Time on March 13, 2009. Kimberly D. Bose, Secretary. [FR Doc. E9–5248 Filed 3–11–09; 8:45 am] BILLING CODE 6717–01–P BILLING CODE 6717–01–P DEPARTMENT OF ENERGY DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 176–018] Federal Energy Regulatory Commission City of Escondido and Vista Irrigation District; Notice of Technical Conference and Site Visit for Escondido Hydroelectric Project [Docket No. ER09–644–000] South Carolina Electric & Gas Company; Notice of Filing March 5, 2009. cprice-sewell on PRODPC61 with NOTICES March 4, 2009. Take notice that on February 2, 2009, South Carolina Electric & Gas Company filed a compliance filing to comply with Commission Order No. 676–C, pursuant to section 206 of the Federal Power Act. Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211, 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed on or before the comment date. On or before the comment date, it is not necessary to serve motions to intervene or protests on persons other than the Applicant. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 14 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for VerDate Nov<24>2008 14:56 Mar 11, 2009 Jkt 217001 Technical Conference On December 15, 2008, The City of Escondido and Vista Irrigation (coapplicants) filed an updated application to relicense the 1.8–MW Escondido Hydroelectric Project. FERC staff will conduct two technical conferences for the purposes of gathering information and answering questions regarding the Escondido Project’s Settlement Agreement and Updated License Application. The meetings will focus on obtaining public and agency input and requesting clarification from the applicants regarding the filed documents. All interested individuals, organizations, and agencies with environmental expertise and concerns are invited to attend one or both of the meetings and to assist the staff in defining and clarifying the issues related to the Escondido Hydroelectric Project licensing proceeding. A. Date, Time, and Location: Morning Meeting Date: Tuesday, March 31, 2009. Time: 9 a.m. (PST). Place: Civic Center Plaza, Mitchell Room. Address: 210 North Broadway, Escondido, CA 92025. Evening Meeting Date: Tuesday, March 31, 2009. Time: 7 p.m. (PST). PO 00000 Frm 00029 Fmt 4703 Sfmt 4703 Place: Civic Center Plaza, Mitchell Room. Address: 210 North Broadway, Escondido, CA 92025. B. Directions to the Mitchell Room, Escondido City Hall: From San Diego, take Interstate 15 north to Hwy 78 east; From Los Angeles, take Interstate 5 south to Hwy 78 east, past Interstate 15; From Ontario/Riverside, take Interstate 15 south to Hwy 78 east; Then, turn right (south) on North Broadway, right again (west) on Valley Parkway (a oneway street), and park in the first or second public lot on the right (the second lot is referred to as the Art Center parking lot). A permit will be issued in the Mitchell Room for you to put on your dashboard that will allow you to exceed the posted parking time limit for either of these two lots. If these lots are both full, proceed west on Valley Parkway and make a right turn (north) on Escondido Blvd. Pass the Performing Arts Center (Lyric Theatre) and the flood control channel and turn right into the Woodward Avenue parking lot. C. FERC Contact: Emily Carter, emily.carter@ferc.gov, 202–502–6512. D. Purpose of Meeting: FERC staff will conduct two technical conferences for the purposes of gathering information and answering questions regarding the Escondido Hydroelectric Project’s Settlement Agreement and Updated License Application. The meetings will focus on obtaining public and agency input and requesting clarification from the applicant’s regarding the filed documents. All interested individuals, organizations, and agencies with environmental expertise and concerns are invited to attend one or both of the meetings and to assist the staff in defining and clarifying the issues related to the Escondido Hydroelectric Project licensing proceeding. The meetings will be recorded by a stenographer and become part of the formal record of the Commission proceeding on the project. Site Visit FERC staff, along with the applicants, will conduct a project site visit beginning at 8:45 a.m. on April 1, 2009. All interested individuals, organizations, and agencies are invited to attend. All participants should meet at the Escondido Civic Center Plaza in the Mitchell Room. All participants are responsible for their own transportation to the site, but car pooling is encouraged as much as possible. Please be aware that several of the facilities on this tour are accessed via rough dirt roads. Vehicles must be suitable for off-road use and four-wheel drive is E:\FR\FM\12MRN1.SGM 12MRN1

Agencies

[Federal Register Volume 74, Number 47 (Thursday, March 12, 2009)]
[Notices]
[Pages 10731-10732]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E9-5258]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. EL00-95-215]


San Diego Gas & Electric Company v. Sellers of Energy and 
Ancillary Services; Notice of Filing

March 5, 2009.

Investigation of Practices of  Docket No. EL00-98-200
 the California Independent
 System Operator and the
 California Power Exchange.
Puget Sound Energy, Inc. v.    Docket No. EL01-10-039
 Sellers of Energy and/or
 Capacity.
Investigation of Anomalous     Docket No. IN03-10-035
 Bidding Behavior and
 Practices in Western Markets.
Fact-finding Investigation     Docket No. PA02-2-056
 Into Possible Manipulation
 of Electric and Natural Gas
 Prices.
City of Riverside, California  Docket No. EL03-150-005
 

    Take notice that on July 1, 2008, the City of Riverside, California 
and the California Parties submit their Joint Compliance Filing in 
response to the Commission's June 4, 2008 Order, San Diego Gas & Elec. 
Co., Order Approving Settlement Subject to Condition, 123 FERC ] 61,242 
(2008) (June 4 Order).
    Any person desiring to intervene or to protest this filing must 
file in accordance with Rules 211 and 214 of the Commission's Rules of 
Practice and Procedure (18 CFR 385.211, 385.214). Protests will be 
considered by the Commission in determining the appropriate action to 
be taken, but will not serve to make protestants parties to the 
proceeding. Any person wishing to become a party must file a notice of 
intervention or motion to intervene, as appropriate. Such notices, 
motions, or protests must be filed on or before the comment date. 
Anyone filing a motion to intervene or protest must serve a copy of 
that document on the Applicant and all the parties in this proceeding.
    The Commission encourages electronic submission of protests and 
interventions in lieu of paper using the ``eFiling'' link at https://
www.ferc.gov. Persons unable to file electronically should submit an 
original and 14 copies of the protest or intervention to the Federal 
Energy Regulatory Commission, 888 First Street, NE., Washington, DC 
20426.

[[Page 10732]]

    This filing is accessible on-line at https://www.ferc.gov, using the 
``eLibrary'' link and is available for review in the Commission's 
Public Reference Room in Washington, DC. There is an ``eSubscription'' 
link on the Web site that enables subscribers to receive e-mail 
notification when a document is added to a subscribed docket(s). For 
assistance with any FERC Online service, please e-mail 
FERCOnlineSupport@ferc.gov, or call (866) 208-3676 (toll free). For 
TTY, call (202) 502-8659.
    Comment Date: 5 p.m. Eastern Time on March 26, 2009.

Kimberly D. Bose,
Secretary.
 [FR Doc. E9-5258 Filed 3-11-09; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.